0% found this document useful (0 votes)
135 views6 pages

Method Statement For VESSEL 1180-E: Expertise Contracting Company

This method statement outlines the process for vessel 1180-E. It involves preparing the site with scaffolding and insulation removal. The key steps include obtaining work permits, blinding, removing insulation at manways, lifting the dome and piping with a crane, internal cleaning by hydrojetting, inspections both before and after cleaning, repairs as needed, and putting everything back together with final inspections. Responsibilities are assigned and safety precautions are outlined to properly complete the work.

Uploaded by

Faraz Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
135 views6 pages

Method Statement For VESSEL 1180-E: Expertise Contracting Company

This method statement outlines the process for vessel 1180-E. It involves preparing the site with scaffolding and insulation removal. The key steps include obtaining work permits, blinding, removing insulation at manways, lifting the dome and piping with a crane, internal cleaning by hydrojetting, inspections both before and after cleaning, repairs as needed, and putting everything back together with final inspections. Responsibilities are assigned and safety precautions are outlined to properly complete the work.

Uploaded by

Faraz Ahmed
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

Expertise Contracting Company

Business Unit Document No.:


METHOD STATEMENT
Industrial Services PR-DIV02-MC-0007

METHOD STATEMENT FOR

VESSEL 1180-E

Action Prepared by Reviewed by Noted by Approved by


Taken

Signature

Name

Position

Date

Project AL-BAYRONI AMMONIA PLANT TA-2022


Client AL-BAYRONI
End-User SABIC
Expertise Contracting RFQ
Contractor Page 06
Company Ltd. No.
Ref. No. Rev Date

FM-DIV02-MC-0007 Rev. 00 / 15st Sep. 2018 1 of 6


Expertise Contracting Company
Business Unit Document No.:
METHOD STATEMENT
Industrial Services PR-DIV02-MC-0007

TABLE OF CONTENTS

1. SCOPE
2. RESPONSIBILTIES
3. SAFETY PRECAUTIONS
4. SUMMARY OF WORK
5. DRAWINGS AND REFERENCES
6. CONCLUSION

1. SCOPE

1.1 This Method Statement has been commissioned by Expertise Contracting Co. Ltd
for VESSEL 1180-E (will be carried in accordance with safe working practice, good
quality and as per recommendation) Standard of the AL-BAYRONI.
1.2 This report outline how this Project, will be constructed efficiently, under
controlled safety conditions.
1.3 This procedure may be amended to suit the particular site circumstances that may
be encountered on individual jobs.

2. RESPONSIBILITIES
2.1 Project Manager:

FM-DIV02-MC-0007 Rev. 00 / 15st Sep. 2018 2 of 6


Expertise Contracting Company
Business Unit Document No.:
METHOD STATEMENT
Industrial Services PR-DIV02-MC-0007

Shall be responsible for Overall progress and Timely execution as well as Completion
with zero Safety incident.

2.2 Site In charge


The Site In charge shall be responsible for the direct execution of works involving site
logistics and rigging works. He shall organize the works force, equipment if necessary,
according to the need and shall execute the job as per the established plan and
drawings with the quality and safety.

2.3 Planner
Planner shall be responsible for preparing the schedule of the project based on the
client window. Monitoring the progress of the shutdown and giving update (progress
report) status of the daily percentage of work completed. Report if any criticality in
the project.

2.4 Field Supervisor


The Field Supervisor will supervise the development of the project. He will provide
such technical assessment for Mechanical and Maintenance Activities as per the work
scope.

2.5 QA/QC
QC shall be Responsible for preparing Quality Plan that supports the project and
clients’ requirements. Preparation of NDT Plan, NDT Procedures, and related
Documents with reference to Codes, standards and project specification.

2.6 Safety Officer


Responsible in all safety procedure for the benefit of the client, workers, plant, and
most important thing to the environment. He shall adhere to confirm the existing
rules and regulations of the company Safety Standards.
2.7 Rigging Engineer/ Supervisor:
Shall be responsible for all lifting activities and lifting plan preparation as per lifting
Standards like Third-Party approval of Rigger, Lifting Tools & Tackles healthiness etc.

3. SAFETY PRECAUTIONS
3.1 Basic PPE`s such as FRC Clothing, Safety Shoes Safety Helmet, Safety Gloves,
Eye protection should be always worn.
3.2 Full body harness while working at height over 1.8 m.
3.3 Proper working gloves should be worn at all times.
3.4 Proper area Barricading should be done during the lifting activities.

FM-DIV02-MC-0007 Rev. 00 / 15st Sep. 2018 3 of 6


Expertise Contracting Company
Business Unit Document No.:
METHOD STATEMENT
Industrial Services PR-DIV02-MC-0007

3.5 Proper eye protection and face protection should be worn while performing jetting
activities.
3.6 All the tools and equipment should be properly inspected.
3.7 Identify wind direction during Lifting Activities.
3.8 Set up sign/warning boards, fence off the area.
3.9 Secure hoses by safety pins (whip lock).

4. SUMMARY OF WORK
Preparation Activities:
4.1 Site visit and requirement checking.
4.2 Safety orientation of crew.
4.3 Permit receiver, Fire watch and standby man training.
4.4 Qualification of the Manpower as per the requirement.
4.5 Equipment inspection and for testing by AL-BAYRONI.
4.6 Preparation of Manpower & Equipment ID.
4.7 Mobilize the Manpower & Equipment to site.
4.8 Erection of Scaffolding, Insulation Removal (if required) activities on the required
locations.
S.No Activity Description Responsibility Remarks

I PRE-SHUTDOWN ACTIVITIES
1. SCAFFOLDING ERECTION AS REQUIRED. EXPERTISE
2. REMOVAL OF INSULATION AS REQUIRED. EXPERTISE
II SHUTDOWN ACTIVITIES
3. OBTAIN WORK PERMIT. EXPERTISE
4. BLINDING AS PER BLIND LIST. EXPERTISE
5. REMOVAL OF INSULATION AT MANWAY. EXPERTISE
6. MOBILIZING CRANE FOR LIFTING. EXPERTISE
7. UNBOLTING OF TOP DOME & ASSOCIATED PIPINGS EXPERTISE
8. OPENING OF MANWAYS, BY LIFTING OF DOME & ASSOCIATED PIPINGS EXPERTISE
USING CHAIN BLOCK AND CRANE
9. PROVIDE PROPER VENTILATION AND LIGHT. EXPERTISE
10. PRE-INSPECTION AL-BAYRONI

FM-DIV02-MC-0007 Rev. 00 / 15st Sep. 2018 4 of 6


Expertise Contracting Company
Business Unit Document No.:
METHOD STATEMENT
Industrial Services PR-DIV02-MC-0007

S.No Activity Description Responsibility Remarks

I PRE-SHUTDOWN ACTIVITIES
11. REMOVAL OF DEMISTER FOR CLEANING AS PER INSPECTION EXPERTISE
RECOMMENDATION.IF ANY
12. OPENING OF BREAKUP FLANGE IF RECOMMENDED. EXPERTISE
13. INSPECTION OF SPRAY NOZZEL. AL-BAYRONI
14. ERECTION OF INTERNAL SCAFFOLDING IF REQUIRED. EXPERTISE
15. PREPARATION FOR HYDROJETTING. EXPERTISE
16. CARRY OUT INTERNAL CLEANING BY HYRDOJETTING & FLUSHING OF EXPERTISE
NOZZLES.
17. DEMISTER PAD CLEANING AS PER RECOMMENDATION.IF ANY EXPERTISE
18. POST INSPECTION AL-BAYRONI
19. CARRY OUT WELD JOINTS BUFFING AT MARKED LOCATION AS PER EXPERTISE
INPECTION.
20. INTERNAL: 100% VISUAL INSPECTION OF SHELL, BOTTOM DISH HEAD, AL-BAYRONI
BED-PACKING SUPPORT GRID, HOLD-DOWN GRID, DEMISTER
CONDUCT INTERNAL INSPECTION AND ASSESSMENT OF INTERNAL
CONDITION BY UT FOR THICKNESS
CONDUCT DPT INSPECTION FOR ALL ACCESSIBLE WELDS OF NOZZLE,
BOTTOM HEAD & SHELL
21. REMOVAL OF EXTERNAL INSULATION AT CUI SUSPECTED LOCATIONS EXPERTISE
AND REMOVE OF INSULATION AT SELECTED TML POINTS.
22. EXTERNAL: AL-BAYRONI
100% EXTERNAL VISUAL INSPECTION INCLUDING SHELL, TOP &
BOTTOM HEADS, SUPPORTS, PAINT, INSULATION, FOUNDATION.
CARRY OUT EXTERNAL CUI INSPECTION.
CARRY OUT UT AT ALL TML POINTS.
23. REPAIR AS PER INSPECTION RECOMMENDATIONS. EXPERTISE

24. REINSTALLATION OF DEMISTER PAD AFTER CLEANING. EXPERTISE


25. REMOVAL OF INTERNAL SCAFFOLDING. EXPERTISE
26. HOUSEKEEPING EXPERTISE
27. FINAL INSPECTION. AL-BAYRONI

FM-DIV02-MC-0007 Rev. 00 / 15st Sep. 2018 5 of 6


Expertise Contracting Company
Business Unit Document No.:
METHOD STATEMENT
Industrial Services PR-DIV02-MC-0007

S.No Activity Description Responsibility Remarks

I PRE-SHUTDOWN ACTIVITIES
28. FINAL BOX-UP CLEARANCE. AL-BAYRONI

29. MOBILIZING CRANE FOR LIFTING. EXPERTISE

30. BOX-UP DOME & ASSOCIATED PIPINGS WITH NEW GASKET. EXPERTISE

31. DEBLINDING. EXPERTISE

32. TORQUEING. EXPERTISE


33. HOUSE KEEPING. EXPERTISE
34. CLOSE WORK PERMIT. EXPERTISE
III POST SHUTDOWN ACTIVITIES
35. RE INSTALLATION OF INSULATION. EXPERTISE
36. DISMANTLING OF SCAFFOLDING EXPERTISE

5. DRAWINGS & REFERENCE

o As Per the Equipment Drawing

6. CONCLUSION
6.1 This method Statement has been prepared by Expertise Contracting Co. Ltd in
conjunction with the works as mentioned in section 1.0. And is not intended for
use on any other.
6.2 The job shall follow the above-mentioned sequence of works unless any further
notification is made.

***END OF DOCUMENT***