0% found this document useful (0 votes)
33 views1 page

EST2641

This document is an estimate for repair work on a Toyota Coaster. It lists 30 items needed including sensors, hoses, belts, a water pump, and labor. The total for spare parts is 3,820 AED with a 310 AED discount, for a subtotal of 3,510 AED. An additional 1,000 AED will be charged for labor, bringing the grand total for the repair work to 4,510 AED. The customer name and vehicle information are provided at the top along with the date and sheet number for the estimate.

Uploaded by

subin sujathan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
33 views1 page

EST2641

This document is an estimate for repair work on a Toyota Coaster. It lists 30 items needed including sensors, hoses, belts, a water pump, and labor. The total for spare parts is 3,820 AED with a 310 AED discount, for a subtotal of 3,510 AED. An additional 1,000 AED will be charged for labor, bringing the grand total for the repair work to 4,510 AED. The customer name and vehicle information are provided at the top along with the date and sheet number for the estimate.

Uploaded by

subin sujathan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

ESTIMATION

INDUSTRIAL AREA, STREET 17


Tel.: 44600087,44722812

SHEET NO: EST2641


CUSTOMER NAME: Al Muftah - Interiors
Car Type: TOYOTA Model: COASTER DATE: 14/Oct/2023
Regd. No: 263680 COLOR: CHASIS NO:

SL.NO DESCRIPTION QTY MRP TOTAL


1 SENSOR SPEED RH org 1 647.00 647.00
2 WATER FILLER org 1 58.00 58.00
3 HOSE org 1 24.00 24.00
4 HOSE org 1 81.00 81.00
5 HOSE org 1 74.00 74.00
6 WATER PUMP org 1 438.00 438.00
7 FAN CLUTCH org 1 562.00 562.00
8 THERMOSTAT org 1 73.00 73.00
9 GASKET org 1 14.00 14.00
10 TENSIONER org 1 658.00 658.00
11 PULLEY org 1 170.00 170.00
12 GASKET org 1 74.00 74.00
13 BELT org 1 163.00 163.00
14 SILICON TUBE org 1 184.00 184.00
15 COOLANT org 1 110.00 110.00
16 CONSUMABLE 2 25.00 50.00
17 ALTERNATOR REPAIR 1 440.00 440.00
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
SPAREPARTS 3,820.00
DISCOUNT AMOUNT 310.00
TOTAL SPAREPARTS 3,510.00
TORNA
LABOR CHARGE 1,000.00
GRAND TOTAL 4,510.00
N/A : not available

MANAGER SIGNATURE CUSTOMER SIGNATURE


NB: GRAND TOTAL MAYBE CHANGED DEPENDING ON THE SPARE PARTS AND THE ACTUAL WORK DONE

You might also like