RFP Package 7
RFP Package 7
May 2024
  2. The Director of Town and Country Planning, DTCP, Tamil Nadu invites RFP from
     eligible bidders for „Preparation of GIS based Master Plans for Tamil Nadu under
     AMRUT 2.0 Sub scheme for Package 7 (Dharmapuri, Krishnagiri, Tirupathur,
     Gudiyatham, Vaniyambadi, Pernampattu)‟ as per the terms and conditions laid
     down in this Request for Proposal (RFP). Interested applicants are requested to
     submit their responses before 4.00 PM (IST), 27-05-2024.
                                                                      Yours sincerely,
                                                                                  Sd/-
                                                Director of Town and Country Planning
                                                            Government of Tamil Nadu
                                                                                    1
2. Instruction to Consultants
                                                         4
3.   PREAMBLE
Government of Tamil Nadu through Directorate of Town and Country Planning intends
to engage Consultants to provide consultancy services for the “Preparation of GIS
based Master Plans for Tamil Nadu under AMRUT 2.0 Sub scheme” in accordance with
the provisions of the Tamil Nadu Town & Country Planning Act, 1971. The Director of
Town and Country Planning (DTCP), Tamil Nadu, invites RFP from eligible bidders for
„Preparation of GIS based Master Plans for Tamil Nadu under AMRUT 2.0 Sub scheme
as per the terms and conditions laid down in this Request for Proposal (RFP). More
details on the services required are provided in the attached Request for Proposal
(RFP).
The Atal Mission for Rejuvenation and Urban Transformation (AMRUT) 2.0 stands as a
pivotal initiative on the path to realizing the vision of „Aatmanirbhar Bharat,‟
emphasizing the crucial needs for water security and functional water tap connections
in urban areas. In alignment with this mission, a robust geo-database, a cornerstone
of the Sub-Scheme, is envisioned to revolutionize urban planning processes. This geo-
database, generated under the ambit of AMRUT 2.0, will play a multifaceted role in
crafting master plans, development plans, zonal plans, local area plans, town planning
schemes, utility plans, and infrastructure plans.
The formulation of master plans for cities is recognized as a linchpin for effective
decision-making, fostering efficient land use practices, and promoting holistic urban
management. This initiative is poised to significantly contribute to the realization of
AMRUT 2.0 objectives, particularly in elevating project planning standards within the
water sector.
With this backdrop, the Directorate of Town and Country Planning, Government of
Tamil Nadu, takes the lead in proposing a comprehensive plan for undertaking
essential work on identified AMRUT Urban Local Bodies (ULBs) in Tamil Nadu. This
                                                                                      5
endeavor marks a significant stride towards realizing the objectives of AMRUT 2.0,
promising a paradigm shift in urban planning and management for the betterment of
cities within the state.
               No.                                                      Extent of
                                          Name
  Package     Master                                                  Planning Area
                                   of the Master Plans
               Plan                                                      (sq.km)
                39      Dharmapuri                                            178.00
                40      Krishnagiri                                           125.49
                41      Tirupathur                                            106.67
      7
                42      Gudiyatham                                             37.59
                43      Vaniyambadi                                             9.54
                44      Pernampattu                                            17.40
List of villages in each master plan is attached below as annexure - xxi
3. In this context, DTCP invites e-tenders from experienced agencies under “Two Cover
System” for Preparation of GIS based Master Plans for Tamil Nadu under AMRUT 2.0
Sub scheme. The details of the tender are furnished in the following sections. The
interested Bidders are requested to review the AMRUT Master Plan guidelines as
available on AMRUT website/TCPO Website.
4.     TERMS OF REFERENCE
4.1 Scope of Work
The broad scope of work for the plan preparation shall include, but not be limited to
the following:
a) Stakeholder Engagement & Communication Plan
b) Information Gathering & Compilation
c) GIS-based Data Gathering & Mapping
d) Conduct Sectoral Analysis to inform the preparation of the Master Plans (e.g.,
    Economic Development, Land Use & Mobility Integration, Infrastructure, Transit
    Priority Corridors, TOD, Climate Adaptation, flood prone area / unstable / unsafe
    area, informal settlements, and Slums, ecological important areas, protected
    areas and key ecosystem services, areas of historical or archeological importance,
    if any etc.) identifying key priority growth needs, areas requiring upgrades & new
    development needs.
                                                                                       6
e) Master Plan Formulation
      a. Vision
      b. Key Strategies & Recommendations for each development sector
      c. Zoning of land use for residential, commercial, industrial, agricultural,
         recreational, educational, Agricultural, and other purposes together with
         Zoning Regulations through land suitability analysis.
      d. Proposed Land Use Map including layout/ network plan of existing and
         proposed streets
      e. Proposed Densities
      f. Infrastructure/Service demand forecasting which takes into consideration
         the need for improved access to resilient infrastructure by all groups and
         genders
      g. Open Space, Recreation & Public Space
      h. Housing Schemes, including affordable housing and different housing
         typology catering the needs of different groups to promote compact, mixed-
         use and mixed-income urban development
      i. Land Pooling Area Development Opportunities
      j. Proposals on Environmental Management & Climate Change Adaptation,
         including delineation of environmentally/socially sensitive zones and special
         regulations for such areas
      k. Affordable Housing
      l. Economic Planning
      m. Blue and Green Infrastructure
      n. Infrastructure / Utility Plan
      o. Infrastructure Upgrades Proposals (Physical & Social)
      p. Mobility Improvements, including the Grid of Roads, Plan to identify the
         hierarchy of road network
f) Urban Design Guidelines
g) Disaster Management Plan
h) Implementation & Phasing Strategy
i) Capital Improvements Plan (Investment Plan)
j) Implementation, Phasing Strategy and Resource Mobilisation
k) Environmental & Social Impacts, Risks and Mitigation Measures
l) Redevelopment of old areas within the study area with special development
   regulations;
m) Form-Based Codes (FBC) for specific areas wherever necessary
n) Tourism and waterfront development plan;
o) Solid waste management plan;
p) Heritage conservation plan;
q) Delineation of Continuous Building area
r) Legislative and Institutional Framework, institutional structure – municipal
   bodies, Local Planning Authority, urban improvement trust, etc.
                                                                                     7
s) Special Area Planning
t) Climate Action Plan
u) The consultant is required to consult a variety of guidelines, rules, and regulations
    at the state, national, and international levels, along with case studies related to
    master plan preparation. These references will provide valuable insights and best
    practices to inform the development of the master plan for the project.
The Detailed description of the assignment and expected tasks with deliverables, but
not be limited to the following:
The Consultant is required to review and identify the gaps in existing master plans,
development plans, and any other relevant studies within the planning area to prepare
a robust strategic Master plan.
The consultant shall prepare the action plan/strategy for the collection of Drone
imagery, Ground Control Points (GCP) collected through Differential Global Positioning
System (DGPS) survey.
                                                                                       8
Task 2: Procurement of Drone Images
The consultant shall procure the latest high resolution Drone image as per AMRUT
Designs and Standards for Drone/UAV Technology, 2020, with resolution of 15cm with
100-meter buffer from the planning area boundary.
DGPS SURVEY: The pair of GCPs to be established is one (1) point for 1 to 2 sq.km.
(Depending upon the size and shape of the district boundary) and these should be
evenly distributed over the planning area. The final out put shall have XYZ values with
accuracy for the entire planning area.
Post-Processing of Drone Imageries: To correct various geometric anomalies in Drone
imagery, Ground Control Points (GCP) collected through Differential Global Positioning
System (DGPS) survey will be used for Geo-referencing of the Drone image. Consultant
shall carry out Geo-Referencing of data on WGS-84 with projection on UTM.
Validation of Drone Survey: The procured Drone imagery will be vetted and validated
by the Client. If any of the discrepancies are found, appropriate corrective measures
shall be taken by the consultant as insisted by the Client which may include repeating
the process.
The deliverables of the Drone imagery that shall be provided by the consultant are as
follows:
•      Raw Images *.jpeg
•      Ortho-mosaic *.tiff
•      Digital Surface Model *.tiff
•      Digital Terrain Model *.tiff
•      Processing Report and Flight Details *.pdf
•      Ortho rectified output in *.ECW
•      DGPS data / GCP monument details with photos
Task 3: Preparation of Base Map Layers using High Resolution Drone images as per
AMRUT Designs and Standards for Drone/ UAV Technology, 2020
An ideal base map should be indicative of and a perfect demonstration of all the
existing site features. It should be accurately positioned and mapped and should be
based upon an in-depth site survey
Spatial Attribute collection & vetting of Base maps:
       The high-resolution drone images from drone surveys conducted by the
consultants will serve as the foundational basis for the preparation of AMRUT base
map. Subsequently, the Consultant is tasked with digitizing all layers in accordance
with the Designs and Standards for the Application of Drone/UAV Technology, 2020, as
mandated by the Ministry of Housing and Urban Affairs (MoHUA) under the approved
AMRUT (Atal Mission for Rejuvenation and Urban Transformation) design and standards.
This entails meticulous attention to detail and adherence to specified protocols to
ensure the accuracy and consistency of the digitized data.
                                                                                      9
       Furthermore, the Consultant is required to conduct ground truthing activities
to validate and finalize spatial attribute data. This crucial step involves verifying and
enhancing the attribute data through direct observation and fieldwork. Key attributes
to be captured during this process include building usage classifications floor-wise land
use categorizations and the number of floors to assess the built up density. These
attributes are integral for facilitating informed decision-making and comprehensive
urban planning initiatives.
       After incorporating spatial attributes, the draft base maps generated shall be
provided to DTCP for vetting, after which the final base maps will be generated which
will be used as an input for plan formulation.
Deliverable of base map with the following details:
a) Digitization of all the layers in the Designs and Standards for Application of Drone/
    UAV Technology, 2020 as separate features classes. The data has to be in GIS
    format only.
b) Consultants should make sure that attribute data collected is verified with
    respective data-holding departments and the same should be submitted to the
    DTCP.
The layer-wise spatial attributes as per the Performa given in Design – Standards under
AMRUT will be collected from the field by the Consultant, so that the draft final base
map can be generated which can be used as an input to the plan formulation
                                                                                        10
 use classifications, and incorporating any other pertinent spatial data found in village
maps, FMB, TSR and A-Register. Furthermore, the consultant will integrate survey
number features into the existing land use map.
        The Revenue / Ward / Block / Parcel Boundary (FMB sketches) must be procured
by the consultants. However, the consultant has to verify the Authenticity, and missing
data/maps and submit them to the client by written request summarizing the findings
        The Consultant shall prepare an Existing Land Use Map and make an inventory
of all parcels within the study area following Tamil Nadu Town and Country Planning
Act (1971), Master plan (Preparation, Publication, and Sanction Rules),1983, Urban and
Regional Development Plan Formulation and Implementation (URDPFI) Guidelines
– 2014, Tamil Nadu Combined Development and Building Rules 2019 (TNCDBR) - and
AMRUT Design & Standards for Formulation of GIS Based Master Plan as recommended
by MoHUA
        The Consultant shall record/update the actual land use by checking land use
maps and ground truthing wherever required, confining to the parcel boundaries along
with its zoning attributes
                                                                                     12
       2. Demographic and socio-economic characteristics including age, gender,
          disability, occupation, social group, consumption basket, assets and
           income.
       3. Establishment and enterprise type, number of workers and their inputs.
       4. Access to infrastructure and public services including power and energy,
          telecom, water, sanitation, sewerage and solid waste
       5. Level of access to social infrastructure including healthcare, education,
          recreation and public spaces.
g) The results of the Primary survey are to be compiled and tabulated as a report
   and matrix with findings and recommendations in a predefined format as
   discussed and approved by the DTCP and shall be annexed as part of the report
   by the consultants
h) Compile all available sector-wise projects – existing and proposed, spatial and
   attribute data, regarding existing conditions in the Planning Area
i)   Ecological Survey: To retain the existing native flora and fauna, and ecological
     habitats across the local planning area. The activity shall also map all wetlands
     (tanks and water bodies), streams and drainage (including inventory of drains and
     canals), parks and open spaces including all protected areas along with their
     existing status.
                                                                                         13
j)   Hazard and Vulnerability Survey and Assessment: A detailed hazard risk
     assessment of the major natural and technological hazards that Planning Area is exposed
     to; a planning area-based assessment of physical, social, economic and environmental
     vulnerabilities; leading to an integrated risk multi-hazard risk assessment and an
     identification of hazard hot-spots in the city and its integration with GIS database. If
     possible, a probabilistic hazard risk assessment over a 25, 50 and 100-year time horizon
     should be undertaken. The Consultants shall take into cognizance of the Industrial Zoning
     Atlas prepared by the Tamil Nadu State Pollution Control Board as well. All red category
     and orange categories industries shall be located.
k) Pollution Survey: Air pollution survey to be conducted next to major traffic signals,
   hospitals, schools, land fill sites, red category industries and shall be mapped.
   Apart from this the pollution levels of surface water bodies shall be determined.
m) The Consultants shall also prepare a map showing all the water bodies, including
   nalas and tanks in the planning are as a separate layers
   a) as per the revenue records and b) based on satellite remote sensing data
   provided.
n) An aquifer delineation and total ground water estimation to be arrived. This shall
   include delineation of various aquifers and their zones and zones of water recharge
   potential. Also water quality of the water sources in the planning area has to be
   collected and analyzed. A ground water flow pattern to be arrived along with water
   resource estimation. List of recommendations to be arrived along with location of
   various recharge structures. This study should also provide a water budget for the
   LPA.
o) The consultant shall indicate “Heritage Buildings” and “Heritage Precincts” and
   shall include the regulations made therein for conservation
                                                                                             14
    facilitate targeted interventions and support programs
q) Continuous Building Area: The consultant shall prepare a filed assessment and
    verify various historic revenue records to ascertain the areas which can be
    classified as Continuous building area.
(Refer Annexure XXII: List of Government Agencies for Data Collection)
    people and should have the buy-in from various GoTN and external stakeholders.
    Accordingly, the consultant shall:
      • Support DTCP in launching the visioning exercise by holding the first
         stakeholders meeting to introduce the project and collect input on key
                                                                                           16
          development issues. Most importantly, the meeting should aim to introduce
          best practices to help stakeholders understand how cities can transform
          (awareness campaign)
      •   Conduct a stakeholder analysis and identify key stakeholders for shaping
           the vision,
       • Support DTCP in the formation of the needed committees to ensure proper
           representation of gender, socially excluded groups, differently abled people
           and senior citizens.
       • Prepare Stakeholder Engagement Plan (SEP) and in implementing it during
           the visioning exercise. DTCP shall support the consultants in preparing the
           SEP. This shall help anticipate and address questions that may come from
           the stakeholders during initial consultation. It may also help DTCP plan next
           steps.
Finally, The vision shall reflect sustainable development principles. It should resonate
with the existing communities of the place, and explain how the area might change,
both in terms of its geography and its socio-economic characteristics. It also needs to
identify clearly the outcomes sought. The vision shall highlight what is unique about
Study area, and its identity. It should address the future aspirations of the city‟s
residents, while building on the city‟s assets / strengths and addressing itschallenges.
                                                                                       17
      17. Gender, differently abled, Senior Citizens & socially excluded groups
          participation in preparation of inclusive plan.
      18. Accessibility
      19. Road safety
      20. Pedestrian priority
      21. Open spaces
      22. Water bodies & water supply
      23. Sewage & Waste disposal
g) The Consultant will develop a set of strategic objectives based on the thematic
   vision statements
h) The Consultant will prepare ideas on making the vision happen including high level
   scoping of detailed studies required to turn the vision into a reality and a sense of
   the timeline. The Consultant will develop key performance indicators to support
   the strategic objectives.
                                                                                       18
Task 11 – Concept plan, Projects and Strategy Formulation
The concept plan serves as the blueprint for the overarching vision and strategic
direction of the master plan. It outlines key objectives, identifies critical issues, and
sets the framework for subsequent stages of planning
The consultant shall develop a conceptual framework that translates the vision and
objectives into spatial, functional, and design principles.
                                                                                        19
k) Management of Environment and Natural Resources, climate adaptation and
   mitigation, carbon footprint.
l) Potential environmental and social risks and impacts
m) Recommend the most appropriate alternative based on the overall analysis.
   The Consultant shall take cognizance of various policies of the Government of
   India and the Government of Tamil Nadu applicable to the respective planning
   area while evolving the scenarios.
                                                                                     20
    and in discussion with the DTCP Slum Development and other social liabilities
   Plan (thinking of other encroachers in solid waste dumpsite etc) with focus on
   affordable housing encompassing PMAY guidelines & Housing Policy of Tamil
   Nadu.
f) Informal sector (street vendors) plan with its location & mechanism of
   functioning and implementation including vegetable markets and wholesale
   godowns.
g) Overall mobility plan for passengers and freight including the identification
   and plan for „Transit Oriented Development (TOD) along major transport
   corridors integrating features such as pedestrianization and cycling to reduce
   carbon footprint;
h) Plan for heritage conservation
i) Gender inclusive plans that consider safe access to services and public places;
   safe and affordable mobility; safety from violence and perceived gender-based
   violence; health and hygiene; security of tenure to affordable housing;
   employment opportunity and climate resilience plan that takes cognizance of
   the needs of differently-abled people and complies with the laws for
   differently abled people
j) Environment – Water Bodies Conservation, Eco-sensitive areas, and natural
   preserves, Pollution levels, Urban Heat Island effects
m) Broad Project Structuring and Block-Cost Estimates for Capital and O&M costs
     • Suggest a suitable institutional and holding structure and funding plan for
         the Master Plan
     • Prepare block cost estimates for capital, operation, and maintenance
         costs for the selected alternative for phase-wise implementation of
         various project components, physical and social infrastructure, external
         linkages, etc. of the Master Plan.
     • Capital Investment Plan and Resource Mobilization Strategies (Business
         Plan)
n) Prepare an exclusive document on the "Working Plan" for the implementation
   of short, medium- and long-term projects that are translated from the Master
   Plan. The consultant shall also provide the merits and demerits of the plan
                                                                                 21
     along with the short-term, medium-term, and long-term projects in a matrix
     form. The Working Plan shall help the DTCP/ ULB‟s for accessing funding for
     various infrastructure projects.
p) The proposed Master Plan shall be in accordance with and synchronization with
   other ongoing Regional Plan and other plans in discussion with the DTCP.
   Necessary interventions are to be proposed in discussion with the DTCP.
q) The Proposed and land use plan shall have the schedule prepared
                                                                                    22
      •   The proposed land use map shall also accommodate all the interventions
          and projects proposed based on the strategy and findings with respect to
          earlier tasks.
      •   The changes required, if any, by the DTCP and the Government in the draft
          Master Plan, during different stages of its adoption, shall be incorporated
          by the Consultant and the final Master Plan comprising the Report and Land
          Use Maps shall be submitted to the DTCP and respective LPA.
    t) The Draft Master Plan after modification based on the remarks of the Director
   of Town and Country Planning will be submitted to the Government for getting
   Consent from the Government for the Draft Master Plan. The changes required, if
   any, by the Government in the draft Master Plan, it shall be incorporated by the
   Consultant till getting the Consent from the Government as per Tamil Nadu Town
   and Country Planning Act, 1971, Master Plan for (Preparation, Publication, and
   Sanction Rules), 1983, etc.
  v) The DTCP will publish the Draft Master Plan inviting objections and
   Suggestions, if any, from the public as per the provisions of the Tamil Nadu Town
    and Country Planning Act, 1971, Master Plan for (Preparation, Publication, and
    Sanction Rules), 1983, etc.
Task 13 – Final Master Plan as per Master Plan (Preparation, Publication, and
Sanction) Rules, 1983
The consultant will develop strategic plans and wide publicity for executing the survey
campaign to solicit objections and suggestions effectively. This involves crafting
methodologies and approaches to encourage active participation, gather valuable
feedback, and address concerns or recommendations raised by stakeholders.
The input gathered through these consultations will be instrumental in refining the
master plan to better align with the needs and aspirations of the community it serves.
The consultant has to prepare a Final Master Plan incorporating the objections,
suggestions, and modifications recommended by the DTCP and other Stakeholders.
                                                                                       23
             a. Deliverables
While the above mentioned indicates the statutory requirements, the Consultants shall
incorporate them in the series of maps and reports as suggested below. The
Consultants shall submit 5 copies of all the intermediate reports along with a soft copy.
The Consultants shall submit 10 copies of the draft and 10 copies of the final and
approved master plan with maps. The list of deliverables is summarized below.
  Stage                                  Deliverable
            Date of Executing the agreement/ Issuance of Work order whichever is
            earlier
    D1      Inception Report
    D2      Spatial attribute collection and Vetting of Base Maps
    D3      Existing Land Use Map
    D4      Situation Analysis Report
    D5      Visioning exercises
    D6      Draft Proposals
    D7      Draft Master Plan
    D8      Final Master Plan (Revised Draft Master Plan)
 *Note: Stage D2 & D3 is a parallel activity that has to start from the date of
 execution of agreement
 In addition to this, The consultant is required to submit monthly progress report
 explaining the progress of work and the way forward approach in achieving the
 upcoming milestone,
After approval of Draft Master Plan, the Consultant will provide support to DTCP from
the date of approval of Draft Master Plan for the plan approval process, workshops,
discussions, O&S and making presentations to various Public/ agencies/ departments,
incorporating modifications if any, as and when required by the client.
              b. Key Experts
The list of key experts required for carrying out the assignment is summarized below.
The bidders may engage the list of key experts and ensure their availability till the
completion of the project. (The key experts are available for the entire duration of
the project)
                                                                                        24
Sl.   Key Professionals            Educational Qualification & Work       Man
No.                                       Expertise Criteria             months
1     Team Leader              ● Master’s          degree          in
                                 urban/regional/urban–regional
                                 planning or equivalent
                               ● 20 years of working experience
                                 after a Master’s degree in thefields
                                 of Physical Development plan/
                                 Land       Pooling/       Regional
                                                                           24
                                 Development Plan
                               ● Should have relevant (minimum 3
                                 projects) experience as Team
                                 Leader/Project Director in the
                                 formulation of Master Plans/
                                 Development plans in India or
                                 abroad.
2     Deputy Team Leader- •         Master’s         degree         in
      cum-Land/Housing Expert       urban/regional/urban–regional
                                    planning or equivalent with
                                    specialization Land Use Planning,
                                    Housing     Studies,  Community
                                    Development, Public Policy, or a
                                    related field                          24
                               •    Minimum 15 years of experience
                               •    He / She should have worked as a
                                    core team member for the
                                    preparation of a minimum of 2
                                    Master         plans/Development
                                    Plans/Planning Studies.
3     Transportation Planner   ● Master’s Degree in Transport
                                 Planning with graduation in civil
                                 engineering or any equivalent
                               ● Minimum 10 years of relevant
                                 experience.
                               ● He/she should have relevant                15
                                 experience (minimum 3 projects)
                                 in transport planning assignments
                                 in Metropolitan cities/regions of
                                 similar magnitude, size, and
                                 nature in India or abroad.
                                                                                  25
                             ● Should have extensive knowledge
                               and experience in the transport
                               sector focusing on rail and roads.
4   Urban Designer           ● Post-graduation in Urban Design
                               /    or   equivalent    from    a
                               recognized institution
                             ● Minimum 10 years of experience
                                                                    12
                             ● Shall have experience working on
                               urban design-related projects in
                               cities / medium and small size
                               towns
5   Urban Economist          ● Master’s Degree in Economics
                             ● 10 years of work experience in
                               urban economic modelling to
                               ensure integrated land use           12
                               development      or     transport
                               planning, measuring impacts and
                               multipliers.
6   GIS Expert               ● Master’s Degree in Urban Planning/
                               Geo-
                               informatics/GIS/Remote Sensing
                               or equivalent
                             ● 10 years of work experience in       15
                               preparing     the    base    map,
                               developing and managing large
                               and diverse databases after
                               Master’s degree
                             ● And Shall also have experience in
                               Drone Surveys, Drone Imagery &
                               Processing of Drone data
6   Infrastructure Planner   ● Master’s Degree in Infrastructure
                               Planning or equivalent
                             ● 10 years of work experience in
                               integrated          infrastructure
                               planning (e.g. roads, drainage,      15
                               water, wastewater, solid waste
                               management,       power,       and
                               telecommunication) including
                               Smart Infrastructure applications
                                                                         26
8    Environmental Planner      ● Master’s Degree in Environmental
                                  Planning or equivalent with
                                  graduation in Civil Engineering,         12
                                  Chemical Engineering, or
                                  Architecture
                                ● 10 years of work experience in
                                  related fields after a Master’s
                                  degree.
9    Social       Development   ● Master’s Degree in Social Sciences,
     Specialist                   Social Work or allied subjects.
                                ● 10 years of work experience in
                                  related fields after a Master's
                                  degree.
                                ● Work experience in related fields
                                                                        12
                                  of    stakeholder     engagement,
                                  public consultations with citizens
                                  and community groups, with
                                  experience in gender-informed
                                ● planning.
10   Communication Expert       ● Bachelor’s Degree or PG in
                                  Communications         or      allied
                                  subjects.
                                ● 10 years of work experience in
                                  related fields
                                                                        12
                                ● Work experience in related fields
                                  of public communications,
                                  communication strategy
                                  development and
                                ● implementation.
                                                                                27
  • The consultants shall include necessary support staff for fulfilling the objectives
    and requirements of this project.
  • Field survey staff: Sufficient field survey staff to be allocated for the survey of the
    road network and other details.
  • The above team should be supported by adequate relevant support
    staff/experts/specialists to ensure that the objectives of the project are achieved
    within the timelines.
  • The proposed Team leader shall be assigned full-time for this project and shall not
   be associated with any other full-time ongoing assignment with the same/any
   other client. The Team Leader shall be a full-time professional to be stationed in
   Chennai till the completion of the Study.
  • It is mandatory that the Social Development Specialist and the Communication
    Expert must possess fluent reading, writing, and speaking abilities in the Tamil
    language, which is the regional language of Tamil Nadu. It is desirable for other
    members of the team to also have proficiency in spoken Tamil.
             a. Review Committee & Review of Reports
The Consultant’s work will be monitored and reviewed by a Consultancy Evaluation and
Review Committee (CERC) under the Chairmanship of Directorate of Town and Country
Planning of Tamil Nadu. The composition of the Committee will be as follows.
(As per: G.O.(Ms)No.99, Housing and Urban Development Department, Dated:
14.08.2023)
       • Director of Town & Country Planning (DTCP)
      •   Senior Officer (Technical), O/o Director of Town and Country Planning
          (DTCP)
      •   Municipal Commissioner of the Town
      •   Representative of MoUD/ TCPO, New Delhi
      •   Member Secretary of Planning Authority
      •   Chief Engineer, Public Works Department(PWD)
      •   Representative of Commissionerate of Municipal Administration
      •   Deputy Secretary to Government, Finance Department
      •   Engineer- in- Chief, Public Works Department (PWD)
      • Regional Chief Engineers, Water Resource Department (WRD)
The consultants shall submit each of the above-mentioned deliverables as per the
schedule mentioned above. This will be followed by a presentation to the CERC within
a week, wherein, the CERC members shall give their comments and suggestions in the
form of feedback. Subsequently, the consultant will incorporate all such comments
and suggestions and submit a revised report.
   It is also suggested that the consultants meet the concerned District collector at
   various times as required to take their views in preparation for each task/
                                                                                          28
     deliverable. After the review meeting of each deliverable, the consultant has to
     submit the revised report by incorporating the suggestions and modifications
     recommended by the CERC within 10 working days.
5 QUALIFICATION CRITERIA
                                                                                    29
          (i) The lead firm should have
          minimum average annual turnover
          of 8 crores.
          (ii) The primary partner firm should
          have minimum average annual
          turnover of 4 crores
         (iii) The secondary partner firm
         should have minimum average
         annual turnover of 3 crores.
3.   Lead Firm should have positive net Copy of the Audited Profit & Loss
     worth as on 31st March 2023.              Statement, Balance sheet and/or
                                               Copy of the letter/ certificate
                                               from a Chartered Accountant
                                               regarding net worth.
4.   Incase of Sole Firm: The Firm should Work order              along with
     have successfully completed atleast completion               certificate
     three Master Plans/ City Development            duly signed         by
     Plan with Landuse for any Town                  concerned      department/
     Planning         Department/        Urban organization (Format as per PQ
     Development Authority (UDA) in the        FORM 2B)
     last 15 years.
                                                                              30
6     LANGUAGE OF THE TENDER
The Tender prepared by the bidder as well as all correspondences and documents
relating to the Tender shall be in English only. If the supporting documents are in a
language other than English/Tamil, the notarized translated English version of the
documents should also be enclosed. Tender received without such translation copy will
be rejected.
7 PREBID MEETING
a. There will be a pre-bid meeting on 06.05.2024 at 3.00 P.M via. Video conferencing
   (https://meet.google.com/coi-yhop-zug) during which the prospective bidders
   can get clarifications about the tender.
b. The bidders are advised to check https://tntenders.gov.in for up-to-date
   information like change in date of pre-bid meeting as DTCP may not be able to
   identify and communicate with the prospective bidders at this stage. Not
   attending of pre-bid meeting is not a disqualification.
                                                                                    31
8     CLARIFICATION ON THE TENDER DOCUMENT
11 SUBMISSION OF TENDER
a. The eligible bidders shall participate in bidding only in online mode through the
   website https://tntenders.gov.in following the two cover system [i.e.
   (i) Technical Bid and (ii) Financial Bid) in the prescribed format].
b. Bidders are allowed to bid until the time of bid closing. The e-Procurement website
   will not allow any bidder to attempt bidding after the scheduled date and time of
   bid submission. The submission of bids physically is not permitted.
c. All the documents in support of eligibility criteria are to be scanned and uploaded
   along with the tender documents in the designated website.
                                                                                       32
d. The bidder should quote the price in the Price-Bid as per the format given in the
   E-tender portal.
e. To participate in the bid, the bidder shall have a valid Class 3 Digital Signature
   Certificate (DSC), obtained from the certifying authorities enlisted by Controller
   of Certifying Authorities (CCA).
f. Every page of the terms and conditions of the tender document should be signed
   and uploaded, in token of having accepted the tender conditions. Failing which
   the tender will be rejected summarily.
g. A bidder may bid on any number of packages but must submit a separate proposal
   for each with a different team.
h. The bidders shall be responsible for all of the costs associated with the preparation
   of their bids and their participation in the Bid Process. DTCP will not be responsible
   or in any way liable for such costs, regardless of the conduct or outcome of the
   Bidding Process.
i. DTCP shall not be liable for any omission, mistake or error in respect of any of the
   above or on account of any matter or thing arising out of or concerning or relating
   to the tender document or the Bidding Process, including any error or
   mistake therein or in any information or data given by DTCP.
a.   The Tender should be accompanied by an Earnest Money Deposit (EMD) to the value
     of Rs.5,00,000 (Rupees Five Lakhs Only). The EMD shall also be remitted online
     through e-tender portal only. MSME registered bidders can avail EMD exemption by
     uploading the MSME certificate.
c. The Earnest Money Deposit will be retained in the case of successful bidder and it
   will not earn any interest and will be dealt with as provided in the terms and
   conditions of the tender.
d. The amount remitted towards EMD is liable to be forfeited in case the bidder fails
   to execute the contract after submission of the tender or after acceptance
   of the offer by DTCP or fail to sign the Agreement.
                                                                                        33
13    PRICE BID
a. The price bid should be submitted only in electronic form as per the prescribed
   format given.
b. The rate should be quoted in Indian Rupees (INR) in the column highlighted as blue
   color in the price bid format.
c. The rate quoted by the bidder shall be kept firm for a period specified in the
   tender from the date of opening of the tender. The bidder should keep the Price
   firm during the entire period of Contract including extension of time if any.
   Escalation of rate will not be permitted during the said periods whether extended
   or not for reasons other than increase of taxes payable to the Governments in India
   within the stipulated delivery period.
d. The price bid should not be altered and should not contain any commercial
   conditions. Variation in the commercial terms and conditions of the tender will
   not be accepted.
14 VALIDITY
The rate quoted in the Tender should be valid for the acceptance by DTCP for a
minimum period of 6 Months from the date of opening of the Tender. Escalation in the
rates will not be entertained under any circumstances.
b. Proposal evaluation will be done on basis of 3-stage process. In the 1st Stage,
   Technical Proposal Part 1 - Prequalification Proposal submitted by interested
   Bidders will be evaluated. Only those who meet the pre-qualification criteria will
   qualify 1st stage and will be considered for 2nd stage, i.e., Technical Proposal Part
   2 Evaluation. To those firms who are not qualified in 1 st Stage the Technical
   Proposal part 2 and Financial Proposal will be returned unopened
                                                                                       34
d. In the 2nd stage, Technical Proposals will be opened and evaluated and Technical
   scores will be given. The Technical bid will be evaluated by the committee of
   DTCP in terms of the qualification criteria. The committee reserves the right to
   disqualify any of the tender in case the Committee is not satisfied with the
   documents furnished, including the past performances.
e. Any adverse / not satisfactory remarks on the performance from the clients of
   previous supplies will entail disqualification of the tender and price bids will not
   be opened.
f. In case there is a tie in the final score of two or more bidders, the bidder that has
   secured higher marks in the Technical Evaluation process will be selected
g. In case sufficient number of bids is not received for any particular Package(s), then
   the DTCP reserves the right to opt for re-tendering only for that specific
   Package(s). Alternatively, the DTCP may at their discretion invite any one of the
   technically qualified bidders in this Tender for negotiation and award of the
   unallocated Package(s).
j. A bidder may be allocated more than one package if they submit separate proposals
     with different teams.
a. The bidders who meet the pre-qualification criteria will be called for technical
   presentation before the technical committee appointed by DTCP.
                                                                             Maximum
 S.No                   Parameter                        Score Details        Total
                                                                              Score
           Adequacy of the proposed work plan
           and methodology in responding to
     1.    Terms of Reference (ToR)                                              25
           a. Understanding of the Project
                                                                5
                                                                                       35
     b. Approach and Methodology for
     overall scope of work                               10
                                                                           36
                                                                             100
   d. Only bidder‟s whose Technical Proposals get a score of 75 (seventy Five) shall
   be qualified and shall be ranked from highest to the lowest on the basis of their
   technical score (Tn).
e. The bidders declared as qualified by the Committee, will be informed the date of
opening of Part III (Price bid).
                                                                                       37
17    EVALUATION OF THE PRICE
       Where,
       Fn = Normalized financial score of the bidder under consideration
       Fb = Evaluated cost of the bidder under consideration
       Fmin = Minimum evaluated cost of any bidder
       Where
       Bn = Overall score of bidder under consideration
       Tn = Technical score obtained as per clause 14(c) of the bidder under
       consideration
       Fn = Normalized financial score of the bidder under consideration
c. The proposals will be ranked in terms of the overall scores obtained from Highest
   to Lowest.
d. The bidder who has the highest combined score will be adjudged as L1.
18 NEGOTIATIONS
a. Prior to the expiration of period of validity of proposal, the DTCP shall notify the
   successful firm who submitted the highest scoring proposal in writing through
   registered letter, facsimile or email and invite them to negotiate the contract.
b. Negotiations normally take two to five days. The invited consultant will, as a pre-
   requisite for attending negotiations, confirm availability of all nominated experts
   / key personnel and satisfy other pre negotiation requirements as the DTCP may
   specify. The aim is to reach agreement on all points, and initial a
   draft contract by the conclusion of negotiations.
                                                                                       38
c. Negotiations shall commence with a presentation on Technical Proposal on the
   proposed methodology (work plan), staffing and any suggestions, which may have
   been made to improve the ToR. These will be discussed. Agreement must then be
   reached on the final ToR; the staffing that shall indicate staff months, logistics
   and reporting. These documents then can be incorporated in the contract as
   “description of services”. Special attention shall be paid to clearly defining the
   required inputs and facilities required from the client to ensure satisfactory
   implementation of the assignment. The client shall prepare minutes of
   negotiations, which will be signed by the client and consultant.
d. It is the responsibility of the Consultant, before starting financial negotiations, to
   contact the local tax authorities to determine the local tax amount to be paid by
   the Consultant under the Contract. The financial negotiations will include a
   clarification (if any) of the firm‟s tax liability in the Client‟s country, and themanner
   in which it will be reflected in the Contract; and will reflect the agreed technical
   modifications in the cost of the services. Unless there are exceptional reasons, the
   financial negotiations will not involve any discussions on neither the remuneration
   rates for staff nor other proposed unit rates.
e. Changes agreed upon shall then be reflected in the Financial Proposal, using
   proposed unit rates (no negotiation of the unit rates, including the man month
   rates).
f. The negotiations shall be concluded with a review of the draft Contract. The DTCP
   and the firm will finalize the agreed contract.
g. If negotiations fail, the DTCP will invite the second ranked consultant, whose
   proposal received the second highest score, to negotiate the contract
19 AWARD OF CONTRACT
b. Upon finalization of negotiated rate, DTCP will issue the Letter of Acceptance
   (LoA) to the successful bidder.
c. However, The client reserves the right to extend the project period to an extent
   necessary beyond the date of completion of the project period without any
   changes to the cost of the project, for any reasons if considered necessary.
d. Any provision not mentioned in the contract agreement but mentioned in the
   TTT act and Rules, notified by the Government from time to time will be
   applicable to this contract agreement.
e. The locations provided in the tender document for survey work is only tentative
   and DTCP reserves the right to change the location during the validity of the
   contract.
                                                                                           39
20    SECURITY DEPOSIT
a. On receipt of the Letter of Acceptance from DTCP, the successful bidder should
   remit a Security Deposit (SD) of 5% of contract value, in the form of a Demand
   Draft or Banker‟s cheque drawn on any Indian Nationalized/Scheduled Commercial
   Bank or irrevocable Bank Guarantee in favor of “Assistant accounts officer DTCP
   Chennai”, payable at Chennai, within 10 (Ten) working days from the date of
   receipt of letter of acceptance. The EMD shall be adjusted with the Security
   Deposit.
b. Any amount pending with DTCP will not be adjusted under any circumstances,
   against the Security Deposit if so requested.
c. EMD & Security Deposit amount remitted will not earn any interest.
d. If the Security Deposit amount is not paid within the time specified, the EMD
   remitted by the bidder shall be forfeited, besides cancelling the communication
   of acceptance of the Tender.
21    AGREEMENT
a. The successful bidder should execute an agreement as may be drawn up to suit
   the conditions on a non-judicial stamp paper of value, as prescribed in law and
   shall pay for all stamps and legal expenses incidental thereto. In the event of
   failure to execute the agreement, within the time prescribed, the SD/EMD amount
   remitted by the bidder will be forfeited besides cancellation of the Tender.
b. In the event of non- performance of the contractual provisions and if the selected
   bidder, has not fulfilled the contractual obligation with DTCP in any manner during
   the currency of the contract or also found on later date, DTCP reserves the right
   to disqualify such bidder to participate in future tenders or blacklist the company
   upto a maximum period of 3 years besides forfeiture of SD.
After signing the Letter of Acceptance shared by DTCP, the bidder shall send back one
copy of the Letter of Acceptance along with the Security Deposit as per the Clause
17(a) of the RFP. Upon successful remittance of the SD, Agreement shall be signed
with the successful bidder.
                                                                                     40
23        TIMELINE
     a. The successful bidder shall adhere to the following timelines for each land
        parcel:
           *Note: Stage D2 & D3 is a parallel activity that has to start from the date of
           execution of agreement
     b. However, The client reserves the right to extend the project period to an extent
        necessary beyond the date of completion of the project period without any
        changes to the cost of the project, for any reasons if considered necessary
     c. If the contract is not completed within the stipulated time or extended time at
        any stage, DTCP will deemed fit to the occasion at the risk and cost of the
        successful bidder. Such cancellation will entail forfeiture of Security Deposit or
        penalty clause as mentioned in Clause 26 will be imposed. Delays beyond that
        period will result in termination of the project,.
24 FORCE MAJEURE
a. The bidder shall not be liable for penalty or termination for default if and to the
   extent that it’s delay in performance or other failure to perform its obligations
   under the Contract is the result of an event of Force Majeure.
b. For purposes of this clause, “Force Majeure” means an event beyond the control
   of the bidder and not involving the bidder/ fault or negligence, and not
   foreseeable. Such events may include, but are not restricted to, acts of the DTCP
   Chennai in its capacity as a buyer, wars or revolutions, terrorist attacks, fires,
   floods, epidemics, quarantine restrictions and freight embargoes.
                                                                                     41
     c. If a Force Majeure situation arises, the bidder shall promptly notify the DTCP
         Chennai in writing of such condition and the cause thereof. Unless otherwise
         directed by the DTCP Chennai in writing, the tenderer shall continue to perform
         its obligations under the Contract as far as is reasonably practical and shall seek
         all reasonable alternative means for performance not prevented by the Force
         Majeure event.
25 PAYMENT TERMS
     a. No advance is permissible.
70
     b. The payment to the bidder for each land parcel will be made in        the following
        manner:
     Stage                      Deliverable                     Time               Payment
                                                               Line (in
                                                                days)
            Date of Executing the agreement/ Issuance of      T                -
            Work order whichever is earlier
       D1   Inception Report                                  30               10%
       D2   Spatial attribute collection and Vetting of Base  150              15%
            Maps
      D3     Existing Land Use Map                                 240         10%
      D4     Situation Analysis Report                             330         15%
      D5     Visioning exercises                                   390         15%
      D6     Draft Proposals                                       450         10%
      D7     Draft Master Plan                                     510         15%
      D8     Final Master Plan (Revised Draft Master Plan)         720         10%
     c. The Bidder should obtain signoff after each milestone from the DTCP and raise
        invoice against the same. The payments shall ordinarily be made within 15 days
        from the date of receipt of invoice.
     d. Upon successful completion of the entire contract as per scope of work, Security
        Deposit SD will be released.
     e. DTCP also reserves the right to recover any dues from the bidder, which is found
        on later date, during audit/excess payment, after final settlement is made to
        them. The bidder is liable to pay such dues to DTCP immediately on demand,
        without raising any dispute/protest.
                                                                                             42
26    PENALTY
The successful bidder should adhere to project milestones as per clause 23 (a), failing
which a penalty @1% per week on the value of the delayed work will be levied up to a
maximum of 5%. Delays beyond that period will result in termination
of contract.
27 TERMINATION OF CONTRACT
DTCP reserves the right to terminate the contract at any time during the validity
period on account of non-fulfillment of contractual obligations and SLA.
28    GENERAL CONDITIONS
 a. DTCP reserves the right to relax or waive or amend any of the tender conditions.
b. The bidders are advised to check https://tntenders.gov.in for up-to-date
   information on the submissions and other process of the tender as DTCP may not
   be able to identify and communicate with the prospective bidders throughout.
c. The right of final acceptance of the tender is entirely vested with DTCP and
   reserves the right to accept or reject any or all the bidder in part or in totality or
   to negotiate with any or all the bidders or to withdraw/ cancel/ modify this tender
   without assigning any reason whatsoever.
d. After acceptance of the tender by DTCP, the bidder will have no right to withdraw
   his tender.
e. The bidder shall not transfer the contract to any other service provider.
f. The bidder must have an established office in Chennai. The documentation
   verifying the establishment of the office in Chennai must be submitted to the
   client.
g. The consultant team must be available at any time of requirement at the DTCP
   Head Office to facilitate discussions with the client, both at the head office and
   in local body offices, as necessary.
h. If performance of the bidder is not as per the schedule, then DTCP reserves the
   right to reallocate full/part order to other qualified bidders. Any additional cost
   incurred by DTCP due to such reallocation should be borne by the bidder
i. DTCP will not have any liability towards the manpower appointed by the bidder
   for implementation of the project.
 j. All the expenses incurred during the stakeholders engagement at all levels in the
    preparation of master plan shall be borne by the consultant only
k. Any notice regarding any problems, to the bidder shall deemed to be sufficiently
   served, if given in writing at his usual or last known place of business.
29     ARBITRATION
 a. In case of any dispute in the bid, including interpretation if any on the clauses of
    the bid or the agreement to be executed, the matter, if not resolved through
                                                                                           43
     amicable settlement, shall be referred to arbitration by an arbitral tribunal
     constituted in accordance with Clause 26(b). Such arbitration shall be proceeded
     as per the provisions of the Arbitration and Conciliation Act, 1996 or under any
     statute in force at that point of time.
c. The venue of the Arbitration shall be at the Head office of Directorate of Town
   and Country Planning, Chennai. The decision of the arbitral tribunal shall be final
   and binding on both the parties to the Arbitration.
d.   The arbitral tribunal may with the mutual consent of the parties, extend the
     time for making the award. The award to be passed by the arbitral tribunal is
     enforceable in the Court at Chennai city only.
Any dispute arising out of non-fulfillment of any of the terms and conditions of this
Agreement or any other dispute arising out of the arbitration award will be subject
to the jurisdiction of the Courts in the City of Chennai only.
DATE:
DESIGNATION:
ADDRESS:
                                                                                        44
ANNEXURE – I
  Certify that Annual turnover of M/s ............................... for the past three years
  (HSN Code :… .... ) as per the book of accounts verified by me is as follows:
                    S.No.                             Turnover
                                  Year                (₹ in lakh)
                     1.        2020-2021
                     2.        2021-2022
                     3.        2022-2023
                                 Total
                   Average annual turnover
Note: Average Turnover of three consecutive financial years will be considered i.e., FY
2020-21, FY 2021-22 and FY 2022-23.
DATE:
    Note:
    1. In case of a consortium, above form has to be submitted for each consortium member.
                                                                                                 45
ANNEXURE – II
          PQ FORM 2A SUMMARY OF FIRM’S / CONSORTIUMS’ ELIGIBLE
                                     EXPERIENCE.
Experience in Preparation of Master Plan/ Development plans using GIS for a city/ Town
having population more than 50,000 or minimum area of 100 sq.km.
                                                                                         46
                      PQ FORM 2B: DETAILS OF SIMILAR ASSIGNMENTS
(Please provide the details for each project along with work order and
completion certificate from client)
Experience in Preparation of Master Plan/ Development plans using GIS for a city/ Town
having population more than 50,000 or minimum area of 100 sq.km
a. Completed Master Plans/Development Plans
                                                                                         47
                    PQ FORM 2C: DETAILS OF SIMILAR ASSIGNMENTS
(Please provide the details for each project along with work order and
completion certificate from client)
Experience in Preparation of Master Plan/ Development plans using GIS for a city/ Town
having population more than 50,000 or minimum area of 100 sq.km.
b. Ongoing Master Plans/Development Plans
                                                                                         48
ANNEXURE – III
                  PQ FORM 3: FORMAT FOR JOINT BIDDING AGREEMENT
                           (IN CASE OF JV / CONSORTIUM)
                       (To be executed on Rs.100 stamp paper of value)
    THIS JOINT BIDDING AGREEMENT is entered into on this the (date in words) day of [month in
    words) [year in "yyyy" format)
    AMONGST
       1. [Company Name] a company incorporated under the Companies Act, 1956 and
          having its registered office at [Address] (Hereinafter referred to as the "First
          Party" which expression shall, unless repugnant to the context include its
          successors and permitted assigns)
    AND
       2. [Company Name] a partnership firm having its registered office at [Address]
          (Hereinafter referred to as the "Second Party" which expression shall, unless
          repugnant to the contextinclude its successor and permitted assigns)
    The above-mentioned parties of the [FIRST AND SECOND] PART are collectively referred to
    as the"Parties "and each is individually referred to as "Party"
    WHEREAS,
    Directorate of Town & Country Planning, having its head office at CMDA Office Complex (3rd
    Floor), E&C Market Road, Koyambedu, Chennai 600 107, Tamil Nadu, India (herein after
    referred to as the "Authority ―which expression shall, unless repugnant to the context or
    meaning thereof, include its administrators, successors and assigns) has invited proposals (the
    Applications) by its "RFP" for " Preparation of GIS based Master Plans for Tamil Nadu under
    AMRUT 2.0 Sub scheme ".
       A. The Parties are interested in jointly bidding for the Consultancy as members of a
          Consortium and in accordance with the terms and conditions of the RFP document
          and other bid document in respect of the Consultancy, and
       B. It is a necessary condition under the Consultancy document that the member of
          the consortium shall enter into a joint Bidding Agree with the Application.
                                                                                                      49
ii. Consortium
   a. The Parties do here by irrevocably constitute a consortium ("the Consortium") for the
      purposesof jointly participating in the selection process for the Consultancy.
   b. The Parties hereby undertake to participate in the Bidding Process only this Consortium
      and not individually and / or through any other consortium Constituted for this
      Consultancy, either directly or indirectly or through any of their Affiliates.
 iii. Covenants
 The Parties hereby undertaken that in the event the Consortium is declared the selected
 Consultant and awarded the Consultancy, the Parties shall enter into contract for consultancy
 services ("Contract") with the Authority and for performing all obligations as the Consultant in
 terms of the Contract for the Consultancy.
 a. The First Party [Company Name] shall be the Members in Charge/ Lead Member of
 theConsortium until the Effective Date under the Contract;
 b. The Second Party [Company Name] shall be the consortium/ associate partner and shall
 have the power of attorney from all Parties for conducting behalf of the Consortium
 during the selection process for the Consultancy.
                                                                                                     50
vii. Representation of the Parties
Each party represents to the other Parties as of the date of this Agreement that:
a. Such Party is duly organizing, validly existing incorporation and has all
requisite power and authority to enter into this agreement;
b. The execution, delivery and performance by such Party of this Agreement has
been authorized by all necessary and appropriated corporate of governmental
action and a copy of the extract of the charter document and board resolution/
power of attorney in favour of the person executing this Agreement on behalf of
the party is annexed to this Agreement, and Will not, to the best of its
knowledge:
i. Require any consent or approval not already obtained;
ii. Violate any Application Law presently in effect and having applicability to it;
iii. Violate the memorandum and articles of association, bye-laws or other
applicableorganizational document thereof;
iv. Violate any clearance, permit, concession, grant, license or other
governmental authorization, approval, judgment, order or decree or any
mortgage agreement, indenture or any other instrument to which such party is
a Party or by which such Party or any of its properties or assets are bound or
that is otherwise applicable to such Party; or
v. Create or impose any lines, mortgages, pledges, claims, security interests,
charges or Encumbrances or obligation to create line, charge, pledge, security
interest, encumbrances or mortgage in or on the property of such Party, except
for encumbrances that would not, individually or in the aggregate, have a
material adverse effect on the financial condition or prospects or business of
such Party so as to prevent such Party from fulfilling its obligations under this
Agreement;
c. This Agreement is the legal and binding obligation of such Party, enforceable
in accordance with its term against it; and
d. There is no litigation pending or, to the best of such Party's knowledge,
threatened to which it or any of its affiliates is a Party that presently affects, or
which would have a material adverse effect on the financial condition or
prospects or business of such Party in the fulfilment of its obligation under this
agreement.
viii. Authorized Representation
The parties agree that, who is employed with consortium partner, or his/her nominee
shall be the authorized representative of the consortium, to do on behalf of the
Consortium, all such acts, deeds and things as are necessary or required in
connection with or incidental to submission of the Consortium's proposal for an the
Consultancy including but not limited to signing and submission of all application,
proposal and other document, participating in pre-bid and other conferences and
providing information responses to the authority, representing the consortium in the
matters before the authority, signing and execution of all contracts and undertakings
consequent to acceptance of the consortium's proposal and generally
                                                                                        51
dealing with the Authority in all matters in connection with or relating or arising
out of the Consultancy.
ix. Termination
This Agreement shall be effective from the date hereby and shall continue in full
force and effect until the Effective Date under the Contract, in case the Consultancy
is awarded to the Consortium. However, in case the Consortium is not selected for
award of the Consultancy, the Agreement wilt stand terminated upon intimation by
the Authority that it has not been selected and upon return of the Bid Security by
the Authority.
x. Miscellaneous
a. This Joint Bidding Agreement shall be governed by laws of India.
b. The Parties acknowledge and accept that this Agreement shall not be
amended by the Partieswithout the prior written consent of the Authority.
Name: Name:
Designation: Designation:
Address: Address:
1. 1.
2. 2.
                                                                                        52
                            ANNEXURE IV:
          FORM TECH 1: TECHNICAL PROPOSAL SUBMISSION FORM
                                                               Location, Date
To:
Director,
Directorate of Town and Country Planning (DTCP), CMDA Office Complex, E&C
Market Road, Koyambedu, Chennai 600 107, Tamil Nadu, India
Email: dtcpmasterplan@gmail.com;
Ph: 044-29585161, 044-29585229 & 044-29585247
Sir/Mam
Subject: Preparation of GIS based Master Plans for Tamil Nadu under AMRUT 2.0
Sub scheme
We, the undersigned offer to provide the consulting services for the above in
accordance with your Request for Proposal dated [date], and our Proposal. We are
hereby submitting our Proposal which includes this Technical Proposal and a
financial proposal.
We understand you are not bound to accept any Proposal you receive. We remain,
Yours Sincerely,
                                                                                53
ANNEXURE – V
                   FORM TECH 2: DETAILS OF THE BIDDER
b) Outside Chennai
                                                                      54
ANNEXURE - VI
   C. Appreciation of Assignment
    1.
    2.
    3.
    4.
    5.
                                                                             55
ANNEXURE – VII
     FORM TECH 4: DESCRIPTION OF THE APPROACH AND METHODOLOGY AND WORK
     PLAN FOR
                            PERFORMING THE ASSIGNMENT
    b)    Work Plan. In this chapter, the consultants shall propose the main
          activities of the assignment, their content and duration, phasing and
          interrelations, milestones, and delivery dates of the reports. The proposed
          work plan shall be consistent with the technical approach and
          methodology, showing understanding of the ToR and ability to translate
          them into a feasible working plan. A list of the final documents, including
          reports, drawings, and tables to be delivered as final output, shall be
          included here. The work plan should be consistent with the Work Schedule.
                                                                                        56
ANNEXURE – VIII
                                                                  57
ANNEXURE – IX
        FORM TECH 6: FORMAT OF CURRICULUM VITAE (CV) FOR PROPOSED
                          PROFESSIONAL STAFF
Country of
Citizenship/Residence
Employment record relevant to the assignment: {Starting with present position, list in
reverse order. Please provide dates, name of employing organization, titles of positions
held, types of activities performed and location of the assignment, and contact
information of previous clients and employing organization(s) who can be contacted for
references. Past employment that is not relevant to the assignment does not need to be
included.}
                                                                                              58
Adequacy for the Assignment:
Certification:
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly
describes myself, my qualifications, and my experience, and I am available, as and when
necessary, to undertake the assignment in case of an award. I understand that any
misstatement or misrepresentation described herein may lead to my disqualification or
dismissal by the Client, and/or sanctions by the Bank.
{day/month/year}
{day/month/year}
                                                                                              59
ANNEXURE – X
        FORM TECH 7,8: STAFFING SCHEDULE FOR KEY PROFESSIONALS AND
                                 TECHNICAL
                              SUPPORT PERSONNEL
                                                Signature
                                                               (Authorized
                                                            Representative)
                                           Full Name:
                                            Title:
                                            Address:
                                                                              60
                      FORM TECH 7,8: WORKS SCHEDULE
                                                                                           61
ANNEXURE –XI
                                    CERTIFICATE
                                                                 Date:
                                                                                      62
ANNEXURE – XII
DECLARATION FORM
Date:
       b) I/We have downloaded the tender document from the internet site
https://tntenders.gov.in and I / We have not tampered / modified the tender
document in any manner. In case, if the same is found to be tampered / modified,
I/ We understand that my/our tender will be summarily rejected and full Earnest
Money Deposit will be forfeited and I /We am/are liable to be banned from doing
business with DTCP or prosecuted.
                                                                                 63
ANNEXURE XIII
                                                      PRICE BID
                                                                                      in ₹
                                                                        GST   Total
 S.No.                  Description                         Base Rate
Grand Total
                                                                                             64
Annexure-XIV
                   FORM FIN 1: FINANCIAL PROPOSAL SUBMISSION FORM
                                                                                    Location, Date
   To:
   Director,
   Subject:         ―Preparation of GIS based Master Plans for Tamil Nadu under AMRUT
                   2.0 Sub scheme‖: Financial Proposal for Package       .
   We, the undersigned, offer to provide the consulting services for the above in accordance
   with your Request for Proposal dated [Date], and our (Technical and Financial Proposal). Our
   attached financial proposal is for the sum of (Amount in words and figures), which is inclusive
   of all taxes excluding service tax. Amount of Service Tax we have estimated at [Amounts(s) in
   words and figures].
   Our financial proposal shall be binding upon us subject to the modifications resulting from
   contract negotiations, up to expiry of the validity period of the Proposal, i.e., [Date].
   We undertake that, in competing for (and, if the award is made to us, in executing) the above
   contract, we will strictly observe the laws against fraud and corruption in force in India namely
   ―Prevention of Corruption Act 1988‖.
We understand that you are not bound to accept any Proposal you receive
We remain,
Yours Sincerely,
                                                                                                       65
Annexure-XV
                            FORM FIN 2: SUMMARY OF COSTS
                                                                           Local
    S. No.                         Description
                                                                          Currency
                                                                            (INR)
     1                              Remuneration
     2                         Reimbursable Expenses
     3                         Miscellaneous Expenses
     4       Taxes Assessed and payable on fees/services provided by
                                        foreign
              Personnel, including duties on equipment imported, if any
     5                 TOTAL COSTS (excluding Service Tax)
     6                               Service Tax
     7                 TOTAL COSTS (inclusive of all Taxes)
                                                                                     66
Annexure-XVI
                  FORM FIN 3: BREAKDOWN OF COST
                                                                     67
Annexure-XVII
                   FORM FIN 4: BREAKDOWN OF REMUNERATION
                                                    Remuneration
                            Staff    Indicate                          Amount(INR)
  Sl.    Name   Position                             Rate     Amount
                           Months    Currency
  No.                                                (INR)     (INR)
                                       (INR)
  1
  2
  3
  -
  -
  1
  2
  -
  -
  -
                               Total Remuneration in INR
                                                                                 68
Annexure-XVIII
                 FORM FIN 5: BREAKDOWN OF REIMBURSABLE EXPENSES
                                                                                        69
Annexure-XIX
               FORM FIN 6: BREAKDOWN OF MISCELLANEOUS EXPENSES
                                                                                   70
Annexure - XX
Bidders are required to submit only soft copies of their bids electronically on the
TAMILNADU GOVERNMENT E PROCUREMENT Portal, using valid Digital Signature
Certificates. The instructions given below are meant to assist the bidders in registering
on the TAMILNADU GOVERNMENT E PROCUREMENT Portal, prepare their bids in
accordance with the requirements and submitting their bids online on the TAMILNADU
GOVERNMENT E PROCUREMENT Portal. More useful information for submitting online bids
on the TAMILNADU GOVERNMENT E PROCUREMENT Portal may be obtained at:
https://tntenders.gov.in
A. REGISTRATION
Bidders are required to enroll on the e-Procurement module of the Tamil Nadu
Government E procurement Portal (URL: https://tntenders.gov.in)
2. As part of the enrolment process, the bidders will be required to choose a unique
   username and assign a password for their accounts.
3. Bidders are advised to register their valid email address and mobile numbers as part
   of the registration process. These would be used for any communication from the
   TAMILNADU E PROCUREMENT Portal.
4. Upon enrolment, the bidders will be required to register their valid Digital Signature
   Certificate(DSC) (Class III Certificates with signing key usage) issued by any Certifying
   Authority recognized by CCA India (e.g. Sify /nCode / eMudhra etc.), with their
   profile.
                                                                                           71
5. Only one valid DSC should be registered by a bidder. Please note that the bidders are
   responsible to ensure that they do not lend their DSC‟s to others which may lead to
   misuse.
6. Bidders can then log in to the site through the secured log-in by entering their user
   ID / password and the password of the DSC / e-Token.
2. Once the bidders have selected the tenders they are interested in, they may download
   the required documents / tender schedules. These tenders can be moved to the
   respective „My Tenders‟ folder. This would enable the TAMILNADU GOVERNMENT E
   PROCUREMENT Portal to intimate the bidders through SMS / e-mail in case there is
   any corrigendum issued to the tender documents.
3. The bidder should make a note of the unique Tender ID assigned to each tender, in
   case they want to obtain any clarification / help from the Helpdesk.
C. PREPARATION OF BIDS
1. Bidder should take into account any corrigendum published on the tender document
   before submitting their bids.
2. Please go through the tender advertisement and the tender document carefully to
   understand the documents required to be submitted as part of the bid. Please note
   the number of covers in which the bid documents have to be submitted, the number
                                                                                       72
    of documents - including the names and content of each of the document that need
    to be submitted. Any deviations from these may lead to rejection of the bid.
3. Bidder, in advance, should get ready with the bid documents to be submitted as
   indicated in the tender document / schedule and should be in PDF formats. Bid
   documents may be scanned with 100 dpi with Black and White option which helps in
   reducing size of the scanned document.
4. To avoid the time and effort required in uploading the same set of standard
   documents which are required to be submitted as a part of every bid, a provision of
   uploading such standard documents (e.g. PAN card copy, annual reports, auditor
   certificates etc.) has been provided to the bidders. Bidders can use “My Space” or
   “Other Important Documents‟‟ are available to them to upload such documents. These
   documents may be directly submitted from the “My Space” area while submitting a
   bid, and need not be uploaded again and again. This will lead to a reduction in the
   time required for bid submission process.
The bidder shall submit online the requirements under qualification criteria and technical
documents required and Price Bid. All the documents are required to be signed digitally
by the bidder. After electronic online bid submission, the system generates a unique bid
reference number which is time stamped. This shall be treated as acknowledgment of bid
submission.
1. Bidder should log-in to the site well in advance for bid submission so that they can
   upload the bid in time i.e. on or before the bid submission time. Bidder will be
   responsible for any delay due to other issues.
2. The bidder has to digitally sign and upload the required bid documents one by one as
   indicated in the tender document.
3. Bidder has to select the payment option as “offline/online” to pay the tender fee /
   EMD as applicable and enter details of the instrument.
                                                                                         73
4. Bidder should prepare the EMD as per the instructions specified in the tender
   document.
5. Bidders are requested to note that they should necessarily submit their financial bids
   in the format provided and no other format is acceptable. If the price bid has been
   given as a standard BoQ format with the tender document, then the same is to be
   downloaded and to be filled by the bidder. Bidders are required to download the BoQ
   file, open it and complete the white coloured (unprotected) cells with their
   respective financial quotes and other details (such as name of the bidder etc). No
   other cells should be changed. Once the details have been completed, the bidder
   should save it and submit it online, without changing the filename. If the BoQ file is
   found to be modified by the bidder, the bid will be rejected.
6. The server time (which is displayed on the bidders‟ dashboard) will be considered as
   the standard time for referencing the deadlines for submission of the bids by the
   bidders, opening of bids etc. The bidders should follow this time during bid
   submission.
7. All the documents being submitted by the bidders would be encrypted using PKI
   encryption techniques to ensure the secrecy of the data. The data entered cannot be
   viewed by unauthorized persons until the time of bid opening. The confidentiality of
   the bids is maintained using the secured Socket Layer 128 bit encryption technology.
   Data storage encryption of sensitive fields is done. Any bid document that is uploaded
   to the server is subjected to symmetric encryption using a system generated
   symmetric key. Further this key is subjected to asymmetric encryption using
   buyers/bid opener‟s public keys.
8. The uploaded bid documents become readable only after the tender opening by the
   authorized bid openers.
9. Upon the successful and timely submission of bids (i.e. after Clicking “Freeze Bid
   Submission” in the portal), the portal will give a successful bid submission message &
   a bid summary will be displayed with the bid no. and the date & time of submission
   of the bid with all other relevant details.
                                                                                        74
10. The bid summary has to be printed and kept as an acknowledgement of the submission
    of the bid. This acknowledgement may be used as an entry pass for any bid opening
    meetings.
11. In all cases, bidder should use their own ID and Password along with Digital Signature
    certificate at the time of submission of their bid.
12. During the entire e-tender process, the bidders will remain completely anonymous to
    one another and also to everybody else.
13. The e-tender floor shall remain open from the pre-announced date & time and for as
    much duration as mentioned above.
14. All electronic bids submitted during the e-tender process shall be legally binding on
    the bidder. Any bid will be considered as the valid bid offered by that bidder and
    acceptance of the same by DTCP will form a binding contract between DTCP and the
    Bidder for execution of supply.
15. It is mandatory that all the bids are submitted with digital signature certificate
    otherwise the same will not be accepted by the system.
16. DTCP reserves the right to cancel or reject or accept or withdraw or extend the tender
    in full or in part as the case may be without assigning any reason thereof.
17. The server time shall be treated as final and binding. Bids recorded in the server
    before the bid closing time will only be treated as valid bid. Bidders are, therefore,
    advised to submit their bids well before the closing time of e-tender. If any bid
    reaches the server after the bid closing time as per server time, the same will not be
    recorded and no complaint in this regard shall be entertained. The DTCP will not be
    held responsible for any sort of delay or the difficulties faced during the submission
    of bids online by the bidders due to local issues.
18. Bidders are advised to exercise caution in quoting their bids in e-tender to avoid any
    mistake. Bids once submitted can‟t be recalled.
19. Any order resulting from this bidding process shall be governed by the terms and
    conditions mentioned in the tender documents.
                                                                                         75
20. No deviation to the technical and commercial terms & conditions are allowed.
F. ASSISTANCE TO BIDDERS:
1. Any queries relating to the tender document and the terms and conditions contained
   therein should be addressed to the DTCP, Chennai for a tender or the relevant contact
   person indicated in the tender.
2. Any queries relating to the process of online bid submission or queries relating to
   Tamil Nadu Government e-Procurement Portal in general may be directed to the 24x7
   Tamil Nadu Government e-Procurement Portal Helpdesk.
                                                                Approved By
                                                                   Director
                                                                   DTCP
                                                                                       76
Annexure – XXI
                                 PACKAGE – 7
                   MASTER PLAN
SI.NO DISTRICT                   TYPE            REVENUE VILLAGE
                      NAME
                            Dharmapuri
                                           Dharmapuri
                                           Vellegoundan palayam
                                           Virupatchipuram
                                           Kadagathur
                                           Haley Dharmapuri
                                           A.Reddihalli
                                           K.Naduhalli
                                           Athagapadi
                                           Pappinakkannahalli
                                           Annasagaram
 39   Dharmapuri    Dharmapuri      CLPA
                                           Settikarai
                                           Nallanahalli
                                           Kuppur
                                           Ungranahalli
                                           Balajangamanahalli
                                           Thadangam
                                           Adhiyamankottai
                                           A.Jettihalli
                                           Madhemengalam
                                           Nallampalli
                                                                   77
                                 Krishnagiri
                                               Krishnagiri town
                                               Boganapalli
                                               Kattiganappalli
                                               Orappam
                                               Kallukurukki
                                               Kundarapalli
                                               Bayanapalli
40   Krishnagiri   Krishnagiri         CLPA    Kondapalli
                                               Kothabetta
                                               Kattinayanapalli
                                               Pethathalapalli
                                               Gangaleri
                                               Devasamudhram
                                               Agasipalli
                                               Periyamuthoor
                                 Thirupathur
                                               Thirupathur
                                               Damalerimuthur
                                               Pachal
                                               Kasinayakkanpatti
                                               Su. Pallipattu
                                               Palnankuppam
                                               Achamangalam
                                               Kadirimangalam
41   Thirupathur   Thirupathur         CLPA    Aadiyur
                                               Rachamangalam
                                               Vengalapuram
                                               Kadirampatti
                                               Madaspalli
                                               Thadavalli
                                               Tirupathur Village (Now
                                               Municipality S.F.Nos)
                                               Konerikuppam
                                                                         78
                                 Gudiyatham
                                              Gudiyatham
                                              Pichanoor
                                              Kondsamuthiram
                                              Sedukkarai
                                              Nellorepettai
42     Vellore     Gudiyatham          CLPA
                                              Seruvangi
                                              Thalayatham
                                              Seevoor
                                              Ammanankuppam
                                              Sethuvandai
                             Vaniyambadi
                                              Govindapuram (pt)
                                              Amburpettai (pt)
43   Thirupathur   Vaniyambadi         SLPA
                                              Devasthanam (pt)
                                              Vaniyambadi (pt)
                             Peranampattu
                                              Pernampattu (Urban )
44    Vellore      Pernampattu        CLPA    Jothikammavarpalli
                                              Pernampattu (Rural)
                                                                     79
Annexure-XXII
The Consultants shall collect and collate critical sectoral plans prepared and/or under
preparation from the following government agency on Planning Area but not be limited
to the following:
S.No. Department
1     Department of Geology and Mining
2     Department of Revenue
3     Tamil Nadu Government Registration Department
4     Tamil Nadu State Disaster Management Authority (TNSDMA)
5     Department of Fisheries
6     Directorate of Census Operations
7     Public Works Department (Water Resources)
8     Tamil Nadu Water and Drainage Board (TWAD)
9     Tamil Nadu Pollution Control Board (TNPCB)
10    Tamil Nadu state wetland authority
11    Tamil Nadu Forest Department
12    India Meteorological Department (IMD)
13    Department of Environment, Tamil Nadu
14    Tamil Nadu Animal Husbandry Department
15    Department of Economics and Statistics
16    Commercial Taxes Department & Goods and Service Tax department
17    Tamil Nadu Tourism Department
18    Tamil Nadu Archaeology Department
19    Tamil Nadu Housing Board (TNHB)
20    Tamil Nadu Urban Habitat Development Board (TNUHDB)
                                                                                      80
21   Tamil Nadu Police Housing Corporation Limited (TNPHC)
22   Directorate of Town and Country Planning (DTCP)
23   Tamil Nadu Real Estate Regulatory Authority (RERA)
24   Municipal Corporation / Municipalities / Town Panchayat and Village Panchayat
25   Department of Rural Development and Panchayat Raj
26   Department of Agriculture
27   Department of Sericulture
28   Department of Horticulture and Plantation Crops
29   Tamil Nadu Commissionerate and Transport Authority
30   Southern Railways
31   Airport Authority of India (AAI)
32   Port Trust of India (PTI)
33   Tamil Nadu State Road Transport Corporation (TNSTC)
34   Highway Department and NHAI
35   District Industries Centre (DIC)
36   Tamil Nadu Small Industries Development Corporation Limited (TANSIDCO)
37   State Industries Promotion Corporation of Tamil Nadu (SIPCOT)
38   Tamil Nadu Industrial Investment Corporation Limited (TIIC)
39   Micro , Small and Medium Enterprises (MSME)
40   Tamil Nadu Generation and Distribution Corporation Limited (TANGEDCO)
41   Tamil Nadu Electricity Board (TNEB)
42   Tamil Nadu Energy Development Agency (TEDA)
43   Directorate of School Education
44   Department of Higher Education
45   Directorate of Technical Education
46   Directorate of Employment and Training
47   Department of Health and Family Welfare
48   Tamil Nadu Police Department
                                                                                     81
49    Sports Development Authority of Tamil Nadu
50    Bank Association
51    Department of Telecommunications
52    Ministry of Petroleum and Natural Gas limited
53    India Post
54    Tamil Nadu e-Governance Agency
55    Central Ground water board
56    Water resources Department
57    Tamil Nadu Agriculture university
58    Centre for Climate Change and Disaster Management, Anna University
59    TNGIS
60    Information Technology Department
The Consultants shall from the above departments collect all the relevant data for Master
Plan and Overlay all those data collected over the geospatial data along with the
attributes. Integrate the various proposals for master plan preparation. The data
collected should be at Urban and Rural Local Body level. And all those data should be
represented spatially in the Master Plan.
                                                                                        82
                                          Annexure XXIII
                               Formulation of GIS-based Master Plan
                   Source: _
                   Extent as per various authorities may be specified as
                   under: Area as per Census of India _
                   Extent of Local Planning Area
                   Municipal Area _
                   Extent as per Local Planning Authority Area _              _
                   Controlled Area                                            _
                                                                                     83
      1.7 Distance from Town
Source: _
Source: _
Note: Please attach Primary Census Abstract 2011, District Census Handbook (for whichever
Census it is available), Housing Tables, Slum Tables and Economic Tables of Census of India.
Also any Report by Bureau of Economics and Statistics or any other State Government
Report
                                                                                                        84
            2.1 Population and Growth Rates
                                                  1961       1971     1981      1991       2001         2011
                    Total population
                    Decadal Growth
                    rate
     Source: _
Source: _
Source: _ _
                                                                                                                    85
     2.5 Persons below Poverty Line             Year                         _
Source: _
Note: Poverty Line defined as: _                                                 _
                                                                                                   86
           3.2         Occupational Classification of Main Workers, 2001
                                     A, B, C                  D                                   E                         F                      G                   H                    I                                J&K             L to Q
                                                                                                                  Gas
                                                      Livestock, Forestry,
                                                                                                                                                                                                                                   Estate,
                                                                                                                                                                 and
                                                                                                                                                                                                Transport, Storage
                                                      Fishing, Hunting &
                                                                                                                                                                                  and
                                                                                                  and Water Supply
Communications
                                                                                                                                                                                                                         Intermediation,
                                                      alliedactivities
Construction
Retail Trade
                                                                                                                                                                       Restaurants
                               Agricultural
                 Cultivators
labourers
                                                                                                   Electricity,
                                                                                        Non HHI
                                                                                                                                                   Wholesale
                                                      Plantation,
                                                                                                                                                                                                                         Renting &
                                                                                                                                                                                                                         Financial
    Ward
                                                                                                                                                                       Hotels
                                                                             HHI
                                                                                                                                                                                                                         Real
                                                                                                                                                                                                and
                 M F T M                      F   T   M       F       T      M     F T M F T M                F         T   M              F   T   M F T M                       F      T       M         F          T   M     F     T       M F T
1
2
…
Total
Source: _ _Note: Separate Table can be made for 2001 and 2011
                                                                                                                                                                                                                                                      87
     Table 4:     INDUSTRIAL ASPECTS (Town level)
     _Definitions:
     (as per                        Act)
S. No.        Types of Industries          No. of units          No. of workers       Run by Manual/HP         H.P
1             Large
2             Medium
3             Small
4             House hold
5             Hazardous
     Source: _                                                  _
Note: Please attach Lead Bank Report, DIC Report, and any other industrial report
                                                                                                                     88
 TABLE 5:         LAND USE (in Hectares)
Source: _
 1
 2
 …
 Total
 Main source of drinking water
 Distance from source                                      _
 Treatment Plant (nos & names)
Source: _ _
                                                                                                     89
  6.2         Water Supply Details              Year
Ward
of
Capita
                                                                                                                                  collection of
                                                                                                                                  Efficiency in
                 of
of supply per
                                                                         Consumption
                                    Times/Hours
Connections
(sq. km.)
                                                                                                                       Metering
                                                                                                                       Achieved
                                                                                                 Covered
                                                                                          Area
                 Quantity
Supplied
                                                                                                                                  charges
                                                         No.
                                                                         (LPCD)
                 Water
(MLD)
                                                                                                                       (%)
                                    day
                                                                         Per
   1
   2
   …
   Total
  Source: _                                     _
Source: _
6.3.1 Is there any scheme for recycling of waste water in the town? Yes No
  6.3.3       Is there any separate water supply line for non-drinking purposes such as
              industry,parks etc.
              If yes, give area covered under the scheme.
6.3.4 Details of ongoing and committed projects under water supply with agency
  Source: _
                                                                                                                                                  90
 Type                    Residential   Commercial       Industrial    Agricultural    Others   Total
 No. of Electric
 Connections
 Electric
 Consumption
 (KWH)
 Source: _                                  _ Proposed power projects to be taken up in the city
                                                                                                       91
TABLE 10: MEDICAL FACILITIES           Year_
 10.1     Number of hospitals, dispensaries, etc., doctors, nurses, paramedical staff
          and total number of beds available therein
 Source: _
 Note: Please follow standard classification if specified by Govt/DTCP and give datain that
 format, namely Sub-Centre, PHC, CHC, District Hospital, Super Specialty Hospital, Nursing
 Home, etc.
                                                                                               92
10.2     Epidemiological Details        (Period from             to             )
   What is the major sanitary system in the town: Sewerage/Septic Tank/LCS (please
   tick)
   Does the Town have a sewerage system:
   If yes, Combined or Separate: _
   Length (km.) _
                                                                    _
   Area Covered:                              sq. km. _                   %
   Population covered _                           (nos)                    %
                                                                                                   93
11.2        Network Details                                     Year
                       Open surface            Covered drains      Underground         Others
                       drains                                      sewerage
       Length in
       km.
       Area served
       (sq. km.)
   Source: _
                                                                                                       94
   12.1        Solid waste generation         Year _
12.2 Disposal method of solid waste (Put a tick mark on appropriate column) Year
Source: _
12.3 Vehicles deployed for Collection and Disposal of Solid waste, Year _
Source: _
Source: _
                                                                                                         95
  12.5   Is there any system of segregation of solid waste?
                                                                                  Yes No
         If yes, please furnish following details (% age of quantum)
Source: _
12.6 Details of ongoing and committed projects under solid waste disposal management
                                                                                           96
13.2      Number of banks and credit societies       Year
Source: _
Source: _
                                                                                              97
TABLE 15:         HOUSING
  15.1       Distribution of House Holds (HHs.), No. of persons and Tenure, Year   _
                                                        Number of
                              Tenure Status          HHs     Persons
                             Owned
                             Rental
                             Sub-letting
                             Rent free
                             Squatter without
                             Rent
                             Squatter with Rent
                             Others
                             Total
                             Distribution          of      Number of
                             Persons    by     living
                                                        HHs    Persons
                             rooms
                             One room
                             Two rooms
                             Three rooms
                             Four rooms
                             Five & above
                             Total
            Source: _
  15.2      Categories of Houses
  Note: For Housing Data, please attach relevant abstract of Housing Table
                                                                                       98
TABLE 16:        LAND OWNERSHIP AND COST (Ward wise)
         Private          Authorized
                          Individuals
                          Unauthorized
                          Individuals
         Others (Specify)
         Total
Source: _
Are there any structures which have been damaged by disaster during last ten years?
Yes/NoIf yes, please give following details
(Year _ _)
                                                                                               99
     Cyclone
     Landslides
     Tsunami
     Fire
     Others
     (specify)
Source: _
                  100
TABLE 18:     PUBLIC-PRIVATE-PARTNERSHIPPROJECTS IMPLEMENTED IN THE TOWN (PPP)
                                              Sewerage (km.)
         Housing      supply       Waste                                                                          Improvement       Slums and       Beautification &
                                                                                      Distribution
                                                                       Generation
                                                                                                     Maintenanc
         units        (MLD)        (area                                                                          of Slum (Area     Squatters       Park
                                                                Road
         (areain                   covered                                  )                                     in sq. km.)       resettlement    maintenance
                                                                            W
                                                                       (mw)
         sq. km.)                  insq.                                    M                                                       (Area in sq.    (Area in sq. km.)
                                                                            (
                                   km.)                                                                                             km.)
Public
Private
PPP
Source: _
                                                                                                                                                                              101
19.2     Availability of Basic Amenities in Slums Ward wise
                               Water Supply
                               Electricity
                               Community
                               toilets
                               Other (specify)
Source: _
Note: Please attach relevant extract of Slum Tables of Census of India with year.
                                                                                     Yes No
       If yes, please give details as under
Source: _
Note: Please attach relevant extract of Houseless Tables of Census of India with year.
                                                                                              102
TABLE 20:          TRAFFIC & TRANSPORTATION- Time Series Yearly Data
Source: _
                                                                                       103
                 Non-motorised
                 •      Cycle/Rickshaw
                 •      Walking
                 •      Others
                 Sub-Total
                 Total
Source: _
Source: _
20.4   Railway
            Items                                          No.
              No of railway Stations
Source: _
                                                                              104
   20.6     Air
                   Items                                             No.
                   No. of Airports (Domestic & International)
                   Traffic volume and passenger data
Source: _
             Type of                                   Area
             pollutan      Residential    Industrial    Commercial    Others
             t
             SO2
             NO
             SPM
             CO
   Source: _
Source: _
Source: _
                                                                                    105
TABLE22:          Animal Husbandry details                Year
Source: _
                                                                                                  106
24.4      Name & Address (with Phone, Fax & e-mail) of Commissioner/Executive Officer of
          ULB:
Source: _
24.5 Name & Address (with Phone, Fax & e-mail) of Mayor/Chairperson of ULB:
Source: _
                                                                                                107
  24.9   Functions entrusted to local bodies as per 12th Schedule appended to 74th
         Constitutional Amendment Act, 1992.
         Revenue Receipt
         Revenue Expenditure
         Revenue less expenditure
         Resource Mobilization
         Debt service charges
         Revenue and Receipt of Local Body
         or
         Department of state Government
         Detailed Revenue Receipt heads
  Source: _
  25.1   Proposed Large Projects
        Proposed         Capital Source of         Investment     Project period
        Projects                 Finance
        Upgradation
        New Infrastructure
        Expansion/Diversificati
        on
  Source: _
                                                                                     108
                                        Introduction
                              Guidelines for Filling the Format
                                         Appendix I
The format for collection of town level data consists of 25 tables which cover key
areas such as demography, physical & locational aspects, physical and social
infrastructure, environment, housing and slums, governance, etc. This data is to be
collected by the Nodal Agency at city/town level, in most cases the Urban Local
Bodies.
Census Town
   As per the Census definition, Towns comprise the following:
   (a) All statutory towns, i.e., all places with a municipality, corporation, cantonment board,
       or a notified town area committee, etc.
   (b) All other places which satisfy the following criteria:
          •   a minimum population of 5,000 ;
          •   at least 75% of the male working population engaged in non-agricultural
              activities; and
          •   a density of population of at least 400 persons per sq. km.
   The city/town which do not have an urban local body as per (a) above, but satisfy
   conditions given in (b), are called by Census of India as Census Towns.
Urban Agglomerations
   Urban Agglomerations represent a continuous urban spread constituting a town and its
   adjoining urban outgrowths or two or more physically contiguous towns having a common
   boundary together with continuous well-recognised urban outgrowths, if any, of such
   towns. Very often, around a core city or statutory town, there are come up fairly large well
   recognized railway colonies, university campuses, etc. Even though these places lie outside
   the precincts of a statutory city or town or within the revenue limits of the village(s) which
   (are) contiguous to the town, such areas may not be themselves qualify to be treated as
   towns. But if they form a continuous spread with the town, they are outgrowths of the town
   and deserve to be treated as urban. Such towns, together with their outgrowths, have been
   treated as one urban unit called `Urban Agglomeration‘. Thus, an urban agglomeration may
   constitute:
   (a) A city or a town with continuous outgrowth, the outgrowth being outside the statutory
       limits but falling within the boundaries of the adjoining village or villages; or
   (b) Two or more adjoining towns with their outgrowths, if any, or
   (c) A city and one or more adjoining towns with or without outgrowths all of which form a
       continuous spread
                                                                                                   109
      Definitions, explanations of the parameters (including abbreviations) used in different
      Tables of the Proforma are as follows:
TABLE 1: PHYSICAL ASPECTS AND LOCATIONAL PARTICULARS
                                                                                                110
1.5      Name of the State
        State name
      The area figures of statutorily notified towns are given by the civic bodies/municipal
      committees based on available records.
      Area figures are also given in the Census Town Directory/District Census Handbook is the
      municipal/UA area. However, the Planning Area of the city/town may be much larger.
      Further, for purposes of planning, urbanisable and controlled areas may have been defined
      by the development authorities. These are vital, because master plan is to be prepared for
      the urbanisable area.
      State HQs., District HQs., Tahsil/Taluk/Mandal HQs., nearest city (having 1 lakh and above
      population) and nearest Railway Station along with distances
      These columns provide details on locational particulars of the town with reference to names
      of the State Hqs., District Hqs., Tahsil/Taluk/Mandal Hqs., nearest city (having 1 lakh and
      above population) and nearest Railway Station, indicating their distances in km., from the
      town. In case the nearest city or the railway station is situated in a state other than the
      state to which the town belongs, name of the nearest city or nearest railway station
      alongwith the name of the state may be indicated.
      Population of the City/town in time series from Census of India. This is available in Town
      Directory published by Census of India. Growth rates may be given or calculated.
                                                                                                   111
2.2       Primary Census Abstract 2011
      This information may be derived from PCA and extract from PCA could also be provided for
      the city/town and if the plan formulation is to be done for planning/urbanisable area,
      then other administrative units covered. For example, the planning area for a particular
      city may cover one or more revenue villages, census towns, outgrowths, etc.
      Number of occupied residential houses: This Table gives the number of occupied residential
      houses in respect of each town. A Census house is a building or a part of building having a
      separate main entrance from the road or common courtyard or staircase etc., used or
      recognized as a separate unit.
             •   Crude Birth Rate: The Crude Birth Rate (CBR) is defined as the number of live
                 births in a year per 1,000 of the midyear population.
             •   Infant Mortality Rate : Infant Mortality Rate (or IMR) is defined as the number
                 ofinfant deaths in a year per 1,000 live births during the year
             •   Life expectancy at birth = Total child births - death of Children at the
                 time ofbirth.
                 Total workers
      Total workers = Main workers + Marginal workers
                                                                                                    112
               Main workers
   Main workers were those who had worked for the major part of the year preceding the date
   of enumeration i.e., those who were engaged in any economically productive activity for
   183 days or six months or more during the year.
               Marginal workers
   Those who worked any time in the year preceding the date of enumeration but did not
   workfor a major part of the year i.e., those who worked for less than 183 days or six months
   were classified as Marginal workers.
                Non-workers
   Those who had not worked any time at all during the year preceding the date of
   enumeration are non-workers. Non-workers include (i) those engaged in household duties
   at home, (ii) students, (iii) dependents, (iv) retired persons (v) beggars, (vi) inmates of
   institutions and
   (vii) other non-workers.
   Main workers classified into 9 major categories are given in Census of India B-series tables.
   This is called the Functional Classification and helps in understanding the functional
   classification of the city/town. This data may be provided for the Census year for which it
   is available.
   4.2 Traditional Industries: details may be provided for the types of traditional industries found
      in the city/town. Some towns specialize in certain traditional industry, often at household
      level, for which special provisions are to be made in Master Plan.
   The names of the most important commodities decided in terms of estimated volume of
   commodities imported are to be indicated.
                                                                                                       113
4.5 Most important commodities exported
The names of the most important commodities decided in terms of estimated volume of
commodities exported are to be indicated.
The area under different landuses in 1991,2001, 2011 to be furnished. Details regarding
landuse classes, etc. is given elsewhere in the Design Standards document. The table may
be modified as per requirements.
Ward wise details of the quantity of water supplied (MLD), No. of Connections, Per Capita
Consumption (LPCD), Area Covered (sq. km.), Capacity of WTPs, percentage of treated
water recycling, etc. to be furnished.
TABLE 7:       ELECTRICITY
The information on electric supply to the town is presented in the form of number of
connections under different consumption groups viz., domestic, industrial, commercial,
and others which includes electricity for agricultural purpose, proposed projects requiring
land in the city/town.
                                                                                            114
If there are composite schools like middle schools with primary classes, or secondary
schools with middle classes, these have been included in the number of primary and middle
schools respectively. For example, if in a town, there are two primary schools and one
middle school with primary classes, the number of primary schools in the town will be given
as three and that of middle schools as one even though there are only three educational
institutions. Same is the case with secondary or senior secondary schools.
Number of colleges
The number of different types of colleges offering various courses in the town is to be
indicated under following sub-heads:
       (1)   General
       (2)   Medical
       (3)   Engineering
       (4)   Law
The particulars of various type of medical institutions in various system of medicines like
Allopathic, Ayurvedic, Unani, Homeopaththic etc. and their numbers viz., Hospitals,
Dispensaries, Health Centres, Family Planning Centres, Nursing Homes and other medical
institutions and the capacity with reference to total beds, doctors, nurses, paramedical
staff available is to be given. The data is to be provided for both Govt./Private institutions.
                                                                                              115
TABLE 11: AVAILABILITY OF SANITARY FACILITIES
The sanitation facilities in a city/town could be based on septic tanks or sewerage system
or low cost sanitation. Studies have shown that proper sewerage systems cover less than
20% of Indian Cities. Therefore, the correct data has to be filled in here so that planning
could be undertaken accordingly.
Municipal solid waste includes commercial and residential waste generated by a community
Collection means collection and removal of solid waste from different collection points
Disposal means final disposal of solid waste;
Recycling means the process by which waste is transformed into new products in such
amanner that the original products lose their identity;
Land fill: Means disposal of solid waste by spreading it in layers over a lined surface or land,
compacting it to the smallest volume and covering it by impervious soil layer at the end
of the day or more frequently. A landfill is operated to prevent leachate for contaminating
ground water and maintaining ambient air quality;
                                                                                               116
Biodegradable substance means a substance that can be degraded by micro-organisms.
Hospital Waste: Waste generating from the hospitals is called hospital waste
The particulars of recreational facilities such as stadia, museum, cinema halls and
auditoria/drama/community halls and their number in the town are to be recorded. The
availability of cultural facilities in the form of the number of public libraries and reading
rooms, if any, available in the town is to be indicated. If fire fighting facility is not
availablein the town, the name of the nearest place where this facility is available is to be
indicatedand the distance of the same is given in column.
Banks
Number of banks, commercial as well as co-operative functioning in the town has to be
indicated. It gives the number of banks both the head as well as branch offices of banks in
each town, which actually transact banking business. The head or branch offices not actually
transacting any banking business are not to be taken into account.
Credit Societies
The information on Agricultural Credit Societies and Non-Agricultural Credit Societies are
to be furnished. The agricultural credit societies include service, multipurpose, agricultural
produce, marketing cooperative societies, etc. The non-agricultural credit societies include
consumer cooperative societies and also credit co-operative societies of certain categories
of persons like teachers, postal-workers, etc.
Mortgage/loans
Percentage of dwellings purchased during the past year that are covered by mortgage and
percentage of dwellings that are covered by non-mortgage.
                                                                                             117
TABLE 17:      DISASTERS
Houseless Population: As per Census of India 2011, households which do not live in buildings
or Census houses but live in the open or roadside, pavements, in hume-pipes, under fly-
overs and staircases, or in the open in places of worship, mandaps, railway platforms, etc.,
are to be treated as Houseless households
        Sulfur dioxide (SO2):SO2 is an irritant colourless gas, which affects the mucous
        membranes when inhaled. Exposure at low level can cause increased upper
        respiratory symptoms such as cough, sore throat and affects lung function.
                                                                                                118
       Oxides of Nitrogen (NO): Of the seven oxides of nitrogen known to exist in the
       ambient air, Nitrogen dioxide is the main oxides affecting human health. Oxides of
       nitrogen are released in all the types of combustion as they are formed by the
       oxidation of atmospheric nitrogen at high temperature. Exposure to excessive NO 2
       affects the defense mechanism of human body.
21.2 Noise Pollution: Noise is an unwanted sound without agreeable musical quality. Noise
levels are measured in decibels. One decibel is the threshold of hearing.
21.3 Water pollution: Water pollution is any physical or chemical change in water that
canadversely affect organisms
                                                                                            119
TABLE 23: TRAVEL & TOURISM
Aspects related to travel and tourism closely affect demand for facilities, demand for land
and economic activity generated such as hotels, parking, eateries, water demand,
electricity demand, etc.
Status of Master/Development Plan: Many cities/towns will have at least some kind of pre-
existing plan document. The details such as date of sanction of the Ist Plan, plan revision
are to be furnished.
City Product
Total product of the city as defined in national accounts procedures. It may either be taken
as the total income or value-added (wages plus business surplus plus taxes plus imports),
or the total final demand (consumption plus investment plus exports).
City Product = (GNP) x (number of households in the city) x (average household income
                     in the city) (Total national household income, from national
                     accounts)
                                                                                           120
                       ANNEXURE – XXIV
Between
and
(Name of Consultant)
Dated
                                                                     121
                                      A. FORM OF CONTRACT
WHEREAS
    (a)    the Employer has requested the Consultants to provide certain consulting
    services as defined in the General Conditions of Contract attached to this Contract
    (hereinafter called the Services");
       (b)    the Consultants, having represented to the Employer that they have the
       required professional skills, and personnel and technical resources, have agreed to
       provide the Services on the terms and conditions set forth in this Contract;
       1.      The following documents attached hereto shall be deemed to form and integral
       part of this Contract:
(A) Letter of award
(B) Minutes of negotiation
(C) The General Conditions of Contract (hereinafter called “GC”);
(D) The Special Conditions of Contract (hereinafter called “SC”);
(E) The following Appendices;
[Note: If any of these Appendices are not used, the words “Not Used” should be inserted
below next to the title of the Appendix on the sheet attached hereto carrying the title of that
Appendix.]
       2.      The mutual rights and obligations of the Employer and the Consultants shall
       be as set forth in the Contract, in particular:
       (a)     The Consultants shall carry out the Services in accordance with the provisions
       of the Contract; and
       (b)     The Employer shall make payments to the Consultants in accordance with the
       provisions of the Contract.
                                                                                          122
IN WITNESS WHEREOF, the Parties hereto have caused this Contract to be signed in their
respective names as of the day and year first above written.
[Note: If the Consultants consist of more than one entity, all these entities should appear as
signatories, e.g., in the following manner:]
[NAME OF MEMBER]
By        (Authorized Representative)
[NAME OF MEMBER]
By        (Authorized Representative)
etc.
                                                                                            123
B. MINUTES OF THE CONTRACT NEGOTIATIONS MEETING /
             CORRESPONDENCE / OTHERS
                                                    124
                            C. GENERAL CONDITIONS OF CONTRACT
1. GENERAL PROVISIONS
1.1 Definitions
Unless the context otherwise requires, the following terms whenever used in this Contract
have the following meanings:
       (a) “Applicable Law” means the laws and any other instruments having the force of
           law in the Government’s country (or in such other country as may be specified in
           the Special Conditions of Contract (SC)), as they may be issued and in force from
           time to time;
       (b) “Contract” means the Contract signed by the Parties, to which these General
           Conditions of Contract (GC) are attached, together with all the documents listed in
           Clause 1 of such signed Contract;
       (c) “Contract Price” means the price to be paid for the performance of the Services, in
           accordance with Clause 6;
       (d) “Foreign currency” means any currency other than the currency of Government;
       (e) “GC” means these General Conditions of Contract;
       (f) “Government” means the Government Employer’s Country;
       (g) “Local Currency” means the currency of the Government;
       (h) “Member,” in case the Consultants consist of a joint venture of more than one
           entity, means any of these entities; “Members” means all of these entities;
           “Member in Charge” means the entity specified in the SC to act on their behalf in
           exercising all the Consultants‟ rights and obligations towards the Employer under
           this Contract;
       (i) “Party” means the Employer or the Consultants, as the case may be, and Parties
           means both of them;
       (j) “Personnel” means persons hired by the Consultants or by any Sub-consultant as
           employees and assigned to the performance of the Services or any part thereof;
       (k) “SC” means the Special Conditions of Contract by which these General
           Conditions of Contract may be amended or supplemented;
       (l) “Services” means the work to be performed by the Consultants pursuant to this
           Contract, as described in Appendix A; and
       (m) “Sub-consultant” means any entity to which the Consultants subcontract any part
           of the Services in accordance with the provisions of Clauses 3.5 and 4.
       This Contract, its meaning and interpretation, and the relation between the Parties
       shall be governed by the Applicable Law.
                                                                                             125
1.3    Language
This Contract has been executed in the language specified in the SC, which shall be the
binding and controlling language for all matters relating to the meaning or interpretation
of this Contract.
1.4 Notices
Any notice, request, or consent made pursuant to this Contract shall be in writing and
shall be deemed to have been made when delivered in person to an authorized
representative of the Party to whom the communication is addressed, or when sent by
registered mail, telex, telegram, or facsimile to such Party at the address specified in
the SC.
1.5 Location
The Services shall be performed at such locations as are specified in Appendix A and,
where the location of a particular task is not so specified, at such locations, whether in
the Government’s country or elsewhere, as the Employer may approve.
Any action required or permitted to be taken, and any document required or permitted
to be executed, under this Contract by the Employer or the Consultants may be taken
or executed by the officials specified in the SC.
Unless otherwise specified in the SC, the Consultants, Sub-consultants, and their
Personnel shall pay such taxes, duties, fees, and other impositions as may be levied
under the Applicable Law, the amount of which is deemed to have been included in the
Contract Price, including GST.
This Contract shall come into effect on the date the Contract is signed by both parties
or such other later date as may be stated in the SC.
The Consultants shall begin carrying out the Services thirty (30) days after the date
the Contract becomes effective, or at such other date as may be specified in the SC.
Unless terminated earlier pursuant to Clause 2.6, this Contract shall terminate at the
end of such time period after the Effective Date as is specified in the SC.
                                                                                     126
2.4     Modification
Modification of the terms and conditions of this Contract, including any modification
of the scope of the Services or of the Contract Price, may only be made by written
agreement between the Parties and shall not be effective until the consent of the Bank
or of the Association, as the case may be, has been obtained.
2.5.1 Definition
For the purposes of this Contract, “Force Majeure” means an event which is beyond the
reasonable control of a Party, and which makes a Party’s performance of its obligations
under the Contract impossible or so impractical as to be considered impossible under
the circumstances.
The failure of a Party to fulfil any of its obligations under the contract shall not be
considered to be a breach of, or default under, this Contract insofar as such inability
arises from an event of Force Majeure, provided that the Party affected by such an
event (a) has taken all reasonable precautions, due care and reasonable alternative
measures in order to carry out the terms and conditions of this Contract, and (b) has
informed the other Party as soon as possible about the occurrence of such an event.
Any period within which a Party shall, pursuant to this Contract, complete any action
or task, shall be extended for a period equal to the time during which such Party was
unable to perform such action as a result of Force Majeure.
2.5.4 Payments
During the period of their inability to perform the Services as a result of an event of
Force Majeure, the Consultants shall be entitled to continue to be paid under the terms
of this Contract, as well as to be reimbursed for additional costs reasonably and
necessarily incurred by them during such period for the purposes of the Services and in
reactivating the Service after the end of such period.
2.6 Termination
        The Employer may terminate this Contract, by not less than thirty (30) days‟
written notice of termination to the Consultants, to be given after the occurrence of
any of the events specified in paragraphs (a) through (d) of this Clause 2.6.1 and sixty
(60) days‟ in the case of the event referred to in (e):
                                                                                     127
(a) if the Consultants do not remedy a failure in the performance of their obligations
under the Contract, within thirty (30) days of receipt after being notified or within any
further period as the Employer may have subsequently approved in writing;
(b) if the Consultants become insolvent or bankrupt;
(c) if, as the result of Force Majeure, the Consultants are unable to perform a material
portion of the Services for a period of not less than sixty (60) days; or
(d) if the consultant, in the judgment of the Employer has engaged in corrupt or
fraudulent practices in competing for or in executing the Contract.
For the purpose of this clause:
         “corrupt practice” means the offering, giving, receiving, or soliciting of
anything of value to influence the action of a public official in the selection process or
in contract execution.
         “fraudulent practice” means a misrepresentation of facts in order to influence a
selection process or the execution of a contract to the detriment of the Borrower, and
includes collusive practice among consultants (prior to or after submission of
proposals) designed to establish prices at artificial non-competitive levels and to
deprive the Borrower of the benefits of free and open competition.
(e) if the Employer, in its sole discretion and for any reason whatsoever, decides to
terminate this Contract.
The Consultants may terminate this Contract, by not less than thirty (30) days‟ written
notice to the Employer, such notice to be given after the occurrence of any of the
events specified in paragraphs (a) and (b) of this Clause 2.6.2:
(a) if the Employer fails to pay any monies due to the Consultants pursuant to this
Contract and not subject to dispute pursuant to Clause 7 hereof within forty-five (45)
days after receiving written notice from the Consultants that such payment is overdue;
or
(b) if, as the result of Force Majeure, the Consultants are unable to perform a material
portion of the Services for a period of not less than sixty (60) days.
Upon termination of this Contract pursuant to Clauses 2.6.1 or 2.6.2, the Employer
shall make the following payments to the Consultants:
3.1     General
                                                                                      128
The Consultants shall perform the Services and carry out their obligations hereunder
with all due diligence, efficiency, and economy, in accordance with generally
accepted professional techniques and practices, and shall observe sound management
practices, and employ appropriate advanced technology and safe methods. The
Consultants shall always act, in respect of any matter relating to this Contract or to the
Services, as faithful advisers to the Employer, and shall at all times support and
safeguard the Employer’s legitimate interests in any dealings with Sub-consultants or
third parties.
The Consultants agree that, during the term of this Contract and after its termination,
the Consultants and their affiliates, as well as any Sub-consultant and any of its
affiliates, shall be disqualified from providing goods, works, or services (other than
the Services and any continuation thereof) for any project resulting from or closely
related to the Services.
Neither the Consultants nor their Sub-consultants nor the Personnel shall engage,
either directly or indirectly, in any of the following activities.
(a) during the term of this Contract, any business or professional activities in the
Government’s country which would conflict with the activities assigned to them
under this Contract: or
(b) after the termination of this Contract, such other activities as may be specified in
the SC
3.3 Confidentiality
The Consultants, their Sub-consultants, and the Personnel of either of them shall not,
either during the term or within two (2) years after the expiration of this Contract,
disclose any proprietary or confidential information relating to the Project, the
Services, this Contract, or the Employer’s business or operations without the prior
written consent of the Employer.
                                                                                      129
3.4    Insurance to be Taken Out by the Consultants
The Consultants (a) shall take out and maintain, and shall cause any Sub-consultants
to take out and maintain, at their (or the Sub-consultants‟, as the case may be) own
cost but on terms and conditions approved by the Employer, insurance against the
risks, and for the coverage, as shall be specified in the SC; and (b) at the Employer's
request, shall provide evidence to the Employer showing that such insurance has been
taken out and maintained and that the current premiums have been paid.
(a) entering into a subcontract for the performance of any part of the Services,
(b) appointing such members of the Personnel not listed by name in Appendix C
(“Key Personnel and Sub-consultants”), and
The Consultants shall submit to the Employer the reports and documents specified in
Appendix B in the form, in the numbers, and within the periods set forth in the said
Appendix.
All plans, drawings, specifications, designs, reports, and other documents and software
submitted by the Consultants in accordance with Clause 3.6 shall become and remain
the property of the Employer, and the Consultants shall, not later than upon termination
or expiration of this Contract, deliver all such documents and software to the Employer,
together with a detailed inventory thereof. The Consultants may retain a copy of such
documents and software. Restrictions about the future use of these documents, if any,
shall be specified in the SC.
4. CONSULTANTS’ PERSONNEL
The titles, agreed job descriptions, minimum qualifications, and estimated periods of
engagement in the carrying out of the Services of the Consultants‟ Key Personnel are
described in Appendix C. The Key Personnel and Sub-consultants listed by title as
well as by name in Appendix C are hereby approved by the Employer.
(b) If the Employer finds that any of the Personnel have (i) committed serious
misconduct or has been charged with having committed a criminal action, or (ii) have
reasonable cause to be dissatisfied with the performance of any of the Personnel, then
the Consultants shall, at the Employer’s written request specifying the grounds
thereof, forthwith provide as a replacement a person with qualifications and
experience acceptable to the Employer.
(c) The Consultants shall have no claim for additional costs arising out of or
incidental to any removal and/or replacement of Personnel.
The Employer shall use its best efforts to ensure that the Government shall provide
the Consultants such assistance and exemptions as specified in the SC.
If, after the date of this Contract, there is any change in the Applicable Law with
respect to taxes and duties which increases or decreases the cost of the services
rendered by the Consultants, then the remuneration and reimbursable expenses
otherwise payable to the Consultants under this Contract shall be increased or
decreased accordingly by agreement between the Parties, and corresponding
adjustments shall be made to the amounts referred to in Clauses 6.2 (a) or (b), as the
case may be.
The Employer shall make available to the Consultants the Services and Facilities
listed under Appendix F.
The Consultant’s total remuneration shall not exceed the Contract Price and shall be a
fixed lump-sum including all staff costs, Sub-consultants‟ costs, printing,
communications, travel, accommodation, and the like, and all other costs incurred by
the Consultant in carrying out the Services described in Appendix A. Except as
provided in Clause 5.2, the Contract Price may only be increased above the amounts
stated in Clause 6.2 if the Parties have agreed to additional payments in accordance with
Clause 2.4.
                                                                                     131
6.2    Contract Price
For the purpose of determining the remuneration due for additional services as may be
agreed under Clause 2.4, a breakdown of the lump-sum price is provided in Appendix
E.
Payments will be made to the account of the Consultants and according to the payment
schedule stated in the SC. Unless otherwise stated in the SC, the first payment shall be
made against the provision by the Consultants of a bank guarantee for the same amount,
and shall be valid for the period stated in the SC. Any other payment shall be made after
the conditions listed in the SC. Any other payment shall be made after the conditions
listed in the SC for such payment have been met, and the Consultants have submitted
an invoice to the Employer specifying the amount due.
If the Employer has delayed payments beyond fifteen (15) days after the due date
stated in the SC, interest shall be paid to the Consultants for each day of delay at the
rate stated in the SC.
7. SETTLEMENT OF DISPUTES
        The Parties shall use their best efforts to settle amicably all disputes arising
out of or in connection with this Contract or its interpretation.
         Any dispute between the Parties as to matters arising pursuant to this Contract
that cannot be settled amicably within thirty (30) days after receipt by one Party of the
other Party’s request for such amicable settlement may be submitted by either Party
for settlement in accordance with the provisions specified in the SC.
                                                                                           132
D. SPECIAL CONDITIONS OF CONTRACT
[7.2.1(a) The words “in the Government’s country” are amended to read “in India”]
Consultants :
Attention :
Facsimile :
       *Clauses in brackets are optional; all notes should be deleted in final test.
       7.6     The Consultants and the personnel shall pay the taxes including GST, duties,
       fees, levies and other impositions levied under the existing, amended or enacted laws
       during life of this contract and the client shall perform such duties in regard to
       deduction of such tax as may be lawfully imposed.
       7.7     The date on which this Contract shall come into effect is signing of the
       Contract and receipt by Consultants of initial payment and by Employer of bank guarantee (see
       Clause 6.4) etc.
       7.8     The date for the commencement of Services is one month from the date of
       signing of the contract.
                                                                                                 133
(1)    Third Party motor vehicle liability insurance as required under Motor Vehicles
Act, 1988, in respect of motor vehicles operated in India by the Consultants or their
Personnel or any Sub-consultants or their personnel, for the period of Consultancy;
(2)     Third Party liability insurance, with a minimum coverage for Rs.500,000 for
the period of Consultancy;
       The Consultants shall not use these documents for purposes unrelated to this
Contract without the prior written approval of the Employer.
7.11 The amount (of Fee) in local currency is: INR                               + GST
in INR……………………
Payment shall be made within 30 days of receipt of the invoice and the relevant
documents specified in Clause 6.4, and within 45 days in the case of the final
payment.
8 DISPUTE SETTLEMENT
8.1       Arbitration Any fact or condition, which may not have been mentioned in
       terms and conditions and may arise after issuing work order, shall be decided as
       per the State Government policy/rules. In case rules /policies do not provide
       such situation, the issue will be referred for arbitration. Arbitration for any such
       dispute shall be conducted in accordance with the provisions of Arbitration and
       Conciliation Act 26 of 1996 or any statuary modification or re- enactment
       thereof. The arbitration shall be by a panel of three Arbitrators, one to be
       appointed by each party and the third party to be appointed by the two
       Arbitrators appointed by the parties.
8.2       If an Arbitrator nominated as above is not in a position for any reason, to
       complete to the end, the arbitration job, The Director of Town and Country
       Planning shall nominate another officer as the arbitrator and such an officer
                                                                                        134
         will either commence the arbitration proceedings de-nova or continue from the
         stage at which the earlier nominee had left them.
8.3       If at any time during currency of the JOB, the SCOPE OF CONTRACT for
       which this job has been awarded is reduced/ abandoned, the payment /value of
       this work order shall be reduced on pro-rata basis by the Directorate of Town and
       Country Planning and would be binding on the Contractor.
8.4    The Directorate of Town and Country Planning may discontinue the contract at
      any point of time, by giving a notice of at least 30 days before the intended date
      of discontinuation, and will not be liable to any additional charges or compensation
      payable to the contractor or any other person.
9 Legal Jurisdiction
9.1    All legal proceedings related to this tender shall be in the appropriate court in
       Chennai only.
9.2    This tender process will be governed by the Tamil Nadu Tender Transparency in
       Tenders Act- 1998 and the Tamil Nadu Transparency in Tenders Rules 2000 as
       amended from time to time.
                                    (Page left blank below)
                                                                                      135
                            IV. APPENDICES
                                                                                    136
                    APPENDIX - B: REPORTING REQUIREMENTS
The Project shall be completed within a period of 24 months from the commencement date.
The time line for mile stones/deliverables identified shall be as follows:
The Consultant will prepare and submit any other reports, data, details, presentation, etc. on
as required basis and also make presentation to various departments / Government from time
to time.
                                                                                           137
 APPENDIX – C: BREAKDOWN OF CONTRACT PRICE IN LOCAL CURRENCY
List here the elements of cost used to arrive at the breakdown of the lump-sum price —
local currency portion:
2. Reimbursable expenditures
       This appendix will exclusively be used for determining remuneration for additional
       services.
                                                                                        138
 APPENDIX – D: SERVICES AND FACILITIES PROVIDED BY THE EMPLOYER
1.   The Client will provide the following inputs and facilities: Data, Services and Facilities
     to be provided to the Consultant as under:
2.   Client will provide office space within the premises with furniture
3.   The consultant has to make his own arrangements for local conveyance, communication
     arrangements for Key personnel, any infrastructure like laptops etc. on as required basis.
4.   The authority will not make any advance payment towards this assignment.
                                                                                            139
                       APPENDIX – E: PAYMENT SCHEDULE
The payment will be paid based on the following schedule and approval of Deliverable
reports by the competent authority
140