Carpentry

The document contains production rates and crew sizes for various formwork and shuttering tasks. It lists the type of formwork or shuttering work, crew size required which typically includes 2 carpenters and 1 helper, and the hourly and 12 hour production rates in square meters. It also includes standard productivity rates for different concrete works in man-days per square meter.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
269 views4 pages

Carpentry

The document contains production rates and crew sizes for various formwork and shuttering tasks. It lists the type of formwork or shuttering work, crew size required which typically includes 2 carpenters and 1 helper, and the hourly and 12 hour production rates in square meters. It also includes standard productivity rates for different concrete works in man-days per square meter.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 4

DESCRIPTION CREW SIZE Hourly Production

Production Rate Per 12 hrs.


SM
FORMWORK
Formwork to footings 2 CARPENTERS, 1 HELPER 1.2 14.4
Formwork to isolated footings 2 CARPENTERS, 1 HELPER 1.6 19.2
Formwork to rafts 2 CARPENTERS, 1 HELPER 1.4 16.8
Formwork to rafts D>0.75m 2 CARPENTERS, 1 HELPER 1.8 21.6
Formwork to tie beams 2 CARPENTERS, 1 HELPER 1 12
Formwork to high level tie beams D>0.45M 2 CARPENTERS, 1 HELPER 1.2 14.4
Formwork to Neck Columns 2 CARPENTERS, 1 HELPER 4.8
Formwork to U/G Water tank 2 CARPENTERS, 1 HELPER 7.2
Formwork to basement retaining walls 2 CARPENTERS, 1 HELPER 10.8
Formwork to columns (small size) 2 CARPENTERS, 1 HELPER 8.4
Formwork to Columns (large size) 2 CARPENTERS, 1 HELPER 10.8
Formwork to D/S beam internal (shallow) 2 CARPENTERS, 1 HELPER 7.2
Formwork to D/S beam external (Deep) 2 CARPENTERS, 1 HELPER 8.4
Formwork to D/S beam external (Shallow) 2 CARPENTERS, 1 HELPER 4.8
Formwork to D/S beam external (Deep) 2 CARPENTERS, 1 HELPER 7.2
Formwork to lift walls single core 2 CARPENTERS, 1 HELPER 7.2
Formwork to lift walls multi core 2 CARPENTERS, 1 HELPER 9.6
Formwork to slab decking (10ft) hourdi 2 CARPENTERS, 1 HELPER 1.6 19.2
Formwork to slab decking (>10ft) hourdi D/S beams 2 CARPENTERS, 1 HELPER 1.2 14.4
Formwork to slab decking (>10ft) hourdi 2 CARPENTERS, 1 HELPER 1.2 14.4
Formwork to slab decking (>10ft) hourdi 2 CARPENTERS, 1 HELPER 1 12
Formwork to staircase (non spiral) 2 CARPENTERS, 1 HELPER 4.8
Formwork to balcony parapets 2 CARPENTERS, 1 HELPER 7.2
Formwork to roof parapets 2 CARPENTERS, 1 HELPER 9.6
Formworks including Concreting of Column 2 CARPENTERS, 1 HELPER 2 Column
Formworks including Concreting of Beam 2 CARPENTERS, 1 HELPER 12m
Formworks including Concreting of Beam 2 CARPENTERS 2span
SHUTTERING
shutter Manufacture for pile caps 1 CARPENTER + 1 HELPER 2.00 24
shutter Fix for pile caps I CARPENTER + 1 HELPER 1.50 36
Deshutter footings/pile caps 1 HELPER 6.00 72
Shutter make column necks 1 CARPENTER + 1 HELPER 1.50 18
Shutter fix column necks 1 CARPENTER + 1 HELPER 1.20 14.4
Deshutter Column necks 1 HELPER 4.80 57.6
Shutter make tie beams 1 CARPENTER + 1 HELPER 1.20 14.4
shutter fix tie beams 1 CARPENTER + 1 HELPER 1.00 12
Column shutter making 1 CARPENTER + 1 HELPER 1.20 14.4
Column shutter fixing 1 CARPENTER + 1 HELPER 1.00 12
Column deshuttering 1 HELPER 4.00 48
Walls shutter making 1 CARPENTER + 1 HELPER 1.50 18
Walls shutter fixing 1 CARPENTER + 1 HELPER 0.80 96
De shutter Tie beam shutter 1 HELPER 4.00 48
Wall formwork deshuttering 1 HELPER 3.20 38.4
Staircase formwork making 1 CARPENTER + 1 HELPER 0.80 9.6
staircase formwork fixing 1 CARPENTER + 1 HELPER 0,8 9.6
Staircase formwork deshuttering 1 HELPER 1,6 19.2
Drop beams formwork making 1 CARPENTER + 1 HELPER 1.00 12
Drop beams formwork fixing 1 CARPENTER + 1 HELPER 0.80 9.6
Drop beams formwork stipping 1 HELPER 3.20 38.4
suspended slab formwork fixing 1 CARPENTER + 1 HELPER 1.20 14.4
suspended slab formwork deshutter 1 HELPER 5.00 60
Formwork fixing for sunshades 1 CARPENTER + 1 HELPER 0.70 8.4
Parapet formwork making 1 CARPENTER + 1 HELPER 1.20 14.4
Parapets formwork fixing 1 CARPENTER + 1 HELPER 1.00 12
Parapets formwork stripping 1 HELPER 4.00 48
Fixing of lintle formwork 1 CARPENTER + 1 HELPER 0.50 6
Deshutter lintle formwork 1 HELPER 2.00 24
Deck formwork fixing 1 CARPENTER + 1 HELPER 1.50 18
Deck Formwork deshuttering 1 HELPER 6.00 72
Pipe scaffolding erection for slab 1 SCAFFOLDER 0.85 102
inverted beam shutter fixing 1 CARPENTER + 1 HELPER 1.00 12
De-Shuttering Manholes, square - circular (Timber) 1 CARPENTER + 1 HELPER 4m2 48m2
Manhole Shutter erection - square or circular(Timber) 1 CARPENTER + 1 HELPER 1,5 m2 18m2
Metal Shutter for Manholes 1 CARPENTER + 1 HELPER 1m2 12m2
Metal Shutter for Precast Beams 2 CARPENTERS + 2 HELPERS 3M2 36M2
Metal Shutter for Pile caps 2 CARPENTERS + 2 HELPERS 3M2 36M2
Metal Shutters for Pile cap Beams 2 CARPENTERS + 2 HELPERS 3M 2
36M2
STANDARD PRODUCTIVITY M2
ITEM PRODUCTIVITY Man-day
Man-day/M2
Rectangular Column/Walls 0.45 2.22
Suspended Floors/Roofs 0.45 2.32
Sides & Soffits of Beams 0.5 2