0% found this document useful (0 votes)
23 views4 pages

L4 HNT COC Practical

The candidate is expected to complete two projects: 1) Design a network infrastructure for a company with four buildings and propose the most cost-efficient and high-throughput solution using Visio software. This includes creating a physical and logical network diagram, choosing appropriate cable types, and network devices. 2) Install and configure a Windows Server 2008 including setting up Active Directory, DNS, DHCP, creating user groups and accounts, setting access limitations, adding client computers to the domain, enabling the firewall, creating technical documentation, and sharing/printing documents.

Uploaded by

bayush
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
23 views4 pages

L4 HNT COC Practical

The candidate is expected to complete two projects: 1) Design a network infrastructure for a company with four buildings and propose the most cost-efficient and high-throughput solution using Visio software. This includes creating a physical and logical network diagram, choosing appropriate cable types, and network devices. 2) Install and configure a Windows Server 2008 including setting up Active Directory, DNS, DHCP, creating user groups and accounts, setting access limitations, adding client computers to the domain, enabling the firewall, creating technical documentation, and sharing/printing documents.

Uploaded by

bayush
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 4

LEVEL_IV

Project Information

Given the necessary materials and supplies the candidate is expected to perform
the following project:
Assessment place: Well equipped Training Centre
Project 1: - Design Network Infrastructure
Time allotted: 4:30 hrs
Task: - Given the following scenario, do according to the following
XYZ Company has four building in a compound that is in average distance of 75m
between them. Each building has two floors. Assume that in average there are 20
users per floor. The company also has a SOHO 1MB speed of internet connection
from the service provider. Here, it is expected that you should propose the cost
efficient and maximum throughput way of implementing this network.
The candidate should demonstrate the following by using Visio 2003
software
1. The physical and logical network diagram
2. The appropriate type of cable to be used
3. The appropriate cabling to be used for the network
4. The appropriate network devices required
Project 2: install and configure server 2008
Task1: installing server 2008 operating
system

1. Install Windows Server 2008 Operating System on the Server Computer

2. Establish connections among the Server and the two Clients

3. Configure the Server as a DNS and Active Directory for the Server Computer using
the HRM .local as a domain name.

4. Configure server as DHCP with range of 192.168.1.2 to 192.168.1.4

Task2:-configer the server


1. Create Groups of Computer using two group names Human recourse and Director office
and make sure that the Client Computers joined the groups.

2. Create Users and Passwords for the two Groups as follows:

A For Human recourse group, Users ( Alemu and Almaz ), Password


(Pa$$w0rd1 and Pa$$w0rd2 ) respectively.

B For Director office group, Users (Mamo and Abrehet ), Password


(Pa$$w0rd 3 and Pa$$w0rd 4) respectively.

3. Set the Access limitation time for the Human recourse group users to access the network
from Monday to Friday during lunch hour from 12:30AM to 1:30PM only.
4. Add (join) the Client Computers to the Domain HRM local.
5. Make your server secure by using Firewall

6. create technical documentation for every network devices that you use on this task

7. save the documentation on the desktop by the name documentation

8. share the document for the clients

9. print the shared document from the clients

Observation Checklist
Candidate’s Name:
Assessor’s Name:
Occupation: Hardware and Network Servicing LV_IV
Unit of Competency: 01,03,04,05,06,07
Date of Assessment:
Time of Assessment:
Instructions for the Assessor
 Observe the candidate.
 Describe the assessment activity and the date on which it was undertaken
 Place a tick in the box to show that the candidate completed each aspects of the
activity to the standard expected in the enterprise.
 Ask the candidate a selection of the questions from the attached list to confirm
his/ her underpinning knowledge.
 Place a tick in the box to show that the candidate answered the questions
correctly.
 Complete the feedback sections of the form.
OBSERVATION
During the demonstration of skills, did the candidate: Yes No
Project 1:- Design Network Infrastructure
Task:- Given the following scenario, do according to the following
 Design the physical and logical network diagram as much
 
similar as the given diagram (See the Diagram)
8/21/2010

Physical and Logical Diagram


Subtitle

Service Provider

UTP_Straight through
Router

UTP_CrossOver UTP_CrossOver
UTP_CrossOver
UTP_CrossOver Distribute Switch
Building1

Access Switch

Access Switch

UTP_CrossOver

Access Switch
Access Switch
UTP_CrossOver

Building_2
Access Switch Building_3
Access Switch

 Choice the appropriate type of cable to be used  


 Show the appropriate cabling (Straight through, Cross over)  
 Set the appropriate network devices  
Project 2:- Server Configuration and Administration
Task 1:- installing server 2008 operating system
 Connect peripheral devices to the Server and Client
 
Computers
 Install Operating Systems on the Server  
 Install the appropriate drivers for the required devices  
 Establish the Network Connectivity among the clients and
 
the Server
 Configure the Active directory and correctly  
 Configure the DNS correctly  
 Configure the DHCP correctly  
Task 2 configure the server
 Create the Groups
 Create Users with in the groups  
 Set the access time limit for users as specified correctly  
 Configure the client computers to join the Domain  
 Turn on the Windows Firewall for the Server Computer  
 create technical documentation for every network devices
 
that you use on this task
 save the documentation on the desktop by the name
 
documentation
 share the document for the clients  
 print the shared document from the clients  
The candidate’s underpinning Skill was:
Satisfactory  Not satisfactory 

You might also like