Hospital Incinerator Specs & Requirements

The document contains the technical specifications for an incinerator required by Levy Mwanawasa hospital. It specifies details such as the incinerator must be a vertical, top-loading type with a minimum chamber volume of 8 cubic meters and burning capacity of up to 500kg per hour. It also lists requirements for burners, refractory materials, insulation, temperature controls and more. The supplier must be certified to relevant standards and the procurement includes delivery, installation and a 24 month warranty.

Uploaded by

Fanny Mulenga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views4 pages

Hospital Incinerator Specs & Requirements

The document contains the technical specifications for an incinerator required by Levy Mwanawasa hospital. It specifies details such as the incinerator must be a vertical, top-loading type with a minimum chamber volume of 8 cubic meters and burning capacity of up to 500kg per hour. It also lists requirements for burners, refractory materials, insulation, temperature controls and more. The supplier must be certified to relevant standards and the procurement includes delivery, installation and a 24 month warranty.

Uploaded by

Fanny Mulenga
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

SECTION V.

SCHEDULE OF REQUIREMENTS
Table 1; SCHEDULE OF REQUIREMENTS

SN DESCRIPTION OF PRODUCT QUANTITY


1 Incinerator One (1)

Details for the Schedule of Requirements for Levy Mwanawasa hospital Incinerator

Item Technical Specification of items required including


Quantity 1
No. applicable standards
1 Incinerator Technical Specifications REQUESTED OFFERED
• Vertical (Top loading) type incinerator, parallel
piped shape
• Minimum chamber volume >8cbm
• Loading capacity per cycle 1,500kg/cycle
• Burning Capacity kg /hr Up to 500kg/hr
• Fuel Diesel
• Electricity consumption <5kW
• Average Fuel Consumption (liters/hr) Average of not
more than 501/hr
• Operating Temperature (Incineration Chamber) 900- l000°C
• Operating Temperature (Post-Combustion 900-1100°C
Chamber)
• Automatic control and temperature Monitoring Required
• Automatic hydraulic door opening Required
• Gas rate (post combustion chamber) 10m/s or better
• Minimum number of required burners (Primary 4
chamber)
• Primary Burner capacity (each) >120kW
• Minimum number of required burners (Secondary 2
chamber)
• Secondary Burner capacity (each) >250kW
• All burners need to be equipped with continuous
Ventilation system
• Burning units to be equipped with instruments for
pyro metric temperature check
• Supplier to indicated quoted brand
• Supply burner to turn on automatically when the
temperature of the gas combustion, after the last air
combustion injection, falls under the target
temperature
• Required operation time Up to l2hrs
• Chimney Height >10m
• Chimney support Mandatory
(supplier to advise
on method)
• Chimney to be manufactured in stainless steel AISI
304 or better
• To be provided in Cylindrical shape
• Refractory: Refractory Cast (high % A1203) >42%
• Insulator: Supplier to indicate quoted brand
• Warranty 24 months from
delivery
- Bidder to include one set of spare parts. Set needs to contain at least:
- One set of Thermo couples One set of Diesel Nozzles
- Complete spare burner in case of malfunctioning
- One bag of suitable refractories in same quality as OEM equipped parts One set of
high temperature mortar
- Ceramic fiber for repair works

Supplied incinerator manufacturer must be certified under following standards:


- ISO1400
- ISO 9001
- EC1069/2009 or respective country equivalent
- EC2000/76 or respective country equivalent
- All offered burners must be CE-certified
This procurement includes supply, delivery, installation and commissioning with 24 months
warranty plus shelter. Bidder to utilize and amend existing structure of the shelter to fit his
quoted unit. All amendments to the existing building need to be priced in the bid. No extra
costs for civil works can be charged after award.

Bidder to include at least a lockable storage area of 1Ocbin for hazardous waste.

Bidder to include one lockable fuel tank.

Delivery period shall be over a contract completion period of 12 months.


SECTION VI. TECHNICAL SPECIFICATIONS
Technical Specification for Levy Mwanawasa hospital Incinerator

Item Technical Specification of items required including


Quantity 1
No. applicable standards
1 Incinerator Technical Specifications REQUESTED OFFERED
• Vertical (Top loading) type incinerator, parallel
piped shape
• Minimum chamber volume >8cbm
• Loading capacity per cycle 1,500kg/cycle
• Burning Capacity kg /hr Up to 500kg/hr
• Fuel Diesel
• Electricity consumption <5kW
• Average Fuel Consumption (liters/hr) Average of not
more than 501/hr
•Operating Temperature (Incineration Chamber) 900- l000°C
•Operating Temperature (Post-Combustion 900-1100°C
Chamber)
• Automatic control and temperature Monitoring Required
• Automatic hydraulic door opening Required
• Gas rate (post combustion chamber) 10m/s or better
• Minimum number of required burners (Primary 4
chamber)
• Primary Burner capacity (each) >120kW
• Minimum number of required burners (Secondary 2
chamber)
• Secondary Burner capacity (each) >250kW
• All burners need to be equipped with continuous
Ventilation system
• Burning units to be equipped with instruments for
pyro metric temperature check
• Supplier to indicated quoted brand
• Supply burner to turn on automatically when the
temperature of the gas combustion, after the last air
combustion injection, falls under the target
temperature
• Required operation time Up to l2hrs
• Chimney Height >10m
• Chimney support Mandatory
(supplier to advise
on method)
• Chimney to be manufactured in stainless steel AISI
304 or better
• To be provided in Cylindrical shape
• Refractory: Refractory Cast (high % A1203) >42%
• Insulator: Supplier to indicate quoted brand
• Warranty 24 months from
delivery
- Bidder to include one set of spare parts. Set needs to contain at least:
- One set of Thermo couples One set of Diesel Nozzles
- Complete spare burner in case of malfunctioning
- One bag of suitable refractories in same quality as OEM equipped parts One set of
high temperature mortar
- Ceramic fiber for repair works

Supplied incinerator manufacturer must be certified under following standards:


- ISO1400
- ISO 9001
- EC1069/2009 or respective country equivalent
- EC2000/76 or respective country equivalent
- All offered burners must be CE-certified
This procurement includes supply, delivery, installation and commissioning with 24 months
warranty plus shelter. Bidder to utilize and amend existing structure of the shelter to fit his
quoted unit. All amendments to the existing building need to be priced in the bid. No extra
costs for civil works can be charged after award.

Bidder to include at least a lockable storage area of 1Ocbin for hazardous waste.

Bidder to include one lockable fuel tank.

Delivery period shall be over a contract completion period of 12 months.

NOTE: Pre-shipment Inspection shall be conducted before shipping the


Equipment to verify compliance to the required specifications.