0% found this document useful (0 votes)
48 views1 page

Duh CDM C RD 12

Uploaded by

Jeboy Chacko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
48 views1 page

Duh CDM C RD 12

Uploaded by

Jeboy Chacko
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

NOTES:

1. ALL DIMENSIONS ARE IN METERS UNLESS


OTHERWISE NOTED.
2. THE MORTAR FILL BED SHALL BE IN
COMPLIANCE WITH THE SPECIFICATIONS.
3.THE DETAILS ARE INCLUDED ASPART OF RTA's
Grouted (Mortared) Riprap STANDARD AND THE SIZES, DIMENSIONS, REBAR
ROAD LEVEL ROAD LEVEL Road Level Slope protection SIZES AND SPACING AND OTHER DETAILS IN
THE DRAWINGS ARE BASED ON RTA's STANDARD
DRAWINGS. THE STRUCTURAL ADEQUACY OF
THE STANDARD DETAILS IS SUBJECT TO THE
TOP WIDTH ENGINEER'S APPROVAL /CONSTRUCTION NOC
VARIABLE
VARIABLE
DITCH TOP LEVEL

'V' DITCH TOP HYDRAULIC LEVEL

STONE PITCHING

n.
50
Mi
1.
1

5.00 5.00
INVERT LEVEL
Grouted Riprap
Ground Level

DETAIL FOR 'V' DITCH


PIPE CULVERT
ELEVATION OF TYPICAL PROTECTION AT UPSTREAM AND DOWNSTREAM

150mm Cement Stabilized Subbase


compacted to 95% MDD

ies
r

n.
Max 1.5 or Varies 1.50 Va

50Mi
Ditch Bottom 3.00 3.00

1.
4:
1

50
1

0.
1
1
19-25mm gravel or stone
20

Loose Riprap
0.
0.

50 Grouted (Mortared) Riprap


DITCH DETAILS
PIPE CULVERT
SECTION OF TYPICAL PROTECTION AT UPSTREAM

150mm Cement Stabilized Subbase


Shoulder Verge = 0.90 compacted to 95% MDD
Full depth pavement 0.15
Existing ground 3.00 3.00 2.00
Wearing Course

n.
50Mi
Base Course
Varies
1

1.
~

Road Base
Suitable fill (CBR > 15%)
@ 95% MDD 1 1

50
0.
1 1
In-situ material CBR > 30% (or improved sub grade) 1.00
Loose Riprap

0
.5
0
SLOPE PROTECTION OUTSIDE EDGE Grouted (Mortared) Riprap
C0 JUL.2024 FIRST ISSUE
REV. DATE DESCRIPTION
PIPE CULVERT Client

SECTION OF TYPICAL PROTECTION AT DOWNSTREAM


ROADS & TRANSPORTAUTHORITY

RTA
C
L

Consultant

Shldr. Carriageway Shldr. Median Shldr. Carriageway Shldr.


0.9 3.00 21.60 3.00 12.00 3.00 21.60 3.00 0.9

Tel: +97144294800, Fax: +97144294801

Up stream Inlet (Down streem) Outlet


Job Title
3.00 3.00
2.00 3.00 5.00 R1155-SH0023
50

KING SALMAN STREET VIADUCT


0.

Box Culvert
n.

AND AL NASEEM STREET

n.
50 Mi

50 Mi
1 Drawing Title
1 0.
51
1.

0 1 1 PROTECTION DETAILS FOR

1.
1
1 1 EMBANKMENT AND CULVERTS

0
Mortared Riprap

.5
1.00

0
Loose RipRap Grouted (Mortared) Riprap
Loose RipRap Job Number Drawing Number

6500054 DUH-CDM-C-RD-12
TYPICAL CROSS-SECTION THROUGH BOX CULVERT
Designed Drawn Revision Suffix
Y.A. S.D. C0

Date Checked By Approved By


:$USERNAME$

JULY 2024 A.H. Y.H.


Scale
:$DATE$
ME$

LE$
:$TI

:$FI

N.T.S
ng

CONTRACT DRAWINGS