CONST OF MISC.
CIVIL WORK FOR CRM
PROJECTS.
INSPECTION & TEST PLAN FOR INCOMING MATERIAL INSPECTION
DOCUMENT NO. : PISL/QA-QC/AM/NS/HAZ/ITP-01 Rev. No. 00 P a g e 1 of 2
AM/NS Records to be
S.No ACTIVITY submitted/ Format
PISL
CAT 1 CAT2 CAT 3 No.
A Document Checking
1 Check whether vendor/ source is approved WC HP HP HP TRF-1
2 Availability of QAP/ ITP duly approved by TPIA WC RW RW RW TRF-1
Availability of MTC/IRN (Availability of stage wise Inspec-
3 tion Reports/ Certificates in case of inspection by TPIA, WC HP HP RW TRF-1
Inspection Reports of Contractor)
4 Availability of certificates from statutory bodies, if appli-
WC HP RW RW
cable TRF-1
5 Delivery challan/ LR WC RW RW - TRF-1
B Physical Verification
1 Checking for Inspection stamp/ Identification mark WC W W S TRF-1
2 Correlation of MTC w.r.t. Heat nos./ Batch no./ Lot no. WC HP W W TRF-1
3 Physical assessment of Quantity WC S S - TRF-1
4 Certification of condition of material WC W W S TRF-1
5 Sampling for field tests / tests from approved laborato-
WC W W W TRF1
ries, if applicable
C Review of field test reports/ test reports if applicable WC RW RW RW TRF-1
D Review & Endorsement on MTC/IRN/TC etc. WC HP HP HP TRF-1
E Endorsement on IMIR WC HP HP HP TRF-1
NOTES:
Sampling plan for checking of bulk items shall be as per discretion of AM/NS INDIA.
AM/NS INDIA and contractor shall jointly finalize the list of incoming materials and catego-
rize in line with inspection categorization plan for bought out items. The items not covered
in AM/NS shall be finalized by Engineer In charge.
All items to be procured from approved vendors / source as per list enclosed in the con-
tract/ approved vendor list. Prior approval for the source / vendor to be taken for items not
listed in the contract / approved vendor list.
CONST OF MISC. CIVIL WORK FOR CRM
PROJECTS.
INSPECTION & TEST PLAN FOR INCOMING MATERIAL INSPECTION
DOCUMENT NO. : PISL/QA-QC/AM/NS/HAZ/ITP-01 Rev. No. 00 P a g e 2 of 2
Anodization / galvanization shall be ensured in shops having proven track record and sam-
ples are to be tested to check galvanizing / anodizing prior to dispatch to sites.
CAT 1 CRITICAL: The materials requiring long time impact to meet the stipulation of end user.
Completely engineered and inspected as per the contract.
CAT 2 MAJOR: The materials requiring lesser time impact on end user. Specified to Industry stan-
dards, lower design category (not fully reviewed of detailed Engg. but all interfaces
checked) and with complete compliance with code, however requiring limited in-
spection.
CAT 3 MINOR: Standard items, fit for the purpose with minimal Engg. review .
Legends:
S-Surveillance, HP-Hold Point, W-Witness Point, Rw-Review of Contractor’s Document, WC-100%
Examined by Contractor
00 25-06-2023 Issued for Review
& Approval
Rev Date Description Prepared By Checked By Reviewed & Approved By
PISL PISL AM/NS