0% found this document useful (0 votes)
106 views1 page

Container Damage and Repair Report

This document is an equipment interchange receipt for an ECGYE10 container. It provides details about the container such as the provider, vessel name, port of origin/destination, and inspection notes. The inspection found issues with the seal bottle and noted that an inspection of the box and machine was missing. No repairs were required based on the status notes and empty line items.

Uploaded by

Ordonjog Julio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
106 views1 page

Container Damage and Repair Report

This document is an equipment interchange receipt for an ECGYE10 container. It provides details about the container such as the provider, vessel name, port of origin/destination, and inspection notes. The inspection found issues with the seal bottle and noted that an inspection of the box and machine was missing. No repairs were required based on the status notes and empty line items.

Uploaded by

Ordonjog Julio
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

EQUIPMENT INTERCHANGE RECEIPT

DEPOSITO FN1-ECGYE10 EIR NUMBER 0


PREFIJO NUMERO PROVIDER GROSS TARA ISO CODE SEAL BOTTLE IN OUT

1400 15000 X
VESSEL NAME VOYAGE SIZE PORT OF ORIGIN / DESTINATION TEMPERATURE SEAL No

BUXHARMONY
DATE HOUR TRUCK PLATE TATC STATUS ML LT DATE MANUFACTURE

GDZ0501
DENT A D N T LOOSE L L O S DCL GUIDELINES NOT OBSERVED I I C
BROKEN B B R K DOOR OR CONTAMINATED O C T M OTHER IMPROPER REPAIRS I O T
CL/T CR TEAR C C U T DIRTY N D T Y POOR STRAIGHTENNIG I S T
BENTED D B N T CARGO DEBRIS OR DUNAGE P D E B POOR SURFACE PREPARATION PAINTING I P N
MISSING F M I S OIL STAIN S O I L POOR WELDING I W L
HOLE H H O L STIFF PR FROZEN T S T F WRONG MATERIAL THICKNESS PROFILE I M A

STATUS SI NO
COIL CONDENSOR X
COMPRESOR X
PLUG X
CABLE X
MICRO X
PUERTA PANEL X

LINE LOCATION TYPE DAMAGE COPONENT AND REPAIR METHOD SIZE OF REPAIR UNIT QTY MAT

01

02

03

04

05

06

07

08

09

10

11

12

13

14

15

16

17

18

SEAL (PLASTICO) SEAL BOTTLE KIT SEAL VENT

FIRMA DESPACHADOR CUSTOMER REPRESENTATIVE

Yard Administrator RECEIVER / DELIVERER FINAL CONDITION

FALTA INSPECCIÓN DE CAJA Y MÁQUINA

You might also like