This document is a cost estimate for plumbing, sanitation, and electrical work for a residential home project. It includes itemized lists of materials and labor costs for installing pipes for rainwater drainage, water supply, sanitation fixtures, floor drains, a water heater, and electrical wiring and fixtures. The total estimated cost is over 1.5 billion Indonesian rupiah. The estimate also outlines a payment schedule by construction milestone.

Uploaded by

Gahri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views2 pages

Edit Update Merged

This document is a cost estimate for plumbing, sanitation, and electrical work for a residential home project. It includes itemized lists of materials and labor costs for installing pipes for rainwater drainage, water supply, sanitation fixtures, floor drains, a water heater, and electrical wiring and fixtures. The total estimated cost is over 1.5 billion Indonesian rupiah. The estimate also outlines a payment schedule by construction milestone.

Uploaded by

Gahri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

NO URAIAN PEKERJAAN VOLUME SAT HARGA JUMLAH

- Pipa air Hujan / buang vertikal dia. 3" ex. Power/rucika D + Aksesoris 7,80 M1 55.000,00 429.000,00

- Pipa air Hujan / buang horizontal dia. 4" ex. Power / rucika D + Aksesoris 26,00 M1 80.000,00 2.080.000,00

3 Instalasi air bersih

- Pipa instalasi 3/4'' rucika AW + aksesoris ex Power (dari sumur ke water toren) 38,00 M1 40.000,00 1.520.000,00

- Pipa induk 1.25'' rucika AW dari toren ke instalasi lantai1 dan dari grountank ke toren 53,00 M1 37.000,00 1.961.000,00

- Pipa instalasi 1/2'' rucika AW dari induk ke sanitair kran 48,00 M1 35.000,00 1.680.000,00

4 Sanitair dan aksesoris

- Tenaga pasang Closet duduk 2,00 set 175.000,00 350.000,00

- Material closet beli baru 1 set (by owner / tukar nota) 1,00 set - -

- Material closet 1 pakai eksisting 1,00 set - -

- Tenaga bongkar pasang Closet jongkok area sevice 1,00 set 300.000,00 300.000,00

- Material pakai eksisting 1,00 set - -

- Tenaga pasang jet washer closet + stop kran 2,00 set 75.000,00 150.000,00

- Material jet washer beli baru (by owner / tukar nota) 2,00 unit - -

- Tenaga pasang ulang Kran + hand shower kamar mandi 2,00 set 150.000,00 300.000,00

- Material kran + handshower beli baru (by owner / tukar nota) 2,00 set - -

- Tenaga pasang Washtafel dinding + kran washtafel 2,00 set 200.000,00 400.000,00

- Beli material kran + washtafel + sifon + stop ktan + fleksible (by owner / tukar nota) 2,00 set - -

- Tenaga pasang Kitchen zink dapur kotor + kran zink 1,00 set 250.000,00 250.000,00

- Beli material zink + kran zink + afur + stop kran + fleksible (by owner / tukar nota) 1,00 set - -

- Tenaga pasang Kran air biasa 5,00 set 30.000,00 150.000,00

- Beli material Kran air biasa ex. Onda 5,00 set 100.000,00 500.000,00

5 Instalasi pemipaan anti rayap pipa 3/4'' 79,72 m1 85.000,00 6.776.200,00

6 Septictank baru 150x180x150 1,00 4.250.000,00 4.250.000,00

7 Bak kontrol 30x30x50 4,00 Bh 450.000,00 1.800.000,00

8 Pembuatan rumahan ground tank 1050 liter + seting 1,00 ls 3.900.000,00 3.900.000,00

- Material ground tank 1050 liter + aksesoris 1,00 set 2.950.000,00 2.950.000,00

9 Tenaga pasang Pompa air sedot dr grountank ke toren 1,00 ls 150.000,00 150.000,00

- Material pompa air shimitzu 128 bit 1,00 set 950.000,00 950.000,00

10 Tenaga pasang Floordrain 3,00 ls 50.000,00 150.000,00

- Material floordrain ex. Wasser 3,00 set 350.000,00 1.050.000,00

11 Instalasi air panas 1,00 unit 5.000.000,00 5.000.000,00

- Material water heater listrik ariston 100 liter 1,00 unit 6.250.000,00 6.250.000,00

- Pipa rifeng untuk air panas lantai 1 & 2 1,00 ls 10.000.000,00 10.000.000,00

SUB JUMLAH 61.338.700,00

D PEKERJAAN MEKANIK ELEKTRIK LANTAI 1

1 Pek titik lampu NYM 2 x 2.5 mm & 2 x 1.5 mm ( service dan ada tambahan ) 37,00 ttk 230.000,00 8.510.000,00

- Downlight LED 12watt 25,00 bh 185.000,00 4.625.000,00

- Lampu ceiling got 10 cm Ledd 12,00 bh 250.000,00 3.000.000,00

Pek. Instalasi Stop Kontak NYM 3 x 2.5 mm ( service dan ada tambahan ) 18,00 ttk 230.000,00 4.140.000,00

- Stop Kontak ex. Panasonic std 18,00 bh 32.000,00 576.000,00


( Rumah Tinggal Halekoa )
8
NO URAIAN PEKERJAAN VOLUME SAT HARGA JUMLAH

REKAPITULASI PEKERJAAN

1 PEKERJAAN PERSIAPAN SEBELUM PEMBANGUNAN 2.311.164,00


2 PEKERJAAN STRUKTUR LANTAI 1 444.167.291,59
3 PEKERJAAN STRUKTUR LANTAI 2 112.895.605,17
4 PEKERJAAN PENUTUP ATAP 103.008.757,50
5 PEKERJAAN ARSITEKTUR LANTAI 1 488.265.489,13
6 PEKERJAAN ARSITEKTUR LANTAI 2 368.249.957,50
GRAND TOTAL 1.518.898.264,88

RINCIAN PEMBAGIAN TERMIN

1 Termin ke-1 (DP): 35% - Progress pembangunan 0% 531.300.000,00

2 Termin ke-2: 20% - Progress pembangunan 40% 303.600.000,00

3 Termin ke-3: 20% - Progress pembangunan 60% 303.600.000,00

4 Termin ke-4: 20% - Progress pembangunan 80% 303.600.000,00

6 Termin ke-6: 3% - Progress pembangunan 100% 45.540.000,00

6 Termin ke-7: 2% - Setelah masa retensi 1 bulan 30.360.000,00

1.518.000.000,00
- Pekerjaan di luar yang tertera dalam Rencana Anggaran Biaya (RAB) ini akan menjadi Pekerjaan tambah kurang yang akan di tagihkan dan dikerjakan setelah di setujui kedua belah pihak.
- Spesifikasi material yang digunakan sesuai dengan yang tertulis RAB, jika terjadi perubahan spesifikasi akan dilakukan perhitungan ulang
- Material yang di sediakan oleh konsumen (BY OWNER) harus di kordinasikan dengan perencana dan dikondisikan dengan kondisi lapangan terlebih dahulu.
- Biaya tersebut diatas tidak termasuk pajak

Disetujui Cirebon, 5 September 2023

( ) ( Perencana )

( Rumah Tinggal Halekoa )