0% found this document useful (0 votes)
73 views1 page

Duh CDM C RD 21

Uploaded by

Jeboy Chacko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views1 page

Duh CDM C RD 21

Uploaded by

Jeboy Chacko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTES:

1A
.L ME
LDI NSONSA
I REI L
NMILME
I TRESUNLESS
OTHE S
RWIENOTED.

2S
.PEEDT ABLEPAVEMENTMATERIALTOBE
VARIES ERS T
IECONDITON.
I AND
VE F
RIIEDASP
SUBJECTTOTHEE NE
NGI ERSAP PROVAL
300mm

100m m
300m m
200mm CLAY TACTILE DOMES ARE SPHERICAL
25mm

5m m
PAVERS WITH FLATTENED TOP
APPROX

50m m
300m m

16
R
PLAN OF

10m m
CEMENT MORTAR ON SUB BASE
ALTERNATIVE MODULE
OR CONCRETE AS DIRECTED
BY THE ENGINEER.
50mm

PLAN OF TACTILE PAVING LAYOUT TACTILE PAVING SURFACE SECTION


(AT GRADE CROSSING)

1650 3000 TO 5000 1650 90m


1500 150 150 1500 150
TRANSITION KERB TRANSITION KERB
TACTILE PAVERS
See Table 4-1 in the Dubai Traffic Control Device Manual

B
FLUSH KERB
(150x200)
3000
BOLLARD
427

1200
SIDE WALK PAVERS

INTERLOCKING BLOCK PAVING

800
TRANSITION KREBS 435

IN)
400
(M
UPSTAND KERB
(150x350)
FLUSH KERB

1500
(150x300)

614

602
INTERLOCKING
VEHICULAR PAVERS
612
ES
VARI

FLUSH KERB
(150x300)

A A
614
YELLOW COLOR REFLECTIVE
SOLID TRIANGLE PAVEMENT
MARKING
UPSTAND KERB UPSTAND KERB
(150x350) (150x350)

800
SIDE WALK PAVERS C0
T6 MAY.2024 ISSUED
FIRSTAS
ISSUE
N.T.T 6
REV. DATE DESCRIPTION
1200

Client

ROADS & TRANSPORTAUTHORITY

BOLLARD FLUSH KERB RTA


B

Consultant
PLAN OF RAISED CROSS WALK PAVING PATTERN DETAILS
BLOCK PAVING OPTION
150
150
800 3000 TO 5000 800 1650 3000 TO 5000 1650
150 1500 150 150 1500 150
Tel: +97144294800, Fax: +97144294801
TRANSITION KERB TRANSITION KERB

Job Title
GALVANIZED BOLLARD OR TO
400
PREVENT VEHICLE SHORT CUTS
R1155-SH0023
(MIN) TOP OF UPSTAND KERB GALVANIZED BOLLARD OR TO TOP OF UPSTAND KERB
400
KING SALMAN STREET VIADUCT
TACTILE PAVERS TACTILE PAVERS INTERLOCKING
8.3% PREVENT VEHICLE SHORT CUTS
TOP OF ASPHALT TOP OF ASPHALT
(MAX)
(MIN) BLOCK PAVING AND AL NASEEM STREET
Drawing Title
150

100

PROPOSED RAISED PEDESTRIAN


CROSSING DETAILS
FLUSH KERB FLUSH KERB FLUSH KERB FLUSH KERB FLUSH KERB FLUSH KERB
~SUB GRADE~ 80mm INTERLOCKING BLOCK PAVING
(150x200) (150x200) (150x300) (150x300) (150x300) (150x300)
50mm SAND BED 80mm INTERLOCKING VEHICULAR PAVERS
Job Number Drawing Number
AGGRECATE BASE COURSE 50mm CRUSHED BLACK SAND

200mm ACCREGATE BASE COURSE 6500054 DUH-CDM-C-RD-21


SUBGRADE
Designed Drawn Revision Suffix
Y.A. A.S. C0
T6

SECTION B-B SECTION A-A Date Checked By Approved By


:$USERNAME$

BLOCK PAVING OPTION BLOCK PAVING OPTION MAY 2024 A.H. Y.H.
(AS PER SPECIFICATIONS) Scale
:$DATE$
ME$

LE$
:$TI

:$FI

N.T.S
TENDER ADDENDUM NO:6