Production Shift Report

The document is a production summary for a manufacturing plant in December 2012. It shows: 1. The monthly turnover was Rs. 7,20,000 and the daily production target was Rs. 15,770. 2. There were multiple production lines with different components being manufactured across two shifts each day. 3. Production data is provided for each line including shots per shift, production quantity, rejections, etc. along with notes on any downtime causes. 4. The total monthly production was 60,000 pieces with a rejection rate of 3,276 pieces and overall achievement of 99.46%.

Uploaded by

Krishna Dwivedi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
38 views24 pages

Production Shift Report

The document is a production summary for a manufacturing plant in December 2012. It shows: 1. The monthly turnover was Rs. 7,20,000 and the daily production target was Rs. 15,770. 2. There were multiple production lines with different components being manufactured across two shifts each day. 3. Production data is provided for each line including shots per shift, production quantity, rejections, etc. along with notes on any downtime causes. 4. The total monthly production was 60,000 pieces with a rejection rate of 3,276 pieces and overall achievement of 99.46%.

Uploaded by

Krishna Dwivedi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 24

December -2012 Monthly Turnover : 7,20,000 Per Day:15770 M/C - 1 180T

B/D TIME SUM


Sr. Shot / Prodn. OK Shot Achved
No.
Shift Operator Name Componant
Shift Shot
Rejn.
Shots Rate
Plan
Amount TOTAL TOTAL Remarks
B/D
1 D Jitendar,Daya Advik Trial - 260 (T1) 1200 350 18 333 11930 0
N Naresh,Jaydev FCB KVTO M11 - M12 1200 250 13 238 11.02 11930 2617
Naresh,Jaydev RVB KPLA M24 - M25 300 15 285 11.04 11930 3146
2 D Jitendar,Daya RVB KPLA M22 - M23 550 28 523 11.04 15770 5768 5.30 Bhatti bolt broke -2hrs,coil fuse broke - 3:30mins
N Sachin,Jaydev RVB KPLA M22 - M23 1450 73 1378 11.04 15770 15208 3.00 Return bolt slip - 25min,M23 ball pin broke, flash cleaned,M22 flash problem
3 D Digamber,Jitendar RVB KPLA M22 - M23 1450 73 1378 11.04 15770 15208
N Sachin,Jaydev RVB KPLA M22 - M23 1300 65 1235 11.04 15770 13634 2.00 Angle pin broke by day person, Piston change -2,M23 ball pin broke
4 D Jitendar,Digamber RVB KPLA M22 - M23 1200 1600 80 1520 11.04 15770 16781 0.50 Metal problem - 30mins off,Piston change -1
N Sachin,Naresh RVB KPLA M22 - M23 1200 1600 80 1520 11.04 15770 16781 2.00 M23 tapping pin broke, Piston change -2times,bhatti metal problem
5 D Digamber,Jitendar RVB KPLA M22 - M23 1200 1200 60 1140 11.04 15770 12586
D Digamber,Jitendar KPHO STAR M5 - M12 1200 400 20 380 30.08 15770 11430
N Sachin,Jaydev KPHO STAR M5 - M12 1200 2350 118 2233 14.08 15770 31434 0.10 Piston change - 2 times
6 D Digamber,Jitendar KPHO STAR M5 - M12 1200 2450 123 2328 14.08 15770 32771 Piston change -2 times, compressor problem - 30mins,nitrogen bottle oil poblem - 30mins
0.06
N Naresh,Jaydev KPHO STAR M5 - M12 1200 2350 118 2233 14.08 15770 31434 Piston change -1times
7 D Weekly Off
N Weekly Off
8 D Weekly Off
N Digamber,Jitendar KPHO STAR M5 - M12 1200 2600 130 2470 14.08 15770 34778
9 D Ajay,Jaydev
Machine Off - No
KPHO STAR M5 - M12 1200 1600 80 1520 14.08 15770 21402
N Operator
Machine Off - No
10 D Operator
N Digamber,Jitendar KPHO STAR M5 - M12 1200 1200 60 1140 14.08 15770 16051
11 D Sachin,Jaydev KPHO STAR M5 - M12 1200 1900 95 1805 14.08 15770 25414
N Digamber,Jitendar KPHO STAR M5 - M12 1200 2400 120 2280 14.08 15770 32102
12 D Sachin,Jaydev KPHO STAR M5 - M12 1200 2350 118 2233 14.08 15770 31434
N Jitendar KPHO STAR M5 - M12 1200 1600 80 1520 14.08 15770 21402
13 D Sachin,Jaydev KPHO STAR M5 - M12 1200 2150 108 2043 14.08 15770 28758
N Digamber KPHO STAR M5 - M12 1200 2400 120 2280 14.08 15770 32102
14 D Weekly Off
N Weekly Off
15 D Digamber,Jitendar KPHO STAR M5 - M12 1200 3050 153 2898 14.08 15770 40797
N Sachin,Jaydev KPHO STAR M5 - M12 1200 1800 90 1710 14.08 15770 24077
16 D Digamber,Sachin RVB KTCO (MM) 1200 100 5 95 15770 0
D Digamber,Sachin FCB KVTO M13 - M14 25 1 24 0
N Sachin,Jaydev FCB NCV M8 - M9 1200 900 45 855 15770 0
17 D Digamber,Jitendar FCB NCV M8 - M9 1200 1300 65 1235 15770 0
N Sachin,Jaydev FCB NCV M8 - M9 1200 1200 60 1140 15770 0
18 D Digamber Advik Trial - 160 (T2) 1200 100 5 95 15770 0
D Digamber FCB A73 M1 - M2 1200 60 1140 0
N Sachin,Jaydev FCB A73 M1 - M2 1200 1800 90 1710 15770 0
19 D Digamber,Jitendar FCB A73 M1 - M2 1200 2000 100 1900 15770 0
N Sachin,Jaydev Spaco 51 1200 1500 75 1425 16 15770 22800
20 D Digamber,Jitendar Spaco 51 1200 1300 65 1235 16 15770 19760
N Sachin,Jaydev Spaco 51 1200 1500 75 1425 16 15770 22800 0.17 Bhatti problem, Soldering observed many times
21 D Weekly Off 1200 0 0 15770 0
N Weekly Off 1200 0 0 15770 0
22 D Sachin,Jaydev Spaco 51 1200 1700 85 1615 15770 0 2.00 Die polished as soldering observed, Pin change
N Digamber Spaco 51 1200 1400 70 1330 15770 0 1.00 Oil removed from nitrogen bottle, ejector jam problem, m/c off for dinner - 30mins
23 D Sachin,Jaydev Spaco 51 1200 600 30 570 15770 0 0.50 soldering observed so polished, fix side wedge broke - 2:15mins
D Sachin,Jaydev DT KTEO M5 - M8 1200 550 28 523 15770 0
N Digamber,Jitendar DT KTEO M5 - M8 1200 1300 65 1235 15770 0
24 D Sachin,Jaydev RVB KTCO M10 - M11 1200 250 13 238 15770 0
N Digamber,Jitendar RVB KTCO M10 - M11 1200 1200 60 1140 15770 0 0.15 M10 cavity fix side pin broken
25 D Sachin,Ashok RVB KTCO M10 - M11 1200 1200 60 1140 15770 0 0.50 Cooling added on fix side,packing inserted in M11 core, Piston change -2
N Digamber,Jitendar RVB KTCO M10 - M11 1200 1600 80 1520 15770 0 0.25 Piston change -2
26 D Sachin,Ashok
Machine off - Tiebar
RVB KTCO M10 - M11 1200 1400 70 1330 15770 0
N broke 1200 0 0 15770 0
27 D 1200 0 0 15770 0
N Digamber,Jitendar RVB KPLA M22 - M23 1200 750 38 713 15770 0 2.00 Fix side pin broke - 4 times so 1 cavity die run
28 N 1200 0 0 15770 0
D 1200 0 0 15770 0
29 N 1200 0 0 15770 0
D 1200 0 0 15770 0
30 N 1200 0 0 15770 0
D 1200 0 0 15770 0
31 N 1200 0 0 15770 0
60000 65525 3276 62249 374.54 855830 582474 19.53 0
FCB KTPO M3,M4
December - 2012 Monthly Turnover : 6,20,000 Per Day:11930 M/C - 2 80T
B/D TIME SUM
Shot / Prodn. OK Shot Achved
Date Shift Operator Name Componant
Shift Shot
Rejn.
Shots Rate
Plan
Amount TOTAL
TOTAL
Remarks
B/D
1 D Shrawan,Gorakh BBS BD 06 M4 - M5 1500 1900 95 1805 12.68 11930 22887 0:00 Ejector Pin change,M5 side core pin change,Piston change -1
44570
N Sitaram,Ajat BBS BD 06 M4 - M5 1500 1800 90 1710 12.68 11930 21683 3:36 Piston change -1
2 D Gorakh BBS BD 06 M4 - M5 1500 1850 93 1758 12.68 11930 22285 1.00 M12cavity core pin broke,Fix side pin broke -45mins
33729
N Ajay BBS BD 06 M4 - M5 1500 950 48 903 12.68 11930 11444
3 D Daya,Gorakh BBS NCV M10 - M12 1500 1400 70 1330 12.68 11930 16864 1.30 All core pin polish - 35mins,Catching marks observed so core put in casting soda
37766
N Ajay,Naresh KSPO DT M9 - M12 1500 950 48 903 23.16 11930 20902 Retorn bolt getting loose
4 D Gorakh,Daya KSPO DT M9 - M12 1500 2200 110 2090 23.16 11930 48404
86908
N Ajay KSPO DT M9 - M12 1500 1750 88 1663 23.16 11930 38504
5 D Daya,Gorakh KSPO DT M9 - M12 1500 1350 68 1283 23.16 11930 29703 2.00 Water leakage from piston rod,2.50 pin NOGO issue fix side unloaded and correction done
77007
N Naresh,Ajay KSPO DT M9 - M12 1500 2150 108 2043 23.16 11930 47304 1.15 Piston change -1,Fix side unloaded by day person -1hroff
6 D Daya,Gorakh KSPO DT M9 - M12 1500 2150 108 2043 23.16 11930 47304 0.30 Compressor problem - 30mins,crucible break
47304
N Machine Off - No Operator
7 D Weekly Off
N Weekly Off
8 D Machine Off - No Operator
30803
N Gorakh KSPO DT M9 - M12 1500 1100 55 1045 23.16 11930 24202 0.15
9 D Naresh KSPO DT M9 - M12 1500 300 15 285 23.16 11930 6601
D Naresh KSPO DT M9 - M12 1500 900 45 855 23.16 19802 68206
N Daya,Gorakh KSPO DT M9 - M12 1500 1900 95 1805 23.16 11930 41804

10 D Ajay KSPO DT M9 - M12 1500 1200 60 1140 23.16 11930 26402


46695
N Daya,Gorakh KTEO BBS M11-M12 1500 2050 103 1948 10.42 11930 20293 0.15 Core pin change

11 D Ajay KTEO BBS M11-M12 1500 1050 53 998 10.42 11930 10394 0.45 Angle pin broke, core pin change -2
30687
N Daya,Gorakh KTEO BBS M11-M12 1500 2050 103 1948 10.42 11930 20293 0.15 Piston tukdi change,Casting getting stuck
12 D Deepchand,Ajay KTEO BBS M11-M12 1500 1600 80 1520 10.42 11930 15838 0.15 Piston change-1,M12 core pin change
37121
N Daya,Gorakh KTEO BBS M11-M12 1500 2150 108 2043 10.42 11930 21283 0.15
13 D Deepchand,Naresh KTEO BBS M11-M12 1500 1950 98 1853 10.42 11930 19303 0.15 M12 core pin change,Piston change,M11 core pin change
38606
N Daya KTEO BBS M11-M12 1500 1950 98 1853 10.42 11930 19303 0.15
14 D Weekly Off
N Weekly Off
15 D Daya KTEO BBS M11-M12 1500 1800 90 1710 10.42 11930 17818 0.15
31182
N Naresh,Ajay KTEO BBS M11-M12 1500 1350 68 1283 10.42 11930 13364
16 D Daya,Gorakh KTEO BBS M11-M12 1500 1700 85 1615 10.42 11930 16828 0.15 Side core pin change,Core pin change
29202
N Anil KTEO BBS M11-M12 1500 1250 63 1188 10.42 11930 12374
17 D Daya,Gorakh KTEO BBS M13-M14 1500 1950 98 1853 10.42 11930 19303 0.15
34647
N Ajay,Naresh KTEO BBS M13-M14 1500 1550 78 1473 10.42 11930 15343 0.15 Piston change-4, core pin change
18 D Daya,Gorakh KTEO BBS M13-M14 1500 200 10 190 10.42 11930 1980
D Daya,Gorakh KTEO BBS M11-M12 1100 55 1045 10.42 11930 10889 1.15 26727 Die Change,Piston jam in sleeve
N Ajay KTEO BBS M11-M12 1500 1400 70 1330 10.42 11930 13859
19 D Daya,Gorakh KTEO BBS M11-M12 2200 110 2090 10.42 11930 21778
N Sonu,anil KTEO BBS M11-M12 1900 95 1805 10.42 11930 18808
20 D Gorakh,Daya KTEO BBS M11-M12 2150 108 2043 10.42 11930 21283 0.15 Piston jam -1hr off, Pum gauage checked, Piston change -2
N Anil KTEO BBS M11-M12 1300 65 1235 10.42 11930 12869 1.20 Angle pin broke,Core pin broke,Piston change -1
21 D Weekly Off 0 0 11930 0
N Weekly Off 0 0 11930 0
22 D Sonu,anil KTEO BBS M11-M12 1000 50 950 10.42 11930 9899 0.15 Soldering observed in core pin so changed - 2 Nos.
N Daya KTEO BBS M11-M12 1450 73 1378 10.42 11930 14354
23 D Sonu,anil KTEO BBS M11-M12 1800 90 1710 10.42 11930 17818 0.15 Pin change
N Daya KTEO BBS M11-M12 900 45 855 10.42 11930 8909 1.00 Angle pin broke
24 D Ajay,Ashok KTEO BBS M11-M12 1100 55 1045 10.42 11930 10889 0.20 side core pin bend
N Daya,Gorakh KTEO BBS M11-M12 1600 80 1520 10.42 11930 15838 2.00 Ejector pin change,Angle pin broke
25 D Sonu,anil KTEO BBS M11-M12 1600 80 1520 10.42 11930 15838 0.30 Soldering observed in core pin so changed
N Gorakh,Daya KTEO BBS M11-M12 1700 85 1615 10.42 11930 16828 0.50 Piston change,Core pin change
26 D Sonu,Jaydev KTEO BBS M11-M12 1800 90 1710 10.42 11930 17818 0.20 Core pin change m11 cavity
N Gorakh,Daya KTEO BBS M11-M12 2100 105 1995 10.42 11930 20788 0.15 Piston change,Core pin change, Side core pin change - 2 Nos.
27 D Sonu, Jaydev KTEO BBS M11-M12 1800 90 1710 10.42 11930 17818 1.00 Fix side soldering observed,M12 cavity pin bend
N Gorakh KTEO BBS M11-M12 1850 93 1758 10.42 11930 18313 0.30 Piston change,Spraygun pipe crack - 1hr,Side core pin bend - 2 Nos.
28 D 0 0 11930 0
N 0 0 11930 0
29 D 0 0 11930 0
N 0 0 11930 0
30 D 0 0 11930 0
N 0 0 11930 0
31 D 0 0 11930 0
N 0 0 11930 0
75200 3760
Total 10:48

;
Hyva
December - 2012 Monthly Turnover : 6,20,000 Per Day:11930 M/C - 3 80T
Achve
d B/D TIME SUM
Shot / Prodn. OK Shot
Date Shift Operator Name Componant
Shift Shot
Rejn.
Shots Rate
Plan TOTAL
TOTAL
Remarks
Amoun B/D
t
1 D
5572
N Deepchand PA 1500 850 43 808 6.9 11930 5572
2 D Sandeep PA 1500 1000 50 950 6.9 11930 6555

N Daya KTEO BBS M11 - M12 1500 300 15 285 10.42 11930

3 D Amit,Shrawan KTEO BBS M11 - M12 1500 1400 70 1330 10.42 11930 13859
22551
N Sitaram FCB KRYO M1 1500 1000 50 950 9.15 11930 8693
4 D Shrawan,Amit FCB KRYO M1 1500 1300 65 1235 9.15 11930 11300
D Shrawan,Amit KTEO BBS M11 - M12 250 13 238 10.42 11930 2475 27139
N Sitaram KTEO BBS M11 - M12 1500 1600 80 1520 10.42 11930 15838
5 D Shrawan,Amit KTEO BBS M11 - M12 1500 2150 108 2043 10.42 11930 21283
40586
N Sitaram,Deepchand KTEO BBS M11 - M12 1500 1950 98 1853 10.42 11930 19303
6 D Amit,Shrawan KTEO BBS M11 - M12 1500 2000 100 1900 10.42 11930 19798
41576
N Sitaram,Deepchand KTEO BBS M11 - M12 1500 2200 110 2090 10.42 11930 21778
7 D Weekly Off
N Weekly Off
8 D Sitaram,Deepchand BBS KTEO M13 - M14 1500 500 25 475 10.42 11930 4950 0.20 Piston change -1
20788
N Shrawan BBS KTEO M13 - M14 1500 1600 80 1520 10.42 11930 15838
9 D Deepchand KTEO BBS M13 - M14 1500 1150 58 1093 10.42 11930 11384
16828
N Amit,Shrawan KTEO BBS M13 - M14 1800 550 28 523 10.42 11930 5444
10 D Sitaram,Deepchand KTEO BBS M13 - M14 1500 700 35 665 11930 0 0.20 15698 Piston change -2
D Sitaram,Deepchand Motion - Trial 100 5 95 0
D Sitara,Deepchand Motion - Trial
N Shrawan,Amit RVC KWSO M5,M6 1500 1700 85 1615 9.72 11930 15698 0.20 Piston change - 1
11 D Sitaram,Deepchand RVC KWSO M5,M6 1500 2300 115 2185 9.72 11930 21238
42476
N Shrawan,Amit RVC KWSO M5,M6 1500 2300 115 2185 9.72 11930 21238 0.20 Piston change -1
12 D Sitaram,Anil RVC KWSO M5,M6 1500 2400 120 2280 9.72 11930 22162
45708
N Amit,Shrawan RVC KWSO M5,M6 1500 2550 128 2423 9.72 11930 23547
13 D Sitaram,Anil RVC KWSO M5,M6 1500 400 20 380 9.72 11930 3694 0.20 Piston change -1
D Sitaram,Anil JT Cover 1000 50 950 30 28500 #REF!
N Amit JT Cover 1500 1400 70 1330 30 11930 39900 0.20 Piston change -1
14 D Weekly Off
#REF!
N Weekly Off
15 D Sachin DT KTEO M9 - M12 1500 150 8 143 11930 0
D Shrawan BBS BD 06 M4 - M5 1500 1600 80 1520 12.68 11930 19274
#REF!
N Sitaram,Deepchand BBS BD 06 M4 - M5 1500 2500 125 2375 12.68 11930 30115 0.20 Piston change -1
16 D Shrawan BBS BD 06 M4 - M5 1500 2050 103 1948 12.68 11930 24694
54809
N Sitaram,Deepchand BBS BD 06 M4 - M5 1500 2500 125 2375 12.68 11930 30115 1.00 Pin not available so pin made of mounting hole
17 D Shrawan,Amit BBS BD 06 M4 - M5 1500 2450 123 2328 12.68 11930 29513
73517
N Sitaram,Deepchand DT KSPO M 9 - M12 1500 2000 100 1900 23.16 11930 44004 0.20 Piston change -1
18 D Shrawan,Amit DT KSPO M 9 - M12 1500 2500 125 2375 23.16 11930 55005
N Sitaram,Deepchand DT KSPO M 9 - M12 1500 2000 100 1900 23.16 11930 44004
19 D Amit,Shrawan DT KSPO M 9 - M12 1500 1400 70 1330 23.16 11930 30803 #REF!
D Amit,Shrawan BBS NCV M10 - M13 1500 550 28 523 0 11930 0 2.00 2hr machine off for cleaning
N Sitara,Jaydeep BBS NCV M10 - M13 1500 1050 53 998 0 11930 0
0
20 D Shrawan,Amit BBS NCV M10 - M13 1500 1650 83 1568 0 11930 0 3.00 Die change, core pin change
N Ajay BBS NCV M10 - M13 1500 850 43 808 6.9 11930 5572
#REF!
21 D Weekly Off 1500 0 0 6.9 11930 0
N Weekly Off 1500 0 0 6.9 11930 0
#REF!
22 D Deepchand,Ajay FCB KRYO M1 1500 1650 83 1568 6.9 11930 10816 0.20 Piston change -1
N Shrawan,Amit FCB KRYO M1 1500 1800 90 1710 6.9 11930 11799 0.50 Piston rod got jam - 1hr
#REF!
23 D Sitaram,Deepchand FCB KRYO M1 1500 1900 95 1805 6.9 11930 12455 1.00 Core pin change, Piston change -1
N Amit,Shrawan FCB KRYO M1 1500 1700 85 1615 6.9 11930 11144 0.20 Piston change -1
11144
24 D Sitaram,Deepchand PA 1500 1050 53 998 11930 0 0.30 Piston change, bhatti problem
N Amit PA 1500 1700 85 1615 6.9 11930 11144 0.20 #REF! Piston change -1
25 D Sitaram,Deepchand PA 1500 2350 118 2233 6.9 11930 15404 0.20 Piston change -1
N Amit,Shrawan PA 1500 2150 108 2043 11930 0 1.00 Piston jam -1 hr off
0
26 D Sitaram,Deepchand PA 1500 1000 50 950 11930 0 0.20 Piston change -1,
D Sitaram,Deepchand DT KSPO M 9 - M12 1500 100 5 95 11930 0
D Sitaram,Deepchand DT KSPO M 9 - M12 800 40 760 6.9 11930 5244 0.50 #REF! Cooling not started so D slot catching problem,Pistom change -1
N Shrawan,Amit RVC KWSO M5,M6 1500 1950 98 1853 6.9 11930 12782
27 D Sitaram,Deepchand RVC KWSO M5,M6 1500 2200 110 2090 6.9 11930 14421 0.50 Piston change,
29825
N Shrawan RVC KWSO M5,M6 1500 2350 118 2233 6.9 11930 15404 0.20 Piston change
28 D 1500 0 0 11930 0
N 1500 0 0 11930 0
29 D 1500 0 0 11930 0
N 1500 0 0 11930 0
30 D 80600 4030 12.60
N
31 D
N
BYST BD06 M4,M5
December - 2012 Monthly Turnover : 7,20,000 Per Day: 15770 M/C -4 180T
B/D TIME SUM
Shot / Prodn. OK Shot Achved
Amount TOTAL TOTAL Remarks
Date Shift Operator Name Componant Rejn. Plan
Shift Shot Shots Rate
B/D
1 D Ramakant,Ramraj Deeksha - Upper Body 1200 600 30 570 14 15770 7980 2.00 Core pin change -1, ball pin change -1
17290
N Shrawan,Kamdev Deeksha - Upper Body 1200 700 35 665 14 15770 9310
2 D Ramakant,Ramraj Deeksha - Upper Body 1200 700 35 665 14 15770 9310
18620
N Raju,Kamdev Deeksha - Upper Body 1200 700 35 665 14 15770 9310
3 D Raju,Kamdev Deeksha - Upper Body 1200 900 45 855 14 15770 11970
21945
N Ramraj Deeksha - Upper Body 1200 750 38 713 14 15770 9975 0.50 Bhatti Problem - M/c off 8hrs

4 D Kamdev,Raju Deeksha - Upper Body 1200 700 35 665 14 15770 9310 0.50 #REF! Bhatti Problem - M/c off 5hrs

N Ramakant,Ramraj Deeksha - Upper Body 1200 800 40 760 14 15770 10640 0.20 Piston change -1
13300
5 D Kamdev,Raju Deeksha - Upper Body 1200 200 10 190 14 15770 2660

D Raju,Kamdev Crompton - Trial 150 8 143 15770 0

D Raju,Kamdev RVB KPLA M22 - M23 1200 600 30 570 11.04 15770 6293 1.00 Metal not ready
20452
N Ramakant,Ramraj RVB KPLA M22 - M23 1200 1350 68 1283 11.04 15770 14159 1.50 Metal not ready
6 D Kamdev RVB KPLA M22 - M23 1200 1400 70 1330 11.04 15770 14683 0.20 Piston Change -2,Tukdi Change
31464
N Ramakant,Ramraj RVB KPLA M22 - M23 1200 1600 80 1520 11.04 15770 16781 2.00 Die change to deeksha top

7 D Weekly off

N Weekly off 1.00 Casting stuck at fix side so polished


8 D Ramakant,Ramraj RVB KPLA M22 - M23 1200 800 40 760 11.04 15770 8390
22549
N Kamdev,Daya RVB KPLA M22 - M23 1200 1350 68 1283 11.04 15770 14159
9 D Nitin RVB KPLA M22 - M23 1200 1150 58 1093 11.04 15770 12061
27793
N Kamdev,Jitendar RVB KPLA M22 - M23 1200 1500 75 1425 11.04 15770 15732

10 D Sachin,Nitin RVB KPLA M22 - M23 1200 100 5 95 11.04 15770 1049

D Sachin,Nitin RVB KPLA M26 - M27 250 13 238 15770 0

D Sachin,Nitin RVB KPLA MM 1200 0 0 15770 0


262
N Kamdev RVB KPLA M22 - M23 1200 25 1 24 11.04 15770 262
11 D Nitin RVB KPLA M22 - M23 1200 500 25 475 11.04 15770 5244 #REF!
N Kamdev RVB KPLA M22 - M23 1200 1600 80 1520 11.04 15770 16781
29366
12 D Sonu,Nitin RVB KPLA M22 - M23 1200 1200 60 1140 11.04 15770 12586

N Kamdev,Gorakh RVB KPLA M22 - M23 1200 1300 65 1235 11.04 15770 13634
20976
13 D Sonu,Nitin RVB KPLA M22 - M23 1200 700 35 665 11.04 15770 7342

N Kamdev,Shrawan RVB KPLA M22 - M23 1200 1700 85 1615 11.04 15770 17830
17830
14 D Weekly off

N Weekly off
4720
15 D Jaisingh,Kamdev RVB KPLA M22 - M23 1200 450 23 428 11.04 15770 4720
N Nitin,Sonu RVB KPLA M22 - M23 1200 1800 90 1710 11.04 15770
16 D Jaisingh,Kamdev RVB KPLA M22 - M23 1200 1800 90 1710 11.04 15770 18878 #REF!
N Nitin,Sonu RVB KPLA M22 - M23 1200 1200 60 1140 11.04 15770 12586
32513
17 D Jaisingh,Kamdev RVB KPLA M22 - M23 1200 1900 95 1805 11.04 15770 19927
N Nitin,Sonu RVB KPLA M22 - M23 1200 1550 78 1473 11.04 15770 16256 #REF!
18 D Jaisingh,Kamdev RVB KPLA M22 - M23 1200 2050 103 1948 11.04 15770 21500
#REF!
N Nitin,Sonu RVB KPLA M22 - M23 1200 1750 88 1663 11.04 15770
19 D Jaisingh,Kamdev RVB KPLA M22 - M23 1200 2100 105 1995 11.04 15770 22025
N Nitin,Naresh RVB KPLA M22 - M23 1200 1900 95 1805 11.04 15770 19927
30940
20 D Jaisingh,Kamdev RVB KPLA M22 - M23 1200 1050 53 998 11.04 15770 11012
N Nitn,Naresh RVB KPLA M22 - M23 1200 1300 65 1235 11.04 15770 13634 1.00 #REF! Piston change - 3 times
21 D Weekly off 1200 0 0 15770 0
0
N Weekly off 1200 0 0 15770 0
22 D Nitin,Naresh RVB KPLA M22 - M23 1200 1350 68 1283 15770 0 1.50 Moving side pin break
N Jaisingh RVB KPLA M22 - M23 1200 1400 70 1330 15770 0 2.00 Machine off for dinner and Piston change
0
23 D Nitin,Naresh RVB KPLA M22 - M23 1200 1350 68 1283 15770 0 2.00 Ejector pin change - 2hrs, Piston change
N Jaisingh,Kamdev RVB KPLA M22 - M23 1200 1050 53 998 15770 0 1.00 Plunger rod bolt broke
0
24 D Nitin,Naresh RVB KPLA M22 - M23 1200 900 45 855 15770 0 0.20 Piston rod bolt broke - 2hrs, M22 core pin broke
N Jaisingh,Kamdev RVB KPLA M22 - M23 1200 1900 95 1805 15770 0 1.00 Ball Pin broke - 30mins, Piston change -15mins,soldering observed in core - 15mins
0
25 D Nitin,Naresh rvb kpls m22 1200 1400 70 1330 15770 0 0.50 Piston change, fix side pin broke
N Jaisingh,Kamdev DT KTEO M5 - M8 1200 1600 80 1520 15770 0 0.20 Piston change
0
26 D Nitin,Naresh DT KTEO M5 - M8 1200 1600 80 1520 15770 0 0.50 Piston change -2 times
N Nitin,Naresh DT KTEO M5 - M8 1200 550 28 523 15770 0 0.40 Piston change -2 times
N Jaisingh,Kamdev RVB KPLA M22 - M23 1000 50 950 0
27 D 1200 0 0 15770 0
N
28 D
N
29 D
N
30 D
N
56275 2814 19.20
Bablu, Arvind UPER BODY
December - 2012 Monthly Turnover : 7,20,000 Per Day:15770 M/C - 5 135Tn
B/D TIME SUM
Shot / Prodn. OK Shot Achved
Date Shift Operator Name Componant
Shift Shot
Rejn.
Shots Rate
Plan
Amount TOTAL Remarks
B/D TOTAL
1 D Jalinder,Sarvesh FCB KRMO M18 - M19 1200 1100 55 1045 13.96 15770 14588 0.20 Piston Change -2
15686
D Jalinder DT KTEO M5 - M8 50 3 48 23.12 1098 0.20 Piston change -1
N Shivkumar,Nitin DT KTEO M5 - M8 1200 1050 53 998 23.12 15770 23062
2 D Jalinder,Sarvesh DT KTEO M5 - M8 1200 60 1140 23.12 15770 26357
N Nitin DT KTEO M5 - M8 1200 60 1140 23.12 15770 26357
3 D Jalinder,Sarvesh DT KTEO M5 - M8 1200 500 25 475 23.12 15770 10982 2.00 #REF! Machine lubrication problem, Die Change
N Nitin DT KTEO M5 - M8 1200 1450 73 1378 23.12 15770 31848 0.20 Piston Change -1, Die locking problem
73579
4 D Jalinder,Sarvesh DT KTEO M5 - M8 1200 1900 95 1805 23.12 15770 41732 0.30 Fix side soldering problem,Piston change -2, Metal problem
N Ntin,Deepchand DT KTEO M5 - M8 1200 1500 75 1425 23.12 15770 32946
38437
5 D Jalinder,Sarvesh DT KTEO M5 - M8 1200 250 13 238 23.12 15770 5491 0.50 Metal problem, Piston change -3
D Jalinder,Sarvesh RVB KTCO M10 - M11 1200 60 1140 11.34 12928
N Nitin,Shivkumar RVB KTCO M10 - M11 1200 1400 70 1330 11.34 15770 15082 0.10 Piston change -3
31780
6 D Jalinder,Sarvesh RVB KTCO M10 - M11 1200 1550 78 1473 11.34 15770 16698
N Shivkumar,Ajay RVB KTCO M10 - M11 1200 1400 70 1330 11.34 15770 15082
7 D Weekly off FCB KTPO M5 - M6 1200 350 18 333 13.82 15770 4595 1.00 Machine off for cleaning and machine problem
19037
N Weekly off FCB KTPO M5 - M6 1200 1100 55 1045 13.82 15770 14442 2.00 Die loacking problem,machine off and degatting done
8 D Nitin,Shivkumar RVB KTCO M10 - M11 1200 600 30 570 11.34 15770 6464 1.00 {Piston change -1,casting stuck 5 times at pipe area
23162
N Jalinder,Sarvesh RVB KTCO M10 - M11 1200 1550 78 1473 11.34 15770 16698 1.50 Piston change -1, Tukdi change, both core polished
9 D Shivkumar,Ramraj RVB KTCO M10 - M11 1200 650 33 618 11.34 15770 7002
23162
N Jalinder,Sarvesh RVB KTCO M10 - M11 1200 1500 75 1425 11.34 15770 16160
10 D Shivkumar,Ramraj RVB KTCO M10 - M11 1200 1300 65 1235 11.34 15770 14005
30164
N Jalinder,Sarvesh RVB KTCO M10 - M11 1200 1500 75 1425 11.34 15770 16160
11 D Shivkumar,Ramraj RVB KTCO M10 - M11 1200 1400 70 1330 11.34 15770 15082
31242
N Jalinder,Sarvesh RVB KTCO M10 - M11 1200 1500 75 1425 11.34 15770 16160
12 D Shivkumar,Ramraj RVB KTCO M10 - M11 1200 1350 68 1283 11.34 15770 14544
32858
N Jalinder,Sarvesh RVB KTCO M10 - M11 1200 1700 85 1615 11.34 15770 18314
13 D Shivkumar,Ramraj RVB KTCO M10 - M11 1200 1200 60 1140 11.34 15770 12928
29626
N Jalinder,Sarvesh RVB KTCO M10 - M11 1200 1550 78 1472.5 11.34 15770 16698
14 D Weekly off
N Weekly off
15 D Jalinder,Sarvesh RVB KTCO M10 - M11 1200 1850 93 1757.5 11.34 15770 19930
N Shivkumar,Ramraj RVB KTCO M10 - M11 1200 1350 68 1282.5 11.34 15770 14544
16 D Jalinder RVB KTCO M10 - M11 1200 1350 68 1282.5 11.34 15770 14544
N Ramraj,Ajay RVB KTCO M10 - M11 1200 1250 63 1187.5 11.34 15770 13466
17 D Jalinder,Sarvesh RVB KTCO M10 - M11 1200 1600 80 1520 11.34 15770 17237
N Shivkumar,Ramraj RVB KTCO M10 - M11 1200 1000 50 950 11.34 15770 10773
18 D Jalinder,Sarvesh RVB KTCO M10 - M11 1200 1750 88 1662.5 11.34 15770 18853
N Shivkumar,Ramraj RVB KTCO M10 - M11 1200 1550 78 1472.5 11.34 15770 16698
19 D Jalinder,Sarvesh RVB KTCO M10 - M11 1200 200 10 190 11.34 15770 2155
D Jalinder,Sarvesh DT KTEO M5 - M8 1650 83 1568 23.12 36241
N Shivkumar,Ramraj DT KTEO M5 - M8 1200 1650 83 1568 23.12 15770 36241
20 D Jalinder,Sarvesh DT KTEO M5 - M8 1200 1950 98 1853 23.12 15770 42830 1.20 M7 cavity pin ejector pin break, casting getting stuck
N Shivkumar,Ramraj DT KTEO M5 - M8 1200 950 48 903 23.12 15770 20866 1.00 Machine off for meeting,M7 pin broke, ejector pin getting jam
21 D Weekly off 1200 0 0 15770 0
N Weekly off 1200 0 0 15770 0
22 D Shivkumar,Ramraj DT KTEO M5 - M8 1200 950 48 903 23.12 15770 20866 0.50 Piston change - 2times,die change
D Shivkumar,Ramraj FCB KRMO M18 - M19 1200 1050 53 998 13.96 15770 13925
N Jalinder,Sarvesh FCB KRMO M18 - M19 1200 1700 85 1615 13.96 15770 22545 0.50 Piston change, helper side return bolt broke
23 D Ramraj,Ajay FCB KRMO M18 - M19 1200 750 38 713 13.96 15770 9947 5.00 Piston change -2 times, Ejectorp late guide bolt broke
N Jalinder,Sarvesh FCB KRMO M18 - M19 1200 1300 65 1235 13.96 15770 17241 1.00 Machine off for cleaning
24 D Ramraj,Ajay FCB KRMO M18 - M19 1200 1250 63 1188 13.96 15770 16578 0.30 Piston change - 2 times
N Jalinder,Sarvesh FCB KRMO M18 - M19 1200 1650 83 1568 13.96 15770 21882 0.33 M19 core pin broke - 20mins
Piston change -2times, Compressor wire broke -30mins, casting
25 D Ramraj,Ajay FCB KRMO M18 - M19 1200 1600 80 1520 13.96 15770 21219 0.50 got stuck - 30mins
N Sarvesh FCB KRMO M18 - M19 1200 900 45 855 13.96 15770 11936 2.00 Piston got jam and 2 piston change - 2hrs
26 D Ramraj FCB KRMO M18 - M19 1200 900 45 855 13.96 15770 11936 3.00 Piston change - 4 times,piston npt there so 3hrs machine off
N Jalinder,Jitendar RVB KTCO M10 - M11 1200 1400 70 1330 11.34 15770 15082
27 D 1200 0 0 15770 0
N 1200 0 0 15770 0
28 D 1200 0 0 15770 0
N 1200 0 0 15770 0
29 D 1200 0 0 15770 0
N 1200 0 0 15770 0
30 D 1200 0 0 15770 0
N 1200 0 0 15770 0
31 D 1200 0 0 15770 0
N

64550 3228
24.33
FCB KVTO M9,M10
December - 2012 Monthly Turnover : 7,20,000 Per Day:15770 M/C - 7 250 Tn
Shot / Prodn. OK Shot Achved
Date Shift Operator Name Componant
Shift Shot
Rejn.
Shots Rate
Plan
Amount
B/D TIME SUM Remarks
1 D Virendar FCB KVTO M9 - M10 1200 450 23 428 11.02 15770 11930 1.00 Core pin change,ejector pin change
26063
N Gorakh FCB KVTO M9 - M10 1200 1350 68 1283 11.02 15770 14133
3 D Gorakh FCB KVTO M9 - M10 1200 750 38 713 11.02 15770 7852
14133
N Virendar FCB KVTO M9 - M10 1200 600 30 570 11.02 15770 6281 0.20 Casting stuck twice,
4 D Gorakh FCB KVTO M9 - M10 1200 1200 60 1140 11.02 15770 12563 0.50 Metal Problem
20415
N Virendar FCB KVTO M9 - M10 1200 750 38 713 11.02 15770 7852 0.50 Piston change, casting stuck - 4 times
5 D Gorakh FCB KVTO M9 - M10 1200 600 30 570 11.02 15770 6281 0.50 Piston change -1, spray gun problem
14657
N Virendar FCB KVTO M9 - M10 1200 800 40 760 11.02 15770 8375
6 D Gorakh FCB KVTO M9 - M10 1200 800 40 760 11.02 15770 8375
10469
N Jaisingh FCB KVTO M9 - M10 1200 200 10 190 11.02 15770 2094 0.50 Bhatti Problem
N Virendar FCB KVTO M9 - M10 1200 800 40 760 11.02 15770 8375 0.60 8375 Casting stuck 3 times
9 D Sachin FCB KVTO M9 - M10 1200 550 28 523 11.02 15770 5758 0.50 Spraygun problem,castign cathcing 5 times
18844
N Virendar FCB KVTO M9 - M10 1200 1250 63 1188 11.02 15770 13086 0.50 Core pin broke,Casting stuck 2 times
10 D Sonu FCB KVTO M9 - M10 1200 1000 50 950 11.02 15770 10469 1.50 Spraygun problem -30mins,bhatti problem-30mins,no power -30mins
23555
N Virendar FCB KVTO M9 - M10 1200 1250 63 1188 11.02 15770 13086 0.10 Casting getting stuck

11 D FCB KVTO M9 - M10 1200 350 18 333 11.02 15770 3664 0.30 Casting getting stuck due to no silver die coat 6 times, Moving side pin broken - 2
sonu 16227
N Virendar FCB KVTO M9 - M10 1200 1200 60 1140 11.02 15770 12563
12 D Santosh FCB KVTO M9 - M10 1200 900 45 855 11.02 15770 9422 0.80 Moving side pin broke, casting stuck in fix side
20415
N Virendar FCB KVTO M9 - M10 1200 1050 53 998 11.02 15770 10992 1.00 Mounting hole pin broke m10 cavity, casting stuck - 2 times

13 D Santosh FCB KVTO M9 - M10 1200 600 30 570 11.02 15770 6281 1.00 #REF! Machine off for repairing spraygun and laddel

15 D FCB KVTO M9 - M10 1200 1350 68 1283 11.02 15770 14133


Virendar 24602
N Santosh FCB KVTO M9 - M10 1200 1000 50 950 11.02 15770 10469
16 D Virendar FCB KVTO M9 - M10 1200 1000 50 950 11.02 15770 10469
20938
N Santosh FCB KVTO M9 - M10 1200 1000 50 950 11.02 15770 10469
17 D Virendar FCB KVTO M9 - M10 1200 950 48 903 11.02 15770 9946 0.50 Mounting hole pin break, casting stuck - 3 times
14657
N Santosh FCB KVTO M9 - M10 1200 450 23 428 11.02 15770 4711 0.60 Mounting hole pin break
18 D Virendar FCB KVTO M9 - M10 1200 1350 68 1283 11.02 15770 14133
28266
N Santosh FCB KVTO M9 - M10 1200 1350 68 1283 11.02 15770 14133
19 D Virendar FCB KVTO M9 - M10 1200 1350 68 1283 11.02 15770 14133
28266
N Santosh FCB KVTO M9 - M10 1200 1350 68 1283 11.02 15770 14133
20 D Virendar FCB KVTO M9 - M10 1200 300 15 285 11.02 15770 3141 7091
89710 4486 17.60
v
ITEM kfI RATE MWDC COST CAVITY SHOT RATE SHIFT SHOT TARGET
FCB KRMO 8.25 6.63 2 13.26 1200
FCB KVTO 6.78 5.31 2 10.62 1200
FCB KTCO 6.2 4.8 2 9.6 1200
FCB KWSO 6.78 5.31 2 10.62 1200
FCB KTPA 8.18 6.66 2 13.32 1200
FCB KTRA 8.18 6.81 2 13.62 1200
FCB KRYO 10.42 8.95 1 8.95 1200

RVB KPLA 7.55 5.27 2 10.54 1200


RVB KCC 7.55 5.27 2 10.54 1200
RVB KTCO 7.55 5.27 2 10.54 1200
RVB KWWO 7.55 6.42 2 12.84 1200
RVC KWWO 6.45 4.35 2 8.7 1200

DT KSPO 7.04 5.84 6 35.04 1200


DT KTEO 7.03 5.83 6 34.98 1500
DT KRYO 2.9 1.68 2 3.36

BY ST KTEO 5.94 5.09 2 10.18 1500


BYST BD 06 7.07 6.17 2 12.34 1500
KPHO STAR 2.22 1.62 12 19.44 1200
KPHO CAP 4.25 3.8 12 45.6 1200

TOP KPHO 3.15 0.96 8 7.68 3500


TOP JB 4.17 1.74 8 13.92 3000
KWSO TOP 5.3 1.38 6 8.28 3000
KWHO TOP 6.15 2.46 8 19.68 3500
M/C No. 7- ø 40mm Hardning piston shot

Prodn.
Date Shift Operator Name Componant
Shot

10-Dec D Jalindar KVTO M7,M8 1050

10-Dec N Ramakant KVTO M7,M8 1400

11-Dec D Jalindar KVTO M7,M8 1400

11-Dec N Ramakant KVTO M7,M8 1200

12-Dec D Jalindar KVTO M7,M8 1200

12-Dec N Ramakant KVTO M7,M8 400

13-Dec D Jalindar KVTO M7,M8 1300

M/C No. 4 :- After plunger lubrication Piston( ø 40mm) consumption


Date Shift Operator Name Componant Prodn. Shot

10-Dec D Bablu, Sanjay RVB KPLA M18,M19 2000

10-Dec N Amit, Arvind RVB KPLA M18,M19 1500

11-Dec D Bablu, Sanjay RVB KPLA M18,M19 900

11-Dec D Bablu, Sanjay RVB KPLA M18,M19 1000

11-Dec N Amit, Arvind RVB KPLA M18,M19 1900

12-Dec D Bablu, Sanjay RVB KPLA M18,M19 1750

12-Dec N Amit RVB KPLA M18,M19 1500

13-Dec D Bablu, Sanjay RVB KPLA M18,M19 400

13-Dec D Bablu, Sanjay RVB KPLA M18,M19 1500

13-Dec N Amit, Arvind RVB KPLA M18,M19 1700

14-Dec D Bablu, Sanjay RVB KPLA M18,M19 1900

14-Dec N Amit, Arvind RVB KPLA M18,M19 1900

15-Dec D Bablu, Vinod RVB KPLA M18,M19 1473


15-Dec N Amit, Arvind RVB KPLA M18,M19 1235

17-Dec D Amit, Arvind RVB KPLA M18,M19 1568

17-Dec N Bablu, Sanjay RVB KPLA M18,M19 1805


18-Dec D Amit, Virendra RVB KPLA M18,M19 1805
18-Dec N Bablu, Sanjay RVB KPLA M18,M19 1900
Each piston
Remark
shot

4500 Piston thread wear out

6550 Piston thread wear out