Profile of
PT. WTM
Member of asad group indonesia
PT. Wadungmas Tambang Mulia
Office : WISMA PONDOK INDAH 2th FLOOR
Jl. Sultan Iskandar muda South Jakarta - 12770
A COAL MINING PROJECT
The 1st Block reserve 550 Mio MT with SR 1 : 4
Total 21.000 Ha - Agreement Area
Location :
AT KUTAI RESIDENCE
EAST KALIMANTAN
APRIL - 2017
LOCATION WTM
PT. WTM
EAST KALIMANTAN
Project Area
LOCATION WTM
Access to site:
Jakarta-Balikpapan by Air Plane 2 Hrs
Balikpapan – kutai 1 hrs ,to Mine Site
by Land Transport 2 Hours
HAULING / LOADING PORT WTM
DIRECTTO M.VESSEL
HOULING DIRECT
TO OPEN SEA -/+ 67
KM / COAL
TERMINAL
HOULING DIRECTTO OPEN SEA /MOTHER VESSEL -/+ 67 KM / COAL TERMINAL -
UP TO 120.000 MTON – LOADING PORT.
HAULING / LOADING PORT WTM
DIRECT TO M.VESSEL
HOULING DIRECT
TO OPEN SEA -/+ 67
KM / COAL
TERMINAL
HOULING DIRECT TO OPEN SEA /MOTHER VESSEL -/+ 67 KM / COAL TERMINAL -
UP TO 120.000 MTON – LOADING PORT.
OPTION 2 :
HAULING / LOADING PORT WTM TO JETTY/ BARGE
HOULING TO
BARGE 250
FET -/+ 5 KM
HOULING TO BARGE 250 FET -/+ 5 KM TRANSHIPMENT TO OPEN SEA -/+ 150
KM TO M.VESSEL
OPTION 2 :
HAULING / LOADING PORT WTM TO JETTY/ BARGE
HOULING TO
BARGE 250
FET -/+ 5 KM
HOULING TO BARGE 250 FET -/+ 5 KM TRANSHIPMENT TO OPEN SEA -/+ 150
KM TO M.VESSEL
COAL TERMINAL AT KUTAI
M VESSEL
MAP CONSESSION PT. WTM
PT. KPC
MAP CONSESSION WTM
LEGALITY WTM
1. Decree of the Minister of Investment Affairs / Head of Investment Coordinating Board
Number: 198 / A.1 / 1999 dated 30 April 1999 on the text of PKP2B (Coal Mining
Working Agreement) in the framework of domestic investment (PMDN) with
prospective third-generation contractors.
2. Decree of the Minister of Mining and Energy of the Republic of Indonesia, Directorate
General of General Mining No. 1451 / 20.01 / DJP / K / 98 dated July 1, 1998,
concerning approval in principle of application of Coal Mining Employers Working
Agreement (PKP2B) on behalf of PT. Wadungmas Tambang Mulia.
3. Letter of Information from Muara Wahau Sub-District Head Number: 24-2009 / 59 / IX /
1998 on the result of village benhes announcement / consultation with coal
exploration on behalf of PT Wadungmas Tambang Mulia.
4. IUPK (SPECIAL MINING BUSINESS PERMISSIONS/IJIN USAHA PERTAMBANGAN
KHUSUS) WILL COMPLETE THIS MONTH.
5. The majority shareholder is Mr. Lilik Sutrisno As’ad Muslim Chairman of PT. Asad
Resources Indonesia ( asad group Indonesia )
COAL QUALITY
The 1st Block reserve 550 Mio MT with SR 1 : 4
The estimated reserves are approximately 1,260,664,950, the inferred reserves are the reserves of the coal seams
With a reserve of approximately 655 million tonnes. Reserved reserves are the amount of coal reserves
With a more detailed calculation results obtained by 605,664,950 tons, while the measured reserves
With the amount of 556,462,643 tons.
The detailed scheme of results and the method of calculating coal resource reserves are listed in the following table:
Measured Reserves Calculation
1st Block
Seam Dip Wide Thicknes Large Volume BJ Weight
(o) (m) (m) (m2) (m3) (kg/m3) (ton)
#1 6 129,77 13,56 96.290.348 136.532.613 1.400 191.145.658
#2 6 112,96 11,81 86.454.715 106.724.706 1.400 149.914.589
#3 6 124,35 13,00 71.470.724 97.109.226 1.400 97.109.226
#4 6 54,21 5,67 60.066.781 35.577.900 1.400 49.809.060
#5 6 43,93 4,59 44.855.010 21.528.872 1.400 30.140.421
397.473.317 556.462.643
MAP OF CONCESSION WTM
PT KPC
RESERVE - STRIPING RATIO 1 :4
The 1st Block reserve 550 Mio MT with SR 1 : 4
SOME OF EXPLORATION DATA
SOME OF EXPLORATION DATA
Jetty Location Plan
The current situation
at Jetty Location Plan
Very nice for a port/ Jetty, close from mining area.
ROM Stockpile
Plan Area
Existing road at Palm trees plantation
The Hauling road will develop with 20 meters wide from mine site to Stock ROM Jetty –
with arround 5 kms, see at Map.
A Coal terminal, at EAST KUTAI
This Coal terminal can be used for Mother Vessel up to 120.000 m ton, with
depth of water 50.6 m, at Makasar Sea Loading rate 5000 t/hr, fully
mechanized operation.
PRODUCTION PLAN
1st 3 months will produce 100,000 up to 300,000
MT/month.
2nd 3 months production increase up to 400,000 MT/month
and then will produce 400.000 MT/month in year 2017
The year of 2018 Production Plan will produce 500,000 MT
The year of 2019 up to 2025 will up to 600,000 MT/ month
Reserve estimation in this area is around 550 Millions MT,
exploration program will continue during mining.
THANK YOU