District Cooling Dubai
District Cooling Dubai
GEC Ghani Workshop 3/23/2012
                    Important!
                     This session is approved for 0.2 IACET or 1.5 PDH. 
                     Many states accept this for Professional Continuing Education. 
                     To qualify for credit you must:
                      Be sure your badge was scanned when you entered the workshop
 Stay for the entire session
 Participate in Question and Answer sessions
                      Fill out the Evaluation Form and hand it to the proctor as you leave
                            out t e a uat o o a d a d t to t e p octo as you ea e
                     If you are registered in Florida, New York, or North Carolina, you must also
                     sign the sheets in the back at the end of the session.  Please print your name,
                     include your registration number, and sign the sheet. 
                          TITLE GOES HERE
                          TITLE GOES HERE
                          TITLE GOES HERE
                          TITLE GOES HERE
                          TITLE GOES HERE
                                                                                                              1
2012 GEC Ghani Workshop                                                      3/23/2012
                         Review of Practices in the District Cooling 
                         R  i    f P ti      i th Di t i t C li
                      Systems and Pumping Schemes to Manage the 
                        Impact on Energy – Burj Khalifa Case Study
                                                 Ahmed Abdul Ganhi
                                                            Chairman
                                                   Allied Consultants
                                                          Cairo, Egypt
                    Learning Objectives
                     1. Understand distribution systems reliability
                     2. Determine
                        Determine distribution system energy running 
                                  distribution system energy running
                        cost
                     3. Understand new Middle East techniques in 
                        District cooling
                                                                                    2
2012 GEC Ghani Workshop                        3/23/2012
United Arab Emirates
Dubai
                                                      3
2012 GEC Ghani Workshop                3/23/2012
Burj Khalifa
Burj Khalifa
                                              4
2012 GEC Ghani Workshop                3/23/2012
Burj Khalifa
Burj Khalifa
                                              5
2012 GEC Ghani Workshop                                                                                                             3/23/2012
                    Master Plan
                                                      DCP‐1
                                  ASHRAE check Figure            215 Sq.ft/TR           DCP
                                                                                DCP      4
                                  Connected Load                  45,700 TR      1
                                  Diversity Factor                  94 %
                                                                                                          DCP 4
                                                                                                          DCP‐4
                                  Plant load                      43,000 TR
                                                                                       ASHRAE check Figure        215 Sq.ft/TR
                                                                                       Connected Load              59,500 TR
                                                                                       Diversity Factor              67 %
                                      DCP‐3
                   ASHRAE check Figure                                                 Plant load                  40,000 TR
                                                 215 Sq.ft/TR
                   Connected Load                    80,700 TR
                                                                                                          DCP‐2
                   Diversity Factor                    74 %
                                                                                                      g
                                                                                       ASHRAE check Figure        215 Sq.ft/TR
                                                                                                                  215 Sq.ft/TR
                   Plant load                        60,000 TR                         Connected load              51,300 TR
                                                                                       Diversity Factor              68 %
                                      DCP                                              Plant load                  35,000 TR
                                       3
                                                                                 DCP
                                                                                  2
10
                    Master Plan
                                                                                        DCP
                                                                                DCP      4
                                                                                 1
                                      DCP
                                       3
                                                                                 DCP
                                                                                  2
11
                                                                                                                                           6
2012 GEC Ghani Workshop                                                                          3/23/2012
                    Interface with Building
                     Direct Connection                        Indirect Connection 
12
                    Direct Connection
                      Advantages                         Disadvantages
                        • More economical no              • Building design pressure 
                          HE (~ 100 $/T exchanger +          should be same as the DCS 
                          accessories).                      which could add cost to the
                                                             which could add cost to the 
                        • No water treatment at user         end user.
                          side.                           • Cross contamination that 
                        • Reduced ETS space                  could affect both systems.
                          (xxxxxxx Sq. ft /TR).           • Building specific water 
                        • Increased ΔT thus reduced          treatment may not be met 
                          distribution system capital        as treatment at central 
                          cost.                              plant.
                        • Reduced equipment 
                          R d d         i                 • Plant & network design 
                                                               l            kd
                          maintenance and potential          pressure might be affected 
                          shutdowns for HE cleaning.         by end user. 
13
                                                                                                        7
2012 GEC Ghani Workshop                                                                   3/23/2012
                    Direct Connection
                          • Decision taken
                          • ETS
                            ETS for all users except for Mall (direct connection) 
                                for all users except for Mall (direct connection)
                            owned by the Energy Provider.
• Burj indirect due to static impact.
                          • Pipes
                            ‐ Pre insulated with HDPE Jackets
                            ‐ Leak detectors
14
                    Pumping Scheme
                     Primary–Secondary
15
                                                                                                 8
2012 GEC Ghani Workshop                                                         3/23/2012
                    Pumping Scheme
                     Primary–Distributed Secondary
16
                    Case Study
                     Primary–Secondary vs. Primary‐Distributed Secondary
1) Primary Secondary
17
                                                                                       9
2012 GEC Ghani Workshop                                                                                                                                                                            3/23/2012
Case Study
2) Distributed Secondary
18
                    Pressure Gradient Diagram
                     1) Primary-Secondary System – Pressure Gradient
                                                                                                PRESSURE GRADIENT
                                                                                            PRIMARY-SECONDARY SYSTEM
                                             200.000
                                                                          MAX PRESSURE:
                                                                             83 4 PSI
                                                                             83.4
                                             175.000
                                             150.000
                          SYSTEM HEAD (ft)
125.000
75.000
50.000
25.000
                                               0.000
                                                                     A
                                                                                                                                                             K
                                                                                       C
                                                                                                                                           H
                                                             1
                                                                                                                                  G
                                                                                                                         F
                                                                                                                                                                           EX
                                                                                                                                                    J
                                                   t0
                                                                                                                -2
                                                          -0
                                                                                                                                                     -
                                                                                                                          -
                                                                                                              VB
                                                                      -
                                                                                                                                                              -
                                                                                        -
                                                                                                                                            -
                                                                                                                                   -
                                                 in
                                                                                                                                                                        --H
                                                                                                                                                  ot
                                                        VB
                                                                                                                       ot
                                                                   ot
ot
ot
                                                                                                                                                           ot
                                                                                     ot
ot
                                                                                                                                         ot
                                                                                                                                ot
                                               Po
                                                                                                                                                Pl
                                                                                                                     Pl
                                                                 Pl
Pl
Pl
                                                                                                                                                         Pl
                                                                                   Pl
Pl
                                                                                                                                       Pl
                                                                                                                              Pl
                                                                                                                                                                     ---
                                                                                                                                                                  K-
STATIONS
19
                                                                                                                                                                                                         10
2012 GEC Ghani Workshop                                                                                                                                                                                                                  3/23/2012
                    Pressure Gradient Diagram
                      2) Primary-Distributed Secondary – Pressure Gradient
                                                                                                                             PRESSURE GRADIENT
                                                                                                                         PRIMARY-DISTRIBUTED SYSTEM
                                                                     200.000
                                                                     175.000
                                                                                                                                                                 MAX PRESSURE:
                                                                                                                                                                    49.5 PSI
                                                                     150.000
                                                SYSTEM HEAD (ft)
125.000
                                                                                                                                                                                                       Supply Line
                                                                     100.000
                                                                                                                                                                                                       Return Line
                                                                                                                                                                                                       Pressure at Each Station
                                                                      75.000
50.000
25.000
                                                                          0.000
                                                                              S
                                                                                                                                                                                                  K
                                                                                                                    C
                                                                                                                                                                             H
                                                                                                                                                                G
                                                                                                                                                                                       J
                                                                                      1
                                                                                                                                                       F
                                                                                                                                             -2
                                                                            P-
-0
                                                                                                                                                                                        -
                                                                                                                                                        -
                                                                                                                                           VB
                                                                                               -
                                                                                                                                                                                                 -
                                                                                                                     -
                                                                                                                                                                              -
                                                                                                                                                                 -
                                                                                                                                                                                     ot
                                                                                  VB
                                                                          -P
                                                                                                                                                     ot
                                                                                            ot
ot
ot
                                                                                                                                                                                              ot
                                                                                                                  ot
ot
                                                                                                                                                                           ot
                                                                                                                                                              ot
                                                                                                                                                                                   Pl
                                                                                                                                                  Pl
                                                                                          Pl
Pl
Pl
                                                                                                                                                                                            Pl
                                                                                                                Pl
Pl
                                                                                                                                                                         Pl
                                                                                                                                                            Pl
                                                                       t0
                                                                     in
                                                                                                                                  STATIONS
                                                                   Po
20
                    Energy Curve of Both
                                                                                                              YEARLY POWER CONSUMPTION
                                                                                                    PRIMARY-DISTRIBUTED VERSUS PRIMARY SECONDARY
800000.00
700000.00
                                              600000.00
                     POWER CONSUMPTION (KW)
500000.00
                                                                                                                                                                                                            Primary Secondary
                                              400000.00
                                                                                                                                                                                                            Distributed Secondary
300000.00
                                              200000 00
                                              200000.00
                     P
100000.00
                                                                   0.00
                                                                          1        2           3            4            5         6        7           8            9            10         11       12
                                                                                                                                  MONTHS
21
                                                                                                                                                                                                                                               11
2012 GEC Ghani Workshop                                                                                           3/23/2012
                    Energy Saving Table
                                             System   Primary  Secondary    Primary Distributed Secondary 
                          Months                                (KW)                       (KW)
                          January                         114830.54                   55911.45
                          February                        145975 33
                                                          145975.33                   71075 98
                                                                                      71075.98
                          March                           306453.67                  149213.53
                          April                           359681.81                  175130.52
                          May                             494584.78                  240815.33
                          June                            629377.48                  306446.44
                          July                            666851.04                  324692.46
                          August                          659807.36                  321262.87
                          September                       543639.12                  264700.08
                          October                         404525.63                  196965.16
                          November                        248761.68                  121123.06
                          December                        155666.54                   75794.67
22
                    Advantages of Selected Pumping Scheme
                     • No ΔP control valve required. Distributed pumps handle 
                       the pressure variations.
                     • Chilled water can be obtained from any plant.
23
                                                                                                                        12
2012 GEC Ghani Workshop                                                               3/23/2012
                    Advantages of Selected Pumping Scheme
                          Any supply temperature could be achieved by direct 
                          mixing as return pressure higher than supply
24
DCP Configuration
25
                                                                                            13
2012 GEC Ghani Workshop                                                                         3/23/2012
                    DCP ‐ 2
                    What are chillers arrangement configurations?
                      1) Parallel Arrangement
26
DCP ‐ 2
                      2) In-Series Arrangement
                                                         • Series chillers have better 
                                                           kw/ton
                                                           kw/ton. 
                                                         • Single path chiller with 
                                                           lower ΔP across evaporator.
                                                         • Both chillers in‐series have 
                                                           higher primary pump head
                                                           higher primary pump head.
27
                                                                                                      14
2012 GEC Ghani Workshop                                     3/23/2012
                    What Happens if Secondary is not
                    Matching Primary?
                     Fig-1: Series Arrangement
28
                    What Happens if Secondary is not
                    Matching Primary?
                     Fig-2: Parallel Arrangement
29
                                                                  15
2012 GEC Ghani Workshop                                                                                                                                                                    3/23/2012
                    Load Profile has to be Analyzed
                     Loading % in each arrangement should be computed
100.00
90.00
                                                80.00
                            ADING PERCENTAGE
70.00
60.00
50.00
                                                40.00
                          LOA
30.00
20.00
10.00
                                                 0.00
                                                        0   100   200   300   400 500   600   700   800   900 1000 1100 1200 1300 1400 1500 1600 1700 1800 1900 2000 2100 2200 2300
                                                                                                            HOURS
30
                    Load Profile has to be Analyzed
                     Hour by hour energy needs to be computed
                                   Fig-1 Inseries Arrangement
31
                                                                                                                                                                                                 16
2012 GEC Ghani Workshop                                                                    3/23/2012
                    Load Profile has to be Analyzed
                          Fig-1 Parallel Arrangement
32
                    Buffer Tank (TES)
                            May Improve the chiller KW/ton as the chillers will be 
                            loaded at all their best efficiency time, but no space
33
                                                                                                 17
2012 GEC Ghani Workshop                                                                             3/23/2012
                    Buffer Tank (TES)
                     Advantages
                        • Reduced compressor lift.
                     Disadvantages
                         • Increased chilled water pump head (two in‐series evaporators). 
                         • Increased condenser pump head (two in‐series condensers).
                         • Increased bypassed energy through decoupler.
                     Conclusion
                        • Analyze series/parallel arrangement with load profile and chiller 
                          loading percentage include pumping energy in primary and
                          loading percentage include pumping energy in primary and 
                          condenser circuits.
                        • Net results. 
                        • Shows saving if chiller staging is properly watched.
34
Chiller Arrangement of DCP‐2
• Series‐counter flow configuration
• Number of chillers original design = (2 x 2500) x 7 modules
• Number of chillers used (2 x 1250) x 14 modules
• Increased number of chillers staging
• Reduced wastage of energy through decouple
35
                                                                                                          18
2012 GEC Ghani Workshop                                                                                    3/23/2012
                    Cooling Tower Types
                     Counter Flow                                        Cross Flow
36
                    Advantages of Counter Flow
                          • Easier to maintain as water basin not restricted by wet deck.
                          • Less  space  needed  because  of  increased  efficiency  and  lack  of 
                            plenum space required for cross flow towers
                            plenum space required for cross flow towers.
                          • Longer  service  life  as  deck  supported  from  structural  supports 
                            underneath. No sagging as cross flow.
                          • Wet  deck  is  encased  on  all  sides  with  no  impact  from  direct 
                            prevailing wind.
                          • No  hot  water  basin  on  top  of  tower,  so  less  and  easy 
                            maintenance achieved.
                          • Taller in height that mean less prone to recirculation effect.
                            Taller in height that mean less prone to recirculation effect
                          • When towers are laid side by side, towers still accessible.
                          • Less pumping energy as no spray nozzles pressure.
37
                                                                                                                 19
2012 GEC Ghani Workshop                                                                                                                        3/23/2012
                    Orientation with Wind Direction
                                                        Wind
                                                        Vw
                                           Disch
                                           arge    Vd
                                                               Plume
Vp
38
Orientation with Wind Direction
39
                                                                                                                                                     20
2012 GEC Ghani Workshop                                                                              3/23/2012
For Wet Coolers
                      where:
                         Humidity is expressed in absolute units of moisture 
                         content, for example, grains of moisture per pound of air.
                         content for example grains of moisture per pound of air
40
                    For Wet Coolers
                          • Recirculation impacts design wet bulb temp
                          • CFD Modeling
                             ‐ Conducted to validate tower performance at prevailing    wind 
                               speed.d
                          • Capacity
                             ‐ Heat rejection
                             ‐ Chiller motor cooling
                             ‐ Safety
                             ‐ Design wet bulb temp. considering recirculation
                          • Pump NPSH
                             ‐ NPSHA > NPSH
                                         NPSHR
                               Hs + Ha ‐ Hf ‐ Hv > NPSHR
                             ‐ Found safe
                             ‐ Other tools to overcome NPSH issues
41
                                                                                                           21
2012 GEC Ghani Workshop                                                              3/23/2012
For Wet Coolers
                            • Sand storm & development construction 
                              activity dust
                                     y
                              ‐ Cooling tower dirt removal
                                 • Sweeper systems
                                 • Side stream filtration
                            • Ozone
                              • Issues & concerns of ozone
                                                    f
                              • Corrosion of steel parts (chiller marine box)
42
                    Other Points Considered
                          • Network air venting & dirt removal
                              p              p p
                          • Impact of air on pump 
43
                                                                                           22
2012 GEC Ghani Workshop                                                                                  3/23/2012
                    Other Points Considered
                      Gas venting (oxygen + nitrogen)
                          • Source 
                             ‐ Air dissolved in make up water: used up by the initial corrosion.
‐ Air trapped in the system after initial filling: proper air venting
• Large bore vent to pass air bubble Surface tension breaker
44
Other Points Considered
Diffusion: Expansion Tanks
                                   • Air ingress due to negative pressure: expansion tank 
                                     pressure should be maintained.
45
                                                                                                               23
2012 GEC Ghani Workshop                                                                                                           3/23/2012
                    Other Points Considered
                          • Air vents                                                                          (1.64 ft/s)
                          • Air & dirt separators
                            Ai & di
Water speed versus removal time – ascending flow
(3.28 ft/s)
                                                                                                   (2.46 ft/s)
                                                                                                 (1.64 ft/s)
Water speed versus removal time – horizontal pipe
46
Other Points Considered
Baffle Separator
Centrifugal Separator
Wire Mesh Separator
47
                                                                                                                                        24
2012 GEC Ghani Workshop                                                                        3/23/2012
Plant Configuration
Plant Arch Configuration
• Plant foot print 200 x 200 ft (60 x 60 mt)
• Chillers foot print 0.75 Sq. ft/T (0.07 Sq.m/T)
• Heat rejection required area 0.43 Sq.ft/T (0.04 Sq.m/T)
                            • Electrical work required area  0.54 Sq.ft/T (0.05 Sq.m/T)
                              Electrical work required area 0 54 Sq ft/T (0 05 Sq m/T)
• Pumps require area 0.32 Sq. ft/T (0.03 Sq.m/T)
48
Plant Configuration
                             Basement:     Pumps + water tank
                                           Height 7 mt
                             Ground:       Chiller Hall + Electrical + Expansion
                                           Height 9 mt
                                           Crane
                             Mezzanine:    Offices + Control Room
                                           Isolation from structure via vibration matt.
Roof: Cooling Tower
49
                                                                                                     25
2012 GEC Ghani Workshop                        3/23/2012
DCP‐2 Plant Section
50
DCP‐2 Photo
51
                                                     26
2012 GEC Ghani Workshop                                                                        3/23/2012
                    District Cooling Plant‐1
                            • First large size district plant with Ice storage
                                p y
                            • Capacity   43000 TR
• Foot print 200 x 200 ft (60 x 60 m)
• Piles completed with no basement
                            • Challenges
                              ‐ Foot print not adequate for heat rejection equipment 
                                Foot print not adequate for heat rejection equipment
                                 (200 x 200 ft)
                              ‐ No basement available 
                              ‐ No space for chillers at ground floor
52
                    District Cooling Plant‐1
                          • Mall design Temp differs from Burj
                            ‐ ΔT 16oF ( 8.8oC)
                              Supply 42oF(5.5oC)
                            ‐ Supply 42
• Temp Challenge due to 5 stages with cascaded ETS
56oF
37oF
53
                                                                                                     27
2012 GEC Ghani Workshop                                                                       3/23/2012
                    District Cooling Plant‐1
                          Solution
                           • Thermal storage 
                             ‐ No sufficient land for chilled storage 0.3 ‐ 0 6 m3/Thr
                               No sufficient land for chilled storage 0 3 ‐ 0.6 m
                                                      o
                             ‐ Low temp below 39.4 F so chilled storage not possible
                               due to density change.
• Ice storage technique 0.07‐ 0.08 m3/Thr
• Tank on ground and up to 1st floor
• As tank occupied the ground, chillers moved to 1st floor
• Electric platform elevator 40 T on capacity (4.5 M US $)
54
                    District Cooling Plant‐1
                    • Condenser pump on 1st floor
                    • NPSHA not sufficient 
                            not sufficient
• Proposed NPSH diffuser
                    • CT on roof elevated by 2 mt
                               f l      db 2
55
                                                                                                    28
2012 GEC Ghani Workshop                                                                                       3/23/2012
District Cooling Plant‐1
• Low Supply Temp Chillers
                          • Load achieved through:‐
                            ‐ Low temp chillers as base load to operate at 
                              37oF (20,000 TR ).
                            ‐ Glycol chillers to produce ice and operate at 
                              peak load via glycol heat exchangers (15,000 
                              TR).
                                 )
                            ‐ Heat exchangers between tank water and 
                              chilled water (7,000 TR ).
56
                    District Cooling Plant‐1
                                                                               Ice Storage
                                                                                Discharging Mode
                              Glycol Chillers
                              Ice Storage                  Glycol Chillers
                                                           Chilling Mode
                                                                                                                    29
2012 GEC Ghani Workshop                        3/23/2012
Flow Diagram
58
DCP‐1 Plant Section
59
                                                     30
2012 GEC Ghani Workshop                                                                      3/23/2012
                    DCP‐1 Plant Section
                    Challenges
                      • Dirt impact on glycol chiller tube heat 
                        transfer Manual cleaning is required
                        transfer.  Manual cleaning is required 
                        to maintain capacity.
                      • Automatic tube cleaning was used 
                        with brushes + diverting valve + 
                        controller to clean tubes 4 times /Day.
60
DCP‐1 Plant Section
                              ATB System Valve
                              Automatically reverses flow 
                              for 30 sec every six hours
ATB System Control
61
                                                                                                   31
2012 GEC Ghani Workshop                        3/23/2012
DCP‐1 Plant Section
62
DCP‐1 Plant Section
63
                                                     32
2012 GEC Ghani Workshop                                                                                    3/23/2012
                     REMEMBER TO FILL OUT AND TURN IN THE EVALUATION FORM
                      Reminder:  If you are registered in Florida, New York, or North Carolina, 
                      you must also sign the sheets in the back at the end of the session.  Please 
                      print your name, include your registration number, and sign the sheet. 
64
33