TESTING AND COMMISSIONING
  
   
Aa heed aries
DESCRIPTION * PRE-FUNCTIONAL TESTS (PFT)
‘SYSTEM LD. : ‘+ FUNCTIONAL PERFORMANCE TESTS (FPT)
‘SYSTEM No. ‘ * ISSUES LOG.
EQUIPMENT TAG ACCU B.1/FCUB
4. EQUIPMENT SUBMITTAL APPROVAL
yes No Romarks:
 
 
2. CONSTRUCTION TESTING
ves No Remarks:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
ves no Romar
K
Test Caric-Out by Witnessed f Accepted by Note By
an Dyanel Leb Ps ipl ‘
Sinatre RK. poy
aod ALP ename eneva he ERAS 7
op. A My |
 
 
[General Commonts:
LES ese 206ee a. TEST RECORD
GES Gana
RTARTA oy — Son
Kato Peg ay Pipes a
Vi tnt: iwe ‘AIR COOLED CONDENSING UNIT
ante
Cama)
eMac
 
caRRIER
accu
eH0P007
asi azrs2re
 
|e damage pevertsthe unt fom startup testing
[me power supp wires cabies ithe unit are corecin size. aed ana
lerminated propery
|The retigerent poe nas passe cn prssre test and propery suse
[Te retigerent ine propery hushed ana vacuumed,
[the ACCUs propery stale, atgned and supported comple with vibration
stator
ne space oar o be condones i ee rom ot, umes, paints and its
ne space or area tobe conctenad is propaty enclosed
[The ACCU is propety ibe or tagged
 
 
 
 
 
CE
AS RERR I2- 2-20
ANAS Date
cB ECeS ine.
i 2 Dec. 200
A. BevT Oy “12 Dee. go20
> one8)
ROCKWELL
PRIMARIES
~Bie3 Lat 18 West Capo Drv Cor, Untod St Bay
Kapiti Pasig Ci Philipines
antage
BI coo)
Ty
enon Mase rss
HERMETIC SCROLL
CARRIER
NOT SPECIFIED
Rar04
NOT SPECIFIED
| SITE FAN TEST
Rated Ambient Temperstre %
“c
c
Pas
Pai
A
vipnae
Ba
Model No:
‘aM 4202
aweoR
NOT SPECIFIED
\VANE ANEMOMETER
CLAMP METER
SUNG
A: RIVERA
MASI
KR. BHYTUTHY
LGB ECBS inc
Salle
Pre Theva tae
20380
Nor eyecrpie’
INSTRUMENTATION
Type
‘Sonat No,
SPLIT TYPE:
3519 0271202
Etectical Supely 290060
Curent (FLA) 2
‘CONDENSER FAN
Condenser Moter SPLIT CAPACITOR
‘ir Flow (LPS) NOT SPECIFIED
‘Staring Method SOFT START
DESIGN
at
NOT SPECIFIED
NOT SPECIFIED
100
205,
20
25
214 73/
12
Serial No:
aD o1s92
17045201207
NOT SPECIFIED
Calibration Cortcate No,
4000.02:3340-1.19
(00001-98642 20
‘NOT SPECIFIEDROCKWELL as TEST RECORD @®
2
a
es
 
 
 
[check ne paca condion ofthe unt Thre hat no shiping nsaonon
|samapes
|v re camage prevent he usta esing?
creck he power supply wires or cable oto unt area are comectin sized
[and state & terminated propery
Check he cucwerk complet, re of debrs, and insta according othe
|sonings and specticaton
Chock at damper inetd, accessibie, and according to the drawings and
spectcaon,
neck at aes amore ao insta
Has he retigerat pipe passed on pressure tet and propery incited?
=e retigerant no propery Rushed and vacuumed?
NINININIANIN
me FCU is prope inte, skgned and supported compete wih vation
slater
he specelaea to be conctenedis re rom dust, fumes, pas, and des
me spaceiaea to be conctened is propery encosed,
ste FCU propery labeled or tage?ROCKWELL _2% Sora)
iw
BEC Wen ap eC OT
Keon un 9 Pee
Vantage
Power input)
Fan Meter (FLA)
‘OPERATION CONTROL,
Type ‘THERMOSTAT
Thermostat Seting 18
FANTYPE DIRECT DRIVE CENTRIFUGAL PUMP
NOT SPECIFIED Staring Method SOFT START
Raton,
NOT APPLICABLE SAFETY NOT APPLICABLE
Aveairrstnce 127
TEST DATA
Test
rows 1300 U/e
[NOT APPLICABLE Noy_APPLLAIBLE
128 Nol Aru ORPLE.
NOT SPECIFIED
Ae On-Call Temperate (OBE) NOT SPECIFIED
AiO. Termpaahre (ORAWR) NoTercorico
ee NOT SPECIFIED 5
ViPhi He 2301700 29/1 / be
a é an
ss Serial No.
\VANE ANEMOMETER. ney
(CLAMP METER. ae
NOT SPEGIFED
A. even
Aus
A. BAUTIS 14
LGB ECBS ine
6. TH
RPOCIRECBihar)
AIR DISTRIBUTION SYSTEM
TERMINAL SUMMARY
= GROUND FLOOR WEST LOBBY
St. Brgy Kapitoly Pasig City Philippines | area Served: MAILROOM
pce) 5 Descnption __:_ FAN COIL UNIT
Viintage — [swonents
ad ‘Syste 1D
 
Design
2 Preliminary
cfm (Gz *
us Desion
iaa.n Shhee Ye]127 7
vas Sli956l129 |
has ‘elise Al a9 Yo
oa.s Shiqa “/s| 143 2
hse E1105 Ys] 120 2
9.5 Shige /sha et
has S51 ‘/5| 104%
39.5 Spay “/e] qo fo
 
 
LOUNGE
LOUNGE
LOUNGE
LOUNGE.
LOUNGE
LOUNGE,
LOUSGE
LOUNGE
 
 
 
 
 
 
 
sleleleh[s-[Fe
 
 
 
rome hoe] 1307 w27
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
‘Test carried out by: A> RWERR
AMASI
Test witnessed and A. pavTisth
=o LGB ECBS Inc.
C.
RPDCIRLC.[ceceNo; yearn.
Test cares out by:
Test winesses and
accepts
Nod by:
rat
PUNCHLIST
tea Served
Vantage on
 
 
 
 
 
 
 
 
 
 
AC givEKA
ws
K. Bhun sth
Leb EHS ie
Get?
[AR MOVEMENT ADVANCE SYSTEM NC.
‘GROUND FLOOR WEST LOBSY
__MAIL ROOM| oF /
‘ 1OQO AIR MOVEMENT
AS Vantace Gaetan
Date: January 30, 2021
Project: The VANTAGE at KAPITOLYO
Attention: Engr. Christiane Joy Castillo
RPDC — Construction Manager
Engr. Tito R. Supang, Jr.
RLC — MEP Senior Coordinator
Engr. Raphael Calderon
RLC- MEP Coordinator
Engr. Jessie Rey Babila
RLC- Mechanical Representative
Subject: FAN COIL UNIT (FCU) AIR FLOW BALANCING ISSUE
Sir/Madam:
In reference for the above subject, we would like to formalize our meeting regarding to
disregard air flow balancing issue at West Lobby.
| hope your kindly consideration regarding this matter.
tH AIR WML AOSD AULD PBS otal, §
PILOTS WITR CNNABLE LATOR ITTY | AnyD THE
Thonk You. VALUTAN i GAPDON Px CONTENT OF TOR mR
SL TEN A mle oF ALE PEP IROTION,
25 te aunuty aptlovellby: ® LENTIATE
THE ihe tain “THE oceutty HL pUMrH
OR SARUEKT "DWM THE oMQmes
PEE MOU AD ad VION.
VERTICATION «= FER Panpatt +
ARDIMET  Aeehee
(a
 
 
  
Fook | CHAPTER §alstra
CERTIFICATE OF COMPLETION
Date_$OY- [9,30
Dear Sir/Ma‘am,
Customer Name: “it ANIC a Lepr fd
We are,
 
pleased to inform you that the servicing works on your equipment listed below which results are recorded in
the Field Service Report (FSR) submitted and explained to your representative have been successfully completed on
MODEL NUMBER ‘SERIAL NUMBER
 
O Trouble Call
Bence
Seo
Acer Ek C[E_ WAL baw far
O Unit Not Operational 3.
O Periodie Maintenance (cMonthly Quarterly 1 Annual)
O Unit Operational
© Unit Not Operational 1
 
 
 
 
 
 
 
 
 
‘Our services are covered by a standard warranty.
trouble:
‘as agreed. Our warranty covers defects in parts and workmanship but
does not include periodic maintenance,
calls and non-warranty repairs.
‘To maintain the current efficiency and, if possible, extend the useful fe of the equipment, we urge you to avail of our
Periodic Maintenance program which entitles you to regular maintenance at reasonable rates,
Tene lus if you have any questions or require any assistance. We assure you that our trained Service Engineers
‘Technicians and support groups are available any time to respond to your service and parts needs
Thank you,
cont /-CARRIER AIR CONDITIONING COMPANY
OW leo
‘Service Engineer / Technician(Breck Exponsion R-22iiwverter 410-A Models - WM,FM,CM,CC & CCid units)
‘TO BE ACCOMPLISHED PRIOR TO TURNOVER TO CUSTOMER SERVICE
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
a
Force nticarysseysienes vee [oe] nemtenamenrrcnn ree
 
 
‘
© Drintnesah rap suggests Yes [7hol—]szeetomainow "a
For case nts What he hig ch ine rea et en
©. Eleciclcomectons othe unt ae corectytohiened Yes. L7}no
© Teel weapon othe cat elem erstty vite aud wen pend tment) Yor [FL]
F. Grout Breaker Brand & Rating _6CH EAI kp AT
G. Wire size: Control Wiring Se02.6 we Tyee, Length
Power Supply Wiring Size_[ {| Type: Lengthy
Wt Ratigeont Poe Stes: sucon-Diwnatar_1 ton et
‘Liquid - Diameter-_¢] Length a
Number of hows Used: | ___Vrica Sepuraton Longin» NET
pone
 
 
 
 
 
 
 
 
 
Aunt Kon! Reiger Chase tan), ;
7
|. Refrigerant Pipe insulation Thickness: ‘Suction Line:_ ‘Liquid Line:_ !
 
 
Uni Hert Reading Temp Setting (rete Only): !
L Unit Operating Vottoge Reecing: Forsphase 122 12 104 1, 3
Forsphace 1 QUI v2 Dis 14.4
‘unt Opermung' Pressures: Suction Pressure [0 pig, Liquid Proseure. 54
 
 
 
 
©. FOU Temperate ReadngeDegees C} or-con: {0A9 room: 224 6, retue Ds ¢
[ Puente ReasoxOmaes C: Anton: DE Le, mite I). omctane 2
S46 04 840 NN408 02 2.04710LR
ee
 
We VANTAGE @ VARIO ine
FIELD SERVICE REPORT
PRIMECOOL AIRCONDITIONING CORPORATION
4130 Road 20, Bray. Bahay, Tore, Project 8, Quezon City
(1: 70-1550 | 51-2240 Te Fax 9202108 Co NO, 00228427360
 
 
 
 
 
 
 
 
 
i
I
I
 
 
 
 
 
 
 
 
 
Projet Nae: Uni pe eee eae
darn: const orcn .
a
D D i Ti)
i ]
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
eS cals poppin
 
 
 
 
 
 
 
 
  
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
onus, F31 rate ew -- Se en
lien c= wien ES aye
ieee we E1SSe wm TOO ees
[ome or Loe OO® romano’ 2 es
roe Sete as
a perro a4 i
Tree = |
cee Foe a
 
 
 
 
 
 
 
 
 
 
Accredited Service Provider of
CONCEPCION-CARRIER AIR-CONDITIONING COMPANY
 
 
PAC: 1735—————————————
 
Vantage
 
 
 
 
PROUECT: VANTAGE @ KAPITOLYO INSPECTION REQUEST NO AMASIWEST-LOBBY-001
Locarion: West Capitol Drive Corner United St. Pasig City DATE: SEPT. 9.2019
‘OWNER: ROCKWELL PRIMARIES
 
ATTENTION: INSPECTOR/ COORDINATOR
THRU: ENGR. BRIAN CALDERON / ENGR. MAWIE MANLANGIT
‘SUBJECT:
ee ze ACCEPTANCE OF MECHANICAL WORKS:
We would We fo request an in
Pectons forthe Tome Isted below‘THE VANTAGE @ KAPITOLYO
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
(Building Element’System: | Heating, Ventlating & Air Conditoning (HVAC) System: = ]
(Gategonr [Air Distribution Systems ]
(Clemso be inspected [SYSTEMS SYSTENBT ]
eile: =
ITEM / REQUIREMENT (Conform n| ancy, | NA. [Remarks Corectve Die | Open ol
‘A SUBMITTALS: a ca
AL Manas
Type : 6.1 SHEE OToTo Ei} ty |
200 BroarTe oro}
3. Origin Se [oy City |
moo ofafa aja
AZ _ Shopdtawing/'SD Oyo Toro Dio |
B_ INSTALLATIONS:
81 Tee olajaja ala
pa et a
Raed —
83 Provision of uct Sooves ote
* tur * [atoalala alo
25 Poms ain @lolola olo
87 bac Joris q eet Sta
55 Geaning eH B+4 pro
C TESTING PROCEDURE:
Ci Smoke Test iz Por | ty oo
C2 her Tet Sete +s ota
‘General Notes, Comments and Recommendations:
20F2{|
5 elf. | =| ae me
 
 
 
 
Peraens Ponypante ae GPA |
arenes 2h tye Phaser
Lo Konymipoe YP SIS ~Seeror foo B Kivan
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
i
OBES
PE cece wy
ed USO KIO sSIARE Ad OUCIED —D pont |e
wah Bs! Pel pwr 4g aEhs S2ION waged «1 = ARIA pu addy,
— +f RG — ag — tp
fo 92YTIAHEP weda WIMddO 4@ rmHD YoNddy Weld 2] > MOPULA, “payeaouo,
Bald 94dd Sy “dHAL NOOGW! bE 42 daminved wy |* aa er ' a
DEAD Tied dita wed sed ARLLAD 44 Veet99 aauvaid 1 |v UID ‘payunoypy
2 bern srmoa] IBAA ‘poyunoyA] 100],
g = ave
[2 Estamos aes] ‘papuedsng Surpiad
= lal went FONBOTRHRED NOW
. a seamen] “saa gl
avn EE amenity aims 7
THRDAVaDwEE FO
Spmioy seen sponse —
i
 
 
 
[ Joxiouiaen av aovinvn an
“WAOUddY 4Od LSANDAU
 
 
 
SEIERZIEE)
TIEAMHNDONINDOOR UNITS
 
42SLA & 40HTA Slimpac
(Floor mounted free blow) FCU’s:
+ Duct free convenience with a simple-to-install casing
+ Unit mounted controls
+ Front panel access for filters
40AX Ceiling Ducted Fan Coil Units:
+ Compact ducted casing with high static fans and motors
+ Factory-fitted internal and extemal insulation to minimize
sweating
+ Factory-fitted expansion device
~ 40RUA Floor or Geiling-Mounted Ducted
Air Handling Units:
+ Separate models for floor-mounted and ceiling-mounted
; - installation
. a ] + Standard and high static fan motor options
+ Wired space thermostat included
OUTDOOR UNIT
38HOP Air Cooled Condensing Units:
+ Upto 10.7 kKJW-Hr EER
- R-440A hermetic seroll compressors
+ Horizontal condenser fan discharge
+ Standard safety features
- High/ Low Pressure switches
- Compressor overload protection
-_Delay on break timer
+ Factory-fitted service valves“TECHNICAL SPECIFICATIONS
on ne)
ee
Eon Cees
So
 
 
cnc
jSaRTaN Gosh. urn, gps
 craeking o: axing
     
| 180 Degree Bend Test Results
Reguier
Hot Dip
Gaivanize
 
 
  
 
  
 
 
Tead-Free
GALVALUME
 
    
DeessatH
 
~ . Criterie
 
APO Galfan shows no cracking or flaking
at OT-Bend:
OT-BEND
aged arnt
  
 
 
 
 
Sunerior Weldanttity & Joining
SS itahiity 2. Joining
52 PUYATISTEEL CORPORATION
hi
 
|) Geivanizea Gaivalume | aluminizen
{ |
less
|
| 4 5
inom [Seater
 
 
 
 
 
 
tw tw
(1 APO Bioe tella, RT] oe
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
sg —| eg eg} | ses | se | rs]
 
 
 
 
 
 
 
 
oo oo aa own 7 ed err a
ertatan Charyly sin lat Syturahe Wy asa cat L
+ extay
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
: :
UF e >
J Drink +8 Ydid NIVUC
+p ELVSNAGNOO
£18) weve] me “ADT
| nate aig ee
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
3pm fa)
evr: aq] seven me
 
 
 
 
 
Votavy av aoWLNUA AEA
( WAOUddY HOS LsaNOaY
  
SSIYVWIad
lTTaMHD08FITTINGS
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
1G _| Coupling Reducer Cay in blue conforms to Philippine National Standard or PNS
Souptiog _{Seurtng reve oe 04 ti vts
em: Ret Poot’ gnwclght High Flow Ra
Ae See as ee
(| _PIPES: T
eee Bushing Reducer | Wale Adapter ||O.D [7 oe
TV 300 Meters —|
(L)
Nominal Size | Thickness Unit Price ‘Standard
a frm [nches)| om) Length oy
Te &l |Femate Ad: ir} | team) s) (mm) a
___teaded Tee ‘bow mal lapter = i 780 a 5
25 4" 4.90 76.00 3
32 ong 2.00 110.00 3
40 4-114 * 2.30 135.00 | 3
50} 1-7/2" 2.90 205.00 3
63 a 3.60 310.00 3
Throaded Elbow Ball Vaive Teflon Tape 15 T 2Ai2" 4.30 560.00 3
90 = 5.20 787.87 3
10 [ —4= | ~6:30 | 7000.00 3
160 6" 9.20 3
INSTALLATION
ca
Solvent Gorman
 
Tee Reducer |
 
 
 
 
 
WANUPACTURED By
 
'Y INDUSTRIES CORB
 
ed
 
Distributed by:
LYS Market
7 Roose
Fax #
Mobile #
velt Ave. SF D.M.
(©32) 41
2.2452
(882) 372-6023
(0916) §78-3886
    
3 cxeriesiteac
  
ting Corporation
Quezon City, Philippines
412-2190 1091; 412-7145
372-6020 to 22 | 372-6018
412-2192
(0916) 773-6286. (0918) 851-1763ER > | an
 
 
 
= at eer
= aan = a sor _————————roreg
oe 3 Loe SST
Petey “yesds Laumed Yh? kndner [ad 3 let
~aBiaee sper |
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
“é
: LE
“4g
aap 7
: PF ws SONILLLA ¥ Sdata
rans how aw 3 pent. INVER RTT
2) = ~IVLONOH
es
avian a
FE: [Fora
‘pamnbey esuodery ——: pawrmang amy 280 ‘orl weno) |
v fae cre meet
(SOLU ty mev.bReA mt
 
SEA
TTSMADON
‘WAOUdaY 4os AsanDTUBRS
Straight Lengths
at
andr Woodan Box Pacing
  
      
 
 
 
 
PRODUCT CATALOGUE anges
gua Lengths Plastic Packing
JS Ec eSea ee cage ast pas
ace
Serpe
 
 
 
 
 
 
 
 
 
EN 087Peren
Copper Fittings
 
Pp lsation: Airscondivioner ond rettigeration used copper fittings
Vemper: Hard
S(oudard: BS 864, ANSI B16.22
‘
£
@
 
{ f 58 102 Wg"
Lr un 1a
tothe steer
and mechanical compacta
UALR REz
LHe ZT ae
_——
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
NOLLWTINSNI
SSWOMIONG
SNINOLLIGNOD
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
2 aa =reRa
18) myo] mma av
. otepeen |
5 at
£18 | ewvicneansl-|
i" rma anes]
ae BE Suan We [ neat i
2 soa Ms val
Soeanin meet pnyeas ma sam ta ono] manning] memnenme| | “Uae,
emeacea) seni] mansnerin | mt seaeneneragan it mon]
istapean srl | _sastrvemmonf —iatimens| runner]
 
 
 
 
 
SEE
« ONTOLIGYM LW SOVILNWA aL
‘TWAQUddY os ASANOTHERMOLINK Crcee
radiation THERMOLINK (irradiated) p
EDM utente te
technolog constantly low thermal conductivity and high stabil
    
SSUES mua cies
THERMOLINK
~ A(fully closed cell, physically crosslinked Duct Insulation
polyolefin foam with factory installed (125 gsm)
reinforced aluminum foil outer barrier and a 100
micron double sided tissue based acrylic
adhesive.
 
>roduct Features
Constant Low Thermal Conductivity
Thermal Conductivily isthe measure ofthe abilty ofa matorial to tranefer heat. Thus, low
2 thermal conductive materials will iower the heet transfer rate through the insulation,
Hex = ol == THERMOLINK Physical Crosslink Foam K- Value: 0.038 Wim.K
Air ASTM C5tE 23°C mean temperature (TUV-SUD Sg)
 
Virtually Zero Water Permeability
, | Water diffusion into insulation is caused by varying vapor pressure on the hot & cold side of
& the insulation.
* THERMOLINK water vapor transmission rate is < 0.40 lm 2/h (ASTM E96/29604-12 Procedure
4
Certified Fire & Smoke Rating
t = Eire & Smoke saiely is another op most feature for THERMOLINK. We go beyond energy
     
 
  
Standard Roll Sizes:
ese
THERMOLINK = Lamm xi.2mx20m
. + 1Smmx1.2mx 20m
Ame a * = 20mm x 1.2m x 20m
— . Sitio
125g5m,
 
Reinforced lero bs & 100 micron, repositionable double sided acrylic
tuminum }ogenous issue interlayer
a ‘radiated cen Seees interlayer adhesive
Foil BarrierZp 2 TET sea]
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
A) ezly ne
Teele Peers Iglf NOILVINSNI dala
; INVURORTATY
- ANITOWWaHL.
 
 
        
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
TOLIdWH Lv SOWLNWA SHI
TWAOUddY YO LszNOU
  
SERA Asia
ITEMADONCre
THERMOLINK
Dene ait
SEN
energy saving tube installation, perfectly installed all the
to long lasting in
lanai
THERMOLINK
Tube Insulation
  
Technical Data:
Matera Physically Crosslinked Polylefin Foam
with Reinforced Foil or Fie Retardant
Film barvior
Cell Structure: (Closed colt
‘Thermal Conductivity: 0.035 W/mK @ 23%¢ (ASTI C518)
Density: 25 ke/m3 (Foarn Core)
Mater Vapor <0.10g/mz/n
Transmission Rate: (asta €s¢/e9600-12)
Fire & Smoke Ratings: Class 0 (B.S. 476 Part 6 &7)
‘lass A (ASTM E24)
Flame Spread inde 0
‘Stoke Developed index: 20
TIGHTSEAL@s78
alow V.0€, Zero
ead, solvent based
adhesive for strict,
use on CELLECT &
THERMOLIVK
INSULATION.
 
Cortfied ROHS Complient product.
(Test Cortficates&: MSDS avalable
‘upon request)
 
ene
ad
lation
 
Product Features:
"An irradiated crosslinking process to produce a fine,
micro cell structure for optimal thermal, Properties
and increased durability.
Choice of Reinforced aluminum foil Or fire retardant
film barrier ( in blue & white: colors)
Factory made elbows and tee’s and reducers
ensuring the highest installed quality standards
available today.
With own specified low V.0.C. liquid adhesive for all
lamination bonding requirements
Available in Slit or uncut lengths
Unmatched labor cost reduction. and installation
speed
For B.l., PVC and Refrigerant Pipes
 
Standard Tube sizes :
Thickness Minimum .D. Max. Nominal Pipe
(men) (rom) Size (inches)
2 6 10°
18 G 10"
20 6 2"
25 6 2a"
30 a0 a
40-75 2 29"