Delhi MRTS & Yesvantpur Station Progress Report
Delhi MRTS & Yesvantpur Station Progress Report
LIMITED
CONTRACT DC-10A-R
“Architectural Finishing Works Including Design, Fabrication, Supply, Erection & Roof sheeting of Prefabricated
Steel Roof Portal Pre- Engineered Building (PEB) Structures & Foot Over Bridge (FOB) including Design &
Construction (Substructure & Superstructure) & necessary changes in existing station for connection of FOB,
External facade, Water Supply, Sanitary Installation, Drainage, Site development works at Seven Elevated Stations
namely Keshopur, Paschim Vihar, Peeragarhi,Mangol Puri, West Enclave, Pushpanjali & Deepali Chowk on
Janakpuri West to R.K.Ashram Corridor (Extn. of Line-8) of Phase-IV of Delhi MRTS”.
PHOTOGRAPH
Monthly Progress Report for period 26th March to 25th April – 2023
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.
Approved by Approved
Revision Revision Submitted by Submitted letter no of Approved by
SI. No Description Drawing No. Authority Approved letter no of Authority Engineer by Remarks
No. Date GLCPL On GLCPL SWR/BNC
Engineer SWR/SBC
A GA Drawing
C Structural Drawing
Column Layout Plan & Schedule East
1 YPR/ER/S-03 R0 5-Jun-23 14-Jun-23 GLCPL/YSR/2023/185 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
Side Elevated Road
Design and Drawing Status - Multi Level Car Parking Cum Office (G+5)
Approved by Approved
Revision Revision Submitted by Submitted letter no of Approved by
SI. No Description Drawing No. Authority Approved letter no of Authority Engineer by Remarks
No. Date GLCPL On GLCPL SWR/BNC
Engineer SWR/SBC
A GA Drawing
DAC/2023/YPR/SWR/AR/GAD/MLCP/
2 GROUND FLOOR PLAN R4 25-Apr-23 1-Aug-23
01B
DAC/2023/YPR/SWR/AR/GAD/MLCP/
3 FIRST FLOOR PLAN R4 25-Apr-23 1-Aug-23
02
DAC/2023/YPR/SWR/AR/GAD/MLCP/
4 SECOND FLOOR PLAN R4 25-Apr-23 1-Aug-23
03
DAC/2023/YPR/SWR/AR/GAD/MLCP/
5 THIRD FLOOR PLAN R4 25-Apr-23 1-Aug-23
04
DAC/2023/YPR/SWR/AR/GAD/MLCP/
6 FOURTH FLOOR PLAN R4 25-Apr-23 1-Aug-23
05
DAC/2023/YPR/SWR/AR/GAD/MLCP/
7 FIFTH FLOOR PLAN R4 25-Apr-23 1-Aug-23 Without letter,old letter
06
222
8 TERRACE FLOOR PLAN DAC/2023/YPR/SWR/AR/GFC/MLCP/07 R4 25-Apr-23 1-Aug-23
DAC/2023/YPR/SWR/AR/GAD/MLCP/
10 SECTION AA' & SECTION CC' R4 25-Apr-23 1-Aug-23
10A
DAC/2023/YPR/SWR/AR/GFC/MLCP/
12 ELEVATION A R4 25-Apr-23 1-Aug-23
09A
DAC/2023/YPR/SWR/AR/GFC/MLCP/
13 ELEVATION B R4 25-Apr-23 1-Aug-23
09B
DAC/2023/YPR/SWR/AR/GFC/MLCP/
14 ELEVATION C & D R4 25-Apr-23 1-Aug-23
09C
B Architectural Drawing
C Structural Drawing
1 Column Layout Plan MLCP YPR/MLCP/S-03 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
R1 22-Jul-23 GLCPL/YSR/2023/261
2 Column ScheduleMLCP YPR/MLCP/S-03A R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
3 Foundation Plan & Detail MLCP YPR/MLCP/S-04 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
R1 22-Jul-23 GLCPL/YSR/2023/261
4 Foundation reinforcement Detail MLCP YPR/MLCP/S-05 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
R1 22-Jul-23 GLCPL/YSR/2023/261
5 Plinth Lvl Framing Plan YPR/MLCP/S-11 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
6 Plinth Lvl Beam Detail YPR/MLCP/S-12 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
7 1ST FL. Framing Plan MLCP YPR/MLCP/S-21 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
8 1ST FL. Slab Detail MLCP YPR/MLCP/S-22 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
9 1ST FL. Beam Detail MLCP YPR/MLCP/S-23 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
10 2ND FL. Framing Plan MLCP YPR/MLCP/S-31 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
11 2ND FL. Slab Detail MLCP YPR/MLCP/S-32 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
12 2ND FLOOR Beam Detail MLCP YPR/MLCP/S-33 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
13 3RD FL. Framing Plan MLCP YPR/MLCP/S-41 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
14 3RD FL. Slab Detail MLCP YPR/MLCP/S-42 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
15 3RD FLOOR Beam Detail MLCP YPR/MLCP/S-43 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
16 4TH & 5TH LVL. Framing Plan MLCP YPR/MLCP/S-51 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
17 4TH & 5TH FL. Slab Detail MLCP YPR/MLCP/S-52 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
18 4TH & 5TH FL. Beam Detail MLCP YPR/MLCP/S-53 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
19 Terrace LVL Framing Plan MLCP YPR/MLCP/S-61 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
20 Terrace FL. Slab Detail MLCP YPR/MLCP/S-62 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
21 Terrace FL. FLOOR Beam Detail MLCP YPR/MLCP/S-63 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.
Approved by Approved
Revision Revision Submitted by Submitted letter no of Approved by
SI. No Description Drawing No. Authority Approved letter no of Authority Engineer by Remarks
No. Date GLCPL On GLCPL SWR/BNC
Engineer SWR/SBC
A GA Drawing
27-Jan-2023
1 Ground Floor Plan DAC/2023/YPR/SWR/AR/GAD/LINEN/01 R0 & 08-Feb- By Mail
2023
Transmittal No. GLCPL-
R1 11-Feb-23 12-Feb-23 YES-TR-004
R2 18-Feb-23 GLCPL/YPR/2023/28
R3
R4 13-Mar-23 14-Mar-23 14-Mar-23 14-Mar-23 24-Mar-23
27-Jan-2023
2 First Floor Plan DAC/2023/YPR/SWR/AR/GAD/LINEN/02 R0 & 08-Feb- By Mail
2023
Transmittal No. GLCPL-
R1 12-Feb-23 YES-TR-004
R2 18-Feb-23 GLCPL/YPR/2023/28
R3
R4 13-Mar-23 14-Mar-23 14-Mar-23 14-Mar-23 24-Mar-23
B Architectural Drawing
C Structural Drawing
1 General Details (Sheet -01 of 04) YPR/S-01 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85
R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
7 Plinth Lvl Framing Plan & Slab Details YPR/LS/S-11 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85
R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A
R2 23-May-23 27-May-23 GLCPL/YPR/2023/161 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
16 Staircase Plan & Detail YPR/LS/ST-01 R0 5-Jun-23 14-Jun-23 GLCPL/YPR/2023/185 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
D Electrical Drawing
1 Light & Power Layout - GF Plan DCCE/RLDA/ELE/GFC/LINEN/01 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142
R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211
3 Light & Power Conduit Layout - GF Plan DCCE/RLDA/ELE/GFC/LINEN/2.1 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142
6 Light & Power Conduit Layout - FF Plan DCCE/RLDA/ELE/GFC/LINEN/4.1 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142
F HVAC
Design and Drawing Status - RPF Office and Bangalore Rural Railway Police station (G+1)
Approved by Approved
Revision Revision Submitted by Submitted letter no of Approved by
SI. No Description Drawing No. Authority Approved letter no of Authority Engineer by Remarks
No. Date GLCPL On GLCPL SWR/BNC
Engineer SWR/SBC
A GA Drawing
27-Jan-2023 &
1 Ground Floor Plan DAC/2023/YPR/SWR/AR/GAD/RPF/01 R0 By Mail
08-Feb-2023
Transmittal No. GLCPL-
R1 11-Feb-23 12-Feb-23
YES-TR-004
R2 18-Feb-23 GLCPL/YPR/2023/28
27-Jan-2023 &
2 First Floor Plan DAC/2023/YPR/SWR/AR/GAD/RPF/02 R0 By Mail
08-Feb-2023
Transmittal No. GLCPL-
R1 11-Feb-23 12-Feb-23
YES-TR-004
R2 18-Feb-23 GLCPL/YPR/2023/28
B Architectural Drawing
1 Ground Floor Plan DAC/2023/YPR/AR/GFC/RPF/01 R3 20-Mar-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23
2 First Floor Plan DAC/2023/YPR/AR/GFC/RPF/02 R3 8-May-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23
3 Terrace Floor Plan DAC/2023/YPR/AR/GFC/RPF/03 R2 20-Mar-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23
4 Section AA DAC/2023/YPR/AR/GFC/RPF/05 R2 20-Jun-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23
5 Section BB DAC/2023/YPR/AR/GFC/RPF/06 R2 20-Jun-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23
6 Section CC & Section DD Refference 29-Apr-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23
C Structural Drawing
2 Foundation Plan & Detail YPR/RPF/S-04 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189
6 First Floor Framing Plan YPR/RPF/S-21 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189
7 First Floor Slab Detail YPR/RPF/S-22 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189
8 First Floor Beam Detail YPR/RPF/S-23 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189
9 Terrace Floor Framing Plan YPR/RPF/S-31 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189
10 Terrace Floor Slab Detail YPR/RPF/S-32 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189
11 Terrace Floor Beam Detail YPR/RPF/S-33 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189
12 Mumty Lvl Framing Plan & Detail YPR/RPF/S-41 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189
13 Staircase Plan & Detail YPR/RPF/ST-01 R0 6/5/2023 14-Jun-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189
D Electrical Drawing
1 Light & Power Layout - GF Plan DCCE/RLDA/ELE/GFC/RPF/01 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211 22-Jun-23
3 Light & Power Conduit Layout - GF Plan DCCE/RLDA/ELE/GFC/RPF/2.1 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
6 Light & Power Conduit Layout - FF Plan DCCE/RLDA/ELE/GFC/RPF/4.1 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
F HVAC
Design a
A GA Drawing
B Architectural Drawing
1
2
3
D Electrical Drawing
1
2
3
F HVAC
1
2
3
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.
Approved by
Revision Revision Submitted by Submitted letter no of
Authority
No. Date GLCPL On GLCPL
Engineer
R0
R1
R2 17-May-23 18-May-23
Approved
Approved by
Approved letter no of Authority Engineer by Remarks
SWR/BNC
SWR/SBC
19.05.2023
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.
Architectural Drawing
Approved by Approved
Revision Revision Submitted by Approved by
SI. No Description Drawing No. Submitted letter no of GLCPL Authority by Remarks
No. Date GLCPL On SWR/BNC
Engineer SWR/SBC
10 SECTION AA' AND SECTION CC' DAC/2023/YPR/SWR/AR/GAD/MLCP/10A R3 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23
11 SECTION BB' DAC/2023/YPR/SWR/AR/GAD/MLCP/10B R3 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.
Structural Drawing
Approved by Approved
Revision Revision Submitted by Approved by
SI. No Description Drawing No. Submitted letter no of GLCPL Authority by Remarks
No. Date GLCPL On SWR/BNC
Engineer SWR/SBC
7 Plinth Lvl Framing Plan & Slab Details YPR/LS/S-11 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85
12 Mumty Lvl Framing Plan & Detail YPR/RPF/S-41 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123
16 4TH & 5TH LVL. Framing Plan MLCP YPR/MLCP/S-51 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164
17 4TH & 5TH FL. Slab Detail MLCP YPR/MLCP/S-52 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164
18 4TH & 5TH FL. Beam Detail MLCP YPR/MLCP/S-53 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164
21 Terrace FL. FLOOR Beam Detail MLCP YPR/MLCP/S-63 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164
MEP Drawing
Approved by Approved
Revision Revision Submitted by Approved by
SI. No Description Drawing No. Submitted letter no of GLCPL Authority by Remarks
No. Date GLCPL On SWR/BNC
Engineer SWR/SBC
3 Light & Power Conduit Layout - GF Plan DCCE/RLDA/ELE/GFC/LINEN/2.1 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142
R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211
6 Light & Power Conduit Layout - FF Plan DCCE/RLDA/ELE/GFC/LINEN/4.1 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142
R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211
8 Fire alarm & ELV Schematic Layout Linen Store DCCE/RLDA/ELE/GFC/LINEN/06 R0 Not Submitted
R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211
9 Drainage Water supply & FF Layout - GF Plan DCCE/RLDA/PL & FF/GFC/LINEN/01 R0 9-May-23 13-May-23 GLCPL/YPR/2023/142
10 Drainage Water supply & FF Layout - FF Plan DCCE/RLDA/PL & FF/GFC/LINEN/02 R0 9-May-23 13-May-23 GLCPL/YPR/2023/142
11 Drainage Water supply & FF Layout - Terrace Floor Plan DCCE/RLDA/PL & FF/GFC/LINEN/01 R0 9-May-23 13-May-23 GLCPL/YPR/2023/142
3 Light & Power Conduit Layout - GF Plan DCCE/RLDA/ELE/GFC/RPF/2.1 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
6 Light & Power Conduit Layout - FF Plan DCCE/RLDA/ELE/GFC/RPF/4.1 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
8 Fire alarm & ELV Schematic Layout Linen Store DCCE/RLDA/ELE/GFC/RPF/06 R0 Not Submitted
9 Drainage Water supply & FF Layout - GF Plan DCCE/RLDA/PL & FF/GFC/RPF/01 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
R0 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211
10 Drainage Water supply & FF Layout - FF Plan DCCE/RLDA/PL & FF/GFC/RPF/02 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
R0 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211
11 Drainage Water supply & FF Layout - Terrace Floor Plan DCCE/RLDA/PL & FF/GFC/RPF/03 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
EAST SIDE
Date Submitted 5/18/2023 Under Prepration Under Prepration
1 2.1 AIR CONCOURSE
Approved / Date Yes/11-07-2023 Under Prepration Under Prepration
Date Submitted 5/18/2023 6/5/2023 14-06-2-23 & 13-07-2023 Under Prepration Under Prepration
3 EAST SIDE ELEVATED ROAD CUM ARRIVAL/DEPARTURE
2.5
PLAZA Yes/ 14-06-2-23 &
Approved / Date Yes/11-07-2023 6/12/2023 Under Prepration Under Prepration
13-07-2023
29-04-2023 & 18-05-2-23 &
Date Submitted 3/14/2023 6/28/2023 6/22/2023
05-06-2023 14-06-2023
4 2.17 LINEN STORE AND OFFICES (G+1)
Approved / Date Yes/24-03-2023 5/16/2023 Yes/08-07-2023 Yes/28-06-2023 Under Review
15-04-2023 &
Date Submitted 3/16/2023 27-04-2023 & 27-05-2023 6/24/2023 6/22/2023
RPF OFFICE AND BANGALORE RURAL RAILWAY POLICE 23-05-2023
5 2.18
STATION (G+1)
Approved / Date Yes/16-03-2023 5/25/2023 Yes/08-07-2023 Yes/24-06-2023 Under Review
Date Submitted
6 EXTERNAL DEVELOPMENT,APPROACH ROADS-EAST
2.13
SIDE,COMPOUND WALL,ARRIVAL PLAZA ON EAST SIDE
Approved / Date
WEST SIDE
Date Submitted
8 2.2 WEST TERMINAL BUILDING - 4( FOUR) STORIED BUILDING
Approved / Date
Date Submitted
9 2.4 WEST SIDE ELEVATED ROAD CUM DEPARTURE PLAZA
AT+2.0M LEVEL
Approved / Date
Date Submitted
10 2.6 ARRIVAL APPROACH ROAD/RAMPS AT -4.0 M LEVEL ON WEST
SIDE
Approved / Date
Date Submitted
11 2.7 DEMOLITION WORK
Approved / Date
Date Submitted
12 2.9 UTILITIES
Approved / Date
Date Submitted
13 PLATFORM UPGDRADATION WORKS IN OTHER THAN AIR
2.10
CONCOURSE PORTION ON ALL PLATFORMS
Approved / Date
Date Submitted
14 PLATFORM UPDRADATION WORKS IN AIR CONCOURSE
2.11
PORTION ON ALL PLATFORMS
Approved / Date
Date Submitted
15 2.12 WESTSIDE PARKING AT +2.0 M LEVEL & -4.0 M LEVEL
Approved / Date
Date Submitted
16 2.14 OHE
Approved / Date
Date Submitted
17 2.15 PIDS,SIGNAGE & IT SECURITY-WEST SIDE BUILDING
Approved / Date
Date Submitted
18 2.16 MEP WORKS
Approved / Date
Date Submitted
19 2.19 INTEGRATED TESTING & COMMISSIONING
Approved / Date
"Major Up-grad
Contract A
Design
SI. No Description
A GA Drawing
4 SecondFloor Plan
6 Section-AA
B Architectural Drawing
1
2
3
C Structural Drawing (IIT VETTED)
D Electrical Drawing
1
2
3
F HVAC
1
2
3
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.
Revision Submitted by
Drawing No. Revision Date
No. GLCPL On
R1 16-Mar-23 31-Aug-23
R1 16-Mar-23 31-Aug-23
R1 16-Mar-23 31-Aug-23
R1 16-Mar-23 31-Aug-23
ailway Station of South Western Railway"
C/Civil/2023/0005, Dated: 20.01.2023.
Approved by
Approved by
Submitted letter no of GLCPL Authority Approved letter no of Authority Engineer
SWR/BNC
Engineer
GLCPL/YPR/2023/300