0% found this document useful (0 votes)
116 views45 pages

D2 Merged

Uploaded by

LN MALVIYA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
116 views45 pages

D2 Merged

Uploaded by

LN MALVIYA
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 45
.N. MALVIYA INFRA PROJECTS PVT. LTD. in Association with Infratech Civil Salutations & Consultant Project office H-N0:10-53, Vijay Moin Nagar Colony, Medha Hospital Lane, Near Pochamma Thalli Temple, id - S01S04 Ranga Reddy Dist, Telangana. Fmail: Inmappajunetion/@gmaiLcom LNM/APPA/TL/Mdb/2023-24/86 Date: 01.02.2024 To The General Manager (T) & Project Director National Highway Authority of India 25A82BA, Staff Quarters Administration Staff College of India (ASC!) College Park Campus, Hyderabad-500034, Telangana. Email: nhaihyd@gmail.com Sir, ‘Subject: ~ NHAI, PIU-Hyderabad - Permission to lay Optical Fibre Cable (OFC) along Road passing from Mrugavani National Park to Chevella Jn (Indira Grandhi Chowk) NH-163 of length of 23.5 km of NH-163, in the State of Telangana — Request to furnish a detailed report along with specific recommendation - Reg Ref: 1. PIU, NHAI, HYDERABAD mail dated 24.01.2024 2. Space world (P2P Networks Pvt Ltd letter dated: 30.01.2024 addressed to PIU, NHAI, HYDERABAD 3. Space world (P2P Networks Pvt Ltd mail dated 01.02.2024 With references to the PIU, NHAI, HYDERABD mail dated: 24.01.2024, we inspected the site along with the Space world officials on 27.12.2023 and submit the following report 1. The Space world (P2P) has submitted the Proposals vide references this office reference 2" and 3" cited. 2. The OFC Cable will be laid on extreme edge of the existing ROW of 30 meters (15 m from C/C) and acquired ROW of 60 meters (30 m from C/C) on LHS of the road at the following chainages. a) From Km 17/200 to 18/500 on LHS of the road (15 m from C/C) b) From Kini 18/500 to 21/350 on LHS of the road (30 mi from C/C} | From Km 21/950 to 26/300 on LHS of the road (15 m from C/C) d) From Km 26/300 to 38/700 on LHS of the road (30 m from C/C) €} From Km 38/700 to 40/800 on LHS of the road (15 m from C/C) Hence permission may be accorded to P2P Networks Pvt Ltd to lay the OFC Cable at the chainages mentioned above duly following the NHA\ relevant ministry circulars. Strip maps are herewith enclosed. 4, The check list submitted by P2P Networks Pvt Ltd for getting approval for laying OFC Cable by private parties in the land along National Highways vested with NHA\ is herewith enclosed. 5. The agreement regarding granting of right of way permissions for laying of utility services on National Highways submitted by P2P Networks Pvt Ltd is herewith enclosed. L.N. MALVIYA INFRA PROJECTS PVT. LTD. In Association with Infratech Civil Salutations & Consultant Project office H-No:10-S3, Vijaya Nagar Colony, Medha Hospital Lane, Near Pocharma Thali Temple, Moinabad - SO1S04 Ranga Reddy Dist, Telangana, Email: lnmappajunctionZgmaiLeom 6. Performance bank guarantee of Rs 23,60,000 and license fee for five years shall be collected before according pert to P2P Networks Pvt Ltd (detailed calculation sheets enclosed). 7. The laying of the OFC cable on LHS of the road shall be followed as per the guidelines issued in the ministry circular dated 22.11.2016. ‘Submitted for favour of further action Thanking you sir, Encl: 1. Strip Plans 2. Check list 3. Agreement Bond 4, Calculation Sheets sPhce we WORLD Date: 30.01.2024, Hyderabad To, The Project Director, NHAI PIU, Hyderabad, Telangana-500034. Dear Sir, ‘Sub: P2P NETWORKS PRIVATE LIMITED-Permission for laying of OFC Cables along Road passing from Hyderabad to Manneguda for length of 23.600 km-Reg We P2P NETWORKS PRIVATE LIMITED, having IP-1 Registration (No.1395/2023) from Department of Telecommunications, for providing Infrastructure Services in Telecom, and we are in the phase of telecom infrastructure development. Itis proposed to lay OFC in the following stretches for commissioning our systems. SiLNo. Name of stretch Chainage Length (kms) 1 Hyderabad to Manneguda 17/2010 40/800| 23.600 The details of route laying OFC by the SIDE of road drawing is enclosed. OFC will be laid by HDD method (Trenchless Method), HDD pit measurement is 2m-depth, 1m width & OT 2m-depth, 0.6m width and at the extreme possible end 1e road. Necessary Track rent / OT (wherever HDD not possible) charges will be paid on receipt of Demand Note from your office. We will take all safety precautionary methods to minimize the inconvenience to the General public ‘we will Co-ordinate with Traffic authorities for a smooth flow of traffic. Kindly communicate for any further documents as per your procedure for laying OFC along the roads T— ‘indy do the needful atthe eariest P2P NETWORKS PRIVATE LIMITED Unit No.125 & 126, First Floor, Vardhman Premium Mall, Deepali, Ptampura, Delhi Northwest - DL 110034 info@spacegrp.com ©) +91 97111 55059 { nttps://spaceworld.in/ CIN: U64204012023°TC410275 17200 PROPOSED OFC Hyderabad - Mannoguda * ROAD ROW PLAN, ROAD NAME: HYDREABAD - MANNEGUDA NH-163 P2P NETWORK PRIVATE LIMITED Berm Boundary ROAD ROW PLAN ROAD NAME: HYDREABAD - MANNEGUDA NH-163 PROPOSED OFC Boundary i Hyderabad Chevalla can P2P NETWORK PRIVATE LIMITED (2%) \i ication: Berm —— BT Road qe Row Boundary ——— Other Cables ee -~ Culvert LIK NV Proposed OFC ROAD ROW PLAN ROAD NAME: HYDREABAD - MANNEGUDA NH-163 PROPOSED OFC Hyderabad - Mamneguda Hyderabad P2P NETWORK PRIVATE LIMITED i Row Boundary Proposed OFC Chevalla Bem Boundary 2 —— __ BT Road ——— Other Cables acai: ~~ Culvert ROAD ROW PLAN ROAD NAME: HYDREABAD - MANNEGUDA NH-163 24300 PROPOSED OFC Pecamangalaram Rd Hyderabad Hiyderabed - Manneguda Row Boundary Proposed OFC P2P NETWORK PRIVATE LIMITED ‘Bem Boundary Chevalla GPR 4 Yc) 2) g \ /s BT Road Ee Other Cables Timea ROAD ROW PLAN ROAD NAME: HYDREABAD - MANNEGUDA NH-163 2¢700 5 ce S Cine < z | g g , i a i th, |) c= 3 E ton E eae eee ie ‘Hyderabad - Manneguda * : t Hyderabad 8 Chevalla 3 edie é 1 1 P2P NETWORK PRIVATE LIMITED a Berm —— _ BTRoad ——— __ Row Boundary Other Cables Proposed OFC ser (CHECK — LIST Guidelines For the Project Director for processing the proposal of laying optical fiber cable by private parties in the Land along National highways vested with NHAL. Relevant Circulars Ministry circular No.NH-36094/01/2022-S&R(P&B),Dated 17-04-2023 Ministry circular No.F.NoRW/NH-33044/29/2015 S&R(R),Dated 22-11-2016 istry circular No.RW/NH-330441/17/2000 S&R dated 29-09-2000 NHATs circular No, NHAI/OEC/2k/Vol II dated 7-11-2000, which includes the comprehensive guidelines And draft license agreement for laying oft cable by private party in the land Along National highways vested with NHAI Ministry circular No.RW/NH-33044/27/2015-S&R(R) dated 22-1 1-2016.It is regarding the Modification of the previous Ministry circular enhancing the amount of performance bank Guarantee and charges for granting licenses for use of highway Land. Check list for getting approval for laying of optical fiber cables on NH SLNo. Item Information/ Status Remarks 1 General Information P2P Network Private Limited having its Regd. Ofice located at, Unit No.125 &126 First Name and Address of the Floor, Vardhman Premium Applicant/Agency “Mall Deepali, Pitampura, Delhi Northwest-DL110034 1.2 __| National Highway Number NH-163 a 13 _| State i 2 ‘Telangana : 1.4 [Location a Hyderabad-Manneguda 1.5 | (Chainage in km.) From km 17/200 to km 40/800 1.6 | Length in Meters 23600mtrs 1.7 | Width of available ROW. (a) Left side from center line towards 30mtrs increasing chainage/ km direction foe 1 (b) Right side from center line towards increasing chainage/ km direction NA 18 Proposal to lay the utility (a) Left side from center line towards | increasing chainage/ km direction L4meters. (©) Right side from center line towards increasing chainage/ km direction NA 19 Proposal to acquire land NA a) left side from center line right side from center line 1.10 Whether proposal is In the same side where land Is not to be acquired ‘Land Acquired If not then where to lay the cable NA’ Details of already lald services, if any, along the proposed route 112 ‘Number of existing lanes (2/4/6/8lanes) 2-lane or 4-lane 113 Proposed Number of lanes (2 lane with paved shoulders/4 /6/8 lanes) 114 Service road existing or not No Ifyes then which side (a) Left side from center line (b) Right side from center line LIS Proposed Service road (a) Left side from center Ii (b) Right side from center line 116 Whether proposal to lay utility Is after the service road or between the service road and ‘main carrlageway Tn the NH premises Document/Drawings to be enclosed with the proposal Yes’ 21 Cross section showing the size of trench for open trenching method No Is it normal size of 1.5m deep x 0.3 m wide 2) should not be greater than 60 cms wider than the outer diameter of the pipe TH) located as close to the extreme edge of the Right of Way as > possible but not less than 15m from the center line of the nearest carriageway TID) shall not be permitted to run along the ‘National Highways when the road formation is situated in double cutting oe fe nor shall these be laid over the existing culverts and bridges TV) These should be so laid that their top Is at least 0.6m below the ground level so as not to obstruct drainage of | the road land 2.2 | Cross section showing the size of pit HDD method and location of cable for HDD method 23 _| Strip plan / Route Plan showi ‘Yes, Attached as per Drawing utility/OFCchainage, width of ROW, distance of proposed pipe line from the edge of ROW, important mile stone, Intersections, cross drainage works ete 24 | Methodology for laying of the OFC Laying Methodology ‘Attached 24.1 | Open trenching method (may be Backfill the soil excavated allowed in utility corridor only where pavement is neither cement concrete nor dense bituminous concrete type) If yes, what is the methodology of refilling the trench with Compaction @ every 300mm. a) The trench width should be at least 30 ems, but not more than 60 cms. wider than the outer diameter of the pipe ’) For filling of the trench, Bedding shall be to a depth of not less than 30 ms. It shall consist of granular material, free of lumps, clods, cobbles and graded to yield firm surface without sudden change In the bearing value. ‘Unsuitable soil and rock edges should be excavated and replaced by selected material. ©) The backfill shall be completed In two stages- i) side fill to the level of the top of the pipe and ii) overfill to the ‘bottom of the road crust ‘The side fill shall consist of granular material laid in 15 cms. Layers each the proctor density. Overfill shall be compacted to the same density as the material that has been removed. Consolidation by saturation or ponding will not be permitted. consolidated by mechanical tampering and controlled addition of moisture to 95% of — ————— ©) The road crust shall be built to thesame strength as the existing crust on either side of the trench. Care shall be taken to avoid the formation of a dip at the trench. 1) The excavation shall be protected by flagman, Signs and barricades and red lights during night hours. g) If required a diversion shall be constructed at the expense of agency ‘owing the utility line. 2.4.2 | Horizontal Directional Drilling (HDD) ‘Along the Road on NH Method premises 743 | Methodology for laying of the OFC No through works and method of laying In cases where the carrying of OFC on the bridge becomes inescapable 3 | Draft License Agreement signed by two ‘Yes witnesses 4. | Confirmation of BG has been obtained or | BG Shall be submitted as not as per MoRTH/NH guidelines per NHAI Guidelines 3 _| Affidavit/Undertaking from the Applicant for following Is to be furnished S.1_ | Undertaking for not to damage any other Yes; Enclosed utility, if damaged then to pay the losses cither to NH or to the concemed agency _ 5.2 | Undertaking for Renewal of Bank Yes,will be obiain after Guarantee as and when asked by submission of BG MoRTH/NH 33 | Undertaking for confirming all standard | Yes:Enclosed conditions of Ministry/NH’s guidelines 54 | Undertaking for Indemnity against all ‘Yes;Enclosed 35 @ for management of traffic | Yes;Enclosed ‘movement during laying of utility line without hampering the traffic 5.6 | Undertaking that if any claim Is ralsed by | Yes:Enclosed the Concessionaire/contractor then the ~ same has to be pajd by the applicant 5.7 | Undertaking that prior approval of the NH | Yes:Enclosed shall obtained before undertaking any work of _ Installation, shifting or repairs, or alterations to the utility located In the National Highway Right of Ways 58 | Undertaking that expenditure ifany incurred | Yes;Enclosed by NH for repairing any damage caused to the NH by laying, maintenance or shifling of the utility line will be borne by the applicant agency owning the line. © | Power of attomey to sign the Agreement is | Yes:Enclosed available or not 7] The Project Director shall submit the following Certificates 711 Certificate that the proposal is confirming to | Undertaking Enclosed all standard conditions issued vide MORTH circular No. RW/NH/33044/29/2015/S&R 72 | Certificate from the PD in the following YesiEnclosed format i) “itis certified that any other location of the OFC would be. Extremely difficult and unreasonably costly and the Installation of OFC within RoW will not adversely affect the design, stability and traffic safety of the highway nor the likely future Improvement such as Widening of the carriage way, casing of of curve etc.” i) for 6-laning JJ IF NAT seetion proposed to be taken up by NH] M/S P2P Network ‘on BOT basis — a clause is to be inserted in private Limited.,will the be give assurance agreement “the permitted highway on which and Honour the licensee has been granted the right lay OFC During Laying ofe duct has also been granted as a right of way ‘concessionaire under the concession agreement for up gradation of. on Build, Operate and Transfer basis and therefore the licensee shall honor same. 3] The agreement fee oF Rs I shall be charged | Yes submitted in the form of DD. TT | Who will pay the claims for damages M/s P2P Network done/disruption in working of Concessionaire | private Limited if asked by the Concessionaire?, | TET A certificate from PD that he willenterthe | M/s P2P Network proposed permission In the register of Fecords | private Limited of the permissions In the prescribed proforma (copy enclosed) 13 | Ifany previous approval Is accorded for laying No cable line then Photocopy of register of records of permissions accorded (as maintained by PD) tobe enclosed. \ ‘Name, Designation, and Signature of the ‘The authorized representative of the applicant Boorves AAT TELANGANA {at ssamasnsone sunwamanuna Dac 28 DEC 2025, 067 PM LUCENSED STAM VENDOR faves r aun tun za ieeas™ Sour st NEFWoRKS RRVarE LIMITED eee ' ' AGREEMENT REGARDING GRANTING OF RIGHT OF WAY. PERMISSIONS FOR 1 LAYIN ILITY SEI ES ON NAL Hi i Agreement to lay Telecom Cables/OFC/ducts on both sides along NH-163, ' Hyderabad-Manneguda road from Km 17/200 to Km 40/800 in LHS & RHS across the road, for a total route length of 23600 meters in Telangana Limits, under the Jurisdiction of NHAI division, Hyderabad. ' This Agreement made this day of Month of 2023 between acting in his rapacity 5 through (hereinafter referred to the "Authority" which expression shall unlessexcluded by or repugnant to the context, include his successors in office and assignees) on the ‘one part and M/s P2P Network private Limited, a company registe 4 4 4 companies act 1956 and having its registered office at Office Unit No.125 &126 First Floor, Vardhman Premium Mall Deepali, Pitampura, Delhi Northwest-DL110034 (herein after called the "Licensee" which expression shall unless, excluded by or repugnant to the context. Include his successiorvadministrator assignees on the second part Whereas the Authority is responsible, inter all for development andmaintenance of lands in Km 23.600 of NH-163 ROW. Whereas the Licensee proposes to lay Telecom Cables/ducts etc. referred to as utility services in subsequent paras. Whereas the Licensee has applied to the Authority for permission to lay utility services from Km 17/200 to Km 40/800 in LHS & RHS across the road fora total route length of 23600 meters in Telangana Limits, under the Jurisdiction of NHAI division, Hyderabad ‘And whereas the Authority has agreed to grant such permission for way leave on the NH RoW as per the terms and conditions hereinafter mentioned. Now this agreement witnesses that in consideration of the conditions hereinafter contained and on the part of the licensee to be observed and performed, the Authority hereby grants to the Licensee. permission to lay utility services as per the approved drawing attached hereto subject to the following conditions, namely: - 4. ROW permissions are only enabling in nature. The purpose of extending the Way Leave facility on the National Highway Row is not for enhancing the scope of activity of a utility service provider, either by content or by Intent. Further, enforceability of the permissions so granted shall be restricted only to es the extent of provisions/scope of activities defined in the license agreement and for the purpose for which it is granted No licensee shall claim exclusive right on the ROW and any subsequent user will be permitted to use the ROW, either above or below, or by the side of the utilities laid by the first user, subject to technical requirements being fuffiled. Decision of the Authority in relation to fulfilment of technical requirements shall be final and binding. In case any disruption/damage caused to any existing user by the subsequent user, the Authority shall not be held accountable or liable in any manner. The Licensee shall be responsible for undertaking all activities including, but not limited to site identification, survey, design, engineering, arranging finance, project management, obtaining regulatory approvals and necessary clearances, supply of equipment, material, construction, erection, testing and ‘commissioning, maintenance and operation and all other activities essential or required for efficient functioning of their own utility/industrial Infrastructure facilities. The Licensee shall pay license fee @ Rs. /sq.m/month to the Authority. The license fee shall become payable from the date of handing over ROW land to the licensee, for laying of _utilities/cables/conduits/pipe lines for Infrastructure/service provider. As regards tariff and terms. and conditions for providing common utility ducts along National Highways, there shall be a separate agreement regime. Fee shall have to be paid in advance for the period for which permission is granted for entering into a license agreement. In case of renewal, ra S prevailing at the time of renewal shall be charged. Delay in deposition of fee shall attract interest @ 15% per annum compounded annually. Present policy of the MoRTH Is to provide a 2.00 m wide utility corridor on either side of the extreme edge of ROW. In cases where utility ducts with sufficient space are already available along NH, the utility services shall be lald in such duets subject to technical requit ments being fulfilled. The utility services shall be laid at the edge of the ROW. In case of restricted width of ROW, which may be adequate only to accommodate the carriageway, central verge, shoulders, slopes of embankments, drains, other road side fumiture etc; the utility services shall be laid beyond the toe line of the embankments and clear of the drain The Licensee shall make his own arrangement for crossing of cross drainage structure, rivers, etc. below the bed. In case this is not feasible, the utility services may be carried outside the railings/parapets and the bridge super structure. The fixing and supporting arrangement with all details shall be required to be approved in advance from the concemed Highway ‘Administration. Additional cost on account of fixing and supporting arrangement as assessed by the authority shall be payable by the licensee. In exceptional cases, where ROW is restricted the utlity services can be allowed beneath the carriageway of service road, if available, subject to the condition that the utility services be laid in concrete ducts, which will be designed to carry traffic on top. The width of the duct shall not be less than one lane. In such cases, it also needs to ensure that maintenance of the utilityservices shall not interfere with the safe and smooth flow of traffic. The cost ofoperation and maintenance will have to be borne by the licensee. 10. " 12, 13. It is to be ensured that at no time there is interference with the drainage of the road land and maintenance of National Highways. Towards this, the top of the utility services shall be at least 0.6m below the Ground Level. However, any structure above ground shall be aesthetically provided for/landscaped with required safety measures as directed by the concerned Authority. The utility services shall be permitted to cross the National Highway either through structure or conduits specially built for that purpose. The casing/conduit pipe should, as minimum, extend from drain to drain in cutsand toe of slope to toe of slope in the fills and shall be designed in accordance with provision of IRC and executed following the specifications of the Ministry. Existing drainage structures should not be allowed to carry the line across. The top of casing/conduit pipe containing the utility services to cross the road shall be at least 1.2m below the top of the sub grade or the existing ground level whichever is lower, subject to being at least 0.3m below the draininverts. A typical sketch snowing the clearances is given in Attachment-1 14, 16, 16. The utility services shall cross the National Highway preferably on a line normal to it or as nearly as practicable. The casing/conduit pipe for crossing the road may be installed under the road embankment either by boring or digging a trench. Installation by Boring method shall be preferred, In case of Trenching, the sides of the trench should be done as nearly vertical as possible. The trench width should be at least 30 cm, but not more than 60 cm. wider than the outer diameter of the pipe. Filling of the trench shall confirm to the specifications contained herein, below or as supplied by the 17. 18. Authority Bedding shall be to a depth not less than 30 cm. It shall consist of granular material, free of lumps, clods and cobbles, and graded to yield firm surface without sudden change in the bearing value. Unsuitable soil and rock edges should be excavated and replaced by selected material. The backfill shall be completed in two stages (i) Side fill to the level of the top of the pipe (i) overfill to the bottom of the Road crust. The side fill shall consist of granular material laid in 15 cm layers each consolidated by mechanical tamping and controlled addition of moisture to 95% of the proctor’s Density. Overfill shall be compacted to the same density as the material that had been removed. Consolidation by saturation or ponding will not be permitted The road crust shall be built to the same strength as the existing crust on either side of the trench or to thickness and specifications stipulated by the Highway Authority. The licensee shall ensure making good the excavated trench for laying utility services by proper filling and compaction, so as to restore the land in to the same condition as it was before digging the trench, clearing debris/loose earth produced due to execution of trenching at least 50 m away from the edge of the right of way. All required restoration works subsequent to laying of the cable shall be required to be undertaken by the licensee at its cost either by itself or through its authorized representative In consultation with the authority as per predetermined time schedule and quality standards. 6 19 20. 2 Prior to commencement of any work on the ground a Performance Bank Guarantee @ Rs. per route meter/Rs. per sq. meter with a validity of one year initially (extendable if required till satisfactory completion of work) shall have to be furnished by the licensee to the Authority/ its designated agency as a security against improper restoration of ground in terms offiling/unsatisfactory compaction damages caused to other underground installations/utility services & interference, interruption, disruption or failure caused thereof to any services etc. In case of the licensee failing to discharge the obligation of making good of the ‘excavated trench/ather restoration. work, the Authority shall have a right to make good the damages caused by excavation, at the cost of the licensee and recover the amount by forfeiture of the Bank Guarantee. In case the Performance Bank Guarantee is invoked as mentioned above, the licensee shall be required to replenish and reinstate the required Performance Bank Guarantee within one month of such Invoking. In the case work contemplated herein is not completed to the satisfaction of the Authority, which has granted the permission, within a period of 11 months from the date of issue of the Bank Guarantee, the Licensee shall either furnish a fresh guarantee or extend the guarantee for a further period of one year. Notwithstanding this, the licensee shall be liable to pay full compensation to the aggrieved Authority/its designated agency for any damage sustained by them by reason of the exercise of the ROW facility. ‘The Licensee shall shift the utility services within 90 days (or as specified by the respective authority) from the date of issue of the notice by the concerned Authority to shift/ relocate the utility services, in case it is so required for the 22. 23. 24, purpose of improvement/widening of the road/route/highway or construction of flyover/bridge and restore the road/lane to its original condition own cost and risk. The Licensee shall be responsible to ascertain from the respective agency in co-ordination with Authority, regarding the location of other utlities/underground installations/facilities etc. The licensee shall ensure the safety and security of already existing underground Installations/ utilities! facilities etc. before commencement of the excavation/using the existing cable ducts. The licensee shall procure insurance from a reputed Insurance company against damages to already existing underground installations’ utilties/facilities ete, The licensee shall be solely responsiblefiiable for full compensation’ indemnification of concemed agency/aggrieved authority for any direct, Indirect, or consequential damage caused to them/claims or replacements sought for at the cost and risk of the licensee. The concerned agency in co- ordination with authority shall also have a right to make good such damages/recover the claims by forfeiture of Bank Guarantee. If the licensee fails to comply with any condition to the satisfaction of the authority, the same shall be executed by the authority at the cost and risk of the licensee. Grant of license is subject to the licensee satisfying (a) minimum disruption of traffic and (b) no damages to the highways. As far as possible, the licensee should avoid cutting of the road for crossing highway, and other roads and try to carry out the work by trenchless technology. In case any damage is caused to the road pavement in this process, the licensee will be required to restore the road to the original condition at its cost. If due to unavoidable reasons the road Co 8 (a < na 25. 26, 27. 28, needs to be cut for crossing or laying utility services, the licensee has to execute the restoration work in a time bound manner at its cost either by itself or through its authorized representative in consultation with the authority as per predetermined time schedule and quality standards. In case of the licensee failing to discharge the obligation of making good of the excavated trench father restoration work, the authority shall have a right to make good the damages caused by excavation, at the cost of the licensee and recover the amount by forfeiture of the ‘Bank Guarantee. The licensee shall informigive a notice to the concerned agency designated by the authority at least 15 days in advance with route details prior to digging trenches for fresh or maintenance/repair works. A separate performance Bank Guarantee for maintenancelrepair works shall have to be furnished by the licensee Each day, the extent of digging the trenches should be strictly regulated so that utility services is laid and trenches filled up before the close of the work that day. Filling should be completed to the satisfaction of the concemed agency designated by the authority. ‘The licensee shall indemnify the concemed agency in co-ordination with authority, against all damages and claims, if any, due to the digging of trenches for laying cables/ducts. The permission for laying utlity services is granted maximum for 5 years at a time, which can thereafter be considered for renewal on payment of additional fee at the time of renewal, the permission shall automatically be renewed, unless defaults exist. In case of renewal, rate prevailing at the time of renewal shall be charged. Delay in deposition of fee shall attract interest @ 15% per annum compounded annually, 29, 30. 31 32 33. 34. 36. The permission shall be valid for the period it is issued and fee deposited However, the authority has a right to terminate the permission or to extend the period of agreement That the licensee shall not undertake any work of shifting, repairs or alterations to the utility services without the prior written permission/concernedagency in co-ordination with the authority. The permission granted shall not in any way be deemed to convey to the Licensee any ownership right or any interest in route/road/highway land/property other than what is herein expressly granted. No use of NH ROWwill be permitted for any purpose other than that specified in the Agreement. During the subsistence of this Agreement, the utility services located in highway land /property shall be deemed to have been constructed and continued only by the consent and permission of the Authority so that the rightof the Licensee to the use thereof shall net become absolute and indefeasible by lapse of time. The Licensee shall bear the Stamp Duty charged on this Agreement. Three copies of ‘as laid drawings of utilities (hard and soft copies) with geotagged photographs and geotagged video recordings of laying of cables in the trench (with respect to the NH) and after complete restoration shall be submitted to the Authority for verification and record within a month of completion of works. The Licensee shall allow free access to the site at all times to the Authorized representatives of Authority to inspect the project facilities and to investigate any matter within their authority and upon reasonable notice, shall provide 36, 37. 38. 39, functions. The utility services shall not be made operational by the licensee unless a completion certificate to the effect that the utility services has been laid in accordance with the approved specifications and drawings and trenches have been filed up to the satisfaction of the concerned agency in co-ordination with the authority has been obtained. Notwithstanding anything contained herein, this Agreement may be cancelled at any time by the Authority for breach of any condition of the same and the Licensee shall neither be entitled to any compensation for any loss caused to it by such cancellation nor shall it be absolved from any liability already incurred. The Licensee shall ensure adherence to relevant Indian standards and follow best industry practices, methods and standards for the purpose of ensuring the safe, efficient and economic design, construction, commissioning, operation, repair and maintenance of any part of the utility lines/industrial Infrastructure facilities and which practices, methods and standards shall be adjusted as necessary, to take account of: a: Operation, repair and maintenance guidelines given by the manufactures, b. The requirements of the Law, c. The physical conditions at the site, and d. The safety of operating personal and human beings. The Licensee shall have to provide safety measures Ike barricading, danger lighting and other necessary caution boards while executing the work. While laying utility services, at least one lane of road shall be kept open to traffic " 40. 41 42, atall times. In case of single lane roads, a diversion shall be constructed. If any traffic diversion works are found necessary during the working period, such diversion shall be provided at the cast of Licensee. After the termination/expiry of the agreement, the licensee shall remove the utility services within 90 days and the site shall be brought back to the original condition failing which the Licensee will lose the right to remove the utility services. However, before taking up the work of removal of utility services the Licensee shall furnish a Bank Guarantee to the Authority for a period of one year for an amount assessed by the Authority as a security for making good the excavated trench by proper filling and compaction, clearing debris, loose earth produced due to excavation of trenching at least 50 m away from the edge of the ROW ‘Any disputes in interpretation of the terms and conditions of this Agreement or their Implementation shall be referred to the redress mechanism prevailing in the Ministry and the decision of the redress mechanism shall be final and binding on all For PPP projects, in case of any financial loss incurred by the respective project concessionaires due to such laying/ shifting of utility services by the Licensee, compensation for the same shall be required to be borne by the Licensee in mutual agreement with the respective project concessionaires. MORTH/ NH/ Implementing authorities for the project shall not be liable to the concessionaire in any way in this regard. ‘This Agreement has been made in duplicate, each on a Stamp Paper. Each party to this Agreement has retained one stamped copy each. 12 IN WITNESS WHEREOF THE PARTIES HERETO HAVE CAUSED THIS AGREEMENT TO BE EXECUTED THROUGH THEIR RESPECTIVE AUTHORISED REPRESENTATIVES THE DAY AND THE YEAR FIRST ABOVE WRITTEN. SIGNED, SEALED AND DELIVERED BY FOR AND ON BEHALF OF AUTHORITY BY SHRI (Signature, Name and address with Stamp) SIGNED ON BEHAD BY SHRI YVRK.SASTRY (Signature, Name and address with Stamp) P2P Network Private Limited SIGNED ON BEHALF OF M/S. P2P NETWORK PRIVATE LIMTIED. HOLDER OF GENERAL POWER OF ATORNEY DATED EXECUTED IN ACCORDANCE WITH THE RESOLUTION NO DATED, PASSED BY THE MEETING HELD. IN THE PRESENCE OF (WITNESSES): 13 oozes uyssson peoy | goot/2vun'ose/t vreoort lewmose/erun‘ooe/crs| taj M20 80n4"4LON yea may wendens 1ed200) —wonaya, | “PasouEW new unions Ueuy2e peqesopii Sc wun 0014 8H sa coe /z¥'w 0 suite wo ‘aieaig SpOMIAN d O om (se/t6'0H 0006/42" won2esp swou un adeup layeyouopredsuy| woursaide yo | ywouooite ssaippe pewoy prepueis 1s aoyiesyo punt [pes pue voqwas| — Suyseanuy | (un mj aBeueyP) voneoey Pe yeq_ | pequo> pue asuany jo use | Prmare com] weumewa pease rea) sosmoniesiea | em poe asua2q 9 2ueN ganna 40 9p 14820997 est HN “aqwon Hi rn ‘Aouad o 268, eueduei. ‘yes 0 owe {ves pue ns Arono 205 Aayesodas poutensew 94 0) 590 BONE 0} PIVOTS VORSIITT KENTON Ny 2eynD4ID AsIUIW 09 eunsopua] [oroz-r1-z2 paea ‘9u'@S/St0z/6z/vp0EE-HN/MU'ON'S 1 2% i eS INviAte) a TINDIAINONBUDICIAI Boor ATT TELANGANA ‘ran id 254228155013652931 Date 28 DEC 2023, 00:88 PM Perched ‘Le, No. 16020172014 WRK SASTRY Reno, 1602882023 SioY VISHWANATHIAM 2.2.4071674C E Colony Bagh RoUNIT HO. 125,126 IST FLOOR VARDHMAN PREMIUM MALL, DEEPALI,PITAMPURA, DELI ‘Amberpet Hyderabad NORTHWEST -DL 11003 PRossr0Tsios PAP NETWERKS PRIVATE LIMITED UNDERTAKING i wg P2P Network Private Limited having its Regd. Ofice located at, Unit No.125 &126 Fir8t Floor, Vardhman Premium Mall Deepali, Pitampura, Delhi Northwest-DL110034, ing laying of Optical Fiber cables from Km. 17/200 to Km 40/800 and across optical Fiber Km. 17/200 to Km 40/800 on Hyderabad the road at d-Manneguda section of -Nbf-163 road for length of 23600 meters, We hereby Undertake the Standard Conditions of the NH Guidelines: Not to Damage to Other Utility, if damaged then to pay the losses either to NH or to the concerned agency: Regarding the location of other cables, underground installationvutities etc., the M/S P2P Networks Private Limited Shall be responsible to ascertain from the respective agency in coordination with NHAI. The M/S P2P Network Private Limited shall ensure-the safety and i ‘security of already existing cables/underground installatiog!! CNities etc. before the commencement of the excavation. i é 4 P yi 2. Renewal of Bank Guarantee: The M/S P2P Network Private Limited shall furnish a Bank Guarantee @ Rs___ per running meter to the NH, for a period of one year initially (extendable if till satisfactory completion of work) as a security for req ensuring/making good the excavated trench for laying the cables/ducts by proper filling and compaction, clearing debris/loose earth produced due to execution of trenching at least 50m away from the edge of the right of way. No payment shall be payable by the NH to the M/S P2PNetwork Private Limited for clearing debris/loose earth, In case the work contemplated herewith is not completed to the satisfaction of the NH, which has granted the permission, within a period of 1 months from the date of issue of the bank guarantee, the M/S Jio Digital Fibre Private Limited shall either furnish a fresh guarantee or extend the guarantee for a further period of one year. In case of the M/S P2P Network Private Limited failing to discharge the obligation of making good the excavated trench, the NH shall have a right to make good the damages caused by excavation, at the cost of the M/S Jio Digital Fibre Private Limited and recover the amount by invoking the bank guarantee furnished by the M/S P2P Network Private Limited 3. Confirming all standard conditions of NH: i. The period of validity of Way permission shall be co-terminus with the validity licensee given by the Ministry of Communications / DoT. ji, The cable shall be laid at the edge of the right of way within 2m utility corridors, iii, The top of the casing conduit pipe containing the cables shall be at least 1.60m below the surface of the road subject to being at least 0.3m below the drain inverts, iv. The licensee has to cross the NH by horizontal driling method (trenchless technology only). In case any damage is caused to the road pavement in this process, the M/S P2P Network Private Limited will be required to restore the same to the original condition at his own cost. v. _ Existing CD works shall not be allowed for laying HDD method only. The OFC and shall be crossed by vi. No trenching will be done no link road, boring method will be used the link road and cable will be laid at the extreme edge of the road ni the non-BT surface only. vii vill. xi xii xiv. xv, The licensee shall informigive a notice to the NH, Govt. of India or its authorized agency at least 15 days in advance with route details prior to digging trenches for fresh or maintenance/repair work. A separate work pl performance Bank Guarantee @Rs100/- per meter length for maintenance/ repair work shall have to be furnished by the M/S P2P Network Private Limited. Each day, the extent of digging the trenches should be strictly regulated so that cables are laid and trenches filled up before the close of the work that day. Filing should be completed to the satisfaction of the concerned agency designated by the ‘The Licensee shall indemnify the concerned agency in co-ordination with NH, against all damages and claims, if any, due to the digging of trenches for laying cables/ducts. The NH has a right to terminate the permission or to extend the period of agreement. In case the M/S P2P Network Private Limited wants shifting, repairs, or alteration to telecom cables/ducts, he will have to furnish a separate bank guarantee The Licensee shall not without prior permission in writing from the NH Govt. of India or its authorized agency undertake any work of shifting, repairs or alterations to the said telecom cables/ducts. The permission granted shall not in any way be deemed to convey to the M/S P2P Network Private Limited any ownership right or any interest in route/road/highway/ land/ property, other than what is herein expressly granted. During the subsistence of this agreement, the laying telecom cables/ducts located in highway land/property shall be deemed to have been constructed and continued only by the consent and permission of the NH so that the right of the M/S P2P Network Private Limited to the use thereof shall not become absolute and indefeasible by laps of time. The M/S P2P Network Private Limited shall bear the stamp duty charged for the agreement, The telecom cables shalh not be brought in to use by the M/S P2P Network Private Limited unless a completion certificate to the effect that the laying telecom cables/ducts has been laid in accordance with the approved specifications and drawings and the trenches have been filled up to the satisfactions of the concemed agency in co-ordination with the owner has been obtained ] s200 ana sad foot ra xsat2u sno Joon fneL = pasnwars 999 SNEED AALS dhquiy “Tapes Tony aaqweseAD Weg SpUeMIOFeS -/ood'9'€2 ‘Su = wnowy saruerenS, 10000 ‘189k 5 105284 95402 ‘LGELTCT Tezoz vorbe Pave 181N221>- ‘aad s@ -7000'02 “54 JO wnnunyuyu wor] ee {suo | wawsia | woumrou | wewenu | OcésTLST ess 5? = aan Sa oa ee [evosseat | testtse ore ‘Oo ORrE a0 ‘ose a | ©9% sete Tprmeweqeury| €STHN = ra GORING PEqRIDPAA IVHN J0PUN SAWOOBET sae 0 POW or un voras epndouuentpeqeophH v0 008/0¥ 0: WH ODL /LT WOH 230) aaRD 9 ENO 10 uate 105 vorssiied yo BunuesB sop jesodoug O1ewHEy 95807 PUET was _Methodology of OFC Laying Methods + Open Trench inchide Manual sed tachine trenching + Tench less technology by torigonta Oiectional Oring (HOD) Method © Crossings OpenTrench F There will be centinuous digging following a single line in open trench, The depth of trench will be 1.65M in the normal soll condition. Open trench wil be carted out manually and with ‘machine. Cross section of the trench s attached herewith. Trench wil be in ROW limits and willbe marked with lime powder to keep it straight. Trench will be barricaded with the safety ‘ans es shown in the annerure drawing. This method wit be used wherever normal sit is avaliable for open trench. Trench will be laid clear of Drains, service roads, Truck Lay bays ‘ond Bus Bays where ever existing on the High ways “Teeneh Profi Bottom of trench shall be uniform and shall follow ground contour/protile. In areas with, steep siope, trench profile shall be such that bottom of trench shall nt have more than 23, egree gradient with horizontal (.. aiference between two acjacent depth readings at a distance of one meter shal! not be more than 250 nn). Prior to Installation of the duc, the {wench shall be checked to ensure the minimum depth requirements ‘Backing Backfiling shall be done with well eompacted Granular material after ensuring soft materiat adding. Adequate dry compaction shall be done before Crowning. Compaction shal be done in layers of 15 em each. The trench shall be filed up to the required height 0! .2m measured trom top of ducts 2s per Trench cross-section drawing attached in the prepasal) ‘and a 0.2mm thick high density polyethylene warning tape shall be placed above the ducts elor to further backfiling. A crown of 250mm shall be made at the top of the backfilled {trench to eater for soll setiement. No surplus sol shall be left outske trench. Entice srea shall be restored ond debris removed and disposed of! in 2 safe manner and In line with, ‘requirements of the authority havine lrlsdictlon over the area e e Methodology of OFC Laying Installation of OFC Ducts by Trendhless Techniques (e.g. beHDD) For the process of HOD excavation of only 2 pits each of standard sie 1.5K0.5XL,65M fs ‘equired which Is called Entry pit and ext pit. Pit size may vary based on the ste condition. ‘The first stage drils a pilot hole on the designed path, and the second stage (rearing) flanges the hole by passing a larger cutting too! known as the reamer. The reamer ‘fometer depends on the sie ofthe duet (HOPE duct in our case) to be pulled back through the bore hole. The dil increases the diameter according to the outer diameter oF the ‘conduit and to achieve optimal production. The third stage places the Duet (3 t0 7 ducts of ‘40mm dia each) Inthe enlarged hole by way ofthe del stem: its pulled behind the reamer to allow cantering of the Ouct in the newly reamed path. Pit site may vary based on site condition. Entry and exit pts shall be dug at both ends of the segment which shall Iter on ‘become either a location for man-hole/hané hole. The éelled hele profile between entry ‘ond exit pits (except transition areas) shall be a: straight as porsibie. ‘High Ways/Roads/Rallway/Bridge Crossings Highways /Roads/rallway crossings may be crossed by trenchless technique (HDD/Mouling) nproprite / approved by the authorities (refer typeal sketches below). Molling method is, senerally not suitable for crossing width of more than 20 meters For such erossngs only HOD should be used when trenchless technique anly Is approved by authorities. A 3 & pa \SINGLE ROAD CROSSING BY MOILING / BORING | | ‘Water Body Crossing, @ _ Water bodies ane otter natural dbstnctions can be. rose by onan metas trenchless Techniques. in all cascs, installation technique shal be such that protection of HOPE ducts is fercured. Necessary protection should be provided Methodology of OFC Laying Pit size of HOD willbe 4.5K1.543.65m depth arene reser he, a Seaton on K-X Crossing of a small river or channel by HDD Crossing by Open-cut methad 1)” Open cut method is used when Installation on bridge / culvert is not availabe. This method however Is more sulted to seasonal water bodies (prone to flowing water such as malaf stream/ tiver/ canal ete) which may be completely / partially dey during installation period. This method can also be used for small water bodies where It I possiblezo divert ‘water fora short period of instalation. ji tn case there Is only one Hume pipe up to GOOmm dla used as a culvert to equalise the water level on both side of road. The duct can be lad at a min depth of 3.65 m without any protection for more than one 600mm dia and al sizes of Sox-culverts, ducts shall be Installed as clause ll bolow ~_ In ase she water body bed ts not rocky (Le, normal sll fs present) 9 tench 20 ‘below the bottom of culvert bed shall be dug out and DWC pipe of sutable size ‘be Installed Inside the trench. Incase the bed ts racky then minimum depth of trench all be 2.5 m. SOmm thick sand padding (covering highest point oa the trench bottom M ethodology of OFC Laying __ surface) shal be provided before Instaling DWC pipe. Route Markers Route markers made of RCC (1:2:4) shall be provided at a distance of every 250 meters or wherever there are crossings or major deviation In the route from being stealght. Additionally route ‘markers shall be installed on both sides of the crossing, Route markers shall also be put at duct coupler locations and man-hole and Handhole locations. Markers shall be of length 1280 mm with ‘base of 100 mm x 250 mm tapering to 100 mm x 200 mm. Name/logo of Owner shall be engraved on. the surface of marker. Aboveground surface of route marker shall be painted In Blue colour. Route: Markers placed at coupler locations shall be painted yellow. Markers placed at the mar-holes shal be ‘ainted red in colour. Owner name/logo shall be filled with fluorescent whit. ‘Man Holes/Hand holes ‘Size of Manholes made of RCC ts 1.0m dia and depth 1.1m depth. They will be placed S0Omnm below GL and willbe placed each at 1.0km distance. Note: Trenchless technology will be used (e.g: HOD) wherever available ROW ts Festricted/Built up oreas and utility corridors cannot be conveniently earmarked. Traffic Management Plan Fe Duets ae fad a the age ofthe Reh of Way sth minimum datrbance ta the Taff a taf iverson work re found necessary during the wating pera uch dco thal be Co‘erdinatedwth reapectve authorities oa the es sl te torn All construction workers and traffic marshals shall he provied high visibilty valstcoats during the ‘work for protection agalastspeeaing vehiculr trafic Caution Boards, plastic warning tapes, buerades, night lamps (Mckee lamp, tantern with ss Panted red) and watchman shall be deployed te eaution aennst the canger and to prevent any Decidents to pedestans, veel or an Caution Boards sal be set up a Height of 25 meters above Ground level 0 that they ere visible from a minimum sistance of 25 movers. oards stall have yellow and black background with Writing in bold letters with ed fluorescent pant, Boards shal be displayed at start and finish point of area in which Is warkis under progress ‘Additional dlsplay boards shall be placed on ether side of the trench. Board markings shill have the Name of Trenching Authority, Name of Englneer/Superiior of work with conta! phone number and planned date of opentng and closing Trench. ‘An Undertaking for management of trafic movement during lying a uty ne without hampering the trafic al submited alee withthe propors RO: PEN TR Compactes 21}

You might also like