BARAUNI REFINERY
                                                     JOB SAFETY ANALYSIS
PART-A :EPCM 25 A                  Work Permit No:            JSA No. 03/JSA/24        Date: 12/01/2024                             Pages: 1 of 9
Unit:- EPCM 25 A                   Area: NEAR TANK NO.        Work Permit Type: Cold   Location: NEAR TANK NO. 733-C-03 West of TPS ( FO Tank
                                   733-C-03 West of TPS       and Hot Work, Vehicle    area )
                                   ( FO Tank area )           Movement., Work at
                                                              height, Excavation.
                                                                                  JSA Done By:
Job Title: Survey, Scaffolding Erection, Cutting, Grinding, Demolition of wall,   SN               Name & Designation               Signature
Excavation, Reinforcement, foam, Concrete Back filling work.                      1    Mr.Sarvesh sirvasta civil lead EPCM 25
                                                                                  2    Mr.Abhijit parashar HSE lead EPCM 25
                                                                                  3    Mr.Manoj singh HSE ,Toyo
                                                                                  4    Mr.D.Ravichandran,HSE Manager ,Toyo
                                                                                  5    Mr. J Majhi-Civil Engineer ,Toyo
                                                                                  6    Mr. Ashok Hingmire –Area Manager,Toyo
Job to be Executed By :                                                           7    Nitish Bindal PJ Eng
              PJ                             PMC                Contractor        8    Mr. Vipul Sijoria SPJM,IOCL
              IOCL                          TOYO                NRP Projects      9    Fire & Safety
                                                                                  10
JSA Reviewed By (HOD’s                      Name                Designation                          Department                       Signature
Name & Designation)
RCM of PMC                         Mr. Malay Verma /
                                                                RCM /Dy. RCM      TEIPL (PMC)
                                   Mr. Ashok Parmar
HOD of receiving (Executing)             Mr.G.S Sibilal            DGM-PJ         PJ
Department
                                                                                                                                        Page 1 of 11
#         Activities                Hazards                          Recommended Actions /                                    Compliance Status            Checked By
                                                                  Procedures & Control Measures                                (Complied/ Not             Name of IOCL
                                                                                                                                 complied)            Officer/PMC Engineer
                                                                                                                                                      with Sign. Date & time
     Mobilization of            Unauthorized access       IOCL valid Permit to work must be in place
     Manpower, tools &          Defective equipment,      Ensure job specific PPEs
     Equipment                   vehicles                  Activity shall be carried out under competent supervision
                                Lack of awareness         Covid19 infection prevention protocol (i.e. safe
                                Unauthorized entry of          distancing, use of nose mask all the time, use of hand
                                 locals and others              sanitizer, good hygienic practice health monitoring)
                                Fatigue                        shall be maintained
                                                           Area specific work supervisor shall be deployed.
                                                           Project orientation / Induction shall be conducted to all
                                                                the workers
1.
                                                           All the tools & equipment shall be inspected and shall be
                                                                in good condition
                                                           Tool & equipment shall be colour coded.
                                                           All the workers & equipment’s shall hold valid gate pass
                                                           TBT shall be conducted prior to start of activity daily/shift
                                                           Entry of unauthorized persons shall be restricted by
                                                                barricading’s or fence or provision of security or any
                                                                other means of measures
                                                           Job rotation & frequent brake as per work load shall be
                                                                endured
     Survey and marking of      Slip trip fall            Permit shall be obtained prior to start the activity                                 
     coordinates                Manual handling           Site inspection shall be and footsteps shall be watched
                                Damaged hand tools             carefully
                                Insects, scorpions/       While working nearby roads traffic shall be checked and
                                 snakes.                        adequate signs shall be displayed
                                                           Safe manual handling techniques shall be
                                                              Adult man              55 kg
2.                                                            Adult woman            30 kg
                                                              Adolescent male        30 kg
                                                              Adolescent             20 kg
                                                              female
                                                           Hand tools shall be inspected and shall be in good
                                                                condition
                                                           Area shall be inspected daily prior to start of work for
                                                                insect, scorpions or snakes.
3.   Erection of Scaffold                                  Approved scaffolding drawing shall be referred and                                   
                                Ground Soil                    clearance shall be taken from Client / PMC and it shall
                                 Condition-uneven               be done under proper supervision.
                                 surface or loose soil.    Barricading along with caution signages shall be provide.
                                                           All the control measures mentioned in the permit shall be
                                Missing components
                                                                ensured
                                                                                                                                                                   Page 2 of 11
                             Improper Access/          Ground Compacted, levelled & made firm.
                              Work platform in          Scaffold is not erected near to excavation area and vice
                              scaffold                       versa.
                                                        Experienced personnel are engaged.
                             Haphazard lifting
                                                        Scaffolding are erected as per scheme drawing.
                              pattern
                                                             Supervision is ensured.
                             Loose materials at        Scaf tag system is implemented.
                              workplace.                Towers are connected with 2 lock pins.
                             Working when Hoist /      Scaffold erected as per our standard & Inspected by Form
                              poor lighting                  Work Dept.
                             Scaffold Collapse         Trained Scaffold gang is deployed.
                                                        Lateral supports at every 6 metres intervals
                             Slip,trip,fall hazards
                                                        Verticality of scaffold is ensured to the norm of tolerance
                                                             1mm per meter
                                                        Person erecting the materials with pulley & rope is
                                                             allowed stay away from the erection area to safe
                                                             guard from fall of materials.
                                                        Working Platform made with 600 mm width & Secured
                                                             both sides, with handrails
                                                        Use of Full body Harness with Double lanyard is ensured
                                                                No loose material is allowed to keep at top. Hand
                                                                 tools shall be secured so that it will not even if
                                                                 missed.
                                                                Beneath height work is cordoned and deployed
                                                                 one person to ensure no one entries the height
                                                                 work area.
                                                                No work on scaffold is allowed to carry out during
                                                                 raining or immediate after rain.
                                                                Adequate illumination of 150lux is ensured at
                                                                 workplace.
Manually shifting Of DA   Uneven Ground                      Ground Should be Levelled & compacted and same is
& Oxygen cylinder with                                       checked to prior of start work by Supervisor.
Trolley at Designated
Area
                          Obstructed Access                 1-To be Provide the obstruction free access for safe
                                                            movement
                                                            2- Ensure access shall be even.
                          Damaged cylinder Trolley          1- Inspect the Gas cylinder trolley before shifting the
                                                            cylinder
                          Unauthorized Gas Cutter       1- Only experienced Gas Cutter Should is deputed for
                                                        Welding Work.
                                                                                                                       Page 3 of 11
Gas Cutting Activity   Defective and damaged or   1-Soap solution test should be carried out before start of
                       leak in the cylinder.      the activity.
                       Damaged Hose               1-Visual inspected the hoses before start of the activity.
                                                  2-Soap test should be carried out.
                       Flash Back                 1-Trained and experienced gas cutter should be deployed
                                                  for the activity.
                                                  2-Close and continuous supervision.
                                                  3-Provision of NRV at both cylinder regulators.
                       Hot sparks                 1-Prior to start Hot work Permit should be taken
                                                  2- Area should be Barricaded.
Grinding and           Injury due to flying       1-M/C shall be secured from three side to prevent the
Cutting / drilling     particles / Burns          flying object and spark (as applicable)
Machine
                                                  2- Avoid excess force on the grinding wheel / drilling beat
                                                  while grinding / drilling.
                                                                                                                        Page 5 of 11
                                                all the tripping of limit switches by operator.
                                               Verifying the weight of an object to be lifted against
                                                the crane SWL (Safe Working Load) with respect to
                                                boom length and horizontal angle by referring
                                                manufacturer chart.
                                               Load chart will be available in crane operator cabin.
                                               Ensure Close supervision
                                               Reflective jacket will be worn by signal man & use of
                                                mobile phone is strictly prohibited.
                                               Ensuring work in regular shift.
                                               Trained & experience signal man will be deployed.
                                               Trained Signal man will be deployed.
                                                                                                         Page 6 of 11
                       Blocking of access/egress
                       and equipment’s                       Safe access shall be made for free
                                                              movement of vehicle.
                                                             Proper stairway, ladder or ramps to be
                                                              arranged in the excavated trench/pits
                       Fall of excavated material.    1-Remove all the excavated materials from edge of
                       Dust pollution.Interruption    excavated pit.
                       of live lines (Electrical      2-All personnel to use dust mask and goggles as well as
                       Utility)                       appropriate PPE’s must be used.
                                                      3-Work Permit shall be provided before work
                                                      commencement & Strictly follow the PTW system.
                                                      4-Trial pit/pilot cutting to be carried out prior to start
                                                      excavation.
                                                      5-Direct supervision shall be ensured by supervisor.
                                                      6-Flag man to be deployed and reverse horn must be
                                                      functioning.
                                                      Skilled operator to be engaged.
                                                                                                                   Page 7 of 11
    Applying shuttering oil              Land pollution /      Oiling work will be done by placing material in drip
                                          Skin Infection         tray.
                                         Spillage of           Hand gloves & other proper PPE will be worn.
                                          shuttering oil        Waste shuttering oil is collected in waste oil drum &
6                                                                then will be disposed.
                                                                Use spillage kit.
                                                                Keep shuttering oil container away from work site
7   Fixing & removal of              Fall of men /             Provision of proper working platform with the help
    wall, slab & shuttering           materials ( Nails /        of brackets / scaffolding materials.
                                      Mivan pin / Clamp )        Full body harness, safety goggle & other PPE will be
                                     Physical Injury, eye       worn.
                                      injury                    Provision of vertical safety netting before starting
                                     Fall of shuttering         shuttering Provision catching safety netting
                                                                 before starting shuttering.
                                                                Daily housekeeping before & after shuttering.
                                                                Wooden boxes are used for temporary storage of
                                                                 nails & bucket for pins.
                                                                Cut outs will be closed with the help of steel mesh,
                                                                 wooden ply & safety net.Provision of access with
                                                                 the help of ladder.
                                                                Training to the workmen for working at height.
                                                                Use tested and certified lifting tools & tackles.
                                                                 Check physical condition of tools and tackles.
                                                                Provision of proper working platform with the help
                                                                 of brackets / scaffolding materials.
                                                                Full body harness, safety goggle & other PPE will be
                                                                 worn.
                                                                Provision of vertical safety netting before starting
                                                                 shuttering if required.
                                                                 Housekeeping before & after De - shuttering.
                                                                Wooden boxes are used for collection of loose
                                                                 materials like pin shuttering clamps, nails, etc.
                                                                Cut outs will be closed with the help of steel mesh,
                                                                 wooden ply & safety net.                    Provision
                                                                 of access with the help of ladder. Ensured sufficient
                                                                 and trained workmen to be engaged.
                                                                Provision catching safety netting before starting
                                                                 shuttering.
                                                                De - shuttering will be done from outside to inside.
                                                                Removing shuttering simultaneously with the
                                                                                                                         Page 8 of 11
                                                                     removal of its supports.
                                                                    Cordoned off the Work area.
                                                                    Only authorized person allowed in work area.
                                                                    Ensure steel rope life line / anchoring points at
                                                                     required locations.
                                                                                                                                  Page 9 of 11
          Height work              Men and                        Proper Working platform should be made with              
                                    materials falling               scaffolding
                                    from height.                   Toe board, handrail & proper access or use
                                                                    mobile scaffolding
                                                                   Use Of PPE'S like Safety Helmet,
11                                                                 Shoes, Hand gloves, goggles, Dust Mask & Full
                                                                    Body Harness.
     Inclement weather    High Wind speed                Lifting activities should not be done during heavy winds          
                          Heavy rain fall                Work shall be avoided during rain appropriate PPE’s
                          Low visibility                       should be used during rainfall.
                          Lighting                       Adequate lighting should be provided at site. If visibility is
                                                                less than 100 meters at most care should taken
12                                                        Where ever possible boom of the crane should be
                                                                lowered or earthling should be provided for cranes
                                                                during lightings.
13   Working at night            Poor Illumination       Applicable Permit to work validation shall be ensured &           
                                 Poor access                  emergency response preparedness shall be in pace
                                 Workers resting in      Applicable precaution as listed in Night Permissibility
                                  dark areas                   matrix available in HSE plan shall be ensured
                                 Unidentified/un         Adequate illumination shall be arranged for work area
                                  authorized                   and access area
                                  pedestrian walk         Workers shall be issued and use clear glasses during night
                                  ways                         shifts
                                 Walkway Hindrance       Minimum 10 ft candles should be arranged at work
                                 Lack of sleep                locations and 5 ft candles for access
                                 lone worker             Damaged lights shall be replaced immediately
                                 Tripping hazards        All the road/route access shall be identified and strictly
                                 Poor caution                 restricted to it
                                  signage’s               Access shall be clear and free of hindrances
                                 Unidentified rebar’s    Access/ walk ways shall be identified and marked clearly
                          Use of unidentified            Materials shall not be left on the work platform or
                              walkways                         walkways to avoid hindrances
                                                          All the workers should have adequate sleep and be fit for
                                                               night works
                                                          No lone worker shall be deployed or allowed
                                                          No worker shall rest in dark areas and supervisor should
                                                               ensure the same
                                                          Adequate signage's shall be displayed throughout the
                                                                                                                                  Page 10 of 11
                                                                    work area warning and cautioning the workers and for
                                                                    awareness
                                                               All the rebar's shall be protected by caps or other means
                                                                    of protection
                                                               TBT should include not resting in dark areas not using
                                                                    unidentified unauthorized walkways
Note:
1.    To make JSA process effective, the defined job shall be broken down into sequential steps. Actions / activities for each steps shall be logical & linked with previous & forward action
      steps. All possible hazards associated with each job step shall be deliberated among team members and recorded carefully. JSA r ecommendations / control measures for each hazard /
      job step should be validated by team members & recorded in the Part-A of JSA sheet. Use additional JSA sheets as per requirements.
2. Review of JSA shall be done by HODs of respective Operation & Executing Departments. After review respective HODs to put their signature with name & date.
 3.    The Job shall be carried out with safety precautions as per JSA recommendations. In order to ensure that job is being executed as per JSA recommendations, the job shall be audited
       by the JSA Team Members while the job is in progress and recorded in the Part-B of JSA Sheet with compliance status, name, signature, date & time of audit by the Officers. HODs &
       higher management personnel may also check compliance of JSA recommendations while doing 3H visit & checking of hot jobs during schedule visit to the unit / area.
Page 11 of 11