VRW & VBR (LABOUR)= AMOUNT TO BE ADDED OR DEDUCTED FROM IPC NO.
02
RW/BR =VALUE OF
THE COMPLETION
WORK DONE FOR
PL % OF LABOUR
ROAD WORK (2)
SCHEDULE H(1)
OTHER WORKS
COMPONENT
OF A STAGE
FOLLOWING
RESPECTIVE
UNDER THE
ITEMS OF
MONTH
SR
BILL NO DATE DISCRIPTION L0 L1 (L1-L0)/L0 VRW & VBR (LABOUR) REMARKS
NO
(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l)
- 20 121.1 122.20 0.009 - EW/GSB/ Other works.
V1= VRW & VBR (LABOUR) = - 20 121.1 122.20 0.009 - Bituminous Work.
AMOUNT TO BE ADDED OR - 20 121.1 122.20 0.009 - Cement Concrete Pavement.
1 IPC-1 30-06-2022 Feb-22
DEDUCTED FROM IPC DUE TO
- 15 121.1 122.20 0.009 - Culvert, Minor Bridges And Other Structure.
CHANGE IN COST OF LABOUR
56,59,85,339.00 15 121.1 122.20 0.009 6,49,468.18 Major Bridge And Structures
- 20 121.1 125.10 0.033 - EW/GSB/ Other works.
V1= VRW & VBR (LABOUR) = - 20 121.1 125.10 0.033 - Bituminous Work.
AMOUNT TO BE ADDED OR - 20 121.1 125.10 0.033 - Cement Concrete Pavement.
1 IPC-2 31-08-2022 Apr-22
DEDUCTED FROM IPC DUE TO
92,36,972.00 15 121.1 125.10 0.033 38,864.56 Culvert, Minor Bridges And Other Structure.
CHANGE IN COST OF LABOUR
19,56,04,115.00 15 121.1 125.10 0.033 8,23,004.31 Major Bridge And Structures
Page 1 of 1