Installation Instructions
Option
© Siemens, 2004
07539005
© Siemens, 2004
All documents may only be used for rendering
services on Siemens Healthcare Products. Any
document in electronic form may be printed
once. Copy and distribution of electronic docu-
ments and hardcopies is prohibited. Offenders
will be liable for damages. All other rights are re-
served.
2004
2 Copyright / Version / Disclaimer
1Copyright / Version / Disclaimer
Copyright
“© Siemens, 2004“ refers to the copyright of a Siemens entity such as Siemens Aktienge-
sellschaft - Germany, Siemens Mindit Magnetic Resonance Ltd. - China, Siemens Shang-
hai Medical Equipment Ltd. - China, Siemens Medical Solutions USA Inc. - USA and/or
Siemens Healthcare Diagnostics Inc. - USA.
Document Version
Siemens reserves the right to change its products and services at any time.
In addition, manuals are subject to change without notice. The hardcopy documents corre-
spond to the version at the time of system delivery and/or printout. Versions to hardcopy
documentation are not automatically distributed. Please contact your local Siemens office
to order current version or refer to our website http://www.healthcare.siemens.com.
Disclaimer
Siemens provides this documentation “as is“ without the assumption of any liability under
any theory of law.
The installation and service of equipment described herein requires superior understand-
ing of our equipment and may only be performed by qualified personnel who are specially
trained for such installation and/or service.
Bei einer Gefahr, die bei Nichtvermeidung zum Tod oder zu einer
schweren Körperverletzung führen kann.
Please note:
¹ The product-specific safety information in these
instructions,
¹ The general safety information in TD00-000.860.01...,
and
¹ The safety information in accordance with ARTD Part 2.
These instructions are valid for the conversion of a SIREMOBIL Compact, SIREMOBIL
Compact L, SIREMOBIL Iso-C, ARCOSKOP or POWERMOBIL from 17" tube monitors
(mounted to a monitor cart) to 18" TFT displays (8079530).
NOTE Two upgrade kits are available, one for systems with one
monitor (material number 7141380) and one for systems with
two monitors (material number 7141125). These instructions
are valid for both upgrade kits.
Monitor upgrade kit for systems with one monitor, material number 7141380
or
Monitor upgrade kit for systems with two monitors, material number 7141125
NOTE All tools, measuring equipment and aids, with the exception
of those marked with "*", are listed and specified in the SPC
(Spare Parts Catalog).
• Standard toolkit*
• Set of Allen wrenches*
• Protective conductor test device, e.g. UNIMET 1100 ST 51 38 727
• Luminence measuring device, e.g., SMFit spotmeter 77 52 848
• Low-solid screw locking element, e.g. Loctite 221 20 48 874
• Remove the monitor cover (Fig. 1 / p. 10) and unplug all cables from the monitor to be
replaced.
Only for SIMOMED N monitor 1102628: Remove the shield plate (Fig. 2 / p. 10) and the
connection housing (Fig. 3 / p. 10).
• Unscrew the base of the monitor (Fig. 5 / p. 11) from the monitor cart and remove com-
pletely (Fig. 6 / p. 11).
• Screw the new display bracket onto the monitor cart using 4 countersunk screws M6 x
16, 4 washers and 4 nuts (included in the conversion set) (1/Fig. 7 / p. 12).
• Run the free cord end of the new power cord down through the display bracket and
sideways through the rail to the ON/OFF assembly and connect to the terminal strip
(Fig. 8 / p. 12)
- Connect the brown cable ends to terminal block X2.1.
- Connect the blue cable ends to terminal block X2.2.
- Connect the protective conductor (green-yellow) to the ground terminal.
• Run the new BNC video cable with the insulated end down through the display bracket
and sideways through the rail to the Memoskop. Plug the cord to bushing OUT1 and
latch.
NOTE The end with the open shielding braid must be on the display
side (Fig. 10 / p. 12).
• Connect the ground wire received in the scope of delivery to the display bracket (nut
and washer included in conversion kit) (2/Fig. 7 / p. 12). Run the other end down
through the display bracket and connect to the ground wire connection in the log book
compartment (Fig. 9 / p. 12).
• Tightly screw the display to the display bracket with 4 countersunk screws M4 x 12
(contained in the scope of delivery) using a low-solid screw locking element (e.g. Loc-
tite 221) (1/Fig. 11 / p. 13).
Make sure that the cords lie between the spacers of the display bracket
(3/Fig. 7 / p. 12).
• Remove the monitor covers (Fig. 12 / p. 14) and unplug all cables from the monitors to
be replaced.
Only for SIMOMED N monitor 11 02 628: Remove the shield plates (Fig. 13 / p. 14) and
the connection housings (Fig. 14 / p. 14).
Fig. 16: Monitor attachments Fig. 17: Monitor cart cable bushes
• Unscrew both bases of the monitors from the monitor cart and remove completely
(Fig. 16 / p. 15).
• Remove the two video cables.
Fig. 18: ON/OFF assembly Fig. 19: Installation of the support arm
• Screw the adapter plate (1/Fig. 19 / p. 16) to the support arm base using 4 screws M6 x
10 (included in the scope of delivery) and Loctite 221.
• Open the rear cover of the support arm base.
• Run the stripped cord end of the new power cords (included in the scope of delivery)
down through the bracket of the support arm (2/Fig. 19 / p. 16) and the cable bush of
the support arm base (1/Fig. 19 / p. 16), on through the center cable bush of the moni-
tor cart and sideways through the rail to the ON/OFF (Fig. 18 / p. 16) assembly and
connect to the terminal block:
- Connect the brown cable ends to terminal block X2.1.
- Connect the blue cable ends to terminal block X2.2.
- Connect the protective conductor (green-yellow) to the ground terminal
(1/Fig. 18 / p. 16).
NOTE The new power line cables have a length of approx. 2.6 m and
are equipped with a straight IEC connector on one cable end.
• Run the video cable included in the scope of delivery (BNC plug - BNC plug) with the
insulated end towards the bottom through the center cable bush of the monitor cart,
sideways through the lateral rail to the MEMOSKOP. Plug in and lock the cables at the
OUT1 socket (left display) and OUT2 socket (right display).
NOTE The end of the new video cable with the open shielding braid
(Fig. 20 / p. 17) must be on the display side.
Fig. 21: Collision protection Fig. 22: Adjustment of the support arm
NOTE You can adjust the width of the support arm and the distance
between the top and bottom tube to adapt the support arm to
the display in use. In addition, the vertical centering of the
support plate (2/Fig. 22 / p. 18) can be varied. The width of
the support arm is varied using spacer rings
(2/Fig. 21 / p. 18). The distance between the tubes and the
vertical centering of the support plate is variable after loos-
ening each of the 8 countersunk screws of the two vertical
display carriers. Only loosen the 16 countersunk screws
slightly - do not completely unscrew them!
• Temporarily remove the collision protection (Fig. 21 / p. 18). To do so, loosen the
screws (1/Fig. 21 / p. 18) on both top tubes and pull out the collision protection.
• After loosening the 2 x 8 countersunk screws on the support arm(1/Fig. 22 / p. 18), you
can adjust the spacing between both tubes as well as the vertical position of the holding
plate (2/Fig. 22 / p. 18).
• Set the spacing (3/Fig. 22 / p. 18) to approximately 3.7 cm; retighten the countersunk
screws.
Installation 0
NOTE The displays have 4 thread holes on the rear panel for attach-
ing the support.
• Screw in two of the countersunk screws M4 x 10, contained in the scope of delivery,
with washer and contact washer, but do not yet fully tighten (1/Fig. 23 / p. 19).
• Shift the TFT display out until it is possible to screw in the external screws. Do not yet
tighten the screws completely. It must be possible to shift the TFT display horizontally.
• Attach the second TFT display in the same way.
• Place both displays horizontally symmetrical to the center axle (2/Fig. 23 / p. 19).
- Make sure that there is a vertical clearance of approx. 2 mm between the displays.
• If both displays are properly positioned, tighten the fixing screws firmly.
• Refasten the left and right collision guard (3/Fig. 23 / p. 19).
To do so, insert a spacer ring, insert the collision guard into the tube and screw on.
• If required, correct the spacing between the displays and the top and bottom tube of the
support arm.
- Leave a couple of millimeters for ventilation between the displays and the top and
bottom tube of the support arm to prevent collisions due to vibrations while moving
the monitor cart is recommended.
- Both tubes of the support arm should run parallel to each other.
• A short protective ground wire is attached with stripped end to the support arm base.
Unscrew the terminal block and screw on the 2m long terminal block included in the
scope of delivery. Run the stripped end of the protective ground wire through the sup-
port arm base, through the logbook compartment and then through the lateral rail of the
monitor trolley to the ON/OFF assembly. Connect the cable end into an available
ground terminal (1/Fig. 24 / p. 20). Make sure that both protective ground wires make
good contact.
• Withdraw the two radiation indicators (4/Fig. 23 / p. 19), after loosening the lower
mounting screws laterally from the tube.
• One end of the cable of the additional radiation indicator (included in the scope of deliv-
ery) is equipped with 2 free cable ends. On the other end, a connector D50.X7 is
installed. Run both cable ends in the lower tube of the support arm through the two
bores (1/Fig. 25 / p. 21) to the radiation indicators.
• Connect both radiation indicators, then re-insert them in the bottom tube and retighten
them.
• Route the cable end with the attached connector D50.X7 through the support arm base
to the logbook compartment and then through the lateral rail of the monitor cart to the
ON/OFF assembly located below.
• Unplug connector X4 of the ON/OFF assembly. See (2/Fig. 24 / p. 20).
• Wire the Y-cable (included in the scope of delivery), together with the attached plug
connectors D50.X4, D50.X4A and D50.X7, as follows:
Y-cable connector D50.X4A ---- ON/OFF assembly board D50, connector D50.X4
Y-cable, coupling D50.X4 ---- Cable of radiation indicator, connector D50.X4
Y-cables, coupling D50.X7 ---- New support arm, radiation indicator, connector
D50.X7
• Open the rear panel of both TFT displays above the connections.
• Route the power line cables and the video cables to the TFT displays.
• Connect the video cable to the BNC sockets VIDEO of the displays and lock it.
• Connect the shieldings of the video cables to the ground of the display.
• Plug in the power cables.
• Close both covers again located above the display connections.
• Pull back the power cords and video cables as needed into the monitor cart .
- Route the cables without sharp bending radius.
- Ensure that the cables are covered by both support arm rails in the area between
support arm base and the displays (Fig. 23 / p. 19) is recommended.
- The cables should rest in the cable bushes of the support arm base without exces-
sive pulling force or stress (Fig. 26 / p. 22).
• Reinstall the cover on the support arm (Fig. 26 / p. 22).
• Make the checks, and if necessary, adjustments according to the replacement instruc-
tions TD00-000.841.17...
Refer to the 'System-dependent settings' chapter of the instructions.
• Close all covers again. Make sure that the protective conductor connections make good
contact.
• Perform the protective conductor resistance test.
The protective conductor resistance must not exceed 0.2 Ω.
• Perform the IQ quick test of the system.
• Perform the country-specific acceptance tests (part acceptance).