0% found this document useful (0 votes)
58 views14 pages

INFRA Prasan Sukan

1. The document provides details of the roof construction for Block Semi D, including measurements and areas for roof trusses, roof tiles, hip/ridge capping, valleys, fascia boards, and gutters. 2. It also includes two other projects - one for Prasarana Sukan involving measurements for top soil, earth filling, and turfing. The other is for SMK Serting with similar elements. 3. The last section includes an empty table for external wall elements, potentially for future input of measurements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
58 views14 pages

INFRA Prasan Sukan

1. The document provides details of the roof construction for Block Semi D, including measurements and areas for roof trusses, roof tiles, hip/ridge capping, valleys, fascia boards, and gutters. 2. It also includes two other projects - one for Prasarana Sukan involving measurements for top soil, earth filling, and turfing. The other is for SMK Serting with similar elements. 3. The last section includes an empty table for external wall elements, potentially for future input of measurements.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 14

PROJECT : AYER BALOI

BLOCK : SEMI D
ELEMENT : ROOF
TAKER : ACAP
DATE :

ROOF CONSTRUCTION 25 degree =0.9063

1 Roof trusses 25 degree M2


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
roof
3.65 1.07 3.89 0.9063 1 2 Area A 8.58
12.20 12.10 147.62 0.9063 1 2 Area B 325.76
9.60 1.80 17.28 0.9063 1 2 Area C 38.13
TOTAL 372.48

2 Covering roof tiles m2


D1 D2 D3 SubTotal Conversion Tm1 Tm2 Annotation Total

same item 1 372.48

TOTAL 372.48

3 Hip/Ridge caping M
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
8.50 8.50 0.9063 2 2 hip 37.52
9.80 9.80 0.9063 1 2 hip 21.63
1.30 1.30 0.9063 1 2 hip 2.87
2.50 2.50 1 2 ridge 5.00
2.70 2.70 1 2 ridge 5.40
5.40 5.40 1 1 ridge 5.40

TOTAL 77.81

4 valley M
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
7.70 7.70 0.9063 1 2 16.99
8.60 8.60 0.9063 1 2 18.98

TOTAL 35.97

5 fascia board - 225mm x 25mm thick wrot pressure treated 'grade B' M
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
roof
32.80 32.80 1 2 65.60
8.03 8.03 0.9063 1 2 14.56
TOTAL 80.16

6 Gutter M
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
roof
4.40 4.40 1 2 8.80
0.00
TOTAL 8.80
PROJECT : PRASARANA SUKAN
BLOCK : SMK NYALAS
ELEMENT :
TAKER : ACAP
DATE :

1 TOP SOIL
D1 D2 D3 SubTotal Conversion Tm1 Tm2 Annotation Total
Ground floor M3
20.00 100.00 2,000.00 1 1 2000.00
101.00 113.00 11,413.00 1 1 11413.00
52.50 30.00 1,575.00 1 1 1575.00
18.50 60.00 1,110.00 1 1 1110.00

TOTAL 16098.00

2 EARTH FILLING
D1 D2 D3 SubTotal Conversion Tm1 Tm2 Annotation Total
Ground floor M3
20.00 100.00 0.15 300.00 1 1 300.00
101.00 113.00 0.15 1,711.95 1 1 1711.95
52.50 30.00 0.15 236.25 1 1 236.25
18.50 60.00 0.15 166.50 1 1 166.50
DDT
71.00 105.00 0.15 1,118.25 1 1 1118.25

TOTAL 1296.45

3 TURFING
D1 D2 D3 SubTotal Conversion Tm1 Tm2 Annotation Total
Ground floor M3
20.00 100.00 2,000.00 1 1 2000.00
101.00 113.00 11,413.00 1 1 11413.00
52.50 30.00 1,575.00 1 1 1575.00
18.50 60.00 1,110.00 1 1 1110.00
DDT
71.00 105.00 7,455.00 1 1 7455.00

TOTAL 8643.00
PROJECT : PRASARANA SUKAN
BLOCK : SMK SERTING
ELEMENT :
TAKER : ACAP
DATE :

1 TOP SOIL
D1 D2 D3 SubTotal Conversion Tm1 Tm2 Annotation Total
Ground floor M3
150.00 135.00 20,250.00 1 1 20250.00
85.00 150.00 12,750.00 1 1 12750.00
41.00 22.00 902.00 1 1 902.00

TOTAL 33902.00

2 EARTH FILLING
D1 D2 D3 SubTotal Conversion Tm1 Tm2 Annotation Total
Ground floor M3
150.00 135.00 0.15 3,037.50 1 1 3037.50
85.00 150.00 0.15 1,912.50 1 1 1912.50
41.00 22.00 0.15 135.30 1 1 135.30
DDT
150.00 71.00 0.15 1,597.50 1 1 1597.50

TOTAL 3487.80

3 TURFING
D1 D2 D3 SubTotal Conversion Tm1 Tm2 Annotation Total
Ground floor M3
150.00 135.00 20,250.00 1 1 20250.00
85.00 150.00 12,750.00 1 1 12750.00
41.00 22.00 902.00 1 1 902.00
DDT
150.00 71.00 10,650.00 1 1 10650.00

TOTAL 23252.00
PROJECT :
BLOCK :
ELEMENT : EXTERNAL WALL
TAKER :
DATE :

1 standard brickwall m2
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor
- 0.00
- 0.00
1st Floor
DDT
- D1 0.00
-
TOTAL 0.00

2 standard brick wall to parapet wall m2


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor
- 0.00
- 0.00
1st Floor
DDT
- D1 0.00

TOTAL 0.00

3 Precast concrete m2
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor
- 0.00
- 0.00
1st Floor
DDT
- D1 0.00

TOTAL 0.00

4 DPC 115mm wide


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor M
- 1 1 0.00
- 1 1 1st Floor 0.00
DDT
- 1 1 0.00
- 1 1 0.00

TOTAL 0.00

5 Bonding tie
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor M
- 1 1 0.00
- - 1 1 1st Floor 0.00
- DDT
- 1 1 0.00
- 1 1 0.00
TOTAL 0.00

6 Coping M
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor
- 1 1 0.00
- - 1 1 1st Floor 0.00
- DDT
- 1 1 0.00
- 1 1 0.00

TOTAL 0.00

7 groove line M
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total

Ground floor
- 1 1 front 0.00
- 1 1 side 0.00
- 1 1 rear 0.00

TOTAL 0.00

8 ventilation block M
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total

Ground floor
- 1 1 front 0.00
- 1 1 side 0.00
- 1 1 rear 0.00

TOTAL 0.00
PROJECT :
BLOCK :
ELEMENT : INTERNAL WALL
TAKER :
DATE :

1 standard brickwall m2
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor
- 0.00
- 0.00
1st Floor
DDT
- D1 0.00
-
TOTAL 0.00

3 Precast concrete m2
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor
- 0.00
- 0.00
1st Floor
DDT
- D1 0.00

TOTAL 0.00

4 DPC 115mm wide m


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor
- 1 1 0.00
- 1 1 1st Floor 0.00
DDT
- 1 1 0.00
- 1 1 0.00

TOTAL 0.00

5 Bonding tie m
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor
- 1 1 0.00
- 1 1 1st Floor 0.00
DDT
- 1 1 0.00
- 1 1 0.00

TOTAL 0.00
PROJECT : ayer baloi
BLOCK : semi D
ELEMENT : WINDOW / DOOR / SANITARY SCHEDULE
TAKER : acap
DATE :

WINDOW

1 Lintol (125mm x 225mm high) M


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total

2.10 2.10 1 3 W1 6.30


1.50 1.50 1 2 W2 3.00
0.90 - 0.90 1 2 W3 1.80

TOTAL 11.10

2 window coping
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
11.70 11.70 1 2 23.40

23.40

WINDOW SCHEDULE

TYPE BRONZE ANODISED ALUMINIUM


GLASS SLIDING TOP HUNG
W1 W2 W3
SIZE 1800X1650 1200X1650 600X600

No 6 4 4
DOOR

1 Lintol (125mm x 225mm high) M


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total

1.80 1.80 1 2 D1 3.60


1.20 1.20 1 6 D2 7.20
1.20 1.20 1 4 D3 4.80
1.05 1.05 1 4 D4 4.20
2.10 - 2.10 1 2 SL1 4.20

TOTAL 24.00

2 150mm high Heelstone NO


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total

2 2 1 2 D4 4

TOTAL 4

DOOR SCHEDULE

TYPE ZINCANNEALED METAL BRONZE ANODISED ALUMN


DOUBLE LEAF /
SINGLE LEAF / FLUSH DOOR SLIDING DOOR
TIMBER DOOR
D2 D3 D4 D1 / PANEL DOOR SL1
SIZE 2100X900 2100X900 2100X750 2200X1500 2100X1800

No 6 4 4 2 2

IRONMONGERY FOR DOOR

RUBBER DOOR DOOR


TYPE LOCK SET BUTT HINGES BOLT
STOPPER HANDLE CLOSER
D1 2 12 4 2 2 2
D2 6 18 6
D3 4 12 4
D4 4 12
SL1
TOTAL 16 54 4 12 2 2
3 Paint to door surface M2
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total

2.10 0.90 1.89 1 6 d2 11.34


2.10 0.90 1.89 1 4 d3 7.56
2.10 0.75 1.58 1 4 d4 6.30
2.20 1.50 3.30 1 2 d1 6.60
TOTAL 31.80

4 Paint to door frame M


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total

5.10 5.10 1 6 d2 30.60


5.10 5.10 1 4 d3 20.40
4.95 4.95 1 4 d4 19.80
5.90 5.90 1 2 d1 11.80
6.90 6.90 1 2 SL1 13.80
TOTAL 96.40

SANITARY SCHEDULE

WC TAP BASIN TRAP SHOWER SOAP MIRROR TISSUE


HOLDER HOLDER
BILIK AIR 1 2 2 2 2 2 2 2 2
BILIK AIR 2 2 2 2 2 2 2 2 2

TOTAL 4 4 4 4 4 4 4 4
PROJECT :
BLOCK :
ELEMENT : WALL FINISHES
TAKER :
DATE :

INTERNAL FINISHES

1 ceramic wall tiles


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
EXTERNAL WALL
Ground Floor
- - 1 1 0.00
- - 1 1 0.00

INTERNAL WALL
Ground Floor
- 1 1 0.00

DDT
- 1 1 W2 0.00
- 1 2 D3 0.00

TOTAL 0.00

2 19mm Plaster &painted to wall

L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total


EXTERNAL WALL
Ground Floor
- - 1 1 0.00
- 1 1 0.00

EXTERNAL WALL
Grd floor
- 1 2 D3 0.00
- 1 3 D2 0.00
- 1 1 D1 0.00

INTERNAL WALL
Ground Floor
- 2 1 0.00
- 2 1 0.00
- 2 1 0.00

INTERNAL WALL
ground floor

- 2 1 0.00
- 2 1 0.00

DDT FOR CERAMIC 0.00

0.00

3 Precast concrete m2
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor
- 0.00
- 0.00
1st Floor
DDT
- D1 0.00

TOTAL 0.00

EXTERNAL FINISHES
1 painted
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total

6.27 3.10 - 19.42 1 2 1,6/a-e 38.85


10.67 3.10 - 33.07 1 1 a/1-6 33.07
10.67 1.90 - 20.27 0.5 1 a/1-6 10.13
3.20 0.70 - 2.24 1 1 e-c (above roof) 2.24
1.30 0.70 - 0.91 1 1 4-3 (above roof) 0.91
0.70 0.80 0.56 0.5 1 4-3 (above roof) 0.28

DDT
0.90 2.40 2.16 1 1 D1 2.16
0.90 2.10 1.89 1 1 D4 1.89
1.20 1.50 1.80 1 4 W1 7.20
1.20 1.50 1.80 1 2 W2 3.60
0.60 0.45 0.27 1 1 W3 0.27
0.60 0.45 0.27 1 1 W4 0.27

TOTAL 70.09

2 19mm Plaster &painted to parapet wall m2


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor
- 0.00
- 0.00
1st Floor
DDT
- D1 0.00

TOTAL 0.00

3 19mm Plaster &painted precast concrete m2


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor
- 0.00
- 0.00
- 1st Floor 0.00
DDT
- D1 0.00

TOTAL 0.00

4 19mm Plaster &painted Coping


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
Ground Floor M
- 1 1 0.00
- - 1 1 1st Floor 0.00
- DDT
- 1 1 0.00
- 1 1 0.00

TOTAL 0.00
5 paint to groove line
L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total
M
Ground floor
8.15 8.15 1 1 front 8.15
19.20 19.20 1 1 side 19.20
8.20 8.20 1 1 rear 8.20

TOTAL 35.55

6 paint to ventilation block M


L W D/H SubTotal Conversion Tm1 Tm2 Annotation Total

Ground floor
- 1 1 front 0.00
- 1 1 side 0.00
- 1 1 rear 0.00

TOTAL 0.00
PROJECT : ayer baloi
BLOCK : semi D
ELEMENT : CEILING FINISHES
TAKER : acap
DATE :

INTERNAL FINISHES

1 1200 x 600mm UAC cellulose fibre cement board


D1 D2 D3 SubTotal Conversion Tm1 Tm2 Annotation Total
Ground floor

2.70 1.80 4.86 1 2 bilik air 1 9.72


6.90 4.80 33.12 1 2 ruang tamu/mkn 66.24
4.50 3.30 14.85 1 2 dapur 29.70
1.80 1.80 3.24 1 2 bilik air 2 6.48
3.00 2.10 6.30 1 2 ruang jemuran 12.60
6.70 3.60 24.12 1 2 bilik tidur 2&3 48.24
4.90 1.80 8.82 1 2 17.64
4.30 4.80 20.64 1 2 bilik tidur 1 41.28
1.50 2.10 3.15 1 2 utiliti 6.30

TOTAL 238.20

EXTERNAL FINISHES

1 1200 x 600mm x 3mm thk UAC cellulose fibre cement board


D1 D2 D3 SubTotal Conversion Tm1 Tm2 Annotation Total
Ground floor
5.90 1.80 10.62 1 2 serambi 21.24
4.50 0.50 2.25 1 2 4.50
31.70 0.60 19.02 1 1 apron 19.02
TOTAL 44.76
PROJECT : Ayer Baloi
BLOCK : semi D
ELEMENT : SUNDRIES
TAKER : acap
DATE :

1 Counter top
M2
D1 D2 D3 SubTotal Conversion Tm1 Tm2 Annotation Total
Grd Floor
0.60 1.40 0.84 2 2 3.36

TOTAL 3.36