DAILY CHECK LIST UNIT PUMP Date
WO No.
:
:
Customer Pump/Machine Fleet No.
Name : Model :
Location / Site : Serial No. :
Contact Person : Date In Service : HM :
Contact No. / HP : Application/Pit # :
✓ Unit to be locked and tagged before any maintenance or service is performed.
✓ Ensure Unit has cooled down before any services are carried out.
✓ Ensure PPE gear should be used before any maintenance or service is performed.
Schedule Maintenance
1, Engine Oil Maintain oil level between "add" and "full" marks on the dipstick.
2, Coolant Level Maintain level in range above boffle plate and filler neck.
3, Fuel Tank Fill as required.
4, Battery Check all battery terminal and water battery (if wet type battery).
5, Drive Belts Check condition and tension.
6, Air Cleaner Indicator If the indicator piston lock in the UP position, service the element.
7, Transmission Check oil level, noise & leakage.
8, Vacuum Pump Oil Maintain oil level between "high" and "low" marks on the dipstick.
9, Water Trap Empty water trap on vacuum tank.
10, Sensor Temp. Pump Check function of sensor.
11, Bare Shaft Pump Visually inspect the level in hydraulic oil tank.
12, Lubrication System Fill with fresh oil if required to the bottom of the strainer.
13, Mech. Seal Oil Tank Maintain oil level between "add" and "full" marks on the glass.
14, Mech. Seal Check Mech. seal leakage.
15, Gland Seal Check Gland seal condition, change the gland seal if gland seal was damage.
16, Suction Installation Check the hose and strainer for blockages or damage. Make sure it is properly submerged.
17, Discharge Installation Check the hose and connection for blockages or damage.
Running & Performance Test
1, Check safety device operation (if fitted) 3, Check suction and discharge flow and pressure
2, Check function of all instrument panel board 4, Check function auto / emergency shutdown
Engine Parameter Pump Temperature Vacuum & Discharge
Engine Speed : Rpm Fuel Press. : Drive End BSP : ˚C Vacuum Gauge : Kpa
Temperature : ˚C Fuel Rate : L/Hr Impeller BSP : ˚C Discharge Press. :
Oil Pressure : Fuel Usage : Ltr Pump / BSP : ˚C Total Flow : L/s
Charging Battery : Volt Eng. Load : % Mechanical Seal : ˚C PH Water :
Boost Pressure : Coolant : ˚C Gland Seal : ˚C :
Breakdown & Operation Time Record
Shift Total HM Reading (Start of shift) : hours
Breakdown Time (hours)
Day Night Breakdown HM Reading (End of shift) : hours
a. Schedule Maintenance Actual Operation Hours : hours
b.Unschedule Repair Breakdown Time : hours
Total Stand by Time : hours
Note : List down defect founded & backlog
Performed by, Service Section Head by, Customer Approval by,
Name : Name : Name :
Date : Date : Date :