This document contains details of the value of road works (VRW) and value of bridge works (VBR) that are to be added or deducted from two interim payment certificates (IPC) due to changes in the cost of labor. For IPC No. 02 in February 2022, Rs. 6,49,468.18 is to be added for major bridges and structures. For IPC No. 02 in April 2022, Rs. 38,864.56 is to be added for culverts and minor bridges, and Rs. 8,23,004.31 is to be added for major bridges and structures due to an increase in the labor cost.

Uploaded by

Ajay sai kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views1 page

Esc - 2

This document contains details of the value of road works (VRW) and value of bridge works (VBR) that are to be added or deducted from two interim payment certificates (IPC) due to changes in the cost of labor. For IPC No. 02 in February 2022, Rs. 6,49,468.18 is to be added for major bridges and structures. For IPC No. 02 in April 2022, Rs. 38,864.56 is to be added for culverts and minor bridges, and Rs. 8,23,004.31 is to be added for major bridges and structures due to an increase in the labor cost.

Uploaded by

Ajay sai kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

VRW & VBR (LABOUR)= AMOUNT TO BE ADDED OR DEDUCTED FROM IPC NO.

02

RW/BR =VALUE OF

THE COMPLETION
WORK DONE FOR

PL % OF LABOUR
ROAD WORK (2)
SCHEDULE H(1)

OTHER WORKS

COMPONENT
OF A STAGE

FOLLOWING
RESPECTIVE

UNDER THE

ITEMS OF
MONTH
SR
BILL NO DATE DISCRIPTION L0 L1 (L1-L0)/L0 VRW & VBR (LABOUR) REMARKS
NO

(a) (b) (c) (d) (e) (f) (g) (h) (i) (j) (k) (l)
- 20 121.1 122.20 0.009 - EW/GSB/ Other works.

V1= VRW & VBR (LABOUR) = - 20 121.1 122.20 0.009 - Bituminous Work.
AMOUNT TO BE ADDED OR - 20 121.1 122.20 0.009 - Cement Concrete Pavement.
1 IPC-1 30-06-2022 Feb-22
DEDUCTED FROM IPC DUE TO
- 15 121.1 122.20 0.009 - Culvert, Minor Bridges And Other Structure.
CHANGE IN COST OF LABOUR

56,59,85,339.00 15 121.1 122.20 0.009 6,49,468.18 Major Bridge And Structures

- 20 121.1 125.10 0.033 - EW/GSB/ Other works.

V1= VRW & VBR (LABOUR) = - 20 121.1 125.10 0.033 - Bituminous Work.
AMOUNT TO BE ADDED OR - 20 121.1 125.10 0.033 - Cement Concrete Pavement.
1 IPC-2 31-08-2022 Apr-22
DEDUCTED FROM IPC DUE TO
92,36,972.00 15 121.1 125.10 0.033 38,864.56 Culvert, Minor Bridges And Other Structure.
CHANGE IN COST OF LABOUR

19,56,04,115.00 15 121.1 125.10 0.033 8,23,004.31 Major Bridge And Structures