0% found this document useful (0 votes)
244 views9 pages

Phase III Tower II Flooring BOQ

The document outlines costs and specifications for finishing works like flooring, wall tiling, and other surface works for a construction project. It includes 9 items describing works like ceramic floor tiling, marble flooring, granite works, and provides quantities, rates and amounts for each.

Uploaded by

abdullah aktuğ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
244 views9 pages

Phase III Tower II Flooring BOQ

The document outlines costs and specifications for finishing works like flooring, wall tiling, and other surface works for a construction project. It includes 9 items describing works like ceramic floor tiling, marble flooring, granite works, and provides quantities, rates and amounts for each.

Uploaded by

abdullah aktuğ
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 9

Phase III (Tower II)

M/s. Kancon Projects Pvt. Ltd.


Finishing works
Unit
No. DESCRIPTION UNIT QTY Rate Amount

C FLOORING WORK

1 Handling, lifting & fixing of ceramic tiles of specified


size, approved shade and make for Flooring at all
levels & heights over a cement mortar (1:4) bed of
20 mm thickness including cutting wherever
required, laying slope whereever required,making
recesses/drops at the shower area, making Hole for
traps, pipes, comode & electric box, cladding, copla,
V groove cutting & polishing, joint filling with
pigments of matching colour including cleaning,
curing, tools complete in all respect as per drawing
and specifications and as directed and to the
satisfaction of the Project Manager (Including all but
excluding the cost of grey cement & tiles to be
issued by CMGL).

Sqm 5881 223 1311463

2 Handling, lifting & fixing of ceramic tiles of specified


size, approved shade and make for Dado at all
levels & heights over a cement mortar (1:3) bed of
15 mm thickness including cutting wherever
required, making Hole for traps, pipes, comode &
electric box, cladding, copla, V groove cutting &
polishing, joint filling with pigments of matching
colour including cleaning, curing, tools complete in
all respect as per drawing and specifications and as
directed and to the satisfaction of the Project
Manager (Including all but excluding the cost of grey
cement & tiles to be issued by CMGL).

Sqm 2750 233 640750

3 Handling, lifting & fixing of ceramic tiles of specified


size, approved shade and make for Skirting
(100mm high) at all levels & heights over a cement
mortar (1:4) bed of 12 mm thickness including
cutting wherever required, making Hole for traps,
pipes, comode & electric box, cladding, copla, V
groove cutting & polishing, joint filling with pigments
of matching colour including cleaning, curing, tools
complete in all respect as per drawing and
specifications and as directed and to the satisfaction
of the Project Manager (Including all but excluding
the cost of grey cement & tiles to be issued by
CMGL).

RM 6365 40 254600

4 Handling, lifting, cutting & laying/fixing Marble (of


approved shade) tiles & slabs at all levels in Floor
with a layer of white cement slurry over cement
mortar base (CM 1:4) of 20mm thick, finished to all
shapes (curved or straight) and filling the joints with
matching colour pigment including making Hole for
traps, pipes, comode & electric box, cladding, copla,
V groove, cutting, polishing, grinding and cleaning
with acid as per drawings, curing etc. as per
specifications and directions of the Project Manager
(Including all, but excluding the cost of grey cement
& marble).
Sqm 1500 380 570000

BOQ/Price schedule CMGL


Phase III (Tower II)
M/s. Kancon Projects Pvt. Ltd.
Finishing works
Unit
No. DESCRIPTION UNIT QTY Rate Amount
5 Handling, lifting, cutting & laying/fixing Marble (of
approved shade) tiles & slabs at all levels in
Skirting (100mm high) with a layer of white
cement slurry over cement mortar base (CM 1:4)
of 12mm thick, finished to all shapes (curved or
straight) and filling the joints with matching colour
pigment including making Hole for traps, pipes,
comode & electric box, cladding, copla, V groove,
cutting, polishing, grinding and cleaning with acid as
per drawings, curing etc. as per specifications and
directions of the Project Manager (Including all but
excluding the cost of grey cement & marble).

RM 2000 55 110000

6 Handling, lifting & fixing of ceramic & vitrified tiles of


specified size, approved shade and make for
Skirting (150mm high) at all levels & heights over
a cement mortar (1:4) bed of 12 mm thickness
including cutting wherever required, making Hole for
traps, pipes, comode & electric box, cladding, copla,
V groove cutting & polishing, pointing with pigments
of matching colour including cleaning, curing, tools
complete in all respect as per drawing and
specifications and as directed and to the satisfaction
of Project Manager (Including all but excluding the
cost of grey cement & tiles to be issued by CMGL).

RM 1148 40 45900

7 Handling, lifting & fixing of vitrified tiles of specified


size, approved shade and make for corridor floor at
all levels & heights over a cement mortar (1:4) bed
of 20 mm thickness including cutting wherever
required, making Hole for traps, pipes, comode &
electric box, cladding, copla, V groove cutting &
polishing, pointing with pigments of matching colour
including cleaning, curing, tools complete in all
respect as per drawing and specifications and as
directed & to the satisfaction of the Project Manager
(Including all but excluding the cost of grey cement
& tiles to be issued by CMGL).

SQM 1450 233 337734

8 Handling, lifting & fixing of ceramic tiles of specified


size, approved shade and make for Corridor wall
opp. lift well at all levels & heights over a cement
mortar (1:3) bed of 15 mm thickness including
cutting wherever required, making Hole for pipes,
dedectors, electric box, cladding, copla, V groove
cutting & polishing, pointing with pigments of
matching colour including cleaning, curing, tools
complete in all respect as per drawing and
specifications and as directed & to the satisfaction
of the Project Manager (Including all but excluding
the cost of grey cement & tiles to be issued by
CMGL).
Sqm 150 235 35250

BOQ/Price schedule CMGL


Phase III (Tower II)
M/s. Kancon Projects Pvt. Ltd.
Finishing works
Unit
No. DESCRIPTION UNIT QTY Rate Amount
9 Handling, lifting, cutting and laying/fixing pre-
polished Granite (of approved shade) over RCC
kitchen counter at all levels & heights, over cement
mortar base (CM 1:4) of 20mm thick, finished to all
shapes (curved or straight), making Hole for traps,
pipes, electric box, cutting openings for Kitchen
sink, Cladding, copla, V groove cutting & polishing
and filling the paper joints with matching colour
pigment, curing etc as per drawings, specifications
direction & satisfaction of the Project Manager
(Including all but excluding the cost of granite and
grey cement).

Sqm 226 385 87106

9A Handling, lifting, cutting and laying/fixing pre-


polished Granite (of approved shade) over vertical
cuddapah stone at all levels & heights, by groove
cutting in brick masonary, inserting granite min. 1",
jamming by cement mortar & fixing by araldite on
the top edge of the cudappah stone, finished to all
shapes (curved or straight), making Hole for traps,
pipes, electric box, cutting openings for Kitchen
sink, Cladding, copla, V groove cutting & polishing
and filling the paper joints with matching colour
pigment, curing etc as per drawings, specifications
direction & satisfaction of the Project Manager
(Including all but excluding the cost of granite and
grey cement).

Sq.m R.O. 385

9B Handling, lifting, cutting and laying/fixing vertical


cuddapah stone at all levels & heights as supports
for kitchen counter, by groove cutting in brick
masonary, inserting stone min. 1", jamming by
cement mortar, finished to all shapes (curved or
straight), making Hole for traps, pipes, electric box,
cutting openings for Kitchen sink, Cladding, copla, V
groove cutting & polishing and filling the paper joints
with matching colour pigment, curing etc as per
drawings, specifications direction & satisfaction of
the Project Manager (Including all but excluding the
cost of cuduppah stone and grey cement).

Sq.m R.O. 385

10 Handling, lifting and laying/fixing pre-polished


Granite (of approved shade) skirting/facia at all
levels & heights of kitchen counter, with a uniform
layer of araldite and POP on top of granite for
holding till araldite dries, finished to all shapes
(curved or straight) making Holes, Cladding, copla,
V groove cutting & polishing and filling the paper
joints with matching colour pigment as per
drawings, specifications, direction & to the
satisfaction of the Project Manager (Including all but
excluding the cost of granite).

RM 439 90 39510

BOQ/Price schedule CMGL


Phase III (Tower II)
M/s. Kancon Projects Pvt. Ltd.
Finishing works
Unit
No. DESCRIPTION UNIT QTY Rate Amount
11
Handling, lifting and laying/fixing flamed Granite (of
approved shade) at all levels & heights on vertical
surface of corridor wall, with a uniform layer of
araldite and POP on top of granite for holding till
araldite dries, finished to all shapes (curved or
straight) making Holes, Cladding, copla, V groove
cutting & polishing and filling the paper joints with
matching colour pigment, as per drawings,
specifications, direction & to the satisfaction of the
Project Manager (Including all but excluding the cost
of granite). SQM 125 400 50000

12
Handling, lifting & Fixing of door sills (Marble /
Granite / Jaisalmir Stone) of varying width from
65mm to 360mm as required in floor at all levels
with cement mortar (1:4) of 20mm thick and a layer
of white cement slurry including cutting, polishing,
curing etc. complete as per the direction of the
Project Manager, including all but excluding the cost
of cement & stone Rm 747 42 31364

13
Handling, lifting & Fixing of Kota Stone in stair case
over a cement mortar (1:4) bed of 20mm thickness
including pointing with pigments of matching colour
etc. complete as per the direction of the Project
Manager, excluding the cost of grey cement & kota
stone supplied by CMGL. Sqm 36 315 11261

14
Handling, lifting & Fixing of broken tiles in deck level
over a cement mortar (1:4) bed of 20mm thickness
including pointing with pigments of matching colour,
breaking of tiles etc. complete as per the direction of
the Project Manager, excluding the cost of grey
cement & tiles supplied by CMGL. Sqm 105 263 27615

15

Handling, lifting & Fixing of Jaisalmir Stone coping


on stair case railing over a cement mortar (1:4) bed
of 20mm thickness including pointing with pigments
of matching colour, cutting & finishing to all shapes
(curved or straight) etc. complete as per the
direction of the Project Manager, excluding the cost
of grey cement & stone supplied by CMGL. Sqm 30 263 7890

16 Providing and laying IPS flooring in stair case, deck,


ramp including finishing, with red oxide pigment as
required etc.all complete as per the directionof the
Project Manager, excluding the cost of grey cement
to be supplied by CMGL.
a) 25 mm thick Sqm 176 78 13689
b) 40 mm thick Sqm 771 87 67055
c) 50 mm thick Sqm 1050 96 100800

BOQ/Price schedule CMGL


Phase III (Tower II)
M/s. Kancon Projects Pvt. Ltd.
Finishing works
Unit
No. DESCRIPTION UNIT QTY Rate Amount
17
Providing floor protection for all kinds of flooring
works by laying polythene sheet allover the flat and
spreading plaster of paris with minimum thickness of
25mm over the sheet so as to keep it intact and on
handover removing the sheet & POP, cleaning the
flat and disposing the rubbish outside the site as per
the direction of the Project manager
a) For A, B, C type flat Flat R.O. 4000
b) For D & Duplex type flat Flat R.O. 8000
TOTAL (C) 3,741,987

D DOOR WORK / FALSE CEILING / ALUMINUM FRAMES

Handling, lifting and Fixing of main door (panelled)


made of 2nd class Teak wood having single leaf at
all levels including fixing all accessories like brass
handle on both side, door stopper, buffer, hinges,
godrej tribolt lock etc. including polishing complete,
as per the direction & to the satisfaction of the
Project Manager including supply of S.S. screws but
excluding cost of accessories & main door No 98 1060 103350

Handling, lifting & Fixing of internal flush doors of


different sizes at all levels including fixing all
accessories like hinges, buffer, cylindrical locks,
supply & application of two coats of synthetic
enamel paint (ICI/Berger/Asian Paint make) over
two coats of primer complete as per the direction of
the Project Manager, including supply of S.S. screw
but excluding cost of accessories & flush door. No 600 580 348000

3 Handling, lifting & fixing of balcony doors fully


glazed (2 shutters) of different sizes at all levels
including fixing all accessories like hinges, SS
handle, tower bolt, buffer, supply & application of
two coats of synthetic enamel paint
(ICI/Berger/Asian Paint make) over two coats of
primer complete as per the direction of the Project
Manager, including supply of S.S. screws but
excluding cost of glass, accessories & door
shutters.
No 138 620 85560

3A Handling, lifting & fixing of balcony doors fully


glazed (3 shutters) of different sizes at all levels
including fixing all accessories like hinges, SS
handle, tower bolt, buffer, supply & application of
two coats of synthetic enamel paint
(ICI/Berger/Asian Paint make) over two coats of
primer complete as per the direction of the Project
Manager, including supply of S.S. screws but
excluding cost of glass, accessories & door
shutters.
No. 35 750 26250

BOQ/Price schedule CMGL


Phase III (Tower II)
M/s. Kancon Projects Pvt. Ltd.
Finishing works
Unit
No. DESCRIPTION UNIT QTY Rate Amount
4 a Handling, lifting and Fixing of glass in balcony
shutter glazed doors at all levels including applying
putty etc. complete asper the direction of the project
manager, but excluding cost of wooden bead.
(overall area of door shutter shall be measured)
Sqm 523 80 41840

b Supply of 5mm thick clear Modi float glass including


wooden beading of good quality and same as that
of the door wood quality and to the satisfaction of
the Project Manager (overall area of door shutter Sq.m
shall be measured) . 523 350 183050

5
Handling, lifting and Fixing of fire door (flush door)
at all levels with accessories like hinges, lock, door
closure, supply & application of two coats of
synthetic enamel paint (ICI/Berger/Asian Paint
make) over two coats of primer complete, as per the
direction of the Project Manager, including supply of
S.S. screw but excluding cost of accessories & flush
door. No 34 580 19720

6
Handling, lifting and Fixing of Electrical panel door
(teak wood or marbau) at all levels with accessories
like hinges, lock, buffer, supply & application of two
coats of synthetic enamel paint (ICI/Berger/Asian
Paint make) over two coats of primer complete, as
per the direction of the Project Manager, including
supply of S.S. screw but excluding cost of
accessories & door. No 34 580 19720

7
Supplying, handling lifting and fixing of Teak wood
moulding (size 50mm x 12.5mm ) all around the
door frames including polishing at all levels &
heights as per the direction and satisfaction of the
Project Manager. (Sample of moulding to be
approved by CMGL) RM 530 88 46640

8
Supplying, handling, lifting and fixing of Badam
wood or equivalent approved moulding (size 50mm
x 12.5mm ) all around the door frames including two
coats of synthetic enamel paint over a coat of primer
at all levels and heights as per the direction &
satisfaction of the Project Manager. RM 5019 65 326219

9 Providing & fixing PHE duct covering with frame,


shutter, moulding etc. complete (9mm ply & frame
75mm X 50mm) as per the drawing and direction of
the Project Manager in "B" type flat kitchen and
Dining area (size 850mm X 600mm approx.) and
Duplex area as per site requirement with supply 7
application of 2 coats of synthetic enamel paint over
a coat of approved primer.
Nos. 40 800 32000

10 FALSE CEILING

BOQ/Price schedule CMGL


Phase III (Tower II)
M/s. Kancon Projects Pvt. Ltd.
Finishing works
Unit
No. DESCRIPTION UNIT QTY Rate Amount
10a Providing and fixing to the required profile and
shape with 12mm thick gypsum board suspended
from the RCC ceiling with 18 gauge T,U & L
galvanized sections spaced at 600 mm c/c both
ways. Entire work to be finished smooth and painted
with 2 coats of white cement primer and 2 coats of Sqm 978 590
paint of approved shade & brand. Entire work shall
be of high quality finish and shall be as per direction
& to the satisfaction of the PM

OR
10b Providing and fixing to the required profile and
shape with 12mm thick POP board suspended from
the RCC ceiling with 18 gauge T,U & L galvanized
sections spaced at 600 mm c/c both ways. Entire
work to be finished smooth and painted with 2 coats
of white cement primer and 2 coats of paint of Sqm 978 585
approved shade & brand. Entire work shall be of
high quality finish and shall be as per direction & to
the satisfaction of the PM.

OR
10c Providing and fixing to the required profile and
shape with 6mm thick E board suspended from the
RCC ceiling with 18 gauge T,U & L galvanized
sections spaced at 600 mm c/c both ways. Entire
work to be finished smooth and painted with 2 coats
of white cement primer and 2 coats of paint of Sqm 978 600 586950
approved shade & brand. Entire work shall be of
high quality finish and shall be as per direction & to
the satisfaction of the PM.

11
Supplying & Fixing of anodized aluminum frame
(Section - 2" X 1") of size 420mm X 620mm with
taper clips, 4mm thick pin head glass, in electrical
rooms including sealing the joints with silicon
sealant from outside as per the direction of the
Project Manager (sample to be approved by
CMGL). Nos 204 500 102000

12 Providing and fixing anodized aluminum frame


(section 2"X1") for approx. opening size of 700mm
X 800mm of AC cutout including supply & fixing of
4mm thick pin head opaque glass with silicon
sealant from outside for water proofing etc.
complete as per the direction of the Project
Manager and sample approved.
Nos 286 780 223275

13 Fixing of Flush Door at the entrance of flat at all


levels inlcuidng lifting on temporary basis for
security reasons with all fittings like hinge, hatch
bolt, screws etc. complete including supply as per
the direction of the EIC (Flush door to be supplied
by CMGL)
No. R.O. 240

14 Dismantling of the temporary doors, returnig the


doors to CMGL store and repairing the frames with
wooden piece and putty so as to give a smooth neat
finish before fixing the teak main door
No. R.O. 80

BOQ/Price schedule CMGL


Phase III (Tower II)
M/s. Kancon Projects Pvt. Ltd.
Finishing works
Unit
No. DESCRIPTION UNIT QTY Rate Amount
Total for Wood Work ( D) 2,144,574

BOQ/Price schedule CMGL


HILAND PARK - A PROJECT OF CALCUTTA METROPOLITAN GROUP LTD.

COMPARATIVE STATEMENT OF PACKAGES (PHASE III FINISHING)

Sr. No. Description Rahul Beria Amal Base Base Proposed Unit Kanjilal & S.K. Plaza SPCL
Mukherjee Construction Construction Co.

1 Brickwork, Plastering, Painting etc. 0 0 0 0 0 0 0 0

2a Fabrication works (Building) 3,399,805 2,724,014 2,763,947 1,983,111 2,301,718 2,120,734 1907530 2,471,219

2b Fabrication works (Lift shaft) 585,000 585,000 1,323,750 585,000 1,170,000 900,000 900,000 585,000

3 Flooring works 3,517,958 4,035,972 3,741,987 3,741,987 5,653,845 5,214,408 4,298,501 5,727,053

4 Wood Work 1,984,283 2,209,740 2,027,580 2,144,574 3,117,885 11,624,635 2,000,215 11,135,467

9,487,046 9,554,725 9,857,264 8,454,672 12,243,448 19,859,777 9,106,246 19,918,739

11,464,068 1,402,592

You might also like