arate / Office
tea era ee ST ie 4 £2, oa sa aR, free aire,
(aoe ates she arr fae, ITER) aga ate, ara - vag0ou (erm)
National Highways Authority of India Plo No. E- 2 a Jalram Nagar Behind Shivdare Cole
ape ol one, osprey) Jule Step, Solapur ~ 413004 Tex 021728083
feat araferen, garg. sary (FERTE)
Project implementation Unit. Solapur (Maharashtra)
4-34a/Emal: solapurdnal or; piusolapur@gmail.com
No.: NHAI/PIU/SLP/NH-09/OFC Cable/2020-21/ =. Date: 22/05/2021.
INVITATION OF PUBLIC COMMENTS
Sub.: Four Lanning of Solapur - Mah /Kar Border Section of NH-9 from Km 2494000 to
348+800 in the state of Maharashtra on Design, Build, Finance, Operate and
Transfer (DBFOT) Basis under NHDP Phase Ill- Proposal for crossing of 220 KV
Narangwadi - Solapur line on NH - 65 Hyderabad Solapur, near Dastapur
village, Tal- Lohara, Dist. Osmanabad- - Reg.
Sir
1. Executive Engineer, EHV Projects Division, MSETCL, Laturhas submitted the
Proposal for crossing of 220 KV Narangwadi - Solapur line on NH - 65
Hyderabad Solapur, near Dastapur village, Tal- Lohara, Dist. Osmanabad.
2. AS per the guidelines, issued by the Ministry vide OM No. RW /NH-
33044/29/2015/ S@R(R) dated 22.11.2016, the application shall be put out
in the public domain for 30 days for seeking claims and objections (on
‘grounds of public inconvenience, safety and general public interest).
3. In view of the above, comments of the public on the above application is
invited to the below mentioned address, which should reach by this office
within 30 days from the date of publication beyond which no comments shall
be entertained
The Project Director
National Highways Authority of India
Project Implementation Unit, Solapur
Plot No. E-2, Jalaram Nagar,
Solapur, Maharashtra,
Pin - 413004
Thanking you,
wad
&.
atta fers
AUNTS. Tag, soy
Copy to:-
CGM (Tech) RO Mumbai for infor please.
Master file. es
Wey eescopue Mad ade
Head Office : No. G 5 & 6, Sector 10, Dwarka, New Delhi-110 075
Tel, No.: 011-2507 4100 / 2507 4200 Fax No. : 011-2509 3507 / 2509 3514. Web Site : http:/mvw.nhal.orgMARA
on cof The Exeeutive Engineer. EHV Prujects L A
| inthe premises of 132KV MIDC Substation Pot No.21 , MIDC. Barshi Road, Laur - 413531
Ph, 02382-22990, Fax 02382-21990 \
Eimait | 0. |
EEEATCONSTTR 3039
ro, i 4 SEP 2019
Director Projects, .
Indian National Highway,
Plot No, 80, old Santosh Nagar,
Near Devika Gas Agency,
Jule Solapur- 413004.
Sub: - Crossing of proposed 220 Ky Narangwiuli-Solapar Pkg-A to National High
Way No. 65, Hyderabad-Solapur near Dastapur village, Taluka -Omerga
district-Osmanabad & accord approval thereof.
Dear Sir,
"The Mahaashtra State Electricity ‘Transinission Company proposed t0 lay BS erect 220
Ky Narangwadi-Solapur Pkg-A for proposed 220kV Narangwadi substation.
The route of proposed line is evossing the National Highway No. 65 Hyderabad-Solapar
near Dastapur village, Taluka -Omergs, distrie-Osmanabad. The ground clearance to the
seam ment conductor is 18.00 meters, as per profile spotted considering 0.4 ACSR Zebra
corrtraton copy of profile for same is enclosed herewith for your ref this ‘clearance is much
safest than specified as per 1. rules.
It is therefore requested to accord approval For above crossing.
‘Thanking you '
Executive Engineer,
EHV Project Dn. MSETCL.
Enclose: - As above Latur
Cantor
1) The Superintending Engineer, EHV Project Cirle, Aurangabad
2) The SE, PWD Speed project circle, Court premises, Beside *Bandhakam Bhavan’ !Ind Floor,
Aurangabad.
= For needful please
Caw.r.t0%-
Ty The Executive Engineer, Speed Project Division, PWL2 Premises. eed
~ For needful please
iy fe Incharge,
» For follow up until approval service ‘sith fortnight reportCHECK - LIST
Guidelines for Project Directors for processing the proposat of laying 220 kv
Solapur (PGCIL)- Narangwadi DCDC EHV Overhead Line by Maharashira State
Electricity Transmission Company Lid in the land along National Highways
vested with NHA!
» — Relevant circulars -
+) Ministry Circular No. RWINH-33044/17/2000-S8R dated 29.9:2000
2) NHAI's circular No. NHAVO#C/2k vel cated 7.11.2000, which includes _ the
comprehensive guidelines 2x dratt scens> agreement for laying of OFC cable
by private party in the land along Natonai Highway vested with NHAL
3) Ministry's circular No. RWINH-33044/27/2000-S8R (R) dated 21 3. 2006. itis
regarding the modification of previous Ministry's circular entrancing the amount
‘of Performance Bank Guarentee @ Rs. 50/- per route mete: in place of earlier
rate of Rs. 25/- per route meter.
Shock list for wetting sppcoval for eying ot optical fibro cables on NH land
Ss. item Informetion/ Status Remarks
No. Here crescent
{General information 1220 kv Solapur (PGCIL)-
Narangwadi DCDC EHV |
11 Name and Address of the Applicant
Engineot
ides" EHV Projoct
1 Giuisien Plot No2t,Ole
MIDG Latur 415812
4.2. Nabor sv cagniamy Heber New NH- 6b (Old Nel 9)
13° Siat Mabarashica
VA teenie Castaper 7
495 schamaae in ken “120 © Kimi
+> Lengif in meters ; :
|, Width of available ROW iaek cana
{a} Let side from center line towards ' Sanyareay 197 Km ~~)
inereasing ‘chainage/ km | «Sr 300*:20) i
bo Right side wom conunt fine acids Solapur 66 Km
charraye! kin CGR 3004120)
18 Pram seed (he
(a) Left side from center line towards ,
increasing 300+120 chainage/ km
Jay Fugnt side from centerline towards
increasing 300+120 chainaga’ kmjose (S Roe lat CNA
(as Lett side om center line
| (b) Right side thon cent WE
other proposal 's in the same sice | NA
walate Sand 3 ot ke De aegaIes
sie tay he HTM
aed i ez
4 sloaly wit servions # any NA
see Foule
oo ans i 6/B lanes) ZLane
Diane “@ lane
line is after the service road or
between the service road and main
| for 4 laning ahd the position of new
vay hes been denied then
shail oe fag st The eye o
nin ioe atty enetidan
that side of
upyabeuiuey>
i hod) wonpedsu: quauiae.Ge quawioaiBe —_pue woes Bujse9s2u1 (uw
cee OASer o-Aupnen . Jo Suiubis * sesuaoy aia pue_ | spveMmon) HN JO | Ul ASU) “ON
suewoy "hy yooieg yosted. so sieq | yoauen Jo pun |_vordag | apis OH so ¥en’ wanee] | 1S
(aN) SO-HNT seqwnN HN“
aus quajeninb3 Jo UOISINIG Gd JOPWEN “€
WH CvHN/OWa/AMa) ADUBBY JO FUN
enuyses2uew, ‘ayerg yo aun “t
Quajeamite 40 worsiig a
1 Oh Baw
Aaono ‘oyers pue yiy reno
15 WOASSILAIET AE M-$OVL
wuyyuyeus aq 02)
SUITTERUTEHT 34 YOUIIOS
BUTT PEST IOAG AH GUN:
ope!RANKING EX
she Latur Urban Co 09. B
Meh
> p.00007 0b,
INDIA sane pu MAHARASHTRA
Annexure : 5.1
UNDERTAKING
We Executive Engineer, EHV Project Division, Latur ~ 413521 Taluka & District Latur
(Maharashtra) and Mis. Kishor Inffastructure Pvt Ltd, Hyderabad, having its registered
office at Hyderabad ~ (Andhra Pradesh), India hereby do undertake in Reference to om ROW
apolicaton along NH-65 from Solapur in the State of Maharashtra a! EHV Overhess line
crossing locations as under;
') Near Dastapur village at Ch. (300+120 to 3004155) Km
‘We will not damage other utility while laying our EHV Overhead line, In case if it is
Samaged then the losses will be peid to NHAI or the concemed owning agency as per
direction by NHAL.
'
For i Ie
Ms. Kishor Infrastricture Prt Ld., Hyderabad Executive Nengioccr,
7
EHV Project Dn, Latur
Authorized Signatoryba Rem gcpat Ran” EEC Bane Lg UTES 98237 os
\ Par Reet Buspmeet te 8 Se, ToT
heen meat est Ge 40922 We 21 2003
Bar YN 0380706 o0
Pa Cmecotie GRY am mom am ow ar me 15-46
R.0000100j}-resa74
SNDIA stamp pury mananaserre
Amnexure : 5.2
: UNDERTAKING =
We Executive Engineer, EHV Project Division, Latur ~ 413521 Talukade District —Latur
(Maharasirs) and M/s. Kishor Infrastructure Pvt Ltd,, Hyderabad, having its registered
office at Hyderabad — (Andhra Pradesh), India hereby do undertake in Reference to our ROW
application along NH-65 from Solapur in the State of Maharashtra at EHV Overhead line
crossing locations as under;
i, Near Dastapur village at Ch. (300+120 to 300+155) Km
1) Mis. Kishor Infrastructure Pvt Ltd., Hyderabad,shall submit the performance Bank
‘Guarantee for the proposed as and when the demand note is raised by NHAI.
2) Ms. Kishor Infrastructure Pvt Ltd., Hyderabad,and Executive Engineer, EHV Project
Division, Laturshall renew the Performance Bank Guarantee as and when required if
work is not completed in one year time of the submission of the BG.
1
Mis, Kishge Infrastructure Executifé Engineer,
EHV Project Dn. Latur
‘x:
Authorized Signatory. Authorized SignatoryMg crrnicintetss SE sen
A agi CLERK 25m, mma a
pe aur UitanCo-- Ban
a” Rs 0000 100-a5374
INDIA stam bury ‘AAHARASHTRA
UNDERTAKING
We Exccutive Engineer, EHV Project Division, Latur ~ 413521 Talukad District ~Latur
(Maharashtra) and M/s. Kishor Infrastructure Pvt Ltd., Hyderabad, having its registered
office at Hyderabad ~ (Andhra Pradesh), India hereby do undertake in Reference to our ROW
application along NH-65 from Solapur in the State of Maharashtra at EHV. Overhead line
crossing locations as under;
i, Near Dastapur village at Ch. (300+120 to 3004155) Km
We will be carrying out the EHV Overhead line Crossing work as per the specifications and
standards of NHAI and the executed work will confirm all the standard conditions of NHAI
ingineer,
‘M/s. Kishor Infrastructure Pvt Ltd., Hyderabad
ERY Project Dn. Latur
ey
Authorized Signatory Authorized Signatoryoem eck Same es TET 98039 eh aeere
me musts sgt Bi55924 AUG 21 2019
Era! BU as nen me oe ms mm 15:40
Rs 0000 100/pes374
INDIA stave curv mananasimas
Annexure : 5.4
UNDERTAKING
We Executive Engineer,
(Maharashtra) and M/s,
i) Near Dastapur village at Ch. (300+120 to 3004155) Km
We will shifting and relocate EHV. Overhead line at our own cost, as and when required by
NHAI authority within such time as stipulated by NHAIL
For
Mis. Kishor Infiastuctre Put Li, Hyderabad Exec ale
EHV Project Dn. Latur
Authorized Signatory0000 1G0!-ves2
Annexure : §.5
UNDERTAKING
We Executive Engineer, EHV Project Divi ion, Latur — 413521 Talukag District —Latur
(Maharashtra) and M/s, Kishor Infrastructure Pvt Ltd, Hyderabad, having its registered
office at Hyderabad ~ (Andhra Pradesh), indi undertake in Reference to our ROW
For
Mss. Kishor Infrasttck
Ker
a)
EHV Project Dn. Latur
Authorized Signatorya} "tS Se Ban
at Rear reso
LERK BSSTEV © 4
Ene on
we
2015
RY eo oe 15 4D
? R.0000100}-pasa7e
INDIA stam our.
\AHARAGHTRA
Annexure : 5.6 = =
UNDERTAKING
We Executive Engineer, EHV Project Division, Latur - 413521 Talukad District Latur
(Maharashtra) and M/s. Kishor Infrastructure Pvt Ltd., Hyderabad, having its registered
office at Hyderabad ~ (Andhra Pradesh), India hereby do undertake in Reference to our ROW
application along NH-65 from ‘Solapur in the State of Maharashtra at EHV ‘Overhead line
crossing locations as under;
i) Near Dastapur village at Ch. (300+120 to 300+155) Km
We hereby indemnify the NHAT against all damages and claims under any clause if any.
For 4 L (aA
Mis. Kishor Infrastracture Pt Ld, Hyderabad a
EHV Project Dn, Latur
Authorized Signatory:~ Authorized Signatory4 Epos coe aon SRP 90242 ca pers
eK eva Rayer Sune 2 144928 “AUS 21 z0t
SOE nh tere ang Tessormssacte YR mo an a mm me me 15:4
na R.0000100/-re5974
INDIA. stan oury mananacurns
Annexure : 5.7
. NDERTAKING *
We Executive Engineer, EHV Project Division, Latur ~ 413521 Taluka District —Latur
(Maharashtra) and M/s. Kishor Infrastructure Pyt Ltd, Hyderabad, having its registered
Office at Hyderabad — (Andhra Pradesh), India hereby do undertake in Reference to our ROW
‘traffic by way of caution boards Goring daytime and danger light at night witt be provided by
Executive Engineer, EHV Project Division, Laturand M/s. Kishor Infrastructure Pvt Ltd,
EHV Project Dn, Latur
Authorized SignatoryOn Barks § ANSTO)
¥ is re 7 Rereig
SeTgRR Ram Business ee ee :
CR ross mance to | ERY ET an mw amy 154
Y R:0000100}-rass7s
i bind Hi isa
“Annexure : 5.8
ERT)
i) Near Dastapur village at Ch. (300+120 to 300+155) Km
i ary claim is raised by Concessionaire of the projet then the same will be paid by
Executive Engineer,EHV. Project Division, Latur and M/s, Kishor Infrastructure Pvt Lt
Hyderabad. 1
For La
‘Ms. Kishor Infrasthicrure Pvt Lig., Hyderabad Executyié Engineer,
is
EHV Project Dn. Latur
Authorized Signatory5:40
B® x.0000100}-re00
INDIA stam oury stananasiras
UNDERTAKING
We Executive Engincer, EHV Project Division, Latur ~ 413921 Taluka& District “Latur
(Maharashtra) and Mis. Kishor Infrastructure Pvt Lid, Hyderabad, having its registered
5) Near Dastapur village at Ch. (300+120 to 3004155) Km
Prior approval of NHAI shall be obtained before undertaking any work of installation,
Shifting or repairs, or alterations to the showing EHV Overhead line crossing located in the
ROW of National Highway NH-65. '
For
‘M/s, Kishor Infrastructure PvE'Ltd,, Hyderabad Executvé Engineer,
EHV Project Dn, Latur
Authorized Signatory é Authorized Signatory