0% found this document useful (0 votes)
108 views1 page

Punch List Form (Pl1)

This punch list document contains information for the replacement of the Train A&B wash water line at the QURA location. It lists the sheet number, project number, and phase. Category A items must be completed before equipment can be safely operated, while Category B items can be completed later. The punch list is then to be signed off on by the performing body, operations, and commissioning to verify completion and acceptance of the work.

Uploaded by

ahmed Abulayan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
108 views1 page

Punch List Form (Pl1)

This punch list document contains information for the replacement of the Train A&B wash water line at the QURA location. It lists the sheet number, project number, and phase. Category A items must be completed before equipment can be safely operated, while Category B items can be completed later. The punch list is then to be signed off on by the performing body, operations, and commissioning to verify completion and acceptance of the work.

Uploaded by

ahmed Abulayan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Punch List No

PUNCH LIST FORM (PL1)


PL-QURA-424-OMM-01

Sheet 1 of
SH1 No QURA-424-OMM-01 Train A&B wash water line replacement DISCIPLINE MD

MC1 No QURA-424-OMM-01 Train A&B wash water line replacement LOCATION: QURA

DMC1 No: QURA-424-OMM-01-I PHASE SH1

PUNCH LIST RAISED BY: DATE

PERFORMING BODY DATE PRINT NAME CONTRACTOR SIGNATURE COMPANY SIGNATURE

VENDOR/SUPPLIER

CONSTRUCTION

COMMISSIONING 14-6-2022 HAIDER QASIM


OPERATIONS 14-6-2022 AHMED JAWAD
ENTERED IN GOC BY

Category "A" denotes major items that shall be completed or corrected before equipment can be safely energised for commissioning, or operated by introducing fluids, and before handover is acceptable.
Category "B" denotes minor items that can be repaired, completed, or corrected at a later date, allowing equipment to be commissioned or operated without implications for operations or safety of plant and personnel.

Category Cleared by Accepted By ROO


Item No Date Tag No. Description (Should include reference to Drawing No. & Rev) Discipline Responsibility:
A or B (Initial / date) (Initial / date)