0% found this document useful (0 votes)
102 views33 pages

Delhi MRTS & Yesvantpur Station Progress Report

The document appears to be a monthly progress report from GLCPL Construction Pvt. Limited for the period of March 26th to April 25th, 2023. It provides the design and drawing status for two projects - the East Side Elevated Road and a Multi-Level Car Parking Cum Office building (G+5) that are part of the major upgradation of Yesvantpur Railway Station of South Western Railway. The report includes revision details, approval status and letters submitted for various structural and architectural drawings of the two projects.

Uploaded by

yprsd2023
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
102 views33 pages

Delhi MRTS & Yesvantpur Station Progress Report

The document appears to be a monthly progress report from GLCPL Construction Pvt. Limited for the period of March 26th to April 25th, 2023. It provides the design and drawing status for two projects - the East Side Elevated Road and a Multi-Level Car Parking Cum Office building (G+5) that are part of the major upgradation of Yesvantpur Railway Station of South Western Railway. The report includes revision details, approval status and letters submitted for various structural and architectural drawings of the two projects.

Uploaded by

yprsd2023
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 33

URC CONSTRUCTION PVT.

LIMITED

CONTRACT DC-10A-R
“Architectural Finishing Works Including Design, Fabrication, Supply, Erection & Roof sheeting of Prefabricated
Steel Roof Portal Pre- Engineered Building (PEB) Structures & Foot Over Bridge (FOB) including Design &
Construction (Substructure & Superstructure) & necessary changes in existing station for connection of FOB,
External facade, Water Supply, Sanitary Installation, Drainage, Site development works at Seven Elevated Stations
namely Keshopur, Paschim Vihar, Peeragarhi,Mangol Puri, West Enclave, Pushpanjali & Deepali Chowk on
Janakpuri West to R.K.Ashram Corridor (Extn. of Line-8) of Phase-IV of Delhi MRTS”.

Contract Agreement no:DMRC/20/IV-043/2020, Dated: 12.08.2021.

PHOTOGRAPH

Monthly Progress Report for period 26th March to 25th April – 2023
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.

Design and Drawing Status - East Side Elevated road

Approved by Approved
Revision Revision Submitted by Submitted letter no of Approved by
SI. No Description Drawing No. Authority Approved letter no of Authority Engineer by Remarks
No. Date GLCPL On GLCPL SWR/BNC
Engineer SWR/SBC

A GA Drawing

1 East Side Elevated Road DAC/2023/YPR/SWR/AR/GAD/MP/05 R0 GLCPL/YPR/2023/087

R2 18-May-23 18-May-23 18-May-23 19-May-23


B Architectural Drawing
1
2
3

C Structural Drawing
Column Layout Plan & Schedule East
1 YPR/ER/S-03 R0 5-Jun-23 14-Jun-23 GLCPL/YSR/2023/185 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
Side Elevated Road

Foundation Plan & Details East Side


2 YPR/ER/S-04 R0 5-Jun-23 14-Jun-23 GLCPL/YSR/2023/185 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
Elevated Road
R1 3-Jul-23 13-Jul-23 GLCPL/YSR/2023/247
R2 19-Jul-23 22-Jul-23 GLCPL/YSR/2023/259

Foundation Reinforcement Details East


3 YPR/ER/S-05 R0 5-Jun-23 14-Jun-23 GLCPL/YSR/2023/185 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
Side Elevated Road

4 Plinth Level Plan YPR/ER/S-11 R0 11-Jul-23 13-Jul-23 GLCPL/YSR/2023/247

5 Plinth Level Beam Detail YPR/ER/S-12 R0 11-Jul-23 13-Jul-23 GLCPL/YSR/2023/247

6 Plinth Level Beam Detail YPR/ER/S-13 R0 11-Jul-23 13-Jul-23 GLCPL/YSR/2023/247

7 Plinth Level Beam Detail YPR/ER/S-14 R0 11-Jul-23 13-Jul-23 GLCPL/YSR/2023/247

8 Plinth Level Beam Detail YPR/ER/S-15 R0 11-Jul-23 13-Jul-23 GLCPL/YSR/2023/247

9 Plinth Level Beam Detail YPR/ER/S-16 R0 11-Jul-23 13-Jul-23 GLCPL/YSR/2023/247

10 Framing Plan (LVL + 10.200) YPR/ER/S-21 R0 18-Jul-23 22-Jul-23 GLCPL/YSR/2023/259

11 Beam Detail (LVL + 10.200) YPR/ER/S-22 R0 18-Jul-23 22-Jul-23 GLCPL/YSR/2023/259

12 Beam Detail (LVL + 10.200) YPR/ER/S-23 R0 18-Jul-23 22-Jul-23 GLCPL/YSR/2023/259


13 Beam Detail (LVL + 10.200) YPR/ER/S-24 R0 18-Jul-23 22-Jul-23 GLCPL/YSR/2023/259
R0 18-Jul-23 28-Jul-23 GLCPL/YSR/2023/264

14 Beam Detail (LVL + 10.200) YPR/ER/S-25 R0 18-Jul-23 22-Jul-23 GLCPL/YSR/2023/259

15 Beam Detail (LVL + 10.200) YPR/ER/S-26 R0 18-Jul-23 22-Jul-23 GLCPL/YSR/2023/259

16 Beam Detail (LVL + 10.200) YPR/ER/S-27 R0 18-Jul-23 22-Jul-23 GLCPL/YSR/2023/259

17 Beam Detail (LVL + 10.200) YPR/ER/S-28 R0 18-Jul-23 22-Jul-23 GLCPL/YSR/2023/259


R0 18-Jul-23 28-Jul-23 GLCPL/YSR/2023/264

18 Slab Detail YPR/ER/S-29 R0 18-Jul-23 28-Jul-23 GLCPL/YSR/2023/264


"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.

Design and Drawing Status - Multi Level Car Parking Cum Office (G+5)

Approved by Approved
Revision Revision Submitted by Submitted letter no of Approved by
SI. No Description Drawing No. Authority Approved letter no of Authority Engineer by Remarks
No. Date GLCPL On GLCPL SWR/BNC
Engineer SWR/SBC

A GA Drawing

GROUND FLOOR PLAN WITH SITE DAC/2023/YPR/SWR/AR/GAD/MLCP/


1 R4 25-Apr-23 1-Aug-23
CONTEXT 01A

DAC/2023/YPR/SWR/AR/GAD/MLCP/
2 GROUND FLOOR PLAN R4 25-Apr-23 1-Aug-23
01B

DAC/2023/YPR/SWR/AR/GAD/MLCP/
3 FIRST FLOOR PLAN R4 25-Apr-23 1-Aug-23
02
DAC/2023/YPR/SWR/AR/GAD/MLCP/
4 SECOND FLOOR PLAN R4 25-Apr-23 1-Aug-23
03
DAC/2023/YPR/SWR/AR/GAD/MLCP/
5 THIRD FLOOR PLAN R4 25-Apr-23 1-Aug-23
04
DAC/2023/YPR/SWR/AR/GAD/MLCP/
6 FOURTH FLOOR PLAN R4 25-Apr-23 1-Aug-23
05
DAC/2023/YPR/SWR/AR/GAD/MLCP/
7 FIFTH FLOOR PLAN R4 25-Apr-23 1-Aug-23 Without letter,old letter
06
222
8 TERRACE FLOOR PLAN DAC/2023/YPR/SWR/AR/GFC/MLCP/07 R4 25-Apr-23 1-Aug-23

9 MUMTY PLAN (NOT IN MASTER LIST) DAC/2023/YPR/SWR/AR/GFC/MLCP/08 R4 25-Apr-23 1-Aug-23

DAC/2023/YPR/SWR/AR/GAD/MLCP/
10 SECTION AA' & SECTION CC' R4 25-Apr-23 1-Aug-23
10A

11 SECTION BB' DAC/2023/YPR/SWR/AR/GFC/MLCP/10B R4 25-Apr-23 1-Aug-23

DAC/2023/YPR/SWR/AR/GFC/MLCP/
12 ELEVATION A R4 25-Apr-23 1-Aug-23
09A

DAC/2023/YPR/SWR/AR/GFC/MLCP/
13 ELEVATION B R4 25-Apr-23 1-Aug-23
09B
DAC/2023/YPR/SWR/AR/GFC/MLCP/
14 ELEVATION C & D R4 25-Apr-23 1-Aug-23
09C

B Architectural Drawing

C Structural Drawing

1 Column Layout Plan MLCP YPR/MLCP/S-03 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

R1 22-Jul-23 GLCPL/YSR/2023/261
2 Column ScheduleMLCP YPR/MLCP/S-03A R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

3 Foundation Plan & Detail MLCP YPR/MLCP/S-04 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

R1 22-Jul-23 GLCPL/YSR/2023/261

4 Foundation reinforcement Detail MLCP YPR/MLCP/S-05 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

R1 22-Jul-23 GLCPL/YSR/2023/261

5 Plinth Lvl Framing Plan YPR/MLCP/S-11 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

6 Plinth Lvl Beam Detail YPR/MLCP/S-12 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

7 1ST FL. Framing Plan MLCP YPR/MLCP/S-21 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

8 1ST FL. Slab Detail MLCP YPR/MLCP/S-22 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

9 1ST FL. Beam Detail MLCP YPR/MLCP/S-23 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

10 2ND FL. Framing Plan MLCP YPR/MLCP/S-31 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

11 2ND FL. Slab Detail MLCP YPR/MLCP/S-32 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

12 2ND FLOOR Beam Detail MLCP YPR/MLCP/S-33 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

13 3RD FL. Framing Plan MLCP YPR/MLCP/S-41 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

14 3RD FL. Slab Detail MLCP YPR/MLCP/S-42 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

15 3RD FLOOR Beam Detail MLCP YPR/MLCP/S-43 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

16 4TH & 5TH LVL. Framing Plan MLCP YPR/MLCP/S-51 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

17 4TH & 5TH FL. Slab Detail MLCP YPR/MLCP/S-52 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

18 4TH & 5TH FL. Beam Detail MLCP YPR/MLCP/S-53 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
19 Terrace LVL Framing Plan MLCP YPR/MLCP/S-61 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

20 Terrace FL. Slab Detail MLCP YPR/MLCP/S-62 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

21 Terrace FL. FLOOR Beam Detail MLCP YPR/MLCP/S-63 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.

Design and Drawing Status - Linen Store and Office (G+1)

Approved by Approved
Revision Revision Submitted by Submitted letter no of Approved by
SI. No Description Drawing No. Authority Approved letter no of Authority Engineer by Remarks
No. Date GLCPL On GLCPL SWR/BNC
Engineer SWR/SBC

A GA Drawing
27-Jan-2023
1 Ground Floor Plan DAC/2023/YPR/SWR/AR/GAD/LINEN/01 R0 & 08-Feb- By Mail
2023
Transmittal No. GLCPL-
R1 11-Feb-23 12-Feb-23 YES-TR-004
R2 18-Feb-23 GLCPL/YPR/2023/28
R3
R4 13-Mar-23 14-Mar-23 14-Mar-23 14-Mar-23 24-Mar-23

27-Jan-2023
2 First Floor Plan DAC/2023/YPR/SWR/AR/GAD/LINEN/02 R0 & 08-Feb- By Mail
2023
Transmittal No. GLCPL-
R1 12-Feb-23 YES-TR-004
R2 18-Feb-23 GLCPL/YPR/2023/28
R3
R4 13-Mar-23 14-Mar-23 14-Mar-23 14-Mar-23 24-Mar-23

B Architectural Drawing

Ground Floor Plan DAC/2023/YPR/SWR/AR/GFC/LINEN/01 R4 24-Apr-23 28-Jun-23 GLCPL/YPR/2023/219 28-Jun-23

First Floor Plan DAC/2023/YPR/SWR/AR/GFC/LINEN/02 R4 24-Apr-23 28-Jun-23 GLCPL/YPR/2023/219 28-Jun-23

Terrace Floor Plan DAC/2023/YPR/SWR/AR/GFC/LINEN/03 R4 24-Apr-23 28-Jun-23 GLCPL/YPR/2023/219 28-Jun-23

C Structural Drawing
1 General Details (Sheet -01 of 04) YPR/S-01 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85
R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

2 General Details (Sheet -02 of 04) YPR/S-01 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189
3 General Details (Sheet -03 of 04) YPR/S-01 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85
R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

4 General Details (Sheet -04 of 04) YPR/S-01 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

5 Col Layout & Foundation detail YPR/LS/S-03 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

6 Col Schedule YPR/LS/S-05 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

7 Plinth Lvl Framing Plan & Slab Details YPR/LS/S-11 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85
R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A
R2 23-May-23 27-May-23 GLCPL/YPR/2023/161 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

8 Plinth Lvl Beam Details YPR/LS/S-13 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A
R2 23-May-23 27-May-23 GLCPL/YPR/2023/161 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

9 First Floor Framing Plan YPR/LS/S-21 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

10 First Floor Slab Details YPR/LS/S-22 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

11 First Floor Beam Details YPR/LS/S-23 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

12 Terrace Lvl Framing Plan YPR/LS/S-31 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

13 Terrace Lvl Slab Details YPR/LS/S-32 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

14 Terrace Lvl Beam Details YPR/LS/S-33 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

15 Above Terrace Detail YPR/LS/S-41 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

16 Staircase Plan & Detail YPR/LS/ST-01 R0 5-Jun-23 14-Jun-23 GLCPL/YPR/2023/185 7/8/2028 VSPL/APM/YPR/2223-037/2022-23/COLC-189

D Electrical Drawing
1 Light & Power Layout - GF Plan DCCE/RLDA/ELE/GFC/LINEN/01 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142
R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

2 ELV & Fire, PA Layout - GF Plan DCCE/RLDA/ELE/GFC/LINEN/01 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

3 Light & Power Conduit Layout - GF Plan DCCE/RLDA/ELE/GFC/LINEN/2.1 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142

R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

4 Light & Power Layout - FF Plan DCCE/RLDA/ELE/GFC/LINEN/03 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

5 ELV & Fire, PA Layout - FF Plan DCCE/RLDA/ELE/GFC/LINEN/04 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

6 Light & Power Conduit Layout - FF Plan DCCE/RLDA/ELE/GFC/LINEN/4.1 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142

R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

7 Electrical Layout - Terrace Floor Plan DCCE/RLDA/ELE/GFC/LINEN/05 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

Fire alarm & ELV Schematic Layout


8 Linen Store DCCE/RLDA/ELE/GFC/LINEN/06 R0 Not Submitted

R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

E Plumbing & Fire Fighting

Drainage Water supply & FF Layout - GF


1 Plan DCCE/RLDA/PL & FF/GFC/LINEN/01 R0 9-May-23 13-May-23 GLCPL/YPR/2023/142

R0 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

Drainage Water supply & FF Layout - FF


2 Plan DCCE/RLDA/PL & FF/GFC/LINEN/02 R0 9-May-23 13-May-23 GLCPL/YPR/2023/142

R0 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

Drainage Water supply & FF Layout -


3 Terrace Floor Plan DCCE/RLDA/PL & FF/GFC/LINEN/01 R0 9-May-23 13-May-23 GLCPL/YPR/2023/142

R0 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

F HVAC

1 HVAC layout - GF Plan DCCE/RLDA/HVAC/GFC/LINEN/01 R0 Not Submitted


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

2 HVAC layout - FF Plan DCCE/RLDA/HVAC/GFC/LINEN/02 R0 Not Submitted


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.

Design and Drawing Status - RPF Office and Bangalore Rural Railway Police station (G+1)

Approved by Approved
Revision Revision Submitted by Submitted letter no of Approved by
SI. No Description Drawing No. Authority Approved letter no of Authority Engineer by Remarks
No. Date GLCPL On GLCPL SWR/BNC
Engineer SWR/SBC

A GA Drawing
27-Jan-2023 &
1 Ground Floor Plan DAC/2023/YPR/SWR/AR/GAD/RPF/01 R0 By Mail
08-Feb-2023
Transmittal No. GLCPL-
R1 11-Feb-23 12-Feb-23
YES-TR-004
R2 18-Feb-23 GLCPL/YPR/2023/28

Dates as per Signed


R3 16-Mar-23 16-Mar-23 GLCPL/YPR/2023/62 16-Mar-23 18-Mar-23 24-Mar-23
Drawing Copy

27-Jan-2023 &
2 First Floor Plan DAC/2023/YPR/SWR/AR/GAD/RPF/02 R0 By Mail
08-Feb-2023
Transmittal No. GLCPL-
R1 11-Feb-23 12-Feb-23
YES-TR-004
R2 18-Feb-23 GLCPL/YPR/2023/28

Dates as per Signed


R3 16-Mar-23 16-Mar-23 GLCPL/YPR/2023/62 16-Mar-23 18-Mar-23 24-Mar-23
Drawing Copy

B Architectural Drawing
1 Ground Floor Plan DAC/2023/YPR/AR/GFC/RPF/01 R3 20-Mar-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23
2 First Floor Plan DAC/2023/YPR/AR/GFC/RPF/02 R3 8-May-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23
3 Terrace Floor Plan DAC/2023/YPR/AR/GFC/RPF/03 R2 20-Mar-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23
4 Section AA DAC/2023/YPR/AR/GFC/RPF/05 R2 20-Jun-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23
5 Section BB DAC/2023/YPR/AR/GFC/RPF/06 R2 20-Jun-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23
6 Section CC & Section DD Refference 29-Apr-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23

C Structural Drawing

1 Column Layout Plan YPR/RPF/S-03 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189

2 Foundation Plan & Detail YPR/RPF/S-04 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189

3 Column Schedule YPR/RPF/S-05 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189

4 Plinth Lvl Framing Plan YPR/RPF/S-11 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123


R1 5/23/2023 27-May-23 GLCPL/YPR/2023/161 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189
5 Plinth Lvl Beam Detail YPR/RPF/S-13 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123

R1 5/23/2023 27-May-23 GLCPL/YPR/2023/161 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189

6 First Floor Framing Plan YPR/RPF/S-21 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189

7 First Floor Slab Detail YPR/RPF/S-22 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189

8 First Floor Beam Detail YPR/RPF/S-23 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189

9 Terrace Floor Framing Plan YPR/RPF/S-31 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189

10 Terrace Floor Slab Detail YPR/RPF/S-32 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189

11 Terrace Floor Beam Detail YPR/RPF/S-33 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189

12 Mumty Lvl Framing Plan & Detail YPR/RPF/S-41 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189

13 Staircase Plan & Detail YPR/RPF/ST-01 R0 6/5/2023 14-Jun-23 GLCPL/YPR/2023/123 8-Jul-23 VSPL/APM/YPR/2223-037/2022-23/COLC-189

D Electrical Drawing
1 Light & Power Layout - GF Plan DCCE/RLDA/ELE/GFC/RPF/01 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211 22-Jun-23

2 ELV & Fire, PA Layout - GF Plan DCCE/RLDA/ELE/GFC/RPF/02 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211 22-Jun-23

3 Light & Power Conduit Layout - GF Plan DCCE/RLDA/ELE/GFC/RPF/2.1 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142

R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211 22-Jun-23

4 Light & Power Layout - FF Plan DCCE/RLDA/ELE/GFC/RPF/03 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211 22-Jun-23

5 ELV & Fire, PA Layout - FF Plan DCCE/RLDA/ELE/GFC/RPF/04 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211 22-Jun-23

6 Light & Power Conduit Layout - FF Plan DCCE/RLDA/ELE/GFC/RPF/4.1 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142

R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211 22-Jun-23

7 Electrical Layout - Terrace Floor Plan DCCE/RLDA/ELE/GFC/RPF/05 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211 22-Jun-23

Fire alarm & ELV Schematic Layout


8 DCCE/RLDA/ELE/GFC/RPF/06 R0 Not Submitted
Linen Store
R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211 22-Jun-23
E Plumbing & Fire Fighting
Drainage Water supply & FF Layout - GF
1 DCCE/RLDA/PL & FF/GFC/RPF/01 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
Plan
R0 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211 22-Jun-23

Drainage Water supply & FF Layout - FF


2 DCCE/RLDA/PL & FF/GFC/RPF/02 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
Plan
R0 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211 22-Jun-23

Drainage Water supply & FF Layout -


3 DCCE/RLDA/PL & FF/GFC/RPF/03 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
Terrace Floor Plan
R0 8-May-23 22-Jun-23 GLCPL/YPR/2023/211 22-Jun-23

F HVAC

1 HVAC layout - GF Plan DCCE/RLDA/HVAC/GFC/RPF/01 R0 8-May-23 22-Jun-23 GLCPL/YPR/2023/211

2 HVAC layout - FF Plan DCCE/RLDA/HVAC/GFC/RPF/02 R0 8-May-23 22-Jun-23 GLCPL/YPR/2023/211


"Major Up-gradation
Contract Agreem

Design a

SI. No Description Drawing No.

A GA Drawing

1 Air Concourse DAC/2023/YPR/SWR/AR/GAD/MP/05

B Architectural Drawing
1
2
3

C Structural Drawing (IIT VETTED)


1 Column Layout Plan & Schedule concourse YPR/CON/S-03

2 Shear Wall Schedule Concourse YPR/CON/S-03A

3 Foundation Layout Plan YPR/CON/S-04

4 Foundaion reinforcement detail concourse ( Sheet-1) YPR/CON/S-05

5 Foundaion reinforcement detail concourse ( Sheet-2) YPR/CON/S-06

6 Foundaion reinforcement detail concourse ( Sheet-3) YPR/CON/S-07

7 Concourse Level Plan YPR/CON/S-11

D Electrical Drawing
1
2
3

E Plumbing & Fire Fighting


1
2
3

F HVAC
1
2
3
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.

Design and Drawing Status - Air Concourse (75x216M)

Approved by
Revision Revision Submitted by Submitted letter no of
Authority
No. Date GLCPL On GLCPL
Engineer

R0

R1
R2 17-May-23 18-May-23

R0 11-Aug-23 12-Aug-23 GLCPL/YSR/2023/281

R0 11-Aug-23 12-Aug-23 GLCPL/YSR/2023/281

R0 11-Aug-23 12-Aug-23 GLCPL/YSR/2023/281

R0 11-Aug-23 12-Aug-23 GLCPL/YSR/2023/281

R0 11-Aug-23 12-Aug-23 GLCPL/YSR/2023/281

R0 11-Aug-23 12-Aug-23 GLCPL/YSR/2023/281

R0 11-Aug-23 12-Aug-23 GLCPL/YSR/2023/281


way"

Approved
Approved by
Approved letter no of Authority Engineer by Remarks
SWR/BNC
SWR/SBC

19.05.2023
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.

Architectural Drawing

Approved by Approved
Revision Revision Submitted by Approved by
SI. No Description Drawing No. Submitted letter no of GLCPL Authority by Remarks
No. Date GLCPL On SWR/BNC
Engineer SWR/SBC

A Linen Store and Office (G+1)


1 Ground Floor Plan DAC/2023/YPR/SWR/AR/GFC/LINEN/01 R4 24-Apr-23 28-Jun-23 GLCPL/YPR/2023/219 28-Jun-23

2 First Floor Plan DAC/2023/YPR/SWR/AR/GFC/LINEN/02 R4 24-Apr-23 28-Jun-23 GLCPL/YPR/2023/219 28-Jun-23

3 Terrace Floor Plan DAC/2023/YPR/SWR/AR/GFC/LINEN/03 R4 24-Apr-23 28-Jun-23 GLCPL/YPR/2023/219 28-Jun-23

B RPF Office and Bangalore Rural Railway Police station (G+1)


1 Ground Floor Plan DAC/2023/YPR/AR/GFC/RPF/01 R2 20-Mar-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23

2 First Floor Plan DAC/2023/YPR/AR/GFC/RPF/02 R0 8-May-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23

3 Terrace Floor Plan DAC/2023/YPR/AR/GFC/RPF/03 R2 20-Mar-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23

4 Roof Plan DAC/2023/YPR/AR/GFC/RPF/04

5 Section AA DAC/2023/YPR/AR/GFC/RPF/05 R2 20-Jun-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23

6 Section BB DAC/2023/YPR/AR/GFC/RPF/06 R2 20-Jun-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23

7 Section CC & Section DD Refference 29-Apr-23 24-Jun-23 GLCPL/YPR/2023/213 24-Jun-23

C Multi Level Car Parking Cum Office (G+5)


MLCP GROUND FLOOR WITH SITE
1 DAC/2023/YPR/SWR/AR/GAD/MLCP/01A R3 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23
CONTEXT

2 MLCP GROUND FLOOR PLAN DAC/2023/YPR/SWR/AR/GAD/MLCP/01B R4 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23

3 MLCP FIRST FLOOR PLAN DAC/2023/YPR/SWR/AR/GAD/MLCP/02 R4 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23

4 MLCP SECOND FLOOR PLAN DAC/2023/YPR/SWR/AR/GAD/MLCP/03 R4 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23

5 MLCP THIRD FLOOR PLAN DAC/2023/YPR/SWR/AR/GAD/MLCP/04 R4 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23

6 MLCP FOURTH FLOOR PLAN DAC/2023/YPR/SWR/AR/GAD/MLCP/05 R4 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23

7 MLCP FIFTH FLOOR PLAN DAC/2023/YPR/SWR/AR/GAD/MLCP/06 R4 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23

8 MLCP TERRACE FLOOR PLAN DAC/2023/YPR/SWR/AR/GAD/MLCP/07 R3 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23

9 MLCP MUMTY PLAN DAC/2023/YPR/SWR/AR/GAD/MLCP/08 R2 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23

10 SECTION AA' AND SECTION CC' DAC/2023/YPR/SWR/AR/GAD/MLCP/10A R3 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23
11 SECTION BB' DAC/2023/YPR/SWR/AR/GAD/MLCP/10B R3 25-Apr-23 30-Jun-23 GLCPL/YPR/2023/222 30-Jun-23
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.

Structural Drawing

Approved by Approved
Revision Revision Submitted by Approved by
SI. No Description Drawing No. Submitted letter no of GLCPL Authority by Remarks
No. Date GLCPL On SWR/BNC
Engineer SWR/SBC

A Linen Store and Office (G+1)


1 General Details (Sheet -01 of 04) YPR/S-01 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85
R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

2 General Details (Sheet -02 of 04) YPR/S-01 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

3 General Details (Sheet -03 of 04) YPR/S-01 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

4 General Details (Sheet -04 of 04) YPR/S-01 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

5 Col Layout & Foundation detail YPR/LS/S-03 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

6 Col Schedule YPR/LS/S-05 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

7 Plinth Lvl Framing Plan & Slab Details YPR/LS/S-11 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85

R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A


R2 23-May-23 27-May-23 GLCPL/YPR/2023/161

8 Plinth Lvl Beam Details YPR/LS/S-13 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A
R2 23-May-23 27-May-23 GLCPL/YPR/2023/161

9 First Floor Framing Plan YPR/LS/S-21 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

10 First Floor Slab Details YPR/LS/S-22 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

11 First Floor Beam Details YPR/LS/S-23 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

12 Terrace Lvl Framing Plan YPR/LS/S-31 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

13 Terrace Lvl Slab Details YPR/LS/S-32 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

14 Terrace Lvl Beam Details YPR/LS/S-33 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

15 Above Terrace Detail YPR/LS/S-41 R0 28-Mar-23 4-Apr-23 GLCPL/YPR/2023/85


R1 29-Apr-23 18-May-23 GLCPL/YPR/2023/145A

16 Staircase Plan & Detail YPR/LS/ST-01 R0 5-Jun-23 14-Jun-23 GLCPL/YPR/2023/185

B RPF Office and Bangalore Rural Railway Police station (G+1)


1 Column Layout Plan YPR/RPF/S-03 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123

2 Foundation Plan & Detail YPR/RPF/S-04 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123

3 Column Schedule YPR/RPF/S-05 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123

4 Plinth Lvl Framing Plan YPR/RPF/S-11 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123


R1 23-May-23 27-May-23 GLCPL/YPR/2023/161

5 Plinth Lvl Beam Detail YPR/RPF/S-13 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123


R1 23-May-23 27-May-23 GLCPL/YPR/2023/161

6 First Floor Framing Plan YPR/RPF/S-21 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123

7 First Floor Slab Detail YPR/RPF/S-22 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123

8 First Floor Beam Detail YPR/RPF/S-23 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123

9 Terrace Floor Framing Plan YPR/RPF/S-31 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123

10 Terrace Floor Slab Detail YPR/RPF/S-32 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123

11 Terrace Floor Beam Detail YPR/RPF/S-33 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123

12 Mumty Lvl Framing Plan & Detail YPR/RPF/S-41 R0 4/15/2023 27-Apr-23 GLCPL/YPR/2023/123

13 Staircase Plan & Detail YPR/RPF/ST-01 R0 5-Jun-23 14-Jun-23 GLCPL/YPR/2023/123

C Multi Level Car Parking Cum Office (G+5)


1 Column Layout Plan MLCP YPR/MLCP/S-03 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

2 Column ScheduleMLCP YPR/MLCP/S-03A R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

3 Foundation Plan & Detail MLCP YPR/MLCP/S-04 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

4 Foundation reinforcement Detail MLCP YPR/MLCP/S-05 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164


5 Plinth Lvl Framing Plan YPR/MLCP/S-11 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

6 Plinth Lvl Beam Detail YPR/MLCP/S-12 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

7 1ST FL. Framing Plan MLCP YPR/MLCP/S-21 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

8 1ST FL. Slab Detail MLCP YPR/MLCP/S-22 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

9 1ST FL. Beam Detail MLCP YPR/MLCP/S-23 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

10 2ND FL. Framing Plan MLCP YPR/MLCP/S-31 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

11 2ND FL. Slab Detail MLCP YPR/MLCP/S-32 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

12 2ND FLOOR Beam Detail MLCP YPR/MLCP/S-33 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

13 3RD FL. Framing Plan MLCP YPR/MLCP/S-41 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

14 3RD FL. Slab Detail MLCP YPR/MLCP/S-42 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

15 3RD FLOOR Beam Detail MLCP YPR/MLCP/S-43 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

16 4TH & 5TH LVL. Framing Plan MLCP YPR/MLCP/S-51 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

17 4TH & 5TH FL. Slab Detail MLCP YPR/MLCP/S-52 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

18 4TH & 5TH FL. Beam Detail MLCP YPR/MLCP/S-53 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

19 Terrace LVL Framing Plan MLCP YPR/MLCP/S-61 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

20 Terrace FL. Slab Detail MLCP YPR/MLCP/S-62 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

21 Terrace FL. FLOOR Beam Detail MLCP YPR/MLCP/S-63 R0 23-May-23 31-May-23 GLCPL/YSR/2023/164

D East Side Elevated road


Column Layout Plan & Schedule East
1 YPR/ER/S-03 R0 5-Jun-23 14-Jun-23 GLCPL/YSR/2023/185
Side Elevaed Road

Foundation Plan & Details East Side


2 YPR/ER/S-04 R0 5-Jun-23 14-Jun-23 GLCPL/YSR/2023/185
Elevaed Road

Foundation Reinforcement Details East


3 YPR/ER/S-05 R0 5-Jun-23 14-Jun-23 GLCPL/YSR/2023/185
Side Elevaed Road
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.

MEP Drawing

Approved by Approved
Revision Revision Submitted by Approved by
SI. No Description Drawing No. Submitted letter no of GLCPL Authority by Remarks
No. Date GLCPL On SWR/BNC
Engineer SWR/SBC

A Linen Store and Office (G+1)


1 Light & Power Layout - GF Plan DCCE/RLDA/ELE/GFC/LINEN/01 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142
R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

2 ELV & Fire, PA Layout - GF Plan DCCE/RLDA/ELE/GFC/LINEN/01 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

3 Light & Power Conduit Layout - GF Plan DCCE/RLDA/ELE/GFC/LINEN/2.1 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142
R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

4 Light & Power Layout - FF Plan DCCE/RLDA/ELE/GFC/LINEN/03 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

5 ELV & Fire, PA Layout - FF Plan DCCE/RLDA/ELE/GFC/LINEN/04 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

6 Light & Power Conduit Layout - FF Plan DCCE/RLDA/ELE/GFC/LINEN/4.1 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142
R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

7 Electrical Layout - Terrace Floor Plan DCCE/RLDA/ELE/GFC/LINEN/05 R0 23-Apr-23 13-May-23 GLCPL/YPR/2023/142


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

8 Fire alarm & ELV Schematic Layout Linen Store DCCE/RLDA/ELE/GFC/LINEN/06 R0 Not Submitted
R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

9 Drainage Water supply & FF Layout - GF Plan DCCE/RLDA/PL & FF/GFC/LINEN/01 R0 9-May-23 13-May-23 GLCPL/YPR/2023/142

R0 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

10 Drainage Water supply & FF Layout - FF Plan DCCE/RLDA/PL & FF/GFC/LINEN/02 R0 9-May-23 13-May-23 GLCPL/YPR/2023/142

R0 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

11 Drainage Water supply & FF Layout - Terrace Floor Plan DCCE/RLDA/PL & FF/GFC/LINEN/01 R0 9-May-23 13-May-23 GLCPL/YPR/2023/142

R0 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

12 HVAC layout - GF Plan DCCE/RLDA/HVAC/GFC/LINEN/01 R0 Not Submitted


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

13 HVAC layout - FF Plan DCCE/RLDA/HVAC/GFC/LINEN/02 R0 Not Submitted


R1 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

B RPF Office and Bangalore Rural Railway Police station (G+1)


1 Light & Power Layout - GF Plan DCCE/RLDA/ELE/GFC/RPF/01 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
2 ELV & Fire, PA Layout - GF Plan DCCE/RLDA/ELE/GFC/RPF/02 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142

3 Light & Power Conduit Layout - GF Plan DCCE/RLDA/ELE/GFC/RPF/2.1 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142

4 Light & Power Layout - FF Plan DCCE/RLDA/ELE/GFC/RPF/03 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142

5 ELV & Fire, PA Layout - FF Plan DCCE/RLDA/ELE/GFC/RPF/04 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142

6 Light & Power Conduit Layout - FF Plan DCCE/RLDA/ELE/GFC/RPF/4.1 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142

7 Electrical Layout - Terrace Floor Plan DCCE/RLDA/ELE/GFC/RPF/05 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142

8 Fire alarm & ELV Schematic Layout Linen Store DCCE/RLDA/ELE/GFC/RPF/06 R0 Not Submitted

9 Drainage Water supply & FF Layout - GF Plan DCCE/RLDA/PL & FF/GFC/RPF/01 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
R0 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

10 Drainage Water supply & FF Layout - FF Plan DCCE/RLDA/PL & FF/GFC/RPF/02 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142
R0 19-Jun-23 22-Jun-23 GLCPL/YPR/2023/211

11 Drainage Water supply & FF Layout - Terrace Floor Plan DCCE/RLDA/PL & FF/GFC/RPF/03 R0 8-May-23 13-May-23 GLCPL/YPR/2023/142

R0 8-May-23 22-Jun-23 GLCPL/YPR/2023/211

12 HVAC layout - GF Plan DCCE/RLDA/HVAC/GFC/RPF/01 R0 8-May-23 22-Jun-23 GLCPL/YPR/2023/211

13 HVAC layout - FF Plan DCCE/RLDA/HVAC/GFC/RPF/02 R0 8-May-23 22-Jun-23 GLCPL/YPR/2023/211


Structural Detailed Working
S.No Item No Description and Structure Drawing Status GAD Proof Checking Elevation Drawing Remarks
Drawing Drawing

EAST SIDE
Date Submitted 5/18/2023 Under Prepration Under Prepration
1 2.1 AIR CONCOURSE
Approved / Date Yes/11-07-2023 Under Prepration Under Prepration

Date Submitted 5/18/2023 5/23/2023 5/31/2023 6/30/2023 Under Prepration


2 2.3 MLCP
Approved / Date Yes/11-07-2023 Yes/30-05-2023 Yes/08-07-2023 Yes/30-06-2023 Under Prepration

Date Submitted 5/18/2023 6/5/2023 14-06-2-23 & 13-07-2023 Under Prepration Under Prepration
3 EAST SIDE ELEVATED ROAD CUM ARRIVAL/DEPARTURE
2.5
PLAZA Yes/ 14-06-2-23 &
Approved / Date Yes/11-07-2023 6/12/2023 Under Prepration Under Prepration
13-07-2023
29-04-2023 & 18-05-2-23 &
Date Submitted 3/14/2023 6/28/2023 6/22/2023
05-06-2023 14-06-2023
4 2.17 LINEN STORE AND OFFICES (G+1)
Approved / Date Yes/24-03-2023 5/16/2023 Yes/08-07-2023 Yes/28-06-2023 Under Review
15-04-2023 &
Date Submitted 3/16/2023 27-04-2023 & 27-05-2023 6/24/2023 6/22/2023
RPF OFFICE AND BANGALORE RURAL RAILWAY POLICE 23-05-2023
5 2.18
STATION (G+1)
Approved / Date Yes/16-03-2023 5/25/2023 Yes/08-07-2023 Yes/24-06-2023 Under Review

Date Submitted
6 EXTERNAL DEVELOPMENT,APPROACH ROADS-EAST
2.13
SIDE,COMPOUND WALL,ARRIVAL PLAZA ON EAST SIDE
Approved / Date

Date Submitted 8/3/2022


7 2.8 TEMPORARY STRUCTURES(PORTA CABIN /PRE-FABRICATED
CABINS)
Approved / Date Yes/08-08-2022

WEST SIDE
Date Submitted
8 2.2 WEST TERMINAL BUILDING - 4( FOUR) STORIED BUILDING
Approved / Date

Date Submitted
9 2.4 WEST SIDE ELEVATED ROAD CUM DEPARTURE PLAZA
AT+2.0M LEVEL
Approved / Date

Date Submitted
10 2.6 ARRIVAL APPROACH ROAD/RAMPS AT -4.0 M LEVEL ON WEST
SIDE
Approved / Date

Date Submitted
11 2.7 DEMOLITION WORK
Approved / Date

Date Submitted
12 2.9 UTILITIES
Approved / Date

Date Submitted
13 PLATFORM UPGDRADATION WORKS IN OTHER THAN AIR
2.10
CONCOURSE PORTION ON ALL PLATFORMS
Approved / Date

Date Submitted
14 PLATFORM UPDRADATION WORKS IN AIR CONCOURSE
2.11
PORTION ON ALL PLATFORMS
Approved / Date

Date Submitted
15 2.12 WESTSIDE PARKING AT +2.0 M LEVEL & -4.0 M LEVEL
Approved / Date

Date Submitted
16 2.14 OHE
Approved / Date

Date Submitted
17 2.15 PIDS,SIGNAGE & IT SECURITY-WEST SIDE BUILDING
Approved / Date

Date Submitted
18 2.16 MEP WORKS
Approved / Date

Date Submitted
19 2.19 INTEGRATED TESTING & COMMISSIONING
Approved / Date
"Major Up-grad
Contract A

Design

SI. No Description

A GA Drawing

1 Lower Ground Floor Plan

2 Ground Floor Plan

3 First Floor Plan

4 SecondFloor Plan

5 Terrace Floor Plan

6 Section-AA

B Architectural Drawing
1
2
3
C Structural Drawing (IIT VETTED)

D Electrical Drawing
1
2
3

E Plumbing & Fire Fighting


1
2
3

F HVAC
1
2
3
"Major Up-gradation of Yesvantpur Railway Station of South Western Railway"
Contract Agreement no: SWR/SWRC/Civil/2023/0005, Dated: 20.01.2023.

Design and Drawing Status - West Side Main Station Building

Revision Submitted by
Drawing No. Revision Date
No. GLCPL On

DAC/2023/YPR/SWR/AR/GAD/SB/01 R1 16-Mar-23 5-Feb-23

DAC/2023/YPR/SWR/AR/GAD/SB/01 R1 16-Mar-23 31-Aug-23

DAC/2023/YPR/SWR/AR/GAD/SB/02 R1 16-Mar-23 5-Feb-23

DAC/2023/YPR/SWR/AR/GAD/SB/02 R1 16-Mar-23 31-Aug-23

DAC/2023/YPR/SWR/AR/GAD/SB/03 R1 16-Mar-23 5-Feb-23

R1 16-Mar-23 31-Aug-23

DAC/2023/YPR/SWR/AR/GAD/SB/04 R1 16-Mar-23 5-Feb-23

R1 16-Mar-23 31-Aug-23

DAC/2023/YPR/SWR/AR/GAD/SB/05 R1 16-Mar-23 5-Feb-23

R1 16-Mar-23 31-Aug-23

DAC/2023/YPR/SWR/AR/GAD/SB/06 R1 16-Mar-23 5-Feb-23

R1 16-Mar-23 31-Aug-23
ailway Station of South Western Railway"
C/Civil/2023/0005, Dated: 20.01.2023.

West Side Main Station Building

Approved by
Approved by
Submitted letter no of GLCPL Authority Approved letter no of Authority Engineer
SWR/BNC
Engineer

GLCPL Transmittal No.GLCPL-


YES-TR-002

GLCPL/YPR/2023/300

GLCPL Transmittal No.GLCPL-


YES-TR-002 Comments
GLCPL/YPR/2023/300 given on
through
letter
GLCPL Transmittal No.GLCPL- VSPL/APM/Y
YES-TR-002 PR/2223-
GLCPL/YPR/2023/300 037/2022-
23/COLC-20
on
GLCPL Transmittal No.GLCPL- 20.02.2023 &
YES-TR-002 through mail
on
GLCPL/YPR/2023/300 12.09.2023

GLCPL Transmittal No.GLCPL-


YES-TR-002
GLCPL/YPR/2023/300

GLCPL Transmittal No.GLCPL-


YES-TR-002
GLCPL/YPR/2023/300
Approved
by Remarks
SWR/SBC

You might also like