0% found this document useful (0 votes)
44 views137 pages

SCHEDLOG

p6log

Uploaded by

rishijaveri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
44 views137 pages

SCHEDLOG

p6log

Uploaded by

rishijaveri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 137

Scheduling/Leveling Report - 2024-06-25 23:38:13 - PM.

EXE
=========================================================

Default Project..................................................SHBLUD150324
Use scheduling options from......................................SHBLUD150324

Projects:
SHBLUD150324.....................................................Sports
Hotel - Al Hudayriat - Main Contract Works (Rev 2.1) update as of 15 MAR 2024

Scheduling/Leveling Settings:
-----------------------------
General
-------
Scheduling ......................................................Yes
Leveling ........................................................No
Ignore relationships to and from other projects .................Yes
Make open-ended activities critical .............................No
Use Expected Finish Dates .......................................Yes
Schedule automatically when a change affects dates ..............No
Level resources during scheduling ...............................No
Recalculate assignment costs after scheduling ...................No
When scheduling progressed activities use .......................Retained
Logic
Calculate start-to-start lag from ...............................Early Start
Define critical activities as ...................................Longest Path
Compute Total Float As ..........................................Finish Float
Calculate float based on finish date of .........................Each project
Calendar for scheduling Relationship Lag ........................Predecessor
Activity Calendar

Advanced
--------
Calculate multiple float paths...................................Yes
Calculate multiple float paths using.............................Total Float
Number of paths to calculate.....................................1000

Statistics:
-----------
# Projects.......................................................1
# Activities.....................................................6361
# Not Started....................................................5838
# In Progress....................................................170
# Completed......................................................353
# Relationships..................................................20502
# Activities with Constraint.....................................8
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL130 MS 4 -
Garage Storage, Purchasing/ Receiving Office, Ancillary Building Construction
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL140 MS 5 -
Store Rooms (Beverage/ Food), Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL150 MS 6 -
Receiving Area, Kitchen & Coolers. Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL170 MS 8 -
Guest Floors 100%, Safety Deposit Box Room, Recreational Facilities
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL180 MS 3 -
Completion of Works

Errors:
-------
Warnings:
---------
Activities without predecessors..................................1
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL100
Commencement Date

Activities without successors....................................1


Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL180 MS 3 -
Completion of Works

Out-of-sequence activities.......................................91
Project: SHBLUD150324 Activity: CN.HA.LG.CWL.SLWL100 Steel
Fixing for Ret. Walls, Core Walls & Columns
Project: SHBLUD150324 Activity: CN.HA.LG.PC1.BKFL150
Backfill Around Block Masonry & Ret. Wall to Reach Tie Slab Level
Project: SHBLUD150324 Activity: CN.HA.LG.PC1.CAST140 ADM
Inspection and Concrete Casting of Pile Caps and Ret. Wall Base
Project: SHBLUD150324 Activity: CN.HA.LG.TS1.CAST130
Casting of Tie Slab
Project: SHBLUD150324 Activity: CN.HA.LG.TS1.REIN120 Steel
Fixing, Inserting MEP Embedment for Tie Slab
Project: SHBLUD150324 Activity: CN.HA.LG.TS1.SSWP110
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.HA.LG.TS1.TMEP100 MEP
Works Below Tie Slab
Project: SHBLUD150324 Activity: CN.HB.LG.PC2.BKFL150
Backfill Around Solid Block Dead Shutter & Ret. Wall to Reach Tie Slab Level
Project: SHBLUD150324 Activity: CN.HB.LG.PC2.CAST140 ADM
Inspection and Concrete Casting of Pile Caps and Ret. Wall Base
Project: SHBLUD150324 Activity: CN.HB.LG.PC2.PMEP130 MEP
Embedment in Pile Caps and Ret. Wall
Project: SHBLUD150324 Activity: CN.HB.LG.PC3.BKFL150
Backfill Around Solid Block Dead Shutter & Ret. Wall to Reach Tie Slab Level
Project: SHBLUD150324 Activity: CN.HB.LG.PC3.CAST100
Concrete for Pile Caps and Ret. Wall Base
Project: SHBLUD150324 Activity: CN.HB.LG.TS2.ANTR120 Anti-
termite Treatment and PCC Below Tie Slab
Project: SHBLUD150324 Activity: CN.HB.LG.TS2.ERWK110
Earthworks, Leveling & Compaction for Tie Slab
Project: SHBLUD150324 Activity: CN.HB.LG.TS2.TMEP100 MEP
Works Below Tie Slab
Project: SHBLUD150324 Activity: CN.HB.LG.TS3.ERWK110
Earthworks, Leveling & Compaction for Tie Slab
Project: SHBLUD150324 Activity: CN.HB.LG.TS3.TMEP100 MEP
Works Below Tie Slab
Project: SHBLUD150324 Activity: CN.HC.LG.CWL.REIN100 Steel
Fixing for Columns
Project: SHBLUD150324 Activity: CN.HC.LG.PC4.DSHT200
Completing Block Shuttering for Pile Caps
Project: SHBLUD150324 Activity: CN.HG.LG.PLC.BKFL150
Backfill Around Block Work & Pool Walls to Reach Tie Slab Level
Project: SHBLUD150324 Activity: CN.HG.LG.PLC.SSWP110
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.HG.LG.RFT.ERWK110
Earthworks, Leveling & Compaction for Tie Slab
Project: SHBLUD150324 Activity: CN.HG.LG.SLB.TMEP100 MEP
Works Below Tie Slab
Project: SHBLUD150324 Activity: CN.PB.FN.FND.BKFL150
Backfilling, Levelling and Compaction Up to SOG
Project: SHBLUD150324 Activity: CN.PP.FN.RFT.EXCA100
Excavation and Pile Head Trimming
Project: SHBLUD150324 Activity: CN.UB.BS.RFT.ANTR120 Anti-
termite Treatment Below Raft
Project: SHBLUD150324 Activity: CN.UB.BS.RFT.EXCA100
Excavation and Pile Head Trimming
Project: SHBLUD150324 Activity: CN.UB.BS.RFT.PCCW130 PCC
for Raft
Project: SHBLUD150324 Activity: CN.UB.BS.RFT.REIN160 Steel
Fixing for Raft
Project: SHBLUD150324 Activity: CN.UB.BS.RFT.SHTR140
Shuttering Around Raft
Project: SHBLUD150324 Activity: CN.UB.BS.RFT.SSWP150
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.UB.BS.WAL.SHTR120
Shuttering for Walls
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL108 Method
Statement Submittal for Post Tension Slab
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL116 Method
Statement Submittal for Vertical Transportation/ Elevator Works
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL122
Material Submittal for Air Curtains
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL130
Material Submittal for FAHU and Ahus
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL138
Material Submittal for GRP Paneled Tanks
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL140
Material Submittal for Local Water Heaters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL146
Material Submittal for Isolators
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL156
Material Submittal for UPS
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL178
Material Submittal for Storm Water System
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL180
Material Submittal for BMS
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL186
Material Submittal for Idfs and Mdfs
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL306
Material Submittal for Aluminum Cladding
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL312
Material Submittal for GFRC Facade Panel Cladding
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL362
Material Submittal for Electric Car Charging System
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL504
Material Submittal Kids Swimming Pool
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL506
Material Submittal for Outdoor Swimming Pool
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL608
Material Approval for Indoor Swimming Pool
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL610
Material Approval Kids Swimming Pool
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL612
Material Approval for Outdoor Swimming Pool
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL638
Material Submittal for Active Comp and Detectors/ Devices
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL640
Material Submittal for Central Battery
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL818
Material Submittal for Staircase (At Hotel Gym and Spa Building)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL736
Procurement of Subcontractor for BOH Equipment (OI)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL778
Procurement of Subcontractor for Central Clock System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL780
Procurement of Subcontractor for Automatic Gate Barrier
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL106
Procurement of Post Tension Slab
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL113
Procurement of Conduits and Accessories
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL184
Procurement of Passenger Lifts
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL304
Procurement of ATS (Long Lead)
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL800
Submission of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL100 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL130 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.07.GNR.GNRL800
Submission of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL110 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL162 Shop
Drawings Submittal for FF System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL164 Shop
Drawings Submittal for Water Supply System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL166 Shop
Drawings Submittal for Telecom and IPTV System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL168 Shop
Drawings Submittal for Elect Power and Light. Sys
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL170 Shop
Drawings Submittal for Drainage System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL236 Shop
Drawings/ Design/ Calculation Submittal for GFRC Facade Panel Cladding
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL276 Shop
Drawings Submittal for Roof Waterproof
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL390 Shop
Drawings Submittal for Indoor Swimming Pool
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL392 Shop
Drawings Submittal Kids Swimming Pool
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL394 Shop
Drawings Submittal for Outdoor Swimming Pool
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL464 Shop
Drawings Approval for Outdoor Swimming Pool
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL100 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL110 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL120 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL140 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL620 Rev. &
App. of Shop Drawings for Reinforcement
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL100 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL140 Prep.
& Sub. of Shop Drawings for Reinforcement - Zone B - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL160 Prep.
& Sub. of Shop Drawings for Reinforcement - Zone A - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL210 Prep.
& Sub. of Shop Drawings for Reinforcement - Zone C - UGF Slab
Project: SHBLUD150324 Activity: IA.GN.GN.GNR.GNRL120
Submission of Plumbing Drawings to ADM Plumbing
Project: SHBLUD150324 Activity: IA.GN.GN.GNR.GNRL130
Submission of Water Supply Drawing to ADDC
Project: SHBLUD150324 Activity: IA.GN.GN.GNR.GNRL140
Submission of Telecom Drawings to Etisalat
Project: SHBLUD150324 Activity: IA.GN.GN.GNR.GNRL180
Submission of Electrical Shop Drawing to ADDC
Project: SHBLUD150324 Activity: SH-ENG-SDA-3205 Design
Calculation Approval for Post Tension Slab by 3rd Party

Activities with Actual Dates > Data Date.........................0

Milestone Activities with invalid relationships..................0

Finish milestone and predecessors have different calendars.......98


Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL130 MS 4 -
Garage Storage, Purchasing/ Receiving Office, Ancillary Building Construction
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL130 MS 4 -
Garage Storage, Purchasing/ Receiving Office, Ancillary Building Construction
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL130 MS 4 -
Garage Storage, Purchasing/ Receiving Office, Ancillary Building Construction
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL130 MS 4 -
Garage Storage, Purchasing/ Receiving Office, Ancillary Building Construction
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL130 MS 4 -
Garage Storage, Purchasing/ Receiving Office, Ancillary Building Construction
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL130 MS 4 -
Garage Storage, Purchasing/ Receiving Office, Ancillary Building Construction
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL130 MS 4 -
Garage Storage, Purchasing/ Receiving Office, Ancillary Building Construction
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL130 MS 4 -
Garage Storage, Purchasing/ Receiving Office, Ancillary Building Construction
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL130 MS 4 -
Garage Storage, Purchasing/ Receiving Office, Ancillary Building Construction
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL140 MS 5 -
Store Rooms (Beverage/ Food), Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL140 MS 5 -
Store Rooms (Beverage/ Food), Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL140 MS 5 -
Store Rooms (Beverage/ Food), Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL140 MS 5 -
Store Rooms (Beverage/ Food), Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL140 MS 5 -
Store Rooms (Beverage/ Food), Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL140 MS 5 -
Store Rooms (Beverage/ Food), Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL140 MS 5 -
Store Rooms (Beverage/ Food), Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL140 MS 5 -
Store Rooms (Beverage/ Food), Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL140 MS 5 -
Store Rooms (Beverage/ Food), Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL150 MS 6 -
Receiving Area, Kitchen & Coolers. Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL150 MS 6 -
Receiving Area, Kitchen & Coolers. Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL150 MS 6 -
Receiving Area, Kitchen & Coolers. Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL150 MS 6 -
Receiving Area, Kitchen & Coolers. Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL150 MS 6 -
Receiving Area, Kitchen & Coolers. Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL150 MS 6 -
Receiving Area, Kitchen & Coolers. Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL150 MS 6 -
Receiving Area, Kitchen & Coolers. Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL150 MS 6 -
Receiving Area, Kitchen & Coolers. Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL150 MS 6 -
Receiving Area, Kitchen & Coolers. Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL170 MS 8 -
Guest Floors 100%, Safety Deposit Box Room, Recreational Facilities
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL170 MS 8 -
Guest Floors 100%, Safety Deposit Box Room, Recreational Facilities
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL170 MS 8 -
Guest Floors 100%, Safety Deposit Box Room, Recreational Facilities
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL170 MS 8 -
Guest Floors 100%, Safety Deposit Box Room, Recreational Facilities
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL170 MS 8 -
Guest Floors 100%, Safety Deposit Box Room, Recreational Facilities
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL170 MS 8 -
Guest Floors 100%, Safety Deposit Box Room, Recreational Facilities
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL170 MS 8 -
Guest Floors 100%, Safety Deposit Box Room, Recreational Facilities
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL170 MS 8 -
Guest Floors 100%, Safety Deposit Box Room, Recreational Facilities
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL180 MS 3 -
Completion of Works
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL180 MS 3 -
Completion of Works
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL180 MS 3 -
Completion of Works
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL538
Building Completion Certificate

Scheduling/Leveling Results:
----------------------------
# Projects Scheduled/Leveled.....................................1
# Activities Scheduled/Leveled...................................6361
Data Date........................................................15-Mar-24
Earliest Early Start Date........................................15-Mar-24
Latest Early Finish Date.........................................19-Jun-25
Number of float paths............................................1000
Exceptions:
-----------
Critical Activities..............................................133
Project: SHBLUD150324 Activity: CN.HB.01.CWL.CAST190
Concrete Casting of Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.01.CWL.CMEP160 MEP
Embedment in Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.01.CWL.REIN150 Steel
Fixing for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.01.CWL.SHTR180
Shuttering for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.01.FGR.WDDR150
Installation of Doors - Wooden
Project: SHBLUD150324 Activity: CN.HB.01.SLB.CAST140 ADM
Inspection and Concrete Casting of Slab & Stairs @ +12.66
Project: SHBLUD150324 Activity: CN.HB.01.SLB.ENSL100
Embedment for Structural Steel Works of Media Screen - L1
Project: SHBLUD150324 Activity: CN.HB.01.SLB.MSLB130 MEP
Embedment in Slab & Stairs @ +12.66
Project: SHBLUD150324 Activity: CN.HB.01.SLB.REIN110 Steel
Fixing for Slab & Stairs @ +12.66
Project: SHBLUD150324 Activity: CN.HB.01.SLB.SHTR100
Scaffolding, Shuttering for Slab & Stairs @ +12.66
Project: SHBLUD150324 Activity: CN.HB.02.CWL.CAST190
Concrete Casting of Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.02.CWL.CMEP160 MEP
Embedment in Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.02.CWL.REIN150 Steel
Fixing for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.02.CWL.SHTR180
Shuttering for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.02.FGR.WDDR150
Installation of Doors - Wooden
Project: SHBLUD150324 Activity: CN.HB.02.SLB.CAST140 ADM
Inspection and Concrete Casting of Slab & Stairs @ +16.16
Project: SHBLUD150324 Activity: CN.HB.02.SLB.ENSL100
Embedment for Structural Steel Works of Media Screen - L2
Project: SHBLUD150324 Activity: CN.HB.02.SLB.MSLB130 MEP
Embedment in Slab & Stairs @ +16.16
Project: SHBLUD150324 Activity: CN.HB.02.SLB.REIN110 Steel
Fixing for Slab & Stairs @ +16.16
Project: SHBLUD150324 Activity: CN.HB.02.SLB.SHTR100
Scaffolding, Shuttering for Slab & Stairs @ +16.16
Project: SHBLUD150324 Activity: CN.HB.03.CWL.CAST190
Concrete Casting of Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.03.CWL.CMEP160 MEP
Embedment in Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.03.CWL.REIN150 Steel
Fixing for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.03.CWL.SHTR180
Shuttering for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.03.FGR.WDDR150
Installation of Doors - Wooden
Project: SHBLUD150324 Activity: CN.HB.03.SLB.CAST140 ADM
Inspection and Concrete Casting of Slab & Stairs @ +19.66
Project: SHBLUD150324 Activity: CN.HB.03.SLB.ENSL100
Embedment for Structural Steel Works of Media Screen - L3
Project: SHBLUD150324 Activity: CN.HB.03.SLB.MSLB130 MEP
Embedment in Slab & Stairs @ +19.66
Project: SHBLUD150324 Activity: CN.HB.03.SLB.REIN110 Steel
Fixing for Slab & Stairs @ +19.66
Project: SHBLUD150324 Activity: CN.HB.03.SLB.SHTR100
Scaffolding, Shuttering for Slab & Stairs @ +19.66
Project: SHBLUD150324 Activity: CN.HB.04.CWL.CAST190
Concrete Casting of Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.04.CWL.CMEP160 MEP
Embedment in Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.04.CWL.REIN150 Steel
Fixing for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.04.CWL.SHTR180
Shuttering for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.04.FGR.WDDR150
Installation of Doors - Wooden
Project: SHBLUD150324 Activity: CN.HB.04.SLB.CAST140 ADM
Inspection and Concrete Casting of Slab & Stairs @ +23.16
Project: SHBLUD150324 Activity: CN.HB.04.SLB.ENSL100
Embedment for Structural Steel Works of Media Screen - L4
Project: SHBLUD150324 Activity: CN.HB.04.SLB.MSLB130 MEP
Embedment in Slab & Stairs @ +23.16
Project: SHBLUD150324 Activity: CN.HB.04.SLB.REIN110 Steel
Fixing for Slab & Stairs @ +23.16
Project: SHBLUD150324 Activity: CN.HB.04.SLB.SHTR100
Scaffolding, Shuttering for Slab & Stairs @ +23.16
Project: SHBLUD150324 Activity: CN.HB.05.CWL.CAST190
Concrete Casting of Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.05.CWL.CMEP160 MEP
Embedment in Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.05.CWL.REIN150 Steel
Fixing for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.05.CWL.SHTR180
Shuttering for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.05.FGR.WDDR150
Installation of Doors - Wooden
Project: SHBLUD150324 Activity: CN.HB.05.SLB.CAST140 ADM
Inspection and Concrete Casting of Slab & Stairs @ +26.66
Project: SHBLUD150324 Activity: CN.HB.05.SLB.ENSL100
Embedment for Structural Steel Works of Media Screen - L5
Project: SHBLUD150324 Activity: CN.HB.05.SLB.MSLB130 MEP
Embedment in Slab & Stairs @ +26.66
Project: SHBLUD150324 Activity: CN.HB.05.SLB.REIN110 Steel
Fixing for Slab & Stairs @ +26.66
Project: SHBLUD150324 Activity: CN.HB.05.SLB.SHTR100
Scaffolding, Shuttering for Slab & Stairs @ +26.66
Project: SHBLUD150324 Activity: CN.HB.06.CWL.CAST190
Concrete Casting of Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.06.CWL.CMEP160 MEP
Embedment in Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.06.CWL.REIN150 Steel
Fixing for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.06.CWL.SHTR180
Shuttering for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.06.FGR.ELEC110
Electrical - 2nd Fix (Cable Tray, Trunking, Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.06.FGR.FALR120 Fire
Alarm/ Emergency Lighting & Detection - Final Fix (Sensors, Detectors and Exit
Lights)
Project: SHBLUD150324 Activity: CN.HB.06.FGR.LWCS120 Other
Low Current Systems - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.06.FGR.PLST100
Plastering Works
Project: SHBLUD150324 Activity: CN.HB.06.FGR.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HB.06.FGR.PTST120 Paint
- Stucco/ Specialty Plaster (OI)
Project: SHBLUD150324 Activity: CN.HB.06.FGR.TELE100
Telecom 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.06.FGR.WAWP110
Waterproofing and Protection Screed
Project: SHBLUD150324 Activity: CN.HB.06.FGR.WDDR150
Installation of Doors - Wooden
Project: SHBLUD150324 Activity: CN.HB.06.FGR.WLTL400
Installation of Wall Tiles (OI)
Project: SHBLUD150324 Activity: CN.HB.06.GNR.BMSN100 Block
Masonry
Project: SHBLUD150324 Activity: CN.HB.06.SLB.CAST140 ADM
Inspection and Concrete Casting of Slab & Stairs @ +30.16
Project: SHBLUD150324 Activity: CN.HB.06.SLB.ENSL100
Embedment for Structural Steel Works of Media Screen - L6
Project: SHBLUD150324 Activity: CN.HB.06.SLB.MSLB130 MEP
Embedment in Slab & Stairs @ +30.16
Project: SHBLUD150324 Activity: CN.HB.06.SLB.REIN110 Steel
Fixing for Slab & Stairs @ +30.16
Project: SHBLUD150324 Activity: CN.HB.06.SLB.SHTR100
Scaffolding, Shuttering for Slab & Stairs @ +30.16
Project: SHBLUD150324 Activity: CN.HB.07.CWL.CAST190
Concrete Casting of Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.07.CWL.CMEP160 MEP
Embedment in Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.07.CWL.ENSL100
Embedment for Structural Steel Works of Media Screen - L7 Vert.
Project: SHBLUD150324 Activity: CN.HB.07.CWL.FSAC100
Embedment for Facade Access - L7 Parapet
Project: SHBLUD150324 Activity: CN.HB.07.CWL.REIN150 Steel
Fixing for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.07.CWL.SHTR180
Shuttering for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.07.FWA.FALR120 Fire
Alarm/ Emergency Lighting & Detection - Final Fix (Sensors, Detectors and Exit
Lights)
Project: SHBLUD150324 Activity: CN.HB.07.FWA.LWCS120 Other
Low Current Systems - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.07.FWA.WDDR150
Installation of Doors - Wooden
Project: SHBLUD150324 Activity: CN.HB.07.SLB.CAST140 ADM
Inspection and Concrete Casting of Slab & Stairs @ +34.26
Project: SHBLUD150324 Activity: CN.HB.07.SLB.EMPR100
Embedment for Roof Pergola - L7 Slab
Project: SHBLUD150324 Activity: CN.HB.07.SLB.ENSL100
Embedment for Structural Steel Works of Media Screen - L7
Project: SHBLUD150324 Activity: CN.HB.07.SLB.FSAC100
Embedment for Facade Access - L7 Slab
Project: SHBLUD150324 Activity: CN.HB.07.SLB.MSLB130 MEP
Embedment in Slab & Stairs @ +34.26
Project: SHBLUD150324 Activity: CN.HB.07.SLB.REIN110 Steel
Fixing for Slab & Stairs @ +34.26
Project: SHBLUD150324 Activity: CN.HB.07.SLB.SHTR100
Scaffolding, Shuttering for Slab & Stairs @ +34.26
Project: SHBLUD150324 Activity: CN.HB.TR.SLB.CAST140 ADM
Inspection and Concrete Casting of Slab & Stairs @ +37.84
Project: SHBLUD150324 Activity: CN.HB.TR.SLB.DSHT200 De-
shutter and Back Propping @ +37.84
Project: SHBLUD150324 Activity: CN.HB.TR.SLB.EMPR100
Embedment for Roof Pergola - TRF Slab
Project: SHBLUD150324 Activity: CN.HB.TR.SLB.FSAC100
Embedment for Facade Access - TRF Parapet
Project: SHBLUD150324 Activity: CN.HB.TR.SLB.FSAC110
Embedment for Facade Access - TRF Slab
Project: SHBLUD150324 Activity: CN.HB.TR.SLB.MSLB130 MEP
Embedment in Slab & Stairs @ +37.84
Project: SHBLUD150324 Activity: CN.HB.TR.SLB.PTWR170 Final
Stressing & Grouting for PT Slab @ +37.84
Project: SHBLUD150324 Activity: CN.HB.TR.SLB.REIN110 Steel
Fixing for Slab & Stairs @ +37.84
Project: SHBLUD150324 Activity: CN.HB.TR.SLB.SHTR100
Scaffolding, Shuttering for Slab & Stairs @ +37.84
Project: SHBLUD150324 Activity: CN.HB.UG.CWL.CAST190
Concrete Casting of Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.UG.CWL.CMEP160 MEP
Embedment in Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.UG.CWL.REIN150 Steel
Fixing for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.UG.CWL.SHTR180
Shuttering for Core Walls, Walls & Columns
Project: SHBLUD150324 Activity: CN.HB.UG.ELE.ENSL100
Embedment for Structural Steel Works of Media Screen - UGF
Project: SHBLUD150324 Activity: CN.HB.UG.ENT.EMAL100
Embedment for Air Lock Room Structure - UGF Slab
Project: SHBLUD150324 Activity: CN.HB.UG.SLB.CAST140 ADM
Inspection and Concrete Casting of Slab & Stairs @ +7.6
Project: SHBLUD150324 Activity: CN.HB.UG.SLB.MSLB130 MEP
Embedment in Slab & Stairs @ +7.6
Project: SHBLUD150324 Activity: CN.HB.UG.SLB.REIN110 Steel
Fixing for Slab & Stairs @ +7.6
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL200 Rev. &
App. of Shop Drawings for Reinforcement - Zone B - UGF Slab
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL180 MS 3 -
Completion of Works
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL157
Preparation for Temporary Power (ESSW)
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL160
Temporary Power On
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL397 Third
Party Inspection
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL445
Comments Incorporation/ De-snagging
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL460 Third
Party Final Inspection and Uploading Final Report to Civil Defense
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL502 Civil
Defense - Inspection
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL520 NOC -
Civil Defense
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL538
Building Completion Certificate
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL541 BCC -
Final Inspection
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL553
Permanent Supply Activation - Power
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL556
Permanent Supply Activation - Water
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL568
Handover
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL571 Final
Paint and Cleaning
Project: SHBLUD150324 Activity: SH-ENG-SDA-1180 Design
Calculation Approval for Post Tension Slab by Engineer
Project: SHBLUD150324 Activity: SH-ENG-SDA-1185 Design
Calculation Submittal for Post Tension Slab to ADM
Project: SHBLUD150324 Activity: SH-ENG-SDA-1190 Design
Calculation Approval for Post Tension Slab by ADM
Project: SHBLUD150324 Activity: SH-ENG-SDA-3195 Design
Calculation Submittal for Post Tension Slab to 3rd Party
Project: SHBLUD150324 Activity: SH-ENG-SDA-3205 Design
Calculation Approval for Post Tension Slab by 3rd Party
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL130
Energization of MDB/SMDBs/MCCs
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL140
Startup of Chilled Water Pumps
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL180
Flushing, Chemical Cleaning and Passivation of Chilled Water Piping Network
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL190
Startup of Chillers
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL220 Wild
Air On
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL230
Startup of AHUs, FAHUs and FCUs
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL240 Water
Balancing of Chilled Water Network
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL320
Testing and Commissioning of Access Control System
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL330
Testing and Commissioning FA, PA, and CB Systems

Activities with unsatisfied constraints..........................8


Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL110 MS 1 -
Completion of RC & Superstructure Works for All Buildings
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL120 MS 2 -
Completion of First-in-place 2 Nos. Guest Rooms on L2
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL130 MS 4 -
Garage Storage, Purchasing/ Receiving Office, Ancillary Building Construction
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL140 MS 5 -
Store Rooms (Beverage/ Food), Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL150 MS 6 -
Receiving Area, Kitchen & Coolers. Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL160 MS 7 -
Employee Dining Room/ Locker Rooms Etc.
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL170 MS 8 -
Guest Floors 100%, Safety Deposit Box Room, Recreational Facilities
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL180 MS 3 -
Completion of Works

Activities with unsatisfied relationships........................0

Activities with external dates...................................9


Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.ERWK110
Earthworks, Leveling, Compaction for Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.CAST170
Pedestal Casting Incl. Base Plate (On Pump Room Slab and Footing)
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.ERWK110
Earthworks, Leveling, Compaction for Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.ERWK110
Earthworks, Leveling, Compaction for Footing
Project: SHBLUD150324 Activity: CN.EX.RW.ST2.ERWK110
Earthworks, Leveling, Compaction to Formation
Project: SHBLUD150324 Activity: CN.EX.RW.ST3.ERWK110
Earthworks, Leveling, Compaction to Formation
Project: SHBLUD150324 Activity: CN.UB.BS.RFT.CAST180 ADM
Inspection and Concrete Casting of Raft
Project: SHBLUD150324 Activity: CN.UB.BS.SLB.CAST140 ADM
Inspection and Concrete Casting of Slab & Stairs
Project: SHBLUD150324 Activity: CN.UB.LG.SLB.CAST140 ADM
Inspection and Concrete Casting of Slab

Activities that are not on any float paths.......................3563


Project: SHBLUD150324 Activity: CN.EX.EX.GNR.TIEN100 Tie-in
Connection to External Sewerage Network (Incl. Civil Works) - P6 Area
Project: SHBLUD150324 Activity: CN.EX.EX.GNR.TIEN110 Tie-in
Connection 1 to External Storm Water Network (Incl. Civil Works) - P6 Area
Project: SHBLUD150324 Activity: CN.EX.EX.GNR.TIEN120
Telecom Tie-in Connection with External Network - P5 Area
Project: SHBLUD150324 Activity: CN.EX.EX.GNR.TIEN130 WS
Tie-in Connection to External Network & Installation of Water Meter - P6 Area
Project: SHBLUD150324 Activity: CN.EX.EX.GNR.TIEN150 Leave-
out Finishes Post Tie-ins - P5 Area
Project: SHBLUD150324 Activity: CN.EX.EX.GNR.TIEN160 Tie-in
Connection to External Irrigation/ TSE Network (Incl. Civil Works) - P6 Area
Project: SHBLUD150324 Activity: CN.EX.EX.GNR.TIEN180 Leave-
out Finishes Post Tie-ins - P6 Area
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.ALLU160
Installation of Aluminum Louvre Fins and Louvre Windows
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.ALWD120
Installation of Aluminum Windows/ Glazing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.ANTR120 Anti-
termite Treatment Below Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.BMSN100 Block
Masonry
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.CAST100
Pedestal Casting Incl. Base Plate
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.CAST110
Pedestal Casting Incl. Base Plate
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.CAST130
Concrete Casting of Columns
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.CAST160
Casting of Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.DOOR130
Installation of Doors
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.DSHT200 De-
shutter and Back Propping
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.ELEC120 Power
Cable Laying & Terminations
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.ELEC130
Installation of Vehicle Electric Charging Stations
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.ELVE120 ELV
Services Inst. & Terminations
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.ERWK110
Earthworks, Leveling, Compaction for Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.FMSL140 Form
Work and Steel Fixing for Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.FRNS100
Installation of Steel Handrail/ s
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.FRNS130
Installation of Wheel Stoppers
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.FRNS160
Installation of Aluminum Bollards
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.GRFC110 GFRC
Cladding
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.GROT140
Grouting/ Sealants Caulking
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.PCCF110 PCC
for Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.REIN100 Steel
Fixing for Columns
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.REIN150 Steel
Fixing for Slab
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.RFWP140 Roof
PU Waterproofing System
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.SHTR120
Shuttering for Columns
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.SHTR140
Scaffolding, Shuttering for Slab
Project: SHBLUD150324 Activity: CN.EX.EX.ZE1.SSWP130
Waterproofing Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.EX.EX.ZE2.CAST100
Foundation for Sunken Deck Pergola (OI)
Project: SHBLUD150324 Activity: CN.EX.EX.ZE2.ELVE120 ELV
Services Inst. & Terminations
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.BKFL110
Compacted Backfill
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.CAST100
Foundation for Outdoor Exercise Shade
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.DRNG100
Earthworks & PCC for Drainage/ Sewer. Manholes & Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.DRNG110 Laying
of Drainage/ Sewer. Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.DRNG120
Manholes, Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.ELEC100
Earthworks, PCC & Upstands for Power Manholes & Ducts
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.ELEC110 Duct
Inst., Manholes, Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.ELEC120 Power
Cable Laying & Terminations
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.ELVE100
Earthworks, PCC & Upstands for ELV Manholes & Ducts
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.ELVE110 Duct
Inst., Manholes, Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.ELVE120 ELV
Services Inst. & Terminations
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.FRSH100
Placing Boulders
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.FRSH110
Installation of Precast Concrete Seat Wall
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.FRSH120
Installation of Landscape Lighting & Other Site Furnishing Items (Incl. OI)
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.HDSC100 Sub-
base Material
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.HDSC110
Installation of Concrete Kerbstones and Edgings
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.HDSC120 Loose
Gravel Aggregate Surfacing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.HDSC130 Hoggin
Granitic Aggregate Surfacing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.IRRI100
Irrigation Main Pipes Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.IRRI110
Irrigation Sub Main Pipes Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.IRRI120
Irrigation Drip Lines Pipes Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.SFSC100
Planting of Trees Incl. Sweet Soil
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.SFSC110
Planting of Plants Incl. Sweet Soil
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.SFSC120
Planting Grass, Ground Cover and Xeriscape Incl. Sweet Soil
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.SHDE110
Installation of Outdoor Exercise Shade
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.SHFT100
Shifting of Laydown Areas/ Adjustment of Logistics
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.WTSP100
Earthworks, PCC & Upstands for Water Supply Manholes & Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.WTSP110 Water
Supply System Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE3.WTSP120 Cover
Slab & Concrete Encasement Above Water Supply System Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.ANTR110 Anti-
termite Treatment
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.ANTR120 Anti-
termite Treatment Below Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.CAST160
Concrete Casting of Slab
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.CAST170
Pedestal Casting Incl. Base Plate (On Pump Room Slab and Footing)
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.CAST190
Concrete Casting of Walls and Step
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.CAST200 Step
Casting with Mass Concrete
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.DRNG100
Earthworks & PCC for Drainage/ Sewer. Manholes & Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.DRNG110 Laying
of Drainage/ Sewer. Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.DRNG120
Manholes, Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.ELEC100
Earthworks, PCC & Upstands for Power Manholes & Ducts
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.ELEC110 Duct
Inst., Manholes, Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.ELEC120 Power
Cable Laying & Terminations
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.ELVW100
Earthworks, PCC & Upstands for ELV Manholes & Ducts
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.ELVW110 Duct
Inst., Manholes, Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.ELVW120 ELV
Services Inst. & Terminations
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.ERTH100
Earthworks Levelling and Compaction Incl. Road Base
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.ERWK110
Earthworks, Leveling, Compaction for Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.FLTL210
Installation and Protection of Floor Tiles / Skirting
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.FLTL310
Installation and Protection of Floor Tiles / Skirting
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.FMSL140 Form
Work and Steel Fixing for Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.GRAT220
Grating
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.GRAT320
Grating
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.IRRI100
Irrigation Main Pipes Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.IRRI110
Irrigation Sub Main Pipes Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.LADR230
Installation of Ladders
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.LDDR330
Installation of Ladders
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.PCCF110 PCC
for Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.PCCW120 PCC
for RC Slab
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.REIN150 Steel
Reinforcement for RC Slab
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.REIN170 Steel
Fixing for Walls
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.REN170 Steel
Fixing for Walls and Steps
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.SHTR130
Shuttering Around RC Slab
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.SHTR140
Shuttering Around RC Slab
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.SHTR180
Shuttering for Walls and Steps
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.SSWP130
Waterproofing Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.SSWP140
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.STST200
Installation of Steel Shade Structure for Swimming Pool
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.WLTL200
Installation of Wall Tiles
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.WLTL300
Installation of Wall Tiles
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.WTSP100
Earthworks, PCC & Upstands for Water Supply Manholes & Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.WTSP110 Water
Supply System Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE4.WTSP120 Cover
Slab & Concrete Encasement Above Water Supply System Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.ANTR120 Anti-
termite Treatment Below Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.CAST120
Pedestal Casting Incl. Base Plate
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.CAST160
Casting of Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.CLRN110 Site
Clearance, Cutting and Rough Grading
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.DRNG100
Earthworks & PCC for Drainage/ Sewer. Manholes & Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.DRNG110 Laying
of Drainage/ Sewer. Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.DRNG120
Manholes, Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.ELEC100
Earthworks, PCC & Upstands for Power Manholes & Ducts
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.ELEC110 Duct
Inst., Manholes, Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.ELEC120 Power
Cable Laying & Terminations
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.ELVW100
Earthworks & PCC for ELV Manholes & Ducts
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.ELVW110 Duct
Inst., Manholes, Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.ELVW120 ELV
Services Inst. & Terminations
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.ERWK110
Earthworks, Leveling, Compaction for Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.FMSL140 Form
Work and Steel Fixing for Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.FRFT100
Earthworks, PCC & Upstands for Firefighting Manholes & Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.FRFT110 Laying
of UG Concealed Fire Hydrant System Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.FRFT120 Cover
Slab & Concrete Encasement Above Fire Hydrant System Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.FRNS100
Placing Boulders
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.IRRI100
Irrigation Main Pipes Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.IRRI110
Irrigation Sub Main Pipes Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.LPG100 Civil
Base for Buried UG LPG Tank Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.LPG110
Earthworks & PCC for LPG Pipes Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.LPG120 Laying
of LPG Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.LPG130 Buried
UG LPG Tank Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.LPG140
Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.LPG150 Cover
Over Buried UG LPG Tank Inst. (If Any)
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.PCCF110 PCC
for Footing
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.SHFT100
Shifting of Laydown Areas/ Adjustment of Logistics
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.SSWP130
Waterproofing Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.STST100 Multi-
use Lawn Shade - Structural Steel Works
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.WTSP100
Earthworks, PCC & Upstands for Water Supply Manholes & Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.WTSP110 Water
Supply System Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE5.WTSP120 Cover
Slab & Concrete Encasement Above Water Supply System Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.DRNG120
Manholes, Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.ELEC120 Power
Cable Laying & Terminations
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.ELVW100
Earthworks, PCC & Upstands for ELV Manholes & Ducts
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.ELVW110 Duct
Inst., Manholes, Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.ELVW120 ELV
Services Inst. & Terminations
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.FRFT100
Earthworks, PCC & Upstands for Firefighting Manholes & Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.FRFT110 Laying
of UG Concealed Fire Hydrant System Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.FRFT120 Cover
Slab & Concrete Encasement Above Fire Hydrant System Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.FRNS100
Installation of Wheel Stoppers
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.FRNS110
Installation of Aluminum Bollards
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.IRRI100
Irrigation Main Pipes Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.IRRI110
Irrigation Sub Main Pipes Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.LPGW100
Earthworks & PCC for LPG Pipes Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.LPGW110 Laying
of LPG Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.LPGW120
Concrete Encasement & Backfilling
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.SSPT100
Scissor Lift/ Platform Shaft RCC Works
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.SSPT110
Scissor Lift/ Platform Shaft - Survey by Subcontractor
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.SSPT120
Scissor Lift/ Platform Shaft - Preparation and Safety
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.SSPT130
Scissor Lift/ Platform - Assembly/ Installation
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.SSPT140
Scissor Lift/ Platform Flooring
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.WLFN140
Acrylic Painted Graphics on Walls
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.WTSP100
Earthworks, PCC & Upstands for Water Supply Manholes & Pipes
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.WTSP110 Water
Supply System Inst.
Project: SHBLUD150324 Activity: CN.EX.EX.ZE6.WTSP120 Cover
Slab & Concrete Encasement Above Water Supply System Inst.
Project: SHBLUD150324 Activity: CN.HA.01.BDA.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.EPXY150 Floor
Finishes (Epoxy , Polished Concrete)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HA.01.BDA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HA.01.BDA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HA.01.BDA.PTST120 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HA.01.BDA.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.SPPL100
Plastering Works
Project: SHBLUD150324 Activity: CN.HA.01.BDA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.ACWS160
Installation of Aluminum Curtain Wall/ Glazing System
Project: SHBLUD150324 Activity: CN.HA.01.BLC.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.BMSS110 BMS -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.BMSS120 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.BRGR100
Installation of Bracket/ Channels for Glass Railings
Project: SHBLUD150324 Activity: CN.HA.01.BLC.CBCP170
Installation of Cement Board Ceiling Panels
Project: SHBLUD150324 Activity: CN.HA.01.BLC.ELEC120
Electrical - Final Fix (Lighting, Switches, DB, SMDB Dressing & Termination)
(OI)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.ELEC200
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.ELEC220
Electrical - Final Fix (OI)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.EPXY150 Floor
Finishes (Epoxy Coating)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.FALR140 Fire
Alarm 2nd & Final Fix (Wires, Cables & Detectors)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.FALR150 Clean
Agent & Fire Suppression System
Project: SHBLUD150324 Activity: CN.HA.01.BLC.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HA.01.BLC.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HA.01.BLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.GLRL130
Installation of Glass Railings
Project: SHBLUD150324 Activity: CN.HA.01.BLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.LTCN100
Lighting Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.LTCN120
Lighting Control - Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.LWCS120 Other
Low Current Systems - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.PAVA120 PAVA
System - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.PRFT140
Installation and Protection of Floor Tiles / Skirting
Project: SHBLUD150324 Activity: CN.HA.01.BLC.PTFS130 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HA.01.BLC.PTPR100 Primer
Coat
Project: SHBLUD150324 Activity: CN.HA.01.BLC.PTST110 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HA.01.BLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.SCRD120
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HA.01.BLC.SIGN160
Installation of Signages
Project: SHBLUD150324 Activity: CN.HA.01.BLC.SPCP150
Installation of Suspension for Cement Board Panel Ceilings
Project: SHBLUD150324 Activity: CN.HA.01.BLC.SPPL100
Plastering Works
Project: SHBLUD150324 Activity: CN.HA.01.BLC.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.01.BLC.WAWP110
Membrane Waterproofing System and Testing
Project: SHBLUD150324 Activity: CN.HA.01.BWA.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.EPXY150 Floor
Finishes (Epoxy, Heavy Duty Polyurethane, Polished Concrete)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HA.01.BWA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HA.01.BWA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.PLBM100
Plumbing - 1st Fix (Pex Pipes & Accessories)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HA.01.BWA.SPPL100
Plastering Works
Project: SHBLUD150324 Activity: CN.HA.01.BWA.WAWP110
Waterproofing
Project: SHBLUD150324 Activity: CN.HA.01.BWA.WLTL120 Wall
Tiling
Project: SHBLUD150324 Activity: CN.HA.01.FGR.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.BMSS110 BMS -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.BMSS120 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.CPFF160
Installation of Carpet
Project: SHBLUD150324 Activity: CN.HA.01.FLC.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HA.01.FLC.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HA.01.FLC.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HA.01.FLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.LTCN100
Lighting Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.LTCN120
Lighting Control - Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.LWCS120 Other
Low Current Systems - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.MTSK200 Metal
Work Incl. Metal Skirting
Project: SHBLUD150324 Activity: CN.HA.01.FLC.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.PAVA120 PAVA
System - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HA.01.FLC.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HA.01.FLC.PTST120 Paint
- Stucco/ Specialty Plaster (OI)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.SCRD110
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HA.01.FLC.SIGN160
Installation of Signages
Project: SHBLUD150324 Activity: CN.HA.01.FLC.SPPL100
Plaster (OI)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.01.FLC.WDWK400 Wooden
Work
Project: SHBLUD150324 Activity: CN.HA.01.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HA.01.SLB.DSHT200 De-
shutter and Back Propping @ +12.66
Project: SHBLUD150324 Activity: CN.HA.01.SLB.PTWR170 Final
Stressing & Grouting for PT Slab @ +12.66
Project: SHBLUD150324 Activity: CN.HA.02.BLC.ACWS160
Installation of Aluminum Curtain Wall/ Glazing System
Project: SHBLUD150324 Activity: CN.HA.02.BLC.BMSS100 BMS &
Automatic Controls System - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.BMSS110 BMS &
Automatic Controls System - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.BMSS120 BMS &
Automatic Controls System - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.BRGR100
Installation of Bracket/ Channels for Glass Railings
Project: SHBLUD150324 Activity: CN.HA.02.BLC.CBCP170
Installation of Cement Board Ceiling Panels
Project: SHBLUD150324 Activity: CN.HA.02.BLC.DRSW110
Drainage & Storm Water - 2nd Fix (Hangers Supports, Piping & Fittings)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HA.02.BLC.FALR100 Fire
Alarm/ Emergency Lighting & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.FALR110 Fire
Alarm/ Emergency Lighting & Detection - 2nd Fix (Wiring)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.GLRL130
Installation of Glass Railings
Project: SHBLUD150324 Activity: CN.HA.02.BLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, FCU Installation and Valve Connection)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.HVAC120 HVAC -
Final Fix Works (Grills, Diffusers, Thermostat)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.HVAC200 HVAC -
2nd Fix (Duct, Exhaust Fan and Damper Installation)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.LTCN100
Lighting Control - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.LTCN120
Lighting Control - Final Fix Works (Accessories, Sensors, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.LWCS100 Other
Low Current Systems - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.PRFT140
Installation and Protection of Floor Tiles / Skirting
Project: SHBLUD150324 Activity: CN.HA.02.BLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.SCRD120
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HA.02.BLC.SPCP150
Installation of Suspension for Cement Board Panel Ceilings
Project: SHBLUD150324 Activity: CN.HA.02.BLC.TELE100
Telecom 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.02.BLC.WAWP110
Membrane Waterproofing System and Testing
Project: SHBLUD150324 Activity: CN.HA.02.BSR.ALMW100
Aluminum & Metal Works
Project: SHBLUD150324 Activity: CN.HA.02.BSR.ELEC120
Electrical - Final Fix (Lights & Switch Socket etc.) (OI)
Project: SHBLUD150324 Activity: CN.HA.02.BSR.ELEC130 LV
Switchgears (DB's, SMDB, Consumer Unit) Installation
Project: SHBLUD150324 Activity: CN.HA.02.BSR.ELEC140
Lighting Control Panel and Sensor Installation
Project: SHBLUD150324 Activity: CN.HA.02.BSR.ELEC150 Bus
Bar Connection
Project: SHBLUD150324 Activity: CN.HA.02.BSR.FLPC110 Floor
Finishes (Polished Concrete, Epoxy, Polyurethane and Antistatic Vinyl Sheet)
Project: SHBLUD150324 Activity: CN.HA.02.BSR.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HA.02.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HA.03.BLC.ACWS160
Installation of Aluminum Curtain Wall/ Glazing System
Project: SHBLUD150324 Activity: CN.HA.03.BLC.BRGR100
Installation of Bracket/ Channels for Glass Railings
Project: SHBLUD150324 Activity: CN.HA.03.BLC.CBCP170
Installation of Cement Board Ceiling Panels
Project: SHBLUD150324 Activity: CN.HA.03.BLC.GLRL130
Installation of Glass Railings
Project: SHBLUD150324 Activity: CN.HA.03.BLC.PRFT140
Installation and Protection of Floor Tiles / Skirting
Project: SHBLUD150324 Activity: CN.HA.03.BLC.SCRD120
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HA.03.BLC.SPCP150
Installation of Suspension for Cement Board Panel Ceilings
Project: SHBLUD150324 Activity: CN.HA.03.BLC.WAWP110
Membrane Waterproofing System and Testing
Project: SHBLUD150324 Activity: CN.HA.03.BSR.ALMW100
Aluminum & Metal Works
Project: SHBLUD150324 Activity: CN.HA.03.BSR.ELEC120
Electrical - Final Fix (Lights & Switch Socket etc.) (OI)
Project: SHBLUD150324 Activity: CN.HA.03.BSR.ELEC130 LV
Switchgears (DB's, SMDB, Consumer Unit) Installation
Project: SHBLUD150324 Activity: CN.HA.03.BSR.ELEC140
Lighting Control Panel and Sensor Installation
Project: SHBLUD150324 Activity: CN.HA.03.BSR.ELEC150 Bus
Bar Connection
Project: SHBLUD150324 Activity: CN.HA.03.BSR.FLPC110 Floor
Finishes (Polished Concrete, Epoxy, Polyurethane and Antistatic Vinyl Sheet)
Project: SHBLUD150324 Activity: CN.HA.03.BSR.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HA.03.FLC.BMSS100 BMS &
Automatic Controls System - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.BMSS110 BMS &
Automatic Controls System - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.BMSS120 BMS &
Automatic Controls System - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.DRSW110
Drainage & Storm Water - 2nd Fix (Hangers Supports, Piping & Fittings)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HA.03.FLC.FALR100 Fire
Alarm/ Emergency Lighting & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.FALR110 Fire
Alarm/ Emergency Lighting & Detection - 2nd Fix (Wiring)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, FCU Installation and Valve Connection)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.HVAC120 HVAC -
Final Fix Works (Grills, Diffusers, Thermostat)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.HVAC200 HVAC -
2nd Fix (Duct, Exhaust Fan and Damper Installation)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.LTCN100
Lighting Control - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.LTCN120
Lighting Control - Final Fix Works (Accessories, Sensors, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.LWCS100 Other
Low Current Systems - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.TELE100
Telecom 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.03.FLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.03.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HA.04.BLC.ACWS160
Installation of Aluminum Curtain Wall/ Glazing System
Project: SHBLUD150324 Activity: CN.HA.04.BLC.BMSS100 BMS &
Automatic Controls System - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.BMSS110 BMS &
Automatic Controls System - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.BMSS120 BMS &
Automatic Controls System - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.BRGR100
Installation of Bracket/ Channels for Glass Railings
Project: SHBLUD150324 Activity: CN.HA.04.BLC.CBCP170
Installation of Cement Board Ceiling Panels
Project: SHBLUD150324 Activity: CN.HA.04.BLC.DRSW110
Drainage & Storm Water - 2nd Fix (Hangers Supports, Piping & Fittings)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HA.04.BLC.FALR100 Fire
Alarm/ Emergency Lighting & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.FALR110 Fire
Alarm/ Emergency Lighting & Detection - 2nd Fix (Wiring)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.GLRL130
Installation of Glass Railings
Project: SHBLUD150324 Activity: CN.HA.04.BLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, FCU Installation and Valve Connection)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.HVAC120 HVAC -
Final Fix Works (Grills, Diffusers, Thermostat)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.HVAC200 HVAC -
2nd Fix (Duct, Exhaust Fan and Damper Installation)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.LTCN100
Lighting Control - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.LTCN120
Lighting Control - Final Fix Works (Accessories, Sensors, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.LWCS100 Other
Low Current Systems - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.PRFT140
Installation and Protection of Floor Tiles / Skirting
Project: SHBLUD150324 Activity: CN.HA.04.BLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.SCRD120
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HA.04.BLC.SPCP150
Installation of Suspension for Cement Board Panel Ceilings
Project: SHBLUD150324 Activity: CN.HA.04.BLC.TELE100
Telecom 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.04.BLC.WAWP110
Membrane Waterproofing System and Testing
Project: SHBLUD150324 Activity: CN.HA.04.BSR.ALMW100
Aluminum & Metal Works
Project: SHBLUD150324 Activity: CN.HA.04.BSR.ELEC120
Electrical - Final Fix (Lights & Switch Socket etc.) (OI)
Project: SHBLUD150324 Activity: CN.HA.04.BSR.ELEC130 LV
Switchgears (DB's, SMDB, Consumer Unit) Installation
Project: SHBLUD150324 Activity: CN.HA.04.BSR.ELEC140
Lighting Control Panel and Sensor Installation
Project: SHBLUD150324 Activity: CN.HA.04.BSR.ELEC150 Bus
Bar Connection
Project: SHBLUD150324 Activity: CN.HA.04.BSR.FLPC110 Floor
Finishes (Polished Concrete, Epoxy, Polyurethane and Antistatic Vinyl Sheet)
Project: SHBLUD150324 Activity: CN.HA.04.BSR.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HA.04.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HA.05.BSR.FLPC110 Floor
Finishes (Polished Concrete, Epoxy, Polyurethane and Antistatic Vinyl Sheet)
Project: SHBLUD150324 Activity: CN.HA.05.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HA.05.HPR.ELEC300 Cable
Trays Installation
Project: SHBLUD150324 Activity: CN.HA.05.HPR.ELEC310 Cable
Pulling Glanding & Termination
Project: SHBLUD150324 Activity: CN.HA.05.HPR.FRFT120 Fire
Fighting Pipes & Sprinklers Installation
Project: SHBLUD150324 Activity: CN.HA.05.HPR.HVAC110
Ducting Installation & Connection
Project: SHBLUD150324 Activity: CN.HA.05.HPR.HXEQ100
Hypoxic Air Equipment (Air Pipe, Cabinet, Filters, Buffer Tank, Separator &
Compressor)
Project: SHBLUD150324 Activity: CN.HA.05.HPR.LWCS110 Wiring
for Lighting & Other Low Current Systems
Project: SHBLUD150324 Activity: CN.HA.05.MCR.ELEC120
Electrical - Final Fix (Lights & Switch Socket etc.) (OI)
Project: SHBLUD150324 Activity: CN.HA.05.MCR.ELEC130 MCC &
LV Switchgears (DB's, SMDB, Consumer Unit) Installation
Project: SHBLUD150324 Activity: CN.HA.05.MCR.ELEC150 Bus
Bar Connection
Project: SHBLUD150324 Activity: CN.HA.05.ROF.ALLU160
Installation of Aluminum Louvre Fins and Louvre Windows
Project: SHBLUD150324 Activity: CN.HA.05.ROF.ELEC300 DB and
Cable Trays Installation
Project: SHBLUD150324 Activity: CN.HA.05.ROF.ELEC310 Cable
Pulling Glanding & Termination
Project: SHBLUD150324 Activity: CN.HA.05.ROF.FRFT120 Fire
Fighting Pipes & Sprinklers Installation
Project: SHBLUD150324 Activity: CN.HA.05.ROF.LWCS110 Wiring
for Lighting & Other Low Current Systems
Project: SHBLUD150324 Activity: CN.HA.06.ROF.CAST110 MEP
Foundations and Clearance for Waterproofing System
Project: SHBLUD150324 Activity: CN.HA.06.ROF.EFAN100
Extract Fans Installation
Project: SHBLUD150324 Activity: CN.HA.06.ROF.PINT160 Paint
Works
Project: SHBLUD150324 Activity: CN.HA.06.ROF.PTPR120 Primer
Coat
Project: SHBLUD150324 Activity: CN.HA.06.ROF.PTST130 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HA.06.ROF.SRPR100
Surface Preparation
Project: SHBLUD150324 Activity: CN.HA.EL.PR1.ALUM100
Installation of Aluminum Fins, Louvre Fins and Louvres
Project: SHBLUD150324 Activity: CN.HA.EL.PR1.ALUM120 Facade
Temporary Access Leave-out Works
Project: SHBLUD150324 Activity: CN.HA.EL.PR1.FCTV120
Installation of CCTV - Final Fix
Project: SHBLUD150324 Activity: CN.HA.EL.PR1.FLGT110
Installation of Facade Lighting - Final Fix
Project: SHBLUD150324 Activity: CN.HA.EL.PR1.GFRC160 Facade
Temporary Access Leave-out Works
Project: SHBLUD150324 Activity: CN.HA.EL.PR1.RTAS120
Removal of Facade Temporary Access System
Project: SHBLUD150324 Activity: CN.HA.EL.PR2.ALUM100
Installation of Aluminum Fins, Louvre Fins and Louvres
Project: SHBLUD150324 Activity: CN.HA.EL.PR2.ALUM110
Installation of Aluminum Cladding/ Facia System to Balcony Ledges
Project: SHBLUD150324 Activity: CN.HA.EL.PR2.ALUM130 Facade
Temporary Access Leave-out Works
Project: SHBLUD150324 Activity: CN.HA.EL.PR2.ALUM200
Installation of Window Facade Shades
Project: SHBLUD150324 Activity: CN.HA.EL.PR2.FCTV120
Installation of CCTV - Final Fix
Project: SHBLUD150324 Activity: CN.HA.EL.PR2.FLGT110
Installation of Facade Lighting - Final Fix
Project: SHBLUD150324 Activity: CN.HA.EL.PR2.GFRC160 Facade
Temporary Access Leave-out Works
Project: SHBLUD150324 Activity: CN.HA.EL.PR2.RTAS120
Removal of Facade Temporary Access System
Project: SHBLUD150324 Activity: CN.HA.EL.PR3.ALUM100
Installation of Aluminum Fins, Louvre Fins and Louvres
Project: SHBLUD150324 Activity: CN.HA.EL.PR3.ALUM120 Facade
Temporary Access Leave-out Works
Project: SHBLUD150324 Activity: CN.HA.EL.PR3.ALUM230
Installation of Aluminum Cladding/ Facia System to Balcony Ledges
Project: SHBLUD150324 Activity: CN.HA.EL.PR3.FCTV120
Installation of CCTV - Final Fix
Project: SHBLUD150324 Activity: CN.HA.EL.PR3.FLGT110
Installation of Facade Lighting - Final Fix
Project: SHBLUD150324 Activity: CN.HA.EL.PR3.GFRC160 Facade
Temporary Access Leave-out Works
Project: SHBLUD150324 Activity: CN.HA.EL.PR3.RTAS120
Removal of Facade Temporary Access System
Project: SHBLUD150324 Activity: CN.HA.EL.PR4.ALUM100
Installation of Aluminum Fins, Louvre Fins and Louvres
Project: SHBLUD150324 Activity: CN.HA.EL.PR4.ALUM120 Facade
Temporary Access Leave-out Works
Project: SHBLUD150324 Activity: CN.HA.EL.PR4.ALUM240
Installation of Window Facade Shades
Project: SHBLUD150324 Activity: CN.HA.EL.PR4.ALUM250
Installation of Aluminum Cladding/ Facia System to Balcony Ledges
Project: SHBLUD150324 Activity: CN.HA.EL.PR4.EIFS100 Wall
EIFS System - Parapet
Project: SHBLUD150324 Activity: CN.HA.EL.PR4.FCTV120
Installation of CCTV - Final Fix
Project: SHBLUD150324 Activity: CN.HA.EL.PR4.FLGT110
Installation of Facade Lighting - Final Fix
Project: SHBLUD150324 Activity: CN.HA.EL.PR4.GFRC160 Facade
Temporary Access Leave-out Works
Project: SHBLUD150324 Activity: CN.HA.EL.PR4.MTDR100
Installation of Metal Doors
Project: SHBLUD150324 Activity: CN.HA.EL.PR4.RTAS120
Removal of Facade Temporary Access System
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.BMSS100 BMS
Riser Works
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.CHLW120 CHW
Riser Insulation - Service Shafts
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.DRNG100
Drainage Risers - Service Shafts
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.ELEC120 LV
Cable Pulling, Bus Bar and Adaptor - Service Shafts
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.ELSY100
Emergency Lighting System Riser Works
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.FALR100 Fire
Alarm Riser Works
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.FRFT100 Fire
Fighting Pipe Installation/ Refurbishment - Service Shafts
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.HVAC100
Ducting Riser (FAD, EAD, and Jointing) - Service Shafts
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.LTCN100
Lighting Control Riser Works
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.LWCS100 Cable
Trays for Low Current Riser Works
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.LWCS110 Other
Low Current Riser Works
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.PAVA100 PAVA
Riser Works
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.SQST100
Security System Riser Works
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.TELE100
Telephone & Data Riser Works
Project: SHBLUD150324 Activity: CN.HA.GN.RSR.WTSP100 Water
Supply Risers - Service Shafts
Project: SHBLUD150324 Activity: CN.HA.GN.SHF.ACDR150
Service Shafts Access Doors (If Any) - Service Shafts
Project: SHBLUD150324 Activity: CN.HA.GN.SHF.CLFN140
Service Shafts Closing and Finishes - Service Shafts
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.BMSS100 BMS -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.LPGW100 LPG -
1st Fix (Supports Inst.)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.LPGW110 LPG -
2nd Fix (LPG Pipes Inst., etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.LWCS100 Other
Low Current - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.SCRD110
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.SPPL100
Plastering Works
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.BMSS100 BMS -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.BMSS110 BMS -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.BMSS120 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.ELEC120
Electrical - Final Fix (OI)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.FFAE170
Installation of FF&E & Signages
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.FLFN150 Floor
Finishes (Heavy Duty Polyurethane, Epoxy Coating)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.LTCN100
Lighting Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.LTCN120
Lighting Control - Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.LWCS120 Other
Low Current - Final Fix (Devices & Detectors)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.PAVA120 PAVA -
Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.PTFS160 First
Coat Paint
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.PTST120 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.BLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.LG.BSR.ELEC120
Electrical - Final Fix (Lighting, Switches, DB, SMDB Dressing & Termination)
(OI)
Project: SHBLUD150324 Activity: CN.HA.LG.BSR.FALR140 Fire
Alarm 2nd & Final Fix (Wires, Cables & Detectors)
Project: SHBLUD150324 Activity: CN.HA.LG.BSR.FALR150 Clean
Agent & Fire Suppression System
Project: SHBLUD150324 Activity: CN.HA.LG.BSR.PTFS160 First
Coat Paint (Acrylic Based Emulsion)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.BMSS100 BMS -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.BMSS120 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.CBPT160
Installation of Cubicle Partitions and Doors - Wooden
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.ELEC120
Electrical - Final Fix (OI)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.FLFN150 Floor
Finishes (Heavy Duty Polyurethane, Polished Concrete)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.KTEQ170
Installation of Kitchen Equipment (OI)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.LNEQ180
Installation of Laundry Equipment (OI)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.LWCS100 Other
Low Current - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.LWCS120 Other
Low Current - Final Fix (Devices & Detectors)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.PAVA120 PAVA -
Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.PLBM100
Plumbing - 1st Fix (Pex Pipes & Accessories)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.PLBM120
Plumbing - Final Fix
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.SPPL100
Plastering Works
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.WAWP110
Waterproofing
Project: SHBLUD150324 Activity: CN.HA.LG.BWA.WLTL120 Wall
Tiling
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.FLPC110 Floor
Finishes (Polished Concrete)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.BMSS110 BMS -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.BMSS120 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.BMSS200 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.BMSS210 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.BMSS220 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.CBPT160
Installation of Cubicle Partitions and Doors - Wooden
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.CPFF160
Installation of Carpet
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.ELEC130
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.ELEC200
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FALR200 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FALR210 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FALR220 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FCCL130 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FCSP120 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FLPC100 Floor
Finishes (Polished Concrete)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FLPC110 Floor
Finishes (Polished Concrete)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FRFT120 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.FRFT130 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.HVAC110 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.HVAC130 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.LTCN100
Lighting Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.LTCN120
Lighting Control - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.LWCS120 Other
Low Current Systems - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.LWCS200 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.LWCS210 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.LWCS220 Other
Low Current - Final Fix (Devices & Detectors)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.MTDR210
Glazing, Blue Metal to Lift Door Transoms, Art Work Etc.
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.MTSK200
Installation of Metal Skirting
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.PAVA120 PAVA
System - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.PAVA200 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.PAVA210 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.PAVA220 PAVA -
Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.PLBM100
Plumbing - 1st Fix (Pex Pipes & Accessories)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.PLBM120
Plumbing - Final Fix
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.PLBM130
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.PLST120
Plaster -all Types
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.SIGN160
Installation of Signages
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.WAWP110
Waterproofing
Project: SHBLUD150324 Activity: CN.HA.LG.FWA.WLTL120 Wall
Tiling
Project: SHBLUD150324 Activity: CN.HA.LG.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HA.LG.GNR.THRS110
Threshold
Project: SHBLUD150324 Activity: CN.HA.LG.PC1.DDSH100
Completing Solid Block Dead Shutter for Pile Caps and Ret. Wall Footing
Project: SHBLUD150324 Activity: CN.HA.LG.PC1.REIN120 Steel
Fixing for Pile Caps and Ret. Wall
Project: SHBLUD150324 Activity: CN.HA.LG.PC1.SSWP110
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.HA.LG.PT1.CAST140 ADM
Inspection and Concrete Casting of Pile Caps 2000mm Thick
Project: SHBLUD150324 Activity: CN.HA.LG.PT1.CAST170
Concrete for Lift Wall 1.6m
Project: SHBLUD150324 Activity: CN.HA.LG.PT1.DDSH100
Completing Solid Block Dead Shutter for Pile Caps 3.3m Height
Project: SHBLUD150324 Activity: CN.HA.LG.PT1.PMEP130 MEP
Embedment in Pile Caps 08 & 05- 2000mm Thick
Project: SHBLUD150324 Activity: CN.HA.LG.PT1.REIN120 Steel
Fixing for Pile Caps 08 & 05- 2000mm Thick
Project: SHBLUD150324 Activity: CN.HA.LG.PT1.REIN150 Lift/
Core Wall Reinforcement 1.6m Height
Project: SHBLUD150324 Activity: CN.HA.LG.PT1.SHTR160
Shutter for Wall 1.6m Height
Project: SHBLUD150324 Activity: CN.HA.LG.PT1.SSWP110
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.ALLU160
Installation of Aluminum Louvre Fins and Louvre Windows
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.ELEC100
Electrical Connection & Termination
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.ELEC300 Cable
Trays Installation
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.FRFT120 Fire
Fighting Pipes & Sprinklers Installation
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.HVAC110
Ducting Installation & Connection
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.LWCS110 Wiring
for Lighting & Other Low Current Systems
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.MTWR150 Metal
Works
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.PINT160 Paint
Works
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.PTPR120 Primer
Coat
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.PTST130 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.RFGR170
Installation of Roof Grating
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.RFWP140 Roof
PU Waterproofing System
Project: SHBLUD150324 Activity: CN.HA.RF.ROF.SRPR100
Surface Preparation
Project: SHBLUD150324 Activity: CN.HA.UG.SLB.DSHT200 De-
shutter and Back Propping @ +7.5 & +7.6m
Project: SHBLUD150324 Activity: CN.HA.UG.SLB.PTWR170 Final
Stressing & Grouting for PT Slab @ +7.5
Project: SHBLUD150324 Activity: CN.HA.VT.SL5.BGRL130
Brackets and Guide Rails - HSL5
Project: SHBLUD150324 Activity: CN.HA.VT.SL5.CBAS150 Cabins
Assembly - HSL5
Project: SHBLUD150324 Activity: CN.HA.VT.SL5.CBFL160 Cabins
Flooring: Civil - HSL5
Project: SHBLUD150324 Activity: CN.HA.VT.SL5.CRMH170
Cabling, Roping, and Mechanical - HSL5
Project: SHBLUD150324 Activity: CN.HA.VT.SL5.FLET140 Floor
Entrances - HSL5
Project: SHBLUD150324 Activity: CN.HA.VT.SL5.LTSP110 Lift
Shaft Preparation, Lighting, and Safety - HSL5
Project: SHBLUD150324 Activity: CN.HA.VT.SL5.MRIN120
Machine-rooms Installations - HSL5
Project: SHBLUD150324 Activity: CN.HA.VT.STC.EPXY120 Epoxy
Resin Flooring - Staircase C (GF-L7)
Project: SHBLUD150324 Activity: CN.HA.VT.STC.PLST100 Wall
Plaster - Staircase C (GF-L7)
Project: SHBLUD150324 Activity: CN.HA.VT.STC.PTFC140
Acrylic System to Wall - Final Coat - Staircase C (GF-L7)
Project: SHBLUD150324 Activity: CN.HA.VT.STC.PTIC110
Acrylic System to Walls - Initial Coat - Staircase C (GF-L7)
Project: SHBLUD150324 Activity: CN.HA.VT.STC.STHR130 Steel
Handrail - Staircase C (GF-L7)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.EPXY150 Floor
Finishes (Epoxy , Polished Concrete)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.01.BDA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.01.BDA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HB.01.BDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.BMSS110 BMS -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.BMSS120 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.BMSS210 BMS -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.BMSS220 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.BMSS300 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.CPFF160
Installation of Carpet
Project: SHBLUD150324 Activity: CN.HB.01.BLC.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HB.01.BLC.ELEC220
Electrical - Final Fix (OI)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.EPXY150 Floor
Finishes (Epoxy Coating)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FALR200 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FALR210 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FALR220 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FCCL240 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FCSP230 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FRFT200 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.FRFT210 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.HVAC200 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.HVAC220 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.LTCN100
Lighting Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.LTCN120
Lighting Control - Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.LTCN200
Lighting Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.LTCN210
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.LTCN220
Lighting Control - Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.LWCS120 Other
Low Current Systems - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.LWCS200 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.LWCS210 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.LWCS220 Other
Low Current Systems - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.MTSK200 Metal
Work Incl. Metal Skirting
Project: SHBLUD150324 Activity: CN.HB.01.BLC.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.PAVA120 PAVA
System - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.PAVA200 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.PAVA210 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.PAVA230 PAVA
System - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.PLBM210
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.PTFC100 Paint
First Coat
Project: SHBLUD150324 Activity: CN.HB.01.BLC.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HB.01.BLC.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HB.01.BLC.PTST120 Paint
- Stucco/ Specialty Plaster (OI)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.SACS200
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.SACS210
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.SACS220
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.SCRD110
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HB.01.BLC.SIGN160
Installation of Signages
Project: SHBLUD150324 Activity: CN.HB.01.BLC.SIGN260
Installation of Signages
Project: SHBLUD150324 Activity: CN.HB.01.BLC.SPPL100
Plaster (OI)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.TELE200
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.TELE210
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.TELE220
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.01.BLC.WDWK400 Wooden
Work
Project: SHBLUD150324 Activity: CN.HB.01.BSR.ELEC120
Electrical - Final Fix (Lighting, Switches, Rack, Distribution Frame &
Panels) (OI)
Project: SHBLUD150324 Activity: CN.HB.01.BSR.ELEC220
Electrical - Final Fix (Lighting, Switches, DB, SMDB Dressing & Termination)
(OI)
Project: SHBLUD150324 Activity: CN.HB.01.BSR.ELEC320
Electrical - Final Fix (Lighting, Switches, Telephone Rack & Distribution
Frame) (OI)
Project: SHBLUD150324 Activity: CN.HB.01.BSR.ELEC420
Electrical - Final Fix (Cameras, Rack, Distribution Frames & Panels) (OI)
Project: SHBLUD150324 Activity: CN.HB.01.BSR.ELEC520
Electrical - Final Fix (Lighting, Switches, Server Racks & Termination) (OI)
Project: SHBLUD150324 Activity: CN.HB.01.BSR.FALR140 Fire
Alarm 2nd & Final Fix (Wires, Cables & Detectors)
Project: SHBLUD150324 Activity: CN.HB.01.BSR.FALR220 Fire
Alarm 2nd & Final Fix (Wires, Cables & Detectors)
Project: SHBLUD150324 Activity: CN.HB.01.BSR.FALR240 Fire
Alarm 2nd & Final Fix (Wires, Cables & Detectors)
Project: SHBLUD150324 Activity: CN.HB.01.BSR.FALR320 Fire
Alarm 2nd & Final Fix (Wires, Cables & Detectors)
Project: SHBLUD150324 Activity: CN.HB.01.BSR.FALR340 Fire
Alarm 2nd & Final Fix (Wires, Cables & Detectors)
Project: SHBLUD150324 Activity: CN.HB.01.BSR.FALR500 Clean
Agent & Fire Suppression System
Project: SHBLUD150324 Activity: CN.HB.01.BSR.FALR510 Clean
Agent & Fire Suppression System
Project: SHBLUD150324 Activity: CN.HB.01.BSR.FALR520 Clean
Agent & Fire Suppression System
Project: SHBLUD150324 Activity: CN.HB.01.BSR.FALR530 Clean
Agent & Fire Suppression System
Project: SHBLUD150324 Activity: CN.HB.01.BSR.FALR540 Clean
Agent & Fire Suppression System
Project: SHBLUD150324 Activity: CN.HB.01.BWA.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.PLMB100
Plumbing - 1st Fix (Pex Pipes & Accessories)
Project: SHBLUD150324 Activity: CN.HB.01.BWA.SPPL100
Plastering Works
Project: SHBLUD150324 Activity: CN.HB.01.BWA.WAWP110
Waterproofing
Project: SHBLUD150324 Activity: CN.HB.01.BWA.WLTL120 Wall
Tiling
Project: SHBLUD150324 Activity: CN.HB.01.FGR.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.01.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HB.02.BSR.ALMW100
Aluminum & Metal Works
Project: SHBLUD150324 Activity: CN.HB.02.BSR.ELEC120
Electrical - Final Fix (Lights & Switch Socket etc.) (OI)
Project: SHBLUD150324 Activity: CN.HB.02.BSR.ELEC130 LV
Switchgears (DB's, SMDB, Consumer Unit) Installation
Project: SHBLUD150324 Activity: CN.HB.02.BSR.ELEC140
Lighting Control Panel and Sensor Installation
Project: SHBLUD150324 Activity: CN.HB.02.BSR.ELEC150 Bus
Bar Connection
Project: SHBLUD150324 Activity: CN.HB.02.BSR.FLPC110 Floor
Finishes (Polished Concrete, Epoxy, Polyurethane and Antistatic Vinyl Sheet)
Project: SHBLUD150324 Activity: CN.HB.02.BSR.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HB.02.BSR.TELE100 Tel &
IDF System (Containments, Cable Tray Cables & Wires Installation)
Project: SHBLUD150324 Activity: CN.HB.02.BSR.TELE110 ID
Rack Installation (Telecom)
Project: SHBLUD150324 Activity: CN.HB.02.BSR.TELE120 DDC
Panel Installation and Connection (BMS)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.BMSS100 BMS &
Automatic Controls System - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.BMSS110 BMS &
Automatic Controls System - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.BMSS120 BMS &
Automatic Controls System - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.CPFF160
Installation of Carpet
Project: SHBLUD150324 Activity: CN.HB.02.FLC.DRSW110
Drainage & Storm Water - 2nd Fix (Hangers Supports, Piping & Fittings)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HB.02.FLC.FALR100 Fire
Alarm/ Emergency Lighting & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.FALR110 Fire
Alarm/ Emergency Lighting & Detection - 2nd Fix (Wiring)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.FALR120 Fire
Alarm/ Emergency Lighting & Detection - Final Fix (Sensors, Detectors and Exit
Lights)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.02.FLC.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.02.FLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.HVAC100 HVAC -
2nd Fix (Duct, Exhaust Fan and Damper Installation)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.HVAC120 HVAC -
Final Fix Works (Grills, Diffusers, Thermostat)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.HVAC300 HVAC -
2nd Fix (CHW Pipe, FCU Installation and Valve Connection)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.LTCN100
Lighting Control - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.LTCN120
Lighting Control - Final Fix Works (Accessories, Sensors, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.LWCS100 Other
Low Current Systems - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.LWCS120 Other
Low Current Systems - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.MTSK200 Metal
Work Incl. Metal Skirting
Project: SHBLUD150324 Activity: CN.HB.02.FLC.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.PAVA120 PAVA -
Final Fix (Speaker & Accessories)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HB.02.FLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.SIGN160
Installation of Signages
Project: SHBLUD150324 Activity: CN.HB.02.FLC.TELE100
Telecom 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.02.FLC.WDWK400 Wooden
Work
Project: SHBLUD150324 Activity: CN.HB.02.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HB.03.BLC.BMSS100 BMS &
Automatic Controls System - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.BMSS110 BMS &
Automatic Controls System - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.BMSS120 BMS &
Automatic Controls System - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.DRSW110
Drainage & Storm Water - 2nd Fix (Hangers Supports, Piping & Fittings)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HB.03.BLC.FALR100 Fire
Alarm/ Emergency Lighting & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.FALR110 Fire
Alarm/ Emergency Lighting & Detection - 2nd Fix (Wiring)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, FCU Installation and Valve Connection)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.HVAC120 HVAC -
Final Fix Works (Grills, Diffusers, Thermostat)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.HVAC500 HVAC -
2nd Fix (Duct, Exhaust Fan and Damper Installation)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.LTCN100
Lighting Control - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.LTCN120
Lighting Control - Final Fix Works (Accessories, Sensors, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.LWCS100 Other
Low Current Systems - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.TELE100
Telecom 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.03.BLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.03.BSR.ALMW100
Aluminum & Metal Works
Project: SHBLUD150324 Activity: CN.HB.03.BSR.ELEC120
Electrical - Final Fix (Lights & Switch Socket etc.) (OI)
Project: SHBLUD150324 Activity: CN.HB.03.BSR.ELEC130 LV
Switchgears (DB's, SMDB, Consumer Unit) Installation
Project: SHBLUD150324 Activity: CN.HB.03.BSR.ELEC140
Lighting Control Panel and Sensor Installation
Project: SHBLUD150324 Activity: CN.HB.03.BSR.ELEC150 Bus
Bar Connection
Project: SHBLUD150324 Activity: CN.HB.03.BSR.FLPC110 Floor
Finishes (Polished Concrete, Epoxy, Polyurethane and Antistatic Vinyl Sheet)
Project: SHBLUD150324 Activity: CN.HB.03.BSR.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HB.03.BSR.TELE100 Tel &
IDF System (Containments, Cable Tray Cables & Wires Installation)
Project: SHBLUD150324 Activity: CN.HB.03.BSR.TELE110 ID
Rack Installation (Telecom)
Project: SHBLUD150324 Activity: CN.HB.03.BSR.TELE120 DDC
Panel Installation and Connection (BMS)
Project: SHBLUD150324 Activity: CN.HB.03.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HB.04.BLC.BMSS100 BMS &
Automatic Controls System - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.BMSS110 BMS &
Automatic Controls System - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.BMSS120 BMS &
Automatic Controls System - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.DRSW110
Drainage & Storm Water - 2nd Fix (Hangers Supports, Piping & Fittings)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HB.04.BLC.FALR100 Fire
Alarm/ Emergency Lighting & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.FALR110 Fire
Alarm/ Emergency Lighting & Detection - 2nd Fix (Wiring)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.HVAC100 HVAC -
2nd Fix (Duct, Exhaust Fan and Damper Installation)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.HVAC120 HVAC -
Final Fix Works (Grills, Diffusers, Thermostat)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.LTCN100
Lighting Control - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.LTCN120
Lighting Control - Final Fix Works (Accessories, Sensors, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.LWCS100 Other
Low Current Systems - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.TELE100
Telecom 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.04.BLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.04.BSR.ALMW100
Aluminum & Metal Works
Project: SHBLUD150324 Activity: CN.HB.04.BSR.ELEC120
Electrical - Final Fix (Lights & Switch Socket etc.) (OI)
Project: SHBLUD150324 Activity: CN.HB.04.BSR.ELEC130 LV
Switchgears (DB's, SMDB, Consumer Unit) Installation
Project: SHBLUD150324 Activity: CN.HB.04.BSR.ELEC140
Lighting Control Panel and Sensor Installation
Project: SHBLUD150324 Activity: CN.HB.04.BSR.ELEC150 Bus
Bar Connection
Project: SHBLUD150324 Activity: CN.HB.04.BSR.FLPC110 Floor
Finishes (Polished Concrete, Epoxy, Polyurethane and Antistatic Vinyl Sheet)
Project: SHBLUD150324 Activity: CN.HB.04.BSR.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HB.04.BSR.TELE100 Tel &
IDF System (Containments, Cable Tray Cables & Wires Installation)
Project: SHBLUD150324 Activity: CN.HB.04.BSR.TELE110 ID
Rack Installation (Telecom)
Project: SHBLUD150324 Activity: CN.HB.04.BSR.TELE120 DDC
Panel Installation and Connection (BMS)
Project: SHBLUD150324 Activity: CN.HB.04.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HB.05.BSR.ALMW100
Aluminum & Metal Works
Project: SHBLUD150324 Activity: CN.HB.05.BSR.ELEC120
Electrical - Final Fix (Lights & Switch Socket etc.) (OI)
Project: SHBLUD150324 Activity: CN.HB.05.BSR.ELEC130 LV
Switchgears (DB's, SMDB, Consumer Unit) Installation
Project: SHBLUD150324 Activity: CN.HB.05.BSR.ELEC140
Lighting Control Panel and Sensor Installation
Project: SHBLUD150324 Activity: CN.HB.05.BSR.ELEC150 Bus
Bar Connection
Project: SHBLUD150324 Activity: CN.HB.05.BSR.FLPC110 Floor
Finishes (Polished Concrete, Epoxy, Polyurethane and Antistatic Vinyl Sheet)
Project: SHBLUD150324 Activity: CN.HB.05.BSR.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HB.05.BSR.TELE100 Tel &
IDF System (Containments, Cable Tray Cables & Wires Installation)
Project: SHBLUD150324 Activity: CN.HB.05.BSR.TELE110 ID
Rack Installation (Telecom)
Project: SHBLUD150324 Activity: CN.HB.05.BSR.TELE120 DDC
Panel Installation and Connection (BMS)
Project: SHBLUD150324 Activity: CN.HB.05.FLC.BMSS120 BMS &
Automatic Controls System - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.05.FLC.DRSW110
Drainage & Storm Water - 2nd Fix (Hangers Supports, Piping & Fittings)
Project: SHBLUD150324 Activity: CN.HB.05.FLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HB.05.FLC.FALR100 Fire
Alarm/ Emergency Lighting & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.05.FLC.FALR110 Fire
Alarm/ Emergency Lighting & Detection - 2nd Fix (Wiring)
Project: SHBLUD150324 Activity: CN.HB.05.FLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.05.FLC.HVAC120 HVAC -
Final Fix Works (Grills, Diffusers, Thermostat)
Project: SHBLUD150324 Activity: CN.HB.05.FLC.LTCN120
Lighting Control - Final Fix Works (Accessories, Sensors, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.05.FLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HB.05.FLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.05.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HB.06.BSR.ALMW100
Aluminum & Metal Works
Project: SHBLUD150324 Activity: CN.HB.06.BSR.ELEC120
Electrical - Final Fix (Lights & Switch Socket etc.) (OI)
Project: SHBLUD150324 Activity: CN.HB.06.BSR.ELEC130 LV
Switchgears (DB's, SMDB, Consumer Unit) Installation
Project: SHBLUD150324 Activity: CN.HB.06.BSR.ELEC140
Lighting Control Panel and Sensor Installation
Project: SHBLUD150324 Activity: CN.HB.06.BSR.ELEC150 Bus
Bar Connection
Project: SHBLUD150324 Activity: CN.HB.06.BSR.FLPC110 Floor
Finishes (Polished Concrete, Epoxy, Polyurethane and Antistatic Vinyl Sheet)
Project: SHBLUD150324 Activity: CN.HB.06.BSR.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HB.06.BSR.TELE100 Tel &
IDF System (Containments, Cable Tray Cables & Wires Installation)
Project: SHBLUD150324 Activity: CN.HB.06.BSR.TELE110 ID
Rack Installation (Telecom)
Project: SHBLUD150324 Activity: CN.HB.06.BSR.TELE120 DDC
Panel Installation and Connection (BMS)
Project: SHBLUD150324 Activity: CN.HB.06.FLC.BMSS120 BMS &
Automatic Controls System - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.06.FLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HB.06.FLC.HVAC120 HVAC -
Final Fix Works (Grills, Diffusers, Thermostat)
Project: SHBLUD150324 Activity: CN.HB.06.FLC.LTCN120
Lighting Control - Final Fix Works (Accessories, Sensors, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.06.FLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HB.06.FLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.06.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HB.07.BAR.BMS120 DDC
Panel Installation and Connection (BMS)
Project: SHBLUD150324 Activity: CN.HB.07.BAR.DRSW110
Drainage & Storm Water - 2nd Fix (Piping & Fittings)
Project: SHBLUD150324 Activity: CN.HB.07.BAR.ELEC120
Electrical - Light Fittings, Spur Outlet & Isolator Installation
Project: SHBLUD150324 Activity: CN.HB.07.BAR.FALR110 Fire
Alarm Wiring, Sensor and Exit Light Installation
Project: SHBLUD150324 Activity: CN.HB.07.BAR.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.07.BAR.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HB.07.BAR.PAVA120 PAVA
Wiring and Speaker Installation
Project: SHBLUD150324 Activity: CN.HB.07.BAR.SACS110
Security and Access Control Wiring, Devices and CCTV Installation
Project: SHBLUD150324 Activity: CN.HB.07.BAR.TELE110
Telecom Cable Tray, Wiring and GSM Panel Installation
Project: SHBLUD150324 Activity: CN.HB.07.FLC.ALMW100
Aluminum & Metal Works
Project: SHBLUD150324 Activity: CN.HB.07.FLC.BMSS100 BMS &
Automatic Controls System - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.BMSS120 BMS &
Automatic Controls System - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HB.07.FLC.ELEC130 LV
Switchgears (DB's, SMDB, Consumer Unit) Installation
Project: SHBLUD150324 Activity: CN.HB.07.FLC.ELEC140
Lighting Control Panel and Sensor Installation
Project: SHBLUD150324 Activity: CN.HB.07.FLC.ELEC150 Bus
Bar Connection
Project: SHBLUD150324 Activity: CN.HB.07.FLC.FALR100 Fire
Alarm/ Emergency Lighting & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.FALR120 Fire
Alarm/ Emergency Lighting & Detection - Final Fix (Sensors, Detectors and Exit
Lights)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.FLPC110 Floor
Finishes (Polished Concrete, Epoxy, Polyurethane and Antistatic Vinyl Sheet)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.HVAC120 HVAC -
Final Fix Works (Grills, Diffusers, Thermostat)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.LTCN100
Lighting Control - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.LTCN120
Lighting Control - Final Fix Works (Accessories, Sensors, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.LWCS100 Other
Low Current Systems - 1st Fix (Conduits & Boxes)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.LWCS120 Other
Low Current Systems - Final Fix Works (Accessories, Devices, etc.)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.PAVA120 PAVA -
Final Fix (Speaker & Accessories)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HB.07.FLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.TELE100
Telecom 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.07.FLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.EL.PR3.EIFS100 Wall
EIFS System - Parapet
Project: SHBLUD150324 Activity: CN.HB.EL.PR4.ALUM100
Installation of Aluminum Fins, Louvre Fins and Louvres
Project: SHBLUD150324 Activity: CN.HB.EL.PR4.FCTV120
Installation of CCTV - Final Fix
Project: SHBLUD150324 Activity: CN.HB.EL.PR4.FLGT110
Installation of Facade Lighting - Final Fix
Project: SHBLUD150324 Activity: CN.HB.GN.RSR.BMSS100 BMS
Riser Works
Project: SHBLUD150324 Activity: CN.HB.GN.RSR.DRNG100
Drainage GF Riser Works
Project: SHBLUD150324 Activity: CN.HB.GN.RSR.ELEC100
Electrical Cable Tray Riser Works
Project: SHBLUD150324 Activity: CN.HB.GN.RSR.ELEC110
Electrical Cable Pulling Riser Works
Project: SHBLUD150324 Activity: CN.HB.GN.RSR.FRFT100 Fire
Fighting Riser Works
Project: SHBLUD150324 Activity: CN.HB.GN.RSR.HVAC100 HVAC/
CHW Riser Works
Project: SHBLUD150324 Activity: CN.HB.GN.RSR.LWCS110 Other
Low Current Riser Works
Project: SHBLUD150324 Activity: CN.HB.GN.RSR.WTSP100 Water
Supply GF Riser Works
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.BMSS100 BMS -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.LPGW100 LPG -
1st Fix (Supports Inst.)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.LPGW110 LPG -
2nd Fix (LPG Pipes Inst., etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.LPGW120 LPG -
Final Fix (Regulator Panels, Valves & Gas Meters)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.LWCS100 Other
Low Current - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.SCRD110
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.SPPL100
Plastering Works
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.BMSS100 BMS -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.BMSS110 BMS -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.BMSS120 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.ELEC120
Electrical - Final Fix (OI)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.FLFN150 Floor
Finishes (Heavy Duty Polyurethane, Epoxy Coating)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.LTCN100
Lighting Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.LTCN120
Lighting Control - Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.PAVA120 PAVA -
Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.PTFS160 First
Coat Paint
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.PTST120 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.SIGN160
Installation of Signages
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.SPPL100
Plastering Works
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.ELEC200
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.ELEC220
Electrical - Final Fix (Lighting, Switches, DB, SMDB Dressing & Termination)
(OI)
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.ELEC400
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.FALR110 Fire
Alarm 2nd & Final Fix (Wires, Cables & Detectors)
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.FALR210 Fire
Alarm 2nd & Final Fix (Wires, Cables & Detectors)
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.FALR300 Clean
Agent & Fire Suppression System
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.FALR320 Clean
Agent & Fire Suppression System
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.FALR330 Clean
Agent & Fire Suppression System
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.FRFT110 Fire
Fighting 2nd & Final Fix (Pipes & Sprinklers)
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.LWCS120 Time
and Attendance Systems (OI)
Project: SHBLUD150324 Activity: CN.HB.LG.BSR.PTFS160 First
Coat Paint (Acrylic Based Emulsion)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.BMSS100 BMS -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.FLFN150 Floor
Finishes (Heavy Duty Polyurethane, Polished Concrete)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.LWCS100 Other
Low Current - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.PLBM100
Plumbing - 1st Fix (Pex Pipes & Accessories)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.SPPL100
Plastering Works
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.WAWP110
Waterproofing
Project: SHBLUD150324 Activity: CN.HB.LG.BWA.WLTL120 Wall
Tiling
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.FLPC110 Floor
Finishes (Polished Concrete)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.BMSS110 BMS -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.BMSS120 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.FLPC110 Floor
Finishes (Polished Concrete)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.LTCN100
Lighting Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.LTCN120
Lighting Control - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.LWCS120 Other
Low Current Systems - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.MTDR210
Glazing, Blue Metal to Lift Door Transoms, Art Work Etc.
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.MTSK200
Installation of Metal Skirting
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.PAVA120 PAVA
System - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.SIGN160
Installation of Signages
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.FLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.FLPC110 Floor
Finishes (Polished Concrete)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.PLMB100
Plumbing - 1st Fix (Pex Pipes & Accessories)
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.WAWP110
Waterproofing
Project: SHBLUD150324 Activity: CN.HB.LG.FWA.WLTL120 Wall
Tiling
Project: SHBLUD150324 Activity: CN.HB.LG.GNR.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.HB.LG.GNR.THRS110
Threshold
Project: SHBLUD150324 Activity: CN.HB.LG.PC2.DDSH100
Completing Solid Block Dead Shutter for Pile Caps and Ret. Wall Footing
Project: SHBLUD150324 Activity: CN.HB.LG.PC2.SSWP110
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.HB.LG.PC3.DDSH100
Completing Solid Block Dead Shutter for Pile Caps and Ret. Wall Footing
Project: SHBLUD150324 Activity: CN.HB.LG.PC3.SSWP110
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.HB.LG.PT2.CAST140 ADM
Inspection and Concrete Casting of Pile Caps 2000mm Thick
Project: SHBLUD150324 Activity: CN.HB.LG.PT2.DDSH100
Completing Solid Block Dead Shutter for Pile Caps 3.3m Height
Project: SHBLUD150324 Activity: CN.HB.LG.PT2.PMEP130 MEP
Embedment in Pile Caps 09 2000mm Thick
Project: SHBLUD150324 Activity: CN.HB.LG.PT2.REIN120 Steel
Fixing for Pile Caps 09 2000mm Thick
Project: SHBLUD150324 Activity: CN.HB.LG.PT2.REIN150 Lift/
Core Wall Reinforcement 1.6 m Height
Project: SHBLUD150324 Activity: CN.HB.LG.PT2.SSWP110
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.HB.LG.PT3.DDSH100
Completing Solid Block Dead Shutter for Pile Caps 3.3m Height
Project: SHBLUD150324 Activity: CN.HB.LG.PT3.SSWP110
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.HB.TR.ENT.ALST100 Air
Lock Room Steel Structure and Metal Deck
Project: SHBLUD150324 Activity: CN.HB.TR.ENT.CAST100 ADM
Inspection, Reinforcement & Concrete Casting of Air Lock Room
Project: SHBLUD150324 Activity: CN.HB.TR.ROF.ARWL120
Installation of Aircraft Warning Lights
Project: SHBLUD150324 Activity: CN.HB.TR.ROF.CHLW110 HVAC -
2nd Fix (CHW Pipe and Connection)
Project: SHBLUD150324 Activity: CN.HB.TR.ROF.DRSW110
Drainage & Storm Water - 2nd Fix (Piping & Fittings)
Project: SHBLUD150324 Activity: CN.HB.TR.ROF.EFAN120
Extract Fans and Sand Trap and Louver Installation
Project: SHBLUD150324 Activity: CN.HB.TR.ROF.ELEC120
Electrical - Light Fittings, Spur Outlet & Isolator Installation
Project: SHBLUD150324 Activity: CN.HB.TR.ROF.HVAC110 HVAC -
2nd Fix (Duct, Exhaust Fan and Damper Installation)
Project: SHBLUD150324 Activity: CN.HB.TR.ROF.HVAC120 AHU
Installation and Connection
Project: SHBLUD150324 Activity: CN.HB.TR.ROF.WTSP110 Water
Supply (Piping & Connection)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.SCRD110
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.SPPL100
Plastering Works
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.BMSS110 BMS -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.BMSS120 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.ELEC120
Electrical - Final Fix (OI)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.FLFN150 Floor
Finishes (Heavy Duty Polyurethane, Epoxy Coating)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.LTCN100
Lighting Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.LTCN120
Lighting Control - Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.LWCS120 Other
Low Current Systems - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.PAVA120 PAVA
System - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.PTST120 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.SIGN160
Installation of Signages
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.SPPL100
Plastering Works
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.BLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.UG.BSR.ELEC120
Electrical - Final Fix (Lighting, Switches, Telephone Rack & Distribution
Frame) (OI)
Project: SHBLUD150324 Activity: CN.HB.UG.BSR.ELEC220
Electrical - Final Fix (Lighting, Switches, DB, SMDB Dressing & Termination)
(OI)
Project: SHBLUD150324 Activity: CN.HB.UG.BSR.FALR140 Fire
Alarm 2nd & Final Fix (Wires, Cables & Detectors)
Project: SHBLUD150324 Activity: CN.HB.UG.BSR.FALR210 Fire
Alarm 2nd & Final Fix (Wires, Cables & Detectors)
Project: SHBLUD150324 Activity: CN.HB.UG.BSR.FALR400 Clean
Agent & Fire Suppression System
Project: SHBLUD150324 Activity: CN.HB.UG.BSR.FALR410 Clean
Agent & Fire Suppression System
Project: SHBLUD150324 Activity: CN.HB.UG.BSR.PTFS160 First
Coat Paint (Acrylic Based Emulsion)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.BMSS120 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.CBPT160
Installation of Cubicle Partitions and Doors - Wooden
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.ELEC120
Electrical - Final Fix (OI)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.FLFN150 Floor
Finishes (Heavy Duty Polyurethane, Polished Concrete)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.LWCS100 Other
Low Current Systems - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.LWCS120 Other
Low Current Systems - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.PAVA120 PAVA -
Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.PLBM120
Plumbing - Final Fix
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.PLMB100
Plumbing - 1st Fix (Pex Pipes & Accessories)
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.SPPL100
Plastering Works
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.WAWP110
Waterproofing
Project: SHBLUD150324 Activity: CN.HB.UG.BWA.WLTL120 Wall
Tiling
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.FLPC110 Floor
Finishes (Polished Concrete)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.FRCT100
Installation of Fire Curtain
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.PAVA100 PAVA -
1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.PTST120 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.BMSS110 BMS -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.BMSS120 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.EPXY150 Floor
Finishes (Epoxy, Polished Concrete)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.FFEW100 FF & E
(Furniture, Fabric/ Sheer, Curtain)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.JNRY100 Book
Shelf, LED Screen, Metal Screen, Joinery Etc.
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.LTCN100
Lighting Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.LTCN110
Lighting Control - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.LTCN120
Lighting Control - Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.LWCS120 Other
Low Current Systems - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.MTSK200
Installation of Metal Skirting
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.PAVA120 PAVA
System - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.PLST120
Plaster -all Types
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.PTST120 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.SACS100
Security and Access Control - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.SIGN160
Installation of Signages
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.FLC.TELE120
Telecom - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.BMSS100 BMS -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.BMSS110 BMS -
2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.BMSS120 BMS -
Final Fix (Sensors & Devices)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.CBPT160
Installation of Cubicle Partitions and Doors - Wooden
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.CPFF160
Installation of Carpet
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.ELEC120
Electrical - Final Fix
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.FLPC110 Floor
Finishes (Polished Concrete)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.LWCS100 Other
Low Current Systems - 1st Fix (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.LWCS120 Other
Low Current Systems - Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.PAVA120 PAVA -
Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.PLBM120
Plumbing - Final Fix
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.PLMB100
Plumbing - 1st Fix (Pex Pipes & Accessories)
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.WAWP110
Waterproofing
Project: SHBLUD150324 Activity: CN.HB.UG.FWA.WLTL120 Wall
Tiling
Project: SHBLUD150324 Activity: CN.HB.UG.GNR.THRS110
Threshold
Project: SHBLUD150324 Activity: CN.HB.VT.PL1.MRIN120
Machine-rooms Installations - HPL1
Project: SHBLUD150324 Activity: CN.HB.VT.PL2.MRIN120
Machine-rooms Installations - HPL2
Project: SHBLUD150324 Activity: CN.HB.VT.PL3.MRIN120
Machine-rooms Installations - HPL3
Project: SHBLUD150324 Activity: CN.HB.VT.SL4.BGRL130
Brackets and Guide Rails - HSL4
Project: SHBLUD150324 Activity: CN.HB.VT.SL4.CBAS150 Cabins
Assembly - HSL4
Project: SHBLUD150324 Activity: CN.HB.VT.SL4.CBFL160 Cabins
Flooring: Civil - HSL4
Project: SHBLUD150324 Activity: CN.HB.VT.SL4.CRMH170
Cabling, Roping, and Mechanical - HSL4
Project: SHBLUD150324 Activity: CN.HB.VT.SL4.FLET140 Floor
Entrances - HSL4
Project: SHBLUD150324 Activity: CN.HB.VT.SL4.LTSP110 Lift
Shaft Preparation, Lighting, and Safety - HSL4
Project: SHBLUD150324 Activity: CN.HB.VT.SL4.MRIN120
Machine-rooms Installations - HSL4
Project: SHBLUD150324 Activity: CN.HB.VT.SPS.SKRT100 Wooden
Flooring and Skirting - Spiral Staircase (LGF-UGF)
Project: SHBLUD150324 Activity: CN.HB.VT.SPS.SPRL100 Floor
Mounted Railing - Spiral Staircase (LGF-UGF)
Project: SHBLUD150324 Activity: CN.HB.VT.STA.EPXY120 Epoxy
Resin Flooring - Staircase A (LGF-L7)
Project: SHBLUD150324 Activity: CN.HB.VT.STA.PLST100 Wall
Plaster - Staircase A (LGF-L7)
Project: SHBLUD150324 Activity: CN.HB.VT.STA.PTFC140
Acrylic System to Wall - Final Coat - Staircase A (LGF-L7)
Project: SHBLUD150324 Activity: CN.HB.VT.STA.PTIC110
Acrylic System to Walls - Initial Coat - Staircase A (LGF-L7)
Project: SHBLUD150324 Activity: CN.HB.VT.STA.STHR130 Steel
Handrail - Staircase A (LGF-L7)
Project: SHBLUD150324 Activity: CN.HB.VT.STB.EPXY120 Epoxy
Resin Flooring - Staircase B (LGF-L7)
Project: SHBLUD150324 Activity: CN.HB.VT.STB.PLST100 Wall
Plaster - Staircase B (LGF-L7)
Project: SHBLUD150324 Activity: CN.HB.VT.STB.PTFC140
Acrylic System to Wall - Final Coat - Staircase B (LGF-L7)
Project: SHBLUD150324 Activity: CN.HB.VT.STB.PTIC110
Acrylic System to Walls - Initial Coat - Staircase B (LGF-L7)
Project: SHBLUD150324 Activity: CN.HB.VT.STB.STHR130 Steel
Handrail - Staircase B (LGF-L7)
Project: SHBLUD150324 Activity: CN.HB.VT.STR.EPXY120 Epoxy
Resin Flooring - Staircase (LGF-UGF)
Project: SHBLUD150324 Activity: CN.HB.VT.STR.PLST100 Wall
Plaster - Staircase (LGF-UGF)
Project: SHBLUD150324 Activity: CN.HB.VT.STR.PTFC140
Acrylic System to Wall - Final Coat - Staircase (LGF-UGF)
Project: SHBLUD150324 Activity: CN.HB.VT.STR.PTIC110
Acrylic System to Walls - Initial Coat - Staircase (LGF-UGF)
Project: SHBLUD150324 Activity: CN.HB.VT.STR.STHR130 Steel
Handrail - Staircase (LGF-UGF)
Project: SHBLUD150324 Activity: CN.HC.01.EXT.STPG100
Structural Steel Works for External Shade/ Pergola
Project: SHBLUD150324 Activity: CN.HC.01.ROF.ALLU160
Installation of Aluminum Louvre Fins and Louvre Windows
Project: SHBLUD150324 Activity: CN.HC.01.ROF.CAST110 MEP
Foundations and Clearance for Waterproofing System
Project: SHBLUD150324 Activity: CN.HC.01.ROF.ELEC100
Electrical - 1st Fix - Wall (GI Conduits, GI Boxes, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HC.01.ROF.ELEC120
Electrical - Final Fix (Isolators, Light Fitting, WA & Dressing &
Termination)
Project: SHBLUD150324 Activity: CN.HC.01.ROF.FRFT100 Fire
Fighting - 2nd Fix (Risers Pipes & Fittings)
Project: SHBLUD150324 Activity: CN.HC.01.ROF.FRFT110 Fire
Fighting - Final Fix (FHC))
Project: SHBLUD150324 Activity: CN.HC.01.ROF.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, Dampers, Sound Attenuators etc.)
Project: SHBLUD150324 Activity: CN.HC.01.ROF.HVAC120 HVAC -
Final Fix (Equipment's - Extract Fans, Ahus, Fahus, Mahus)
Project: SHBLUD150324 Activity: CN.HC.01.ROF.PLBM110
Plumbing - 2nd Fix (Pipes, Valves & Fittings)
Project: SHBLUD150324 Activity: CN.HC.01.ROF.PLBM120
Plumbing - Final Fix
Project: SHBLUD150324 Activity: CN.HC.01.ROF.RFGR170
Installation of Roof Grating
Project: SHBLUD150324 Activity: CN.HC.01.ROF.RFWP140 Roof
PU Waterproofing System
Project: SHBLUD150324 Activity: CN.HC.01.ROF.RNFN160 Render
Finish
Project: SHBLUD150324 Activity: CN.HC.01.ROF.STLH410
Structural Steel Works for Stud Wall Framing System - Horizontal
Project: SHBLUD150324 Activity: CN.HC.01.ROF.STLV400
Structural Steel Works for Stud Wall Framing System - Verticals
Project: SHBLUD150324 Activity: CN.HC.01.ROF.STRL100
Installation of Steel Railing
Project: SHBLUD150324 Activity: CN.HC.01.ROF.SWFS150 Stud
Wall Framing System
Project: SHBLUD150324 Activity: CN.HC.EL.PR1.CMEP100 MEP
Clearance for Facade Works
Project: SHBLUD150324 Activity: CN.HC.EL.PR1.GFRC100
Installation of Brackets
Project: SHBLUD150324 Activity: CN.HC.EL.PR1.GFRC110
Installation of Supporting Framing
Project: SHBLUD150324 Activity: CN.HC.EL.PR1.GFRC120
Thermal Insulation
Project: SHBLUD150324 Activity: CN.HC.EL.PR1.GFRC130 GFRC
Cladding
Project: SHBLUD150324 Activity: CN.HC.EL.PR1.ITAS100
Installation of Facade Temporary Access System
Project: SHBLUD150324 Activity: CN.HC.EL.PR1.MTDR100
Installation of Metal Doors
Project: SHBLUD150324 Activity: CN.HC.EL.PR1.RTAS120
Removal of Facade Temporary Access System
Project: SHBLUD150324 Activity: CN.HC.EL.PR1.SPDP110
Surface Preparation and Damp Proofing
Project: SHBLUD150324 Activity: CN.HC.EL.PR2.MTDR100
Installation of Metal Doors
Project: SHBLUD150324 Activity: CN.HC.EL.PR3.ALUM140
Installation of Pergolas/ Cladding/ Aluminum Works for External Pergola (OI)
Project: SHBLUD150324 Activity: CN.HC.EL.PR3.CMEP100 MEP
Clearance for Facade Works
Project: SHBLUD150324 Activity: CN.HC.EL.PR3.GFRC100
Installation of Brackets
Project: SHBLUD150324 Activity: CN.HC.EL.PR3.GFRC110
Installation of Supporting Framing
Project: SHBLUD150324 Activity: CN.HC.EL.PR3.GFRC120
Thermal Insulation
Project: SHBLUD150324 Activity: CN.HC.EL.PR3.GFRC130 GFRC
Cladding
Project: SHBLUD150324 Activity: CN.HC.EL.PR3.GFRC140 GFRC
Cladding - Coping and Signage Panels
Project: SHBLUD150324 Activity: CN.HC.EL.PR3.GFRC150
Grouting/ Sealants Caulking
Project: SHBLUD150324 Activity: CN.HC.EL.PR3.ITAS100
Installation of Facade Temporary Access System
Project: SHBLUD150324 Activity: CN.HC.EL.PR3.MTDR100
Installation of Metal Doors
Project: SHBLUD150324 Activity: CN.HC.EL.PR3.RTAS120
Removal of Facade Temporary Access System
Project: SHBLUD150324 Activity: CN.HC.EL.PR3.SPDP110
Surface Preparation and Damp Proofing
Project: SHBLUD150324 Activity: CN.HC.EL.PR4.ALUM140
Installation of Pergolas/ Cladding/ Aluminum Works for External Pergola
Project: SHBLUD150324 Activity: CN.HC.EL.PR4.RTAS120
Removal of Facade Temporary Access System
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.DOOR100
Installation of Doors
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.ELEC120
Electrical - Final Fix (Light Fitting, WA & Dressing & Termination) (OI)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.FLFN150 Floor
Finishes (Heavy Duty Polyurethane, Polished Concrete)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguishers/ FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.PAVA120 PAVA -
Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.PTST120 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.SCRD110
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HC.LG.BDA.TELE120
Telecom - Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.ELEC120
Electrical - Final Fix (Light Fitting, WA & Dressing & Termination) (OI)
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.FLFN150 Floor
Finishes (Heavy Duty Polyurethane, Epoxy Coating)
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.PTST120 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HC.LG.BLC.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.ALMW100
Aluminum & Metal Works
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.ELEC120
Electrical - Final Fix (Light Fitting, WA & Dressing & Termination) (OI)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.EPXY120 Floor
Coating (Epoxy/ Sealant on Smooth Substrate and Flush Joint)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.LWCS120 Other
Low Current Systems - Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.MEPW100 MEP
Works
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.PAVA120 PAVA -
Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.PTST120 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HC.LG.BSR.WAWP110
Waterproofing/ Screed
Project: SHBLUD150324 Activity: CN.HC.LG.BWA.ELEC120
Electrical - Final Fix (Light Fitting, WA & Dressing & Termination) (OI)
Project: SHBLUD150324 Activity: CN.HC.LG.BWA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HC.LG.BWA.FLFN150 Floor
Finishes (Heavy Duty Polyurethane, Polished Concrete)
Project: SHBLUD150324 Activity: CN.HC.LG.BWA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HC.LG.BWA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HC.LG.BWA.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HC.LG.BWA.KTEQ160
Kitchen Equipment Installations (OI)
Project: SHBLUD150324 Activity: CN.HC.LG.BWA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HC.LG.BWA.PLBM120
Plumbing - Final Fix
Project: SHBLUD150324 Activity: CN.HC.LG.BWA.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HC.LG.BWA.WAWP110
Waterproofing
Project: SHBLUD150324 Activity: CN.HC.LG.BWA.WLTL120 Wall
Tiling
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.ELEC120
Electrical - Final Fix (Light Fitting, WA & Dressing & Termination)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.FLPC110 Floor
Finishes (Polished Concrete)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.LWCS100 Other
Low Current Systems - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.LWCS120 Other
Low Current Systems - Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.PAVA120 PAVA -
Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.PRTN100 BIFOLD
PARTITION Installations
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.SACS100
Security and Access Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.TELE120
Telecom - Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HC.LG.FDA.WAWP110
Waterproofing
Project: SHBLUD150324 Activity: CN.HC.LG.PC4.BKFL150
Backfill Around Block Masonry to Reach Tie Slab Level
Project: SHBLUD150324 Activity: CN.HC.LG.PC4.CAST140 ADM
Inspection and Concrete Casting of Pile Caps
Project: SHBLUD150324 Activity: CN.HC.LG.PC4.DSHT200
Completing Block Shuttering for Pile Caps
Project: SHBLUD150324 Activity: CN.HC.LG.PC4.PMEP130 MEP
Embedment in Pile Caps
Project: SHBLUD150324 Activity: CN.HC.LG.PC4.REIN120 Steel
Fixing for Pile Caps
Project: SHBLUD150324 Activity: CN.HC.LG.PC4.SSWP110
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.HC.LG.TS4.ANTR120 Anti-
termite Treatment and PCC Below Tie Slab
Project: SHBLUD150324 Activity: CN.HC.LG.TS4.CAST130
Casting of Tie Slab
Project: SHBLUD150324 Activity: CN.HC.LG.TS4.ERWK110
Earthworks, Leveling & Compaction for Tie Slab
Project: SHBLUD150324 Activity: CN.HC.LG.TS4.REIN120 Steel
Fixing, Inserting MEP Embedment for Tie Slab
Project: SHBLUD150324 Activity: CN.HC.LG.TS4.SSWP110
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.HC.LG.TS4.TMEP100 MEP
Works Below Tie Slab
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.CPFF160
Installation of Carpet
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.DOOR100
Installation of Doors
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.ELEC120
Electrical - Final Fix (Light Fitting, WA & Dressing & Termination)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.LWCS100 Other
Low Current Systems - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.LWCS120 Other
Low Current Systems - Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.MEPW100 MEP
Works
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.PAVA120 PAVA -
Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.SACS100
Security and Access Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.SACS110
Security and Access Control - 2nd Fix (Wiring, etc.)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.SCRD110
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.SPPL100
Specialty Plaster Works
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.TELE120
Telecom - Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HC.UG.MTR.WLFN100
Foldable Acoustic Wall
Project: SHBLUD150324 Activity: CN.HC.UG.ROF.ACHT180
Installation of Access Hatch
Project: SHBLUD150324 Activity: CN.HC.UG.ROF.RFWP140 Roof
PU Waterproofing System
Project: SHBLUD150324 Activity: CN.HC.UG.ROF.SMAL120
Installation of Steel Metal Access Ladder/ s & Stair Bridges
Project: SHBLUD150324 Activity: CN.HG.EL.PR1.ALUM140
Installation of Pergolas/ Cladding/ Aluminum Works for External Pergola (OI)
Project: SHBLUD150324 Activity: CN.HG.EL.PR1.CMEP100 MEP
Clearance for Facade Works
Project: SHBLUD150324 Activity: CN.HG.EL.PR1.GFRC100
Installation of Brackets
Project: SHBLUD150324 Activity: CN.HG.EL.PR1.GFRC110
Installation of Supporting Framing
Project: SHBLUD150324 Activity: CN.HG.EL.PR1.GFRC120
Thermal Insulation
Project: SHBLUD150324 Activity: CN.HG.EL.PR1.GFRC130 GFRC
Cladding
Project: SHBLUD150324 Activity: CN.HG.EL.PR1.ITAS100
Installation of Facade Temporary Access System
Project: SHBLUD150324 Activity: CN.HG.EL.PR1.SPDP110
Surface Preparation and Damp Proofing
Project: SHBLUD150324 Activity: CN.HG.EL.PR2.CMEP100 MEP
Clearance for Facade Works
Project: SHBLUD150324 Activity: CN.HG.EL.PR2.GFRC100
Installation of Brackets
Project: SHBLUD150324 Activity: CN.HG.EL.PR2.GFRC110
Installation of Supporting Framing
Project: SHBLUD150324 Activity: CN.HG.EL.PR2.GFRC120
Thermal Insulation
Project: SHBLUD150324 Activity: CN.HG.EL.PR2.GFRC130 GFRC
Cladding
Project: SHBLUD150324 Activity: CN.HG.EL.PR2.ITAS100
Installation of Facade Temporary Access System
Project: SHBLUD150324 Activity: CN.HG.EL.PR2.MTDR100
Installation of Metal Doors
Project: SHBLUD150324 Activity: CN.HG.EL.PR2.SPDP110
Surface Preparation and Damp Proofing
Project: SHBLUD150324 Activity: CN.HG.EL.PR3.ALUM140
Installation of Pergolas/ Cladding/ Aluminum Works for External Pergola
Project: SHBLUD150324 Activity: CN.HG.EL.PR3.CMEP100 MEP
Clearance for Facade Works
Project: SHBLUD150324 Activity: CN.HG.EL.PR3.GFRC100
Installation of Brackets
Project: SHBLUD150324 Activity: CN.HG.EL.PR3.GFRC110
Installation of Supporting Framing
Project: SHBLUD150324 Activity: CN.HG.EL.PR3.GFRC120
Thermal Insulation
Project: SHBLUD150324 Activity: CN.HG.EL.PR3.GFRC130 GFRC
Cladding
Project: SHBLUD150324 Activity: CN.HG.EL.PR3.ITAS100
Installation of Facade Temporary Access System
Project: SHBLUD150324 Activity: CN.HG.EL.PR3.MTDR100
Installation of Metal Doors
Project: SHBLUD150324 Activity: CN.HG.EL.PR3.SPDP110
Surface Preparation and Damp Proofing
Project: SHBLUD150324 Activity: CN.HG.EL.PR4.ALUM140
Installation of Pergolas/ Cladding/ Aluminum Works for External Pergola
Project: SHBLUD150324 Activity: CN.HG.EL.PR4.MTDR100
Installation of Metal Doors
Project: SHBLUD150324 Activity: CN.HG.LG.PLC.DDSH100
Completing Solid Block Dead Shutter for Pile Caps and Pool Walls (1.4m)
Project: SHBLUD150324 Activity: CN.HG.LG.PLC.SSWP110
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.HG.RF.ROF.ACHT180
Installation of Access Hatch
Project: SHBLUD150324 Activity: CN.HG.RF.ROF.ALLU160
Installation of Aluminum Louvre Fins and Louvre Windows
Project: SHBLUD150324 Activity: CN.HG.RF.ROF.ELEC100
Electrical - 1st Fix - Wall (GI Conduits, GI Boxes, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HG.RF.ROF.ELEC120
Electrical - Final Fix (Isolators, Light Fitting, WA & Dressing &
Termination)
Project: SHBLUD150324 Activity: CN.HG.RF.ROF.FRFT100 Fire
Fighting - 2nd Fix (Risers Pipes & Fittings)
Project: SHBLUD150324 Activity: CN.HG.RF.ROF.FRFT110 Fire
Fighting - Final Fix (FHC))
Project: SHBLUD150324 Activity: CN.HG.RF.ROF.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, Dampers, Sound Attenuators etc.)
Project: SHBLUD150324 Activity: CN.HG.RF.ROF.HVAC120 HVAC -
Final Fix (Equipment's - Extract Fans, Ahus, Fahus, Mahus)
Project: SHBLUD150324 Activity: CN.HG.RF.ROF.PLBM110
Plumbing - 2nd Fix (Pipes, Valves & Fittings)
Project: SHBLUD150324 Activity: CN.HG.RF.ROF.PLBM120
Plumbing - Final Fix
Project: SHBLUD150324 Activity: CN.HG.RF.ROF.RFGR170
Installation of Roof Grating
Project: SHBLUD150324 Activity: CN.HG.RF.ROF.RNFN160 Render
Finish
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.ALMW100
Aluminum & Metal Works
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.ELEC120
Electrical - Final Fix (Light Fitting, WA & Dressing & Termination) (OI)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.EPXY120 Floor
Coating (Epoxy/ Sealant on Smooth Substrate and Flush Joint)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.FCCL140 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.FLFN150 Floor
Finishes (Heavy Duty Polyurethane, Epoxy Coating)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.MTAL300 Metal
Works
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.PAVA120 PAVA -
Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.PBCB140
Plasterboard Ceiling
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.PINT130 Paint
- Color Coat
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.PINT150
Plasterboard Ceiling Paint
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.PLST100
Plastering Works
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.PTPR110 Primer
Coat
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.PTST120 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.SCRD110
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.SIGN160
Installation of Signages
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.TELE120
Telecom - Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HG.UG.BDA.WAWP110
Waterproofing/ Screed
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.CNTR520 Spa
Reception Counters
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.FFAE170
Installation of FF&E
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.GLAZ610
Glazing Works
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.GLDR530
Installation of Doors - Glass & Metal
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.LCKR510
Lockers Works
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.LWCS100 Other
Low Current Systems - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.MIRR500
Mirrors
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.MTAL300 Metal
Works
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.SACS100
Security and Access Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.STBD100 Spa
Stone Bed
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.STLS600
Stainless Steel Works
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.TMWL710 Timber
Wall Finishes
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.VNFL130 Vinyl
Floor Works
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.VNWL710 Veneer
Finishes
Project: SHBLUD150324 Activity: CN.HG.UG.FDA.WDPL300
Acoustic Wood Panel
Project: SHBLUD150324 Activity: CN.HG.UG.FLC.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HG.UG.FLC.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FLC.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HG.UG.FLC.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HG.UG.FLC.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HG.UG.FLC.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FLC.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HG.UG.FLC.SACS100
Security and Access Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FLC.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.HG.UG.FLC.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FLC.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.ACPL200
Acoustic Plaster (Ceiling)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.ACPT210
Acoustic Plaster Ceiling Paint
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.ELEC120
Electrical - Final Fix (Light Fitting, WA & Dressing & Termination)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.EPCL100 Epoxy
Plaster Ceiling
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.EPXY150 Floor
Finishes (Epoxy Coating)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.FFAE170
Installation of FF&E
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.FRFT100 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.FRFT110 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.GLDR530
Installation of Doors - Glass & Metal
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.LWCS100 Other
Low Current Systems - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.LWCS110 Other
Low Current Systems - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.LWCS120 Other
Low Current Systems - Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.MIRR500
Installation of Mirrors
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.MTAL300 Chrome
Metal Works
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.PAVA100 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.PAVA110 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.PAVA120 PAVA -
Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.PINT150
Ceiling Paint
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.PLBM120
Plumbing - Final Fix
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.PLCB140
Plaster Board Ceiling
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.SCRD110
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.SKRT160
Installation of Skirting
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.SNFL120 Stone
Tiles
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.SNFL130 Mosaic
Tiles
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.STCL120 Stone
Ceiling
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.TELE120
Telecom - Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.HG.UG.FWA.TMCL110 Timber
Ceiling
Project: SHBLUD150324 Activity: CN.HG.UG.SLB.CAST110
Reinforcement and Concreting
Project: SHBLUD150324 Activity: CN.HG.UG.SLB.MLDK100
Structural Steel Stairs and Metal Deck Installation
Project: SHBLUD150324 Activity: CN.HG.UG.SLB.STLH410
Structural Steel Works for Stud Wall Framing System - Horizontal
Project: SHBLUD150324 Activity: CN.HG.UG.SLB.STLV400
Structural Steel Works for Stud Wall Framing System - Verticals
Project: SHBLUD150324 Activity: CN.HG.UG.SLB.STPG100
Structural Steel Works for External Shade/ Pergola
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.FFAE170
Installation of FF&E
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.PLBM120
Plumbing - Final Fix
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.PNT320
Acrylic Based Emulsion Paint
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.PTPR120 Primer
Works
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.PTST140 Stucco
1&2 Works
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.SACS100
Security and Access Control - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.SACS120
Security and Access Control - Final Fix (Card Reader, CCTV, Accessories,
etc.)
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.SCRD110
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.SKR330
Installation of Skirting
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.TELE100
Telecom - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.TELE110
Telecom - 2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: CN.PB.GF.BDA.TELE120
Telecom - Final Fix (Devices, Accessories & Panels)
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.ALCL340
Aluminum Cladding
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.CNTR520 Timber
Counter
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.EIFS330 EIFS
Facade System
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.ELEC100
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.ELEC110
Electrical - 2nd Fix (/ Trunking, Wires, Cables)
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.ELEC120
Electrical - Final Fix (Light Fitting, WA & Dressing & Termination)
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.FALR100 Fire
Alarm/ CBS & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.FALR110 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.FALR120 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.FCCL310 False
Ceiling Closing Works
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.FCSP130 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.FFAE170
Installation of FF&E
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.HDPL410 Heavy
Duty Polyurethane
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.HVAC100 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.HVAC120 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.JNRY160
Joinery Works
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.MTAL300 Metal
Works
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.PLBM110
Plumbing - 2nd Fix (Hangers, Supports, Pipes, Valves, Water Heater)
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.PLBM120
Plumbing - Final Fix
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.SCRD110
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.SKRT320
Installation of Skirting
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.SPPL100
Specialty Plaster
Project: SHBLUD150324 Activity: CN.PB.GF.FWA.WLTL400
Installation of Wall Tiles
Project: SHBLUD150324 Activity: CN.PB.GF.GNR.BMSN100 Block
Masonry
Project: SHBLUD150324 Activity: CN.PB.GF.SLB.DSHT200 De-
shutter and Back Propping @ +7.6
Project: SHBLUD150324 Activity: CN.PB.RF.ROF.ALCL100
Installation of Aluminum Cladding
Project: SHBLUD150324 Activity: CN.PB.RF.ROF.ALCL110
Installation of Louvers
Project: SHBLUD150324 Activity: CN.PB.RF.ROF.STSS300 Pool
Bar Building - Structural Steel Works
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.ACHT250 Access
Hatch Door
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.BMSN100 Block
Masonry
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.FLFN140 Sealer
on Smooth Surfaces and Flush Joint- Ceiling of Pool Plant
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.FLFN160 Sealer
on Smooth Surfaces and Flush Joint- Wall of Pool Plant
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.FLFN170
Cementitious Mortar Slurry for Waterproofing- Walls of Balance Tanks
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.FLFN180
Sealant on Smooth Substrate and Flush Joints - Floor of Pool Plant
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.FLFN190
Skirting - Pool Plant
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.FLFN200
Cementitious Mortar Slurry for Waterproofing- Floor of Balance Tanks
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.FRFT100
Installation of Sprinkler Pipes and Fittings
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.FRFT110
Droppers and Sprinklers Installation
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.GRPL240 GRP
Ladder
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.HNRL230 Wall
Mounted Stair Handrail
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.HVAC100
Installation of Ducts/ Fcu's
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.HVAC110
Installation of CHW Pipes and Fittings
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.HVAC120
Insulation for HVAC Ducts and Chilled Water Pipes
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.LTPW100
Installation of GI Conduits and Wires
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.LTPW110
Installation of Light Fittings and Wiring Accessories
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.MTDR130 Metal
Doors
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.PLMB100
Installation of Pumps/ Controller
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.PLMB110
Installation of WS Pipes and Fittings
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.PLMB120
Installation of Condensate Drain Pipes and Fittings
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.PLST110
Plaster Work (Ceiling and Wall)
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.SCRD120
Preparation and Floor Screed
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.STTL220
Porcelain Tile for Stairs
Project: SHBLUD150324 Activity: CN.PP.BS.BSM.WLFN210 Epoxy
Paint to Wall
Project: SHBLUD150324 Activity: CN.PP.BS.CWL.CAST130
Concrete Casting of Walls (Incl. Around Stair)
Project: SHBLUD150324 Activity: CN.PP.BS.CWL.MEPE110 MEP
Embedment in Walls (Incl. Around Stair)
Project: SHBLUD150324 Activity: CN.PP.BS.CWL.REIN100 Steel
Fixing for Walls (Incl. Around Stair)
Project: SHBLUD150324 Activity: CN.PP.BS.CWL.SHTR120
Shuttering for Walls (Incl. Around Stair)
Project: SHBLUD150324 Activity: CN.PP.BS.SLB.CAST140 ADM
Inspection and Concrete Casting of Slab & Stairs
Project: SHBLUD150324 Activity: CN.PP.BS.SLB.DSHT200 De-
shutter and Back Propping
Project: SHBLUD150324 Activity: CN.PP.BS.SLB.MSLB130 MEP
Embedment in Slab & Stairs
Project: SHBLUD150324 Activity: CN.PP.BS.SLB.REIN110 Steel
Fixing for Slab & Stairs
Project: SHBLUD150324 Activity: CN.PP.BS.SLB.SHTR100
Scaffolding, Shuttering for Slab & Stairs
Project: SHBLUD150324 Activity: CN.PP.FN.RFT.ANTR120 Anti-
termite Treatment Below Raft
Project: SHBLUD150324 Activity: CN.PP.FN.RFT.CAST170 ADM
Inspection and Concrete Casting of Raft
Project: SHBLUD150324 Activity: CN.PP.FN.RFT.EXCA100
Excavation and Pile Head Trimming
Project: SHBLUD150324 Activity: CN.PP.FN.RFT.LLCM110
Leveling, Compaction for Raft (500mm and 1000mm Thick)
Project: SHBLUD150324 Activity: CN.PP.FN.RFT.MEPE160 MEP
Embedment in Raft
Project: SHBLUD150324 Activity: CN.PP.FN.RFT.PPCW130 PCC
for Raft
Project: SHBLUD150324 Activity: CN.PP.FN.RFT.REIN150 Steel
Fixing for Raft
Project: SHBLUD150324 Activity: CN.PP.FN.RFT.SHTR140
Shuttering Around Raft
Project: SHBLUD150324 Activity: CN.PP.FN.RFT.SSWP110
Waterproofing Horizontal and Vertical Incl. Protection Screed
Project: SHBLUD150324 Activity: CN.PP.RF.ROF.RFWP100
Waterproofing System to Walls and Roof
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.BMSN100 Block
Masonry
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.ELEC100 MEP -
1st Fix Wall Conduiting & DB Back Box Fixing (Clearance to Start Plaster Works)
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.ELEC110
Electrical - 2nd Fix (Cable Tray, Trunking, Wires, Cables)
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.ELEC120 MEP
Cable Pulling
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.ELEC130 Mep-
electrical Db's Dressing & Cable Termination
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.ELEC140 Mep-
light Fittings Installation (Final Fix)
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.ELEC150 Mep-
electrical Wiring Accessories, (Final Fix)
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.EMLS100 MEP-
Conduits & Trunking Installation
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.EMLS110 MEP-
Wiring for SMATV System
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.EMLS120 Mep-
installation of SMATV Devices
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.EPXY120 Epoxy
Flooring
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.FRFT100
Installation of Fire Fighting Pipes & Branches
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.FRFT110 Fire
Fighting Pipe Droppers
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.FRFT120
Installation of Fire Fighting Pumps
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.FRFT130
Sprinklers Installation
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.FRFT140 Fire
Extinguishers & Cabinets
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.FRFT150 Fire
Fighting Valves & Assembly
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.FRFT160
Testing of Fire Fighting Pipes
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.LWCS100 MEP-
Conduits & Trunking Installation
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.LWCS110 MEP-
Wiring for Fire Alarm & Central Battery
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.LWCS120 Mep-
installation of Fire Alarm Devices & Panels
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.PLMB100
Drainage Pipe Installation and Testing
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.PLMB110 Water
Supply Pipe Installation, Testing and Connection
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.PLMB120
Irrigation & Domestic Pumps Installation and Connection
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.PTFC120 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.PTFS120 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.PTPR110 Primer
Coating
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.SQSY100 MEP-
Conduits & Trunking Installation
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.SQSY110 MEP-
Wiring for Security System
Project: SHBLUD150324 Activity: CN.UB.BS.PRM.SQSY120 Mep-
installation of Cameras
Project: SHBLUD150324 Activity: CN.UB.BS.RFT.EXCA100
Excavation and Pile Head Trimming
Project: SHBLUD150324 Activity: CN.UB.EL.ELE.ALDR100
Installation of Doors
Project: SHBLUD150324 Activity: CN.UB.EL.ELE.GFRC130 GFRC
Cladding
Project: SHBLUD150324 Activity: CN.UB.EL.ELE.GFRC140
Installation of Aluminum Windows/ Glazing
Project: SHBLUD150324 Activity: CN.UB.EL.ELE.GFRC150
Grouting/ Sealants Caulking
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.ALDR170
Install Double Lead Aluminum Doors
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.ALDR180
Install Aluminum Louver Doors
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.BMSN100 Block
Masonry (Internal and External)
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.ELEC100
Install Conduit and Outlet Box for Light and Power
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.ELEC110 Cable
Pulling for Light and Power
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.ELEC120
Install and Erect EMDB
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.ELEC130
Install Wiring Devices Socket Isolators and Switches
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.ELEC140
Install and Erect Generator & Fuel Tank
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.ELEC150
Install and Erect DB
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.ELEC160
Install Lighting Fittings
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.ELEC170 LV
Cable Pulling Connecting with Generator to EMBD
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.ELEC180 LV
Cable Pulling Connecting and Termination EMDB to DB
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.EPXY150 Epoxy
Coating to Floor and Skirting
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.EPXY160 Epoxy
Coating to Wall and Floor of Trench and Equipment Plinth Level
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.FRFT100
Install Dry Powder and Co2 Fire Extinguishers
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.FRFT110
Install Clean Agent System
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.HVAC100
Install Duct Work for Supply and Return
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.HVAC110
Install Volume Control Dampers with Sound Attenuators
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.HVAC120
Install DX Split Units with Refrigerant Pipe
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.HVAC130
Install BMS for HVAC
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.HVAC140
Install Air Grills and Diffusers
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.HVAC150
Install Smoke Extract Fans
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.LWCS100
Install Conduit and Outlet Junction Box for Low Current
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.LWCS110 Cable
Pulling for Low Current Fire Alarm CCTV
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.LWCS120
Install Earth Pits Conductor Copper Tape Air Terminals
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.LWCS130
Install Central Monitoring System Unit
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.LWCS140
Install Central Monitored Emergency Lighting System
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.LWCS150
Install Fire Alarm Smoke/ Heat Detectors Flasher with Sounder Break Glass
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.LWCS160
Install CCTV & IT Network Security System
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.LWCS170
Install Access Control Door Contacts
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.PLMB100
Install Storm Pipe 80mm Dia
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.PLMB110
Install Condensate Drain Pipe 25mm Dia
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.PLMB120
Soakaway Pit and Condensate Drain Pipe 300mm Dia
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.PLST110
Ceiling Slab and Soffit Plaster
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.PLST120
Internal Wall Plaster
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.PTFC200 Paint
- Final Coat
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.PTFS140 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.PTPR130 Primer
and Stucco Coating for the Walls
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.SIGN210
Install Signages
Project: SHBLUD150324 Activity: CN.UB.LG.GRM.STLS190
Stainless Steel Trench Grating in Substation LV Room, 1000mm Width
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ALDR150
Install Double Lead Aluminum Frame and Doors
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ALDR160
Install Aluminum Louver Frame and Doors
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.CLFN140
Install Suspended Ceiling to Office
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC100
Install Conduit and Outlet Box for Light and Power
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC110 Wire &
Cable Pulling for Light and Power
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC120
Install Cable Tray/ Ladder Wall Mounted
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC130
Install Cable Tray/ Ladder Floor Mounted
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC140 Cable
Pulling & Laying in Cable Trays
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC150
Install Earth Pits Conductor Copper Tape Air Terminals
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC180
Install and Erect Transformer
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC190
Install and Erect Switch Gear HV & LV Switch Gear
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC200
Install and Erect Capacitor Bank
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC210
Install and Erect SMDB
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC220 Hv
Cable Connecting to Transformer
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC230
Install Distribution Management System
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC240 LV
Cable Pulling Connecting and Termination with Transformer
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC250 LV
Cable Pulling Connecting and Termination to Switch Gears
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.ELEC260 HV
Cable Pulling Connecting Transformer to Distribution Management System
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.EPXY130 Epoxy
Floor Coating and Skirting (Rooms Corridor Switch Gear Room)
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.FLFN110 Fair
Faced Finish to Grade Slab to Receive Floor Coating
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.FLFN120
Install U-channel Roller Access for Transformer
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.FLFN170
Installation and Protection of Floor Tiles / Skirting
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.FRFT100
Install Fire Fighting Pipe Hangers Supports, Pipes, Fittings & Valves
Installation
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.FRFT110
Install Fire Fighting - Final Fix Works Sprinklers
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.FRFT120
Install Clean Agent System to Battery ELV DC and Switch Gear Room
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.FRFT130
Install Fire Fighting Breaching Inlet
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.FRFT140
Install Fire Suppression System in Transformer Room 1 & 2
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.FRFT150
Install Fire Hose Cabinet
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.FRFT160
Install Dry Powder and Co2 Fire Extinguishers
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.HVAC100
Install Chilled Water and Refrigerant Pipe
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.HVAC110
Install Duct Work for Supply and Return
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.HVAC120
Install Volume Control Dampers with Sound Attenuators
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.HVAC130
Install Acoustic Lining for the Duct
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.HVAC140
Install AHU and Plenum Box 8 Nos
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.HVAC150
Install FAHU
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.HVAC160
Install Air Grills Louvers and Diffusers
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.HVAC170
Install Split Units 04 Nos
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.HVAC180
Install Extract Fans
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.LWCS100
Install Conduit and Outlet Junction Box for All Low Current Systems
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.LWCS110 Wiring
& Cabling for Telephone System
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.LWCS120 Wiring
& Cabling for Fire Alarm
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.LWCS130 Wiring
& Cabling for Central Monitoring System
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.LWCS140 Wiring
& Cabling for CCTV
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.LWCS150 Wiring
& Cabling for Access Control System
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.LWCS160 Wiring
for BMS
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.LWCS170
Install Fire Alarm Smoke/ Heat Detectors Flasher with Sounder Break Glass
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.LWCS180
Install H2S Sensors
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.LWCS190
Install CCTV & IT Network Security System
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.LWCS200
Install Access Control Door Contacts
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.LWCS210
Install Central Monitored Emergency Lighting System
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.PLMB100
Install UPVC Pipe
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.PLMB110
Install AC Condensate Drain Pipe
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.PLMB120
Install Sump Pump 1 2 3 & 4
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.PLMB130
Install Pipes Valves Inlet and Out Let Connection with Valves Fittings
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.PLMB140
Install Valves and Chamber
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.PTFS100 Paint
- 1st Coat
Project: SHBLUD150324 Activity: CN.UB.LG.TRM.WDDR190
Install Timber Doors
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.CAST110 MEP
Foundations
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.CHWC100
Chilled Water Connection
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.DRSW110
Drainage & Storm Water - 2nd Fix (Piping & Fittings)
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.EFAN100
Extract Fans and Sand Trap and Louver Installation
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.ELEC120
Electrical - Light Fittings, Spur Outlet & Isolator Installation
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.HVAC100 AC
Outdoor Units and Ducting Installation/ Connection
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.PINT160 Paint
Works
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.PTPR120 Primer
Coat
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.PTST130 Paint
- Stucco
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.RFWP140 Roof
PU Waterproofing System
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.SMAL120
Installation of Steel Metal Access Ladder/ s & Stair Bridges
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.SRPR100
Surface Preparation
Project: SHBLUD150324 Activity: CN.UB.UG.ROF.WTSP100 Water
Supply (Piping & Connection)
Project: SHBLUD150324 Activity: ED.GN.GN.GNR.GNRL100 IFC
Final Drawings (ID)
Project: SHBLUD150324 Activity: ED.GN.GN.GNR.GNRL110 IFC
Final Drawings (MEP)
Project: SHBLUD150324 Activity: ED.GN.GN.GNR.GNRL120 IFC
Final Drawings (Architecture)
Project: SHBLUD150324 Activity: ED.GN.GN.GNR.GNRL140 Issue
Design Air-conditioning Load Calculation
Project: SHBLUD150324 Activity: ED.GN.GN.GNR.GNRL150 Issue
the Updated Design Noc's from All Related Authorities
Project: SHBLUD150324 Activity: ED.GN.GN.GNR.GNRL160 Issue
Plot Gate Levels
Project: SHBLUD150324 Activity: ED.GN.GN.GNR.GNRL170
Building Permit/ ADM Approved Drawings Ready for Collection
Project: SHBLUD150324 Activity: ED.GN.GN.GNR.GNRL180 Issue
Other IFC Drawings/ Documents
Project: SHBLUD150324 Activity: ED.GN.GN.GNR.GNRL190
Handing Over of Approved Pile Test Report
Project: SHBLUD150324 Activity: ED.GN.GN.GNR.GNRL200 Taking
Over of Enabling Works
Project: SHBLUD150324 Activity: ED.GN.GN.GNR.GNRL210
Conduct Joint Survey, Inspection & Report of Piling Works/ Verification Piles
Locations
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL100 Client
Selection for External Stud Wall System
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL103 Client
Selection for Passenger Lifts
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL106 Client
Selection for Service Lifts
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL112 Client
Selection for Render to Stud Wall Framing System and EIFS System
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL115 Client
Selection for Aluminum Cladding
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL121 Client
Selection Decorative/Specialty Plaster
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL124 Client
Selection for GFRC Facade Panel Cladding
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL136 Client
Selection for Tiling Works
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL142 Client
Selection for Pool Gazebos
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL145 Client
Selection for Roof Bar Pergola
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL148 Client
Selection Outdoor Exercise Shade
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL151 Client
Selection for Kids Pool Shade
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL157 Client
Selection for Pantries
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL160 Client
Selection for Counters
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL163 Client
Selection for Cafeteria Vanity Counters
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL166 Client
Selection for Glass Balustrade Railing
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL172 Client
Selection for Media Screen Structure and Platforms
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL175 Client
Selection for Roof Grating Structures
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL178 Client
Selection for Perforated Metal Mesh Ceiling
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL181 Client
Selection for Acoustic Wood Panel Suspended Ceiling
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL190 Client
Selection for Metal Doors
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL193 Client
Selection for Landscape Furniture
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL196 Client
Selection for Softscape
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL199 Client
Selection for Reception Counters
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL202 Client
Selection for FOH Pantries
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL205 Client
Selection for Granite Stone Paving (OI)
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL208 Client
Selection for Bronze Mirror Ceiling
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL211 Client
Selection for FOH Vanity Counters
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL220 Client
Selection for Roller Shutters
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL226 Client
Selection for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL229 Client
Selection for Wooden Balustrade - Feature Stair
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL232 Client
Selection for Road/ Pavement Marking
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL235 Client
Selection for Loose Gravel Aggregate Surfacing
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL238 Client
Selection for Hoggin Granitic Aggregate Surfacing
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL241 Client
Selection for Boulders
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL244 Client
Selection for External Porcelain and Granite Tiles
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL247 Client
Selection for Topcrete Flooring
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL250 Client
Selection for Concrete Kerbstones, Edgings & Interlock
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL253 Client
Selection for Cast-in-situ Concrete Pavements
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL256 Client
Selection for TPV Flooring
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL259 Client
Selection for Irrigation
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL262 Client
Selection for Traffic Accessories/ Wheel Stoppers
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL265 Client
Selection for Precast Seating Walls and Blocks
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL268 Client
Selection for Bike Wash
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL271 Client
Selection for GRG Curved Ceiling Panel
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL277 Client
Selection for Facade Aluminum Louvres and Trellis
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL280 Client
Selection for Folding Partition At MICE
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL283 Client
Selection for Indoor Swimming Pool
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL286 Client
Selection Kids Swimming Pool
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL289 Client
Selection for Outdoor Swimming Pool
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL292 Client
Selection for Foldable Acoustic Wall - Meeting Rooms
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL301 Client
Selection for Dry Wall Partition
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL304 Client
Selection for Aluminum Tile Ceiling
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL307 Client
Selection for Gypsum Lining to Internal Areas
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL310 Client
Selection for Acoustic Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL313 Client
Selection for Facade Vestibule Entrance
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL316 Client
Selection for Stainless Steel Work
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL319 Client
Selection for Water Feature to All Day Dining (OI)
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL322 Client
Selection for Shower Glass Enclosures
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL325 Client
Selection for Facade Balcony Fascia
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL331 Client
Selection for Ironmongery - (Incl. OI)
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL340 Client
Selection for Access Ladders
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL343 Client
Selection for Railings to Staircases
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL346 Client
Selection for Wall Guard (Garbage Room)
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL349 Client
Selection for Garbage Containers
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL352 Client
Selection for Engineering Wood Flooring
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL355 Client
Selection for WC Cubicle Partition
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL361 Client
Selection for Internal Stone Works
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL364 Client
Selection Media Screen System
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL367 Client
Selection for Scissor Lift/ Platform
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL370 Client
Selection for Railings/ Access Control Gates/ Steel Bridges At Roof
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL373 Client
Selection for Bicycle Racks
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL376 Client
Selection for Climbing Bars and Basket Ball Hoop
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL379 Client
Selection for Laundry Equipment (OI)
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL382 Client
Selection for Staff Dining Equipment (OI)
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL385 Client
Selection for Bar Equipment (OI)
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL388 Client
Selection for Kitchen Equipment (OI)
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL391 Client
Selection for FOH Metal Skirtings
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL394 Client
Selection for FOH Carpets
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL397 Client
Selection for Airlock Carpet
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL400 Client
Selection for Modular Carpet Flooring
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL403 Client
Selection for Chain Link Fencing
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL406 Client
Selection for Stainless Steel PVD Ceiling
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL409 Client
Selection for Cedar Wood Ceiling
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL412 Client
Selection for Stainless Steel Curved Ceiling
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL415 Client
Selection for Solid Wood Timber Finish
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL418 Client
Selection for External Shade/ Pergola (OI)
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL421 Client
Selection for Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL427 Client
Selection for External Painting Works
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL433 Client
Selection for Facade Aluminum External Shadow Feature
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL436 Client
Selection Central Clock System
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL439 Client
Selection for Entrance Canopy
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL442 Client
Selection for Paneled Cement Board Ceiling
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL454 Client
Selection for Reception and Entrance FF&E
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL457 Client
Selection for All Day Dining Counters
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL460 Client
Selection for Lobby Cafe Hub Counters
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL463 Client
Selection for Cafe Retail Counters
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL466 Client
Selection for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL469 Client
Selection for Roof Bar Counters
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL472 Client
Selection for Facade Aluminum Canopy
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL475 Client
Selection for Mirrors
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL478 Client
Selection for GFRC Planters
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL487 Client
Selection for Pergola to All Day Dining (OI)
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL502 Client
Selection for Edge Switches
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL529 Client
Selection for 24 Hours Bulk Storage Tank (OI)
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL532 Client
Selection for Time and Attendance System (OI)
Project: SHBLUD150324 Activity: EP.CL.GN.GNR.GNRL546 Client
Selection for Cladding and Fins to Shade/Overhang Canopy (OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL100 Method
Statement Submittal for Steel Reinforcment
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL102 Method
Statement Submittal for Waterproofing (Sub-Structure)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL104 Method
Statement Approval for Steel Reinforcment
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL106 Method
Statement Approval for Waterproofing (Sub-Structure)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL112 Method
Statement Submittal for Airlock Room/ Vestibule Entrance Slab
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL114 Method
Statement Approval for Airlock Room/ Vestibule Entrance Slab
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL116 Method
Statement Submittal for Vertical Transportation/ Elevator Works
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL118 Method
Statement Submittal for GRP Lining
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL120 Method
Statement Submittal for External Stud Wall System
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL122 Method
Statement Approval for Vertical Transportation/ Elevator Works
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL124 Method
Statement Approval for GRP Lining
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL126 Method
Statement Approval for External Stud Wall System
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL128 Method
Statement Submittal for EIFS
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL132 Method
Statement Approval for EIFS
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL134 Method
Statement Submittal for Retractable Canopy At Roof Bar
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL136 Method
Statement Submittal for Epoxy System
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL138 Method
Statement Submittal for Roof Waterproof
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL140 Method
Statement Submittal for Wet Area Waterproof
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL142 Method
Statement Submittal for Raised Flooring
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL146 Method
Statement Submittal for Balcony/ Terraces Waterproofing
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL148 Method
Statement Submittal for Polished Concrete Works
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL150 Method
Statement Submittal for Fabric Acoustic Walls
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL152 Method
Statement Submittal Decorative/Specialty Plaster
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL154 Method
Statement Submittal for Blue Mirrors
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL156 Method
Statement Submittal for Render to Stud Wall Framing System and EIFS System
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL158 Method
Statement Submittal for Aluminum Cladding
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL160 Method
Statement Approval for Retractable Canopy At Roof Bar
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL162 Method
Statement Approval for Epoxy System
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL164 Method
Statement Approval for Roof Waterproof
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL166 Method
Statement Approval for Wet Area Waterproof
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL168 Method
Statement Approval for Raised Flooring
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL170 Method
Statement Approval for Balcony/ Terraces Waterproofing
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL172 Method
Statement Submittal for Roller Shutters Works
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL174 Method
Statement Approval for Polished Concrete Works
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL176 Method
Statement Approval Decorative/Specialty Plaster
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL178 Method
Statement Submittal for GFRC Facade Panel Cladding
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL180 Method
Statement Submittal for Stone Travertine Wall
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL182 Method
Statement Submittal for Tiling Works
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL184 Method
Statement Submittal for Pool Gazebos
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL186 Method
Statement Submittal for Roof Bar Pergola
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL188 Method
Statement Submittal for Kids Pool Shade
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL190 Method
Statement Submittal for Pantries
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL192 Method
Statement Submittal for Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL194 Method
Statement Submittal for Cafeteria Vanity Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL196 Method
Statement Submittal for Vinyl Flooring
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL198 Method
Statement Approval for Blue Mirrors
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL200 Method
Statement Approval for Render to Stud Wall Framing System and EIFS System
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL202 Method
Statement Approval for Aluminum Cladding
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL204 Method
Statement Submittal for HD Polyurethane Flooring
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL206 Method
Statement Approval for Fabric Acoustic Walls
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL208 Method
Statement Submittal for Folding Partition At MICE
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL210 Method
Statement Submittal for Foldable Acoustic Wall - Meeting Rooms
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL212 Method
Statement Submittal Outdoor Exercise Shade
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL214 Method
Statement Approval for Roller Shutters Works
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL216 Method
Statement Submittal for Media Screen Structure and Platforms
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL218 Method
Statement Submittal for Perforated Metal Mesh Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL220 Method
Statement Submittal for Roof Access Hatch
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL222 Method
Statement Submittal for Acoustic Wood Panel Suspended Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL224 Method
Statement Submittal for Roof Grating Structures
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL226 Method
Statement Approval for GFRC Facade Panel Cladding
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL228 Method
Statement Approval for Stone Travertine Wall
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL230 Method
Statement Approval for Tiling Works
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL232 Method
Statement Approval for Pool Gazebos
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL234 Method
Statement Approval for Roof Bar Pergola
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL236 Method
Statement Approval for Kids Pool Shade
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL238 Method
Statement Approval for Pantries
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL240 Method
Statement Approval for Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL242 Method
Statement Approval for Cafeteria Vanity Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL244 Method
Statement Submittal for Metal Doors
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL246 Method
Statement Submittal for Landscape Furniture
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL248 Method
Statement Submittal for Softscape
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL250 Method
Statement Submittal for Reception Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL252 Method
Statement Submittal for FOH Pantries
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL254 Method
Statement Submittal for Hardscape
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL256 Method
Statement Submittal for Bronze Mirror Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL258 Method
Statement Submittal for FOH Vanity Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL260 Method
Statement Submittal for Timber Doors
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL262 Method
Statement Approval for Vinyl Flooring
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL264 Method
Statement Submittal for Guest Wooden Joinery/Other Furnish. (Incl. OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL266 Method
Statement Submittal for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL268 Method
Statement Submittal for Wooden Balustrade - Feature Stair
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL270 Method
Statement Approval for HD Polyurethane Flooring
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL272 Method
Statement Submittal for Irrigation
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL274 Method
Statement Submittal for GRG Curved Ceiling Panel
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL276 Method
Statement Approval for Folding Partition At MICE
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL278 Method
Statement Approval for Foldable Acoustic Wall - Meeting Rooms
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL280 Method
Statement Submittal for Glass Balustrade Railing
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL282 Method
Statement Submittal for Sliding Panel
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL284 Method
Statement Approval Outdoor Exercise Shade
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL286 Method
Statement Submittal for External Shade/ Pergola (OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL288 Method
Statement Submittal for Ironmongery - (Incl. OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL290 Method
Statement Approval for Media Screen Structure and Platforms
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL292 Method
Statement Submittal for Wall Guard (Garbage Room)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL294 Method
Statement Submittal for Garbage Containers
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL296 Method
Statement Approval for Perforated Metal Mesh Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL298 Method
Statement Submittal Media Screen System
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL300 Method
Statement Submittal for Scissor Lift/ Platform
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL302 Method
Statement Approval for Roof Access Hatch
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL304 Method
Statement Submittal for Kitchen Equipment (OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL306 Method
Statement Approval for Acoustic Wood Panel Suspended Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL308 Method
Statement Approval for Roof Grating Structures
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL310 Method
Statement Submittal for Indoor Swimming Pool
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL312 Method
Statement Submittal Kids Swimming Pool
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL314 Method
Statement Submittal for Outdoor Swimming Pool
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL316 Method
Statement Approval for Metal Doors
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL318 Method
Statement Approval for Landscape Furniture
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL320 Method
Statement Approval for Softscape
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL322 Method
Statement Approval for Reception Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL324 Method
Statement Approval for FOH Pantries
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL326 Method
Statement Approval for Hardscape
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL328 Method
Statement Approval for Bronze Mirror Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL330 Method
Statement Approval for FOH Vanity Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL332 Method
Statement Approval for Timber Doors
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL334 Method
Statement Approval for Guest Wooden Joinery/Other Furnish. (Incl. OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL336 Method
Statement Approval for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL338 Method
Statement Approval for Wooden Balustrade - Feature Stair
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL340 Method
Statement Approval for Irrigation
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL342 Method
Statement Approval for GRG Curved Ceiling Panel
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL344 Method
Statement Submittal for Dry Wall Partition
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL346 Method
Statement Submittal for Aluminum Tile Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL348 Method
Statement Approval for Glass Balustrade Railing
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL350 Method
Statement Approval for Sliding Panel
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL352 Method
Statement Submittal for Gypsum Lining to Internal Areas
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL354 Method
Statement Submittal for Acoustic Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL356 Method
Statement Approval for External Shade/ Pergola (OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL358 Method
Statement Submittal for Facade Access System (Abseiling System/ Rope Access)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL360 Method
Statement Approval for Ironmongery - (Incl. OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL362 Method
Statement Submittal for Facade Aluminum Louvres and Trellis
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL364 Method
Statement Submittal for Stainless Steel Work
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL366 Method
Statement Approval Media Screen System
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL368 Method
Statement Approval for Scissor Lift/ Platform
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL370 Method
Statement Approval for Kitchen Equipment (OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL372 Method
Statement Submittal for Entrance Canopy
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL374 Method
Statement Approval for Indoor Swimming Pool
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL376 Method
Statement Approval Kids Swimming Pool
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL378 Method
Statement Approval for Outdoor Swimming Pool
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL380 Method
Statement Submittal for External Painting Works
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL382 Method
Statement Submittal for Facade Vestibule Entrance
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL384 Method
Statement Approval for Dry Wall Partition
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL386 Method
Statement Approval for Aluminum Tile Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL388 Method
Statement Approval for Wall Guard (Garbage Room)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL390 Method
Statement Approval for Garbage Containers
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL392 Method
Statement Approval for Gypsum Lining to Internal Areas
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL394 Method
Statement Approval for Acoustic Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL396 Method
Statement Approval for Facade Access System (Abseiling System/ Rope Access)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL398 Method
Statement Submittal for Access Ladders
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL400 Method
Statement Submittal for Railings to Staircases
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL402 Method
Statement Submittal for Engineering Wood Flooring
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL404 Method
Statement Submittal for WC Cubicle Partition
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL406 Method
Statement Submittal for Trench Cover/ Grating for Substation
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL408 Method
Statement Submittal for Internal Stone Works
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL410 Method
Statement Submittal for Railings/ Access Control Gates/ Steel Bridges At Roof
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL412 Method
Statement Submittal for Bicycle Racks
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL414 Method
Statement Submittal for Climbing Bars and Basket Ball Hoop
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL416 Method
Statement Submittal for Laundry Equipment (OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL418 Method
Statement Submittal for Staff Dining Equipment (OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL420 Method
Statement Submittal for Bar Equipment (OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL422 Method
Statement Submittal for FOH Metal Skirtings
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL424 Method
Statement Submittal for FOH Carpets
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL426 Method
Statement Submittal for Airlock Carpet
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL428 Method
Statement Submittal for Modular Carpet Flooring
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL430 Method
Statement Submittal for Chain Link Fencing
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL432 Method
Statement Submittal for Stainless Steel PVD Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL434 Method
Statement Submittal for Cedar Wood Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL436 Method
Statement Submittal for Stainless Steel Curved Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL438 Method
Statement Submittal for Solid Wood Timber Finish
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL440 Method
Statement Submittal for Shower Glass Enclosures
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL442 Method
Statement Submittal for Facade Balcony Fascia
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL444 Method
Statement Approval for Facade Aluminum Louvres and Trellis
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL446 Method
Statement Approval for Stainless Steel Work
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL448 Method
Statement Submittal for Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL450 Method
Statement Approval for Entrance Canopy
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL452 Method
Statement Approval for External Painting Works
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL454 Method
Statement Approval for Facade Vestibule Entrance
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL456 Method
Statement Approval for Access Ladders
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL458 Method
Statement Approval for Railings to Staircases
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL460 Method
Statement Approval for Engineering Wood Flooring
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL462 Method
Statement Approval for WC Cubicle Partition
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL464 Method
Statement Approval for Trench Cover/ Grating for Substation
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL466 Method
Statement Approval for Internal Stone Works
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL468 Method
Statement Approval for Railings/ Access Control Gates/ Steel Bridges At Roof
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL470 Method
Statement Approval for Bicycle Racks
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL472 Method
Statement Approval for Climbing Bars and Basket Ball Hoop
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL474 Method
Statement Approval for Laundry Equipment (OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL476 Method
Statement Approval for Staff Dining Equipment (OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL478 Method
Statement Approval for Bar Equipment (OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL480 Method
Statement Approval for FOH Metal Skirtings
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL482 Method
Statement Approval for FOH Carpets
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL484 Method
Statement Approval for Airlock Carpet
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL486 Method
Statement Approval for Modular Carpet Flooring
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL488 Method
Statement Approval for Chain Link Fencing
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL490 Method
Statement Approval for Stainless Steel PVD Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL492 Method
Statement Approval for Cedar Wood Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL494 Method
Statement Approval for Stainless Steel Curved Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL496 Method
Statement Approval for Solid Wood Timber Finish
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL498 Method
Statement Approval for Shower Glass Enclosures
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL500 Method
Statement Approval for Facade Balcony Fascia
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL502 Method
Statement Approval for Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL504 Method
Statement Submittal for Facade Aluminum External Shadow Feature
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL506 Method
Statement Submittal for Paneled Cement Board Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL508 Method
Statement Submittal for Staircase (At Hotel Gym and Spa Building)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL510 Method
Statement Submittal for Reception and Entrance FF&E
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL512 Method
Statement Submittal for All Day Dining Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL514 Method
Statement Submittal for Lobby Cafe Hub Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL516 Method
Statement Submittal for Cafe Retail Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL518 Method
Statement Submittal for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL520 Method
Statement Submittal for Roof Bar Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL522 Method
Statement Approval for Facade Aluminum External Shadow Feature
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL524 Method
Statement Approval for Paneled Cement Board Ceiling
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL526 Method
Statement Approval for Staircase (At Hotel Gym and Spa Building)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL528 Method
Statement Submittal for Facade Aluminum Canopy
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL530 Method
Statement Approval for Reception and Entrance FF&E
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL532 Method
Statement Approval for All Day Dining Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL534 Method
Statement Approval for Lobby Cafe Hub Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL536 Method
Statement Approval for Cafe Retail Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL538 Method
Statement Approval for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL540 Method
Statement Approval for Roof Bar Counters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL542 Method
Statement Approval for Facade Aluminum Canopy
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL544 Method
Statement Submittal for GFRC Planters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL546 Method
Statement Submittal for Mirrors
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL548 Method
Statement Approval for GFRC Planters
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL550 Method
Statement Approval for Mirrors
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL555 Method
Statement Approval for Cladding and Fins to Shade/Overhang Canopy (OI)
Project: SHBLUD150324 Activity: EP.MD.GN.GNR.GNRL560 Method
Statement Submittal for Cladding and Fins to Shade/Overhang Canopy (OI)
Project: SHBLUD150324 Activity: EP.MK.GN.GNR.GNRL508 Fire
Fighting Final Fix Items - Material Procurement (1st In Place)
Project: SHBLUD150324 Activity: EP.MK.GN.GNR.GNRL511 HVAC
Final Fix Items - Material Procurement (1st In Place)
Project: SHBLUD150324 Activity: EP.MK.GN.GNR.GNRL513 False
Ceiling - Material Procurement (1st In Place)
Project: SHBLUD150324 Activity: EP.MK.GN.GNR.GNRL531 Shower
Partition - Material Procurement (1st In Place)
Project: SHBLUD150324 Activity: EP.MK.GN.GNR.GNRL540 Dry
Area Floor Tile - Material Procurement (1st In Place)
Project: SHBLUD150324 Activity: EP.MK.GN.GNR.GNRL544
Threshold - Material Procurement (1st In Place)
Project: SHBLUD150324 Activity: EP.MK.GN.GNR.GNRL554 Wooden
Door - Material Procurement (1st In Place)
Project: SHBLUD150324 Activity: EP.MK.GN.GNR.GNRL575
Ironmongery - Material Procurement (1st In Place)
Project: SHBLUD150324 Activity: EP.MK.GN.GNR.GNRL589 Low
Current Final Fix Items - Material Procurement (1st In Place)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL100
Material Submittal for Steel Reinforcment
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL102
Material Submittal for Post Tension Slab
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL104
Material Submittal for Waterproofing (Sub-Structure)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL106
Material Submittal for Underground Pipes and Access
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL108
Material Approval for Waterproofing (Sub-Structure)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL110
Material Approval for Steel Reinforcment
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL114
Material Submittal for CAT6 Cable
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL116
Material Submittal for Grills and Diffusers
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL118
Material Submittal for Chilled Water Pipes and Accessories (Incl. OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL120
Material Submittal for External Ducts
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL126
Material Submittal for Chilled Water Pumps
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL130
Material Submittal for FAHU and Ahus
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL132
Material Submittal for Internal Ducts
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL138
Material Submittal for GRP Paneled Tanks
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL140
Material Submittal for Local Water Heaters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL144
Material Submittal for Booster, Transfer and Circulation Pumps
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL146
Material Submittal for Isolators
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL150
Material Submittal for Conduits and Accessories
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL152
Material Submittal for Cable Trays and Trunking
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL154
Material Submittal for LV Cables
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL166
Material Submittal for Manhole Covers
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL168
Material Submittal for Drain Pipes Acoustic Insulation
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL170
Material Submittal for Condensate Drain Pipes and Access
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL172
Material Submittal for Fire Extinguishers
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL174
Material Submittal for Fire Pump
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL176
Material Submittal for Fire Hose Reels
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL180
Material Submittal for BMS
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL182
Material Submittal for Sprinkler System (Incl. OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL184
Material Submittal for Water Supply Pipes and Access.
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL186
Material Submittal for Idfs and Mdfs
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL190
Material Submittal for Above-ground Pipes and Access
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL192
Material Submittal for Chillers
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL196
Material Approval for Post Tension Slab
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL198
Material Submittal for Lightning Protection System - Structural Fix
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL200
Material Approval for Underground Pipes and Access
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL202
Material Approval for Lightning Protection System - Structural Fix
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL206
Material Approval for CAT6 Cable
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL208
Material Approval for Grills and Diffusers
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL210
Material Approval for Chilled Water Pipes and Accessories (Incl. OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL212
Material Approval for External Ducts
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL220
Material Approval for Vent. Fans
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL222
Material Approval for FAHU and Ahus
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL224
Material Approval for Internal Ducts
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL226
Material Approval for DX Split Units
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL228
Material Approval for FCU
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL230
Material Approval for GRP Paneled Tanks
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL232
Material Approval for Local Water Heaters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL234
Material Approval for WS Pipe Insulation
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL236
Material Approval for Booster, Transfer and Circulation Pumps
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL242
Material Approval for Conduits and Accessories
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL244
Material Approval for Cable Trays and Trunking
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL246
Material Approval for LV Cables
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL248
Material Approval for UPS
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL250
Material Approval for ATS
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL252
Material Approval for Generator
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL254
Material Approval for Energy Meter
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL256
Material Approval for Capacitor Bank
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL258
Material Approval for Manhole Covers
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL260
Material Approval for Drain Pipes Acoustic Insulation
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL262
Material Approval for Condensate Drain Pipes and Access
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL264
Material Approval for Fire Extinguishers
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL266
Material Approval for Fire Pump
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL268
Material Approval for Fire Hose Reels
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL272
Material Approval for BMS
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL274
Material Approval for Sprinkler System (Incl. OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL276
Material Approval for Water Supply Pipes and Access.
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL278
Material Approval for Idfs and Mdfs
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL280
Material Approval for LV Panels
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL282
Material Approval for Above-ground Pipes and Access
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL288
Material Submittal for External Stud Wall System
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL290
Material Approval for External Stud Wall System
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL292
Material Submittal for Passenger Lifts
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL294
Material Submittal for Service Lifts
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL296
Material Approval for Passenger Lifts
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL298
Material Approval for Service Lifts
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL300
Material Submittal for GRP Lining
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL304
Material Submittal for Render to Stud Wall Framing System and EIFS System
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL310
Material Submittal Decorative/Specialty Plaster
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL312
Material Submittal for GFRC Facade Panel Cladding
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL314
Material Approval for GRP Lining
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL318
Material Approval for Render to Stud Wall Framing System and EIFS System
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL320
Material Approval for Aluminum Cladding
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL324
Material Approval Decorative/Specialty Plaster
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL332
Material Submittal for Tiling Works
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL336
Material Approval for GFRC Facade Panel Cladding
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL338
Material Submittal for Pool Gazebos
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL340
Material Submittal for Roof Bar Pergola
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL342
Material Submittal Outdoor Exercise Shade
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL344
Material Submittal for Kids Pool Shade
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL348
Material Submittal for Pantries
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL350
Material Submittal for Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL352
Material Submittal for Cafeteria Vanity Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL362
Material Submittal for Electric Car Charging System
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL368
Material Submittal for Media Screen Structure and Platforms
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL370
Material Submittal for Wooden Wall Covering
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL372
Material Submittal for Acoustic Wood Panel Suspended Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL380
Material Approval for Tiling Works
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL384
Material Approval for Pool Gazebos
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL386
Material Approval for Roof Bar Pergola
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL388
Material Approval Outdoor Exercise Shade
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL390
Material Approval for Kids Pool Shade
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL394
Material Approval for Pantries
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL396
Material Approval for Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL398
Material Approval for Cafeteria Vanity Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL406
Material Submittal for Metal Doors
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL408
Material Submittal for Palisade Fencing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL410
Material Submittal for Softscape
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL412
Material Submittal for Reception Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL414
Material Submittal for FOH Pantries
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL418
Material Submittal for Roof Waterproof
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL420
Material Submittal for Wet Area Waterproof
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL422
Material Submittal for Granite Stone Paving (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL426
Material Submittal for Wood Parquet Floors
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL428
Material Submittal for FOH Vanity Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL432
Material Submittal for Vinyl Flooring
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL434
Material Submittal for Balcony/ Terraces Waterproofing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL438
Material Submittal for Roller Shutters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL446
Material Submittal for Polished Concrete Works
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL448
Material Submittal for HD Polyurethane Flooring
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL450
Material Submittal for Road/ Pavement Marking
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL452
Material Submittal for Loose Gravel Aggregate Surfacing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL454
Material Submittal for Hoggin Granitic Aggregate Surfacing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL456
Material Submittal for Boulders
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL458
Material Submittal for External Porcelain and Granite Tiles
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL460
Material Submittal for Topcrete Flooring
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL462
Material Submittal for Concrete Kerbstones, Edgings & Interlock
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL464
Material Submittal for Cast-in-situ Concrete Pavements
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL466
Material Submittal for TPV Flooring
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL468
Material Submittal for Irrigation
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL470
Material Submittal for Traffic Accessories/ Wheel Stoppers
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL472
Material Submittal for Precast Seating Walls and Blocks
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL474
Material Submittal for Bike Wash
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL476
Material Submittal for GRG Curved Ceiling Panel
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL478
Material Approval for Glass Balustrade Railing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL484
Material Approval for Electric Car Charging System
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL488
Material Approval Media Screen Structure and Platforms
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL494
Material Submittal for Facade Aluminum Louvres and Trellis
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL496
Material Approval for Perforated Metal Mesh Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL498
Material Approval for Acoustic Wood Panel Suspended Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL500
Material Submittal for Folding Partition At MICE
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL502
Material Submittal for Indoor Swimming Pool
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL504
Material Submittal Kids Swimming Pool
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL506
Material Submittal for Outdoor Swimming Pool
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL508
Material Submittal for Foldable Acoustic Wall - Meeting Rooms
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL518
Material Approval for Metal Doors
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL520
Material Approval for Palisade Fencing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL522
Material Approval for Softscape
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL524
Material Approval for Reception Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL526
Material Approval for FOH Pantries
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL530
Material Approval for Roof Waterproof
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL532
Material Approval for Wet Area Waterproof
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL534
Material Approval for Granite Stone Paving (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL538
Material Approval for Bronze Mirror Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL540
Material Approval for FOH Vanity Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL544
Material Approval for Vinyl Flooring
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL546
Material Approval for Balcony/ Terraces Waterproofing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL550
Material Approval for Roller Shutters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL554
Material Approval for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL556
Material Approval for Wooden Balustrade - Feature Stair
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL558
Material Approval for Polished Concrete Works
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL560
Material Approval for HD Polyurethane Flooring
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL562
Material Approval for Road/ Pavement Marking
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL564
Material Approval for Loose Gravel Aggregate Surfacing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL566
Material Approval for Hoggin Granitic Aggregate Surfacing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL568
Material Approval for Boulders
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL570
Material Approval for External Porcelain and Granite Tiles
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL572
Material Approval for Topcrete Flooring
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL574
Material Approval for Concrete Kerbstones, Edgings & Interlock
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL576
Material Approval for Cast-in-situ Concrete Pavements
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL578
Material Approval for TPV Flooring
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL580
Material Approval for Irrigation
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL582
Material Approval for Traffic Accessories/ Wheel Stoppers
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL584
Material Approval for Precast Seating Walls and Blocks
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL586
Material Approval for Bike Wash
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL588
Material Approval for GRG Curved Ceiling Panel
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL590
Material Submittal for Dry Wall Partition
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL592
Material Submittal for Aluminum Tile Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL594
Material Submittal for Gypsum Lining to Internal Areas
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL596
Material Submittal for Acoustic Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL600
Material Approval for Facade Aluminum Louvres and Trellis
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL602
Material Submittal for Facade Vestibule Entrance
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL604
Material Submittal for Stainless Steel Work
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL606
Material Approval for Folding Partition At MICE
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL608
Material Approval for Indoor Swimming Pool
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL610
Material Approval Kids Swimming Pool
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL612
Material Approval for Outdoor Swimming Pool
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL614
Material Approval for Foldable Acoustic Wall - Meeting Rooms
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL620
Material Submittal for Water Feature to All Day Dining (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL622
Material Approval for Dry Wall Partition
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL624
Material Approval for Aluminum Tile Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL626
Material Submittal for Shower Glass Enclosures
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL628
Material Submittal for Facade Balcony Fascia
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL630
Material Approval for Gypsum Lining to Internal Areas
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL632
Material Approval for Acoustic Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL634
Material Submittal for FP Cable
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL636
Material Submittal for Lighting Control
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL638
Material Submittal for Active Comp and Detectors/ Devices
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL640
Material Submittal for Central Battery
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL644
Material Submittal for Ironmongery - (Incl. OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL654
Material Submittal for Wall Guard (Garbage Room)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL656
Material Submittal for Garbage Containers
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL658
Material Submittal for Engineering Wood Flooring
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL660
Material Submittal for WC Cubicle Partition
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL664
Material Submittal for Internal Stone Works
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL666
Material Submittal Media Screen System
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL668
Material Submittal for Scissor Lift/ Platform
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL672
Material Submittal for Bicycle Racks
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL674
Material Submittal for Roof Access Hatch
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL676
Material Submittal for Climbing Bars and Basket Ball Hoop
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL678
Material Submittal for Laundry Equipment (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL680
Material Submittal for Staff Dining Equipment (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL682
Material Submittal for Bar Equipment (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL684
Material Submittal for Kitchen Equipment (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL686
Material Submittal for FOH Metal Skirtings
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL688
Material Submittal for FOH Carpets
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL690
Material Submittal for Airlock Carpet
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL692
Material Submittal for Modular Carpet Flooring
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL694
Material Submittal for Chain Link Fencing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL696
Material Submittal for Stainless Steel PVD Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL698
Material Submittal for Cedar Wood Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL700
Material Submittal for Stainless Steel Curved Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL702
Material Submittal for Solid Wood Timber Finish
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL704
Material Submittal for External Shade/ Pergola (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL706
Material Submittal for Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL708
Material Approval for Facade Vestibule Entrance
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL710
Material Approval for Stainless Steel Work
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL712
Material Submittal for Lightning Protection System - Roof Fix
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL714
Material Approval for Water Feature to All Day Dining (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL716
Material Approval for Shower Glass Enclosures
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL718
Material Approval for Facade Balcony Fascia
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL722
Material Approval for FP Cable
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL724
Material Approval for Lighting Control
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL726
Material Approval for Active Comp and Detectors/ Devices
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL728
Material Approval for Central Battery
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL732
Material Approval for Ironmongery - (Incl. OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL738
Material Approval for Access Ladders
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL740
Material Approval for Railings to Staircases
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL742
Material Submittal for External Painting Works
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL744
Material Approval for Wall Guard (Garbage Room)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL746
Material Approval for Garbage Containers
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL748
Material Approval for Engineering Wood Flooring
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL750
Material Approval for WC Cubicle Partition
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL754
Material Approval for Internal Stone Works
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL756
Material Approval Media Screen System
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL758
Material Approval for Scissor Lift/ Platform
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL760
Material Approval for Railings/ Access Control Gates/ Steel Bridges At Roof
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL762
Material Approval for Bicycle Racks
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL764
Material Approval for Roof Access Hatch
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL766
Material Approval for Climbing Bars and Basket Ball Hoop
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL768
Material Approval for Laundry Equipment (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL770
Material Approval for Staff Dining Equipment (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL772
Material Approval for Bar Equipment (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL774
Material Approval for Kitchen Equipment (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL776
Material Approval for FOH Metal Skirtings
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL778
Material Approval for FOH Carpets
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL780
Material Approval for Airlock Carpet
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL782
Material Approval for Modular Carpet Flooring
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL784
Material Approval for Chain Link Fencing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL786
Material Approval for Stainless Steel PVD Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL788
Material Approval for Cedar Wood Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL790
Material Approval for Stainless Steel Curved Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL792
Material Approval for Solid Wood Timber Finish
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL794
Material Approval for External Shade/ Pergola (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL798
Material Approval for Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL800
Material Submittal for Facade Aluminum External Shadow Feature
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL802
Material Submittal for Central Clock System
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL806
Material Approval for Lightning Protection System - Roof Fix
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL810
Material Submittal for Facade Access System (Abseiling System/ Rope Access)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL812
Material Submittal for Paneled Cement Board Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL816
Material Approval for External Painting Works
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL822
Material Approval for Facade Aluminum External Shadow Feature
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL830
Material Approval for Central Clock System
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL834
Material Submittal for Reception and Entrance FF&E
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL836
Material Submittal for All Day Dining Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL838
Material Submittal for Lobby Cafe Hub Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL840
Material Submittal for Cafe Retail Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL842
Material Submittal for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL844
Material Submittal for Roof Bar Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL846
Material Approval for Entrance Canopy
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL848
Material Approval for Facade Access System (Abseiling System/ Rope Access)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL850
Material Approval for Paneled Cement Board Ceiling
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL852
Material Submittal for Facade Aluminum Canopy
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL854
Material Approval for Staircase (At Hotel Gym and Spa Building)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL862
Material Approval for Reception and Entrance FF&E
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL864
Material Approval for All Day Dining Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL866
Material Approval for Lobby Cafe Hub Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL868
Material Approval for Cafe Retail Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL870
Material Approval for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL872
Material Approval for Roof Bar Counters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL874
Material Approval for Facade Aluminum Canopy
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL876
Material Submittal for Mirrors
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL878
Material Submittal for GFRC Planters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL884
Material Submittal for Pergola to All Day Dining (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL894
Material Approval for Mirrors
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL896
Material Approval for GFRC Planters
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL898
Material Submittal for Edge Switches
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL916
Material Submittal for 24 Hours Bulk Storage Tank (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL922
Material Approval for Pergola to All Day Dining (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL932
Material Approval for Edge Switches
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL950
Material Approval for 24 Hours Bulk Storage Tank (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL952
Material Submittal for Time and Attendance System (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL958
Material Approval for Time and Attendance System (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL971
Material Approval for Cladding and Fins to Shade/Overhang Canopy (OI)
Project: SHBLUD150324 Activity: EP.MT.GN.GNR.GNRL976
Material Submittal for Cladding and Fins to Shade/Overhang Canopy (OI)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL100 Submit
Supplier Prequalification for Steel Reinforcment
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL105 Submit
Subcontractor Prequalification for Post Tension Slab
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL110 Submit
Subcontractor Prequalification for Waterproofing (Sub-Structure)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL115
Approval Supplier Prequalification for Steel Reinforcment
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL120 Submit
Subcontractor Prequalification for Steel Structure
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL125
Approval Subcontractor Prequalification for Post Tension Slab
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL130
Approval Subcontractor Prequalification for Waterproofing (Sub-Structure)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL140
Approval Subcontractor Prequalification for MEP
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL150
Approval Subcontractor Prequalification for Steel Structure
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL160 Submit
Subcontractor Prequalification for Suspended Ceiling & Drywall Partition
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL165
Approval Subcontractor Prequalification for Suspended Ceiling & Drywall
Partition
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL170 Submit
Subcontractor Prequalification for Vertical Transportation/ Elevator Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL175
Approval Subcontractor Prequalification for Vertical Transportation/ Elevator
Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL180 Submit
Subcontractor Prequalification for GRP Lining
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL190 Submit
Subcontractor Prequalification for GFRC Facade
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL195 Submit
Subcontractor Prequalification for Aluminum Facade Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL205 Submit
Subcontractor Prequalification for Decorative/Specialty Plaster
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL210
Approval Subcontractor Prequalification for GRP Lining
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL220
Approval Subcontractor Prequalification for GFRC Facade
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL225
Approval Subcontractor Prequalification for Aluminum Facade Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL235
Approval Subcontractor Prequalification Decorative/Specialty Plaster
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL240 Submit
Subcontractor Prequalification for Wooden Wall Covering
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL260 Submit
Subcontractor Prequalification for Pergolas and Shades Cladding
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL270 Submit
Subcontractor Prequalification for BOH Joinery
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL275 Submit
Subcontractor Prequalification for EIFS
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL280 Submit
Subcontractor Prequalification for Acoustic Wood Panel Suspended Ceiling
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL290 Submit
Subcontractor Prequalification for Electric Car Charging System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL300
Approval Subcontractor Prequalification for Wooden Wall Covering
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL320
Approval Subcontractor Prequalification for Pergolas and Shades Cladding
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL330
Approval Subcontractor Prequalification for BOH Joinery
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL340
Approval Subcontractor Prequalification for Acoustic Wood Panel Suspended
Ceiling
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL345 Submit
Subcontractor Prequalification for Landscape Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL355 Submit
Subcontractor Prequalification for Wood Parquet Floors
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL360 Submit
Subcontractor Prequalification for Metal Doors Incl. Ironmongery
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL380 Submit
Subcontractor Prequalification for Waterproofing and Roofing (Super Structure)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL390 Submit
Subcontractor Prequalification for Polished Concrete Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL395 Submit
Subcontractor Prequalification for GRG Curved Ceiling Panel
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL405
Approval Subcontractor Prequalification for Electric Car Charging System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL415 Submit
Subcontractor Prequalification for Movable Wall/ Folding Partition System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL420 Submit
Subcontractor Prequalification for Swimming Pool Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL425
Approval Subcontractor Prequalification for Landscape Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL435
Approval Subcontractor Prequalification for Wood Parquet Floors
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL440
Approval Subcontractor Prequalification for Metal Doors Incl. Ironmongery
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL460
Approval Subcontractor Prequalification for Waterproofing and Roofing (Super
Structure)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL470
Approval Subcontractor Prequalification for Polished Concrete Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL475
Approval Subcontractor Prequalification for GRG Curved Ceiling Panel
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL480 Submit
Subcontractor Prequalification for Ironmongery
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL485 Submit
Subcontractor Prequalification for Stainless Steel Work
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL490
Approval Subcontractor Prequalification for Movable Wall/ Folding Partition
System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL495
Approval Subcontractor Prequalification for Swimming Pool Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL500 Submit
Subcontractor Prequalification for Lighting Control
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL505 Submit
Subcontractor Prequalification for Fire Alarm and Voice Evacuation System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL510 Submit
Subcontractor Prequalification for Central Battery
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL520 Submit
Subcontractor Prequalification for Garbage Containers/ Wall Guard (Garbage Room)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL525 Submit
Subcontractor Prequalification for Engineering Wood Flooring
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL530 Submit
Subcontractor Prequalification for WC Cubicle Partition
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL540 Submit
Subcontractor Prequalification for Internal Stone Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL545 Submit
Subcontractor Prequalification for Media Screen System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL550 Submit
Subcontractor Prequalification for Scissor Lift/ Platform
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL555 Submit
Subcontractor Prequalification for Roof Access Hatch
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL560 Submit
Subcontractor Prequalification for BOH Equipment (OI)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL565 Submit
Subcontractor Prequalification for Carpet Flooring
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL570 Submit
Subcontractor Prequalification for Stainless Steel PVD Ceiling
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL575 Submit
Subcontractor Prequalification for Cedar Wood Ceiling
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL580 Submit
Subcontractor Prequalification for Stainless Steel Curved Ceiling
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL585 Submit
Subcontractor Prequalification for Solid Wood Timber Finish
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL590
Approval Subcontractor Prequalification for Ironmongery
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL595
Approval Subcontractor Prequalification for Stainless Steel Work
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL600
Approval Subcontractor Prequalification for Lighting Control
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL605
Approval Subcontractor Prequalification for Fire Alarm and Voice Evacuation
System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL610
Approval Subcontractor Prequalification for Central Battery
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL620
Approval Subcontractor Prequalification for Garbage Containers/ Wall Guard
(Garbage Room)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL625
Approval Subcontractor Prequalification for Engineering Wood Flooring
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL630
Approval Subcontractor Prequalification for WC Cubicle Partition
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL640
Approval Subcontractor Prequalification for Internal Stone Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL645
Approval Subcontractor Prequalification Media Screen System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL650
Approval Subcontractor Prequalification for Scissor Lift/ Platform
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL655
Approval Subcontractor Prequalification for Roof Access Hatch
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL660
Approval Subcontractor Prequalification for BOH Equipment (OI)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL665
Approval Subcontractor Prequalification for Carpet Flooring
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL670
Approval Subcontractor Prequalification for Stainless Steel PVD Ceiling
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL675
Approval Subcontractor Prequalification for Cedar Wood Ceiling
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL680
Approval Subcontractor Prequalification for Stainless Steel Curved Ceiling
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL685
Approval Subcontractor Prequalification for Solid Wood Timber Finish
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL690 Submit
Subcontractor Prequalification for Central Clock System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL700 Submit
Subcontractor Prequalification for Facade Access System (Abseiling System/ Rope
Access)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL705
Approval Subcontractor Prequalification for Central Clock System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL715 Submit
Subcontractor Prequalification for FOH Counters
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL720
Approval Subcontractor Prequalification for Facade Access System (Abseiling
System/ Rope Access)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL725
Approval Subcontractor Prequalification for FOH Counters
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL726
Procurement of Subcontractor for Waterproofing (Sub-Structure)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL727
Procurement of Subcontractor for Waterproofing and Roofing (Super Structure)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL728
Procurement of Subcontractor for Post Tension Slab
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL729
Procurement of Subcontractor for Steel Structure
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL730
Procurement of Subcontractor for GRP Lining
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL731
Procurement of Subcontractor for GFRC Facade
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL732
Procurement of Subcontractor for Aluminum Facade Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL733
Procurement of Subcontractor for Facade Access System (Abseiling System/ Rope
Access)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL734
Procurement of Subcontractor for Garbage Containers/ Wall Guard (Garbage
Room)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL735
Procurement of Subcontractor for WC Cubicle Partition
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL736
Procurement of Subcontractor for BOH Equipment (OI)
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL737
Procurement of Subcontractor for Carpet Flooring
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL740
Procurement of Subcontractor for BOH Joinery
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL741
Procurement of Subcontractor for Roof Access Hatch
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL742
Procurement of Subcontractor for Polished Concrete Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL743
Procurement of Subcontractor for EIFS
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL744
Procurement of Subcontractor for FOH Counters
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL745
Procurement of Subcontractor for Stainless Steel Work
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL747
Procurement of Subcontractor for Internal Stone Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL749
Procurement of Subcontractor for Metal Doors Incl. Ironmongery
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL751
Procurement of Subcontractor for Suspended Ceiling & Drywall Partition
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL753
Procurement of Subcontractor for Ironmongery
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL756
Procurement of Subcontractor for Solid Wood Timber Finish
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL759
Procurement of Subcontractor for Decorative/Specialty Plaster
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL760
Procurement of Subcontractor for Interior Acoustic Wall Cladding
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL761
Procurement of Subcontractor for Stainless Steel PVD Ceiling
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL762
Procurement of Subcontractor for Stainless Steel Curved Ceiling
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL763
Procurement of Subcontractor for Wooden Wall Covering
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL764
Procurement of Subcontractor for Cedar Wood Ceiling
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL765
Procurement of Subcontractor for Acoustic Wood Panel Suspended Ceiling
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL766
Procurement of Subcontractor for Wood Parquet Floors
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL767
Procurement of Subcontractor for GRG Curved Ceiling Panel
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL768
Procurement of Subcontractor for Pergolas and Shades Cladding
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL769
Procurement of Subcontractor for Swimming Pool Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL770
Procurement of Subcontractor for Landscape Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL771
Procurement of Subcontractor for Central Battery
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL772
Procurement of Subcontractor for Electric Car Charging System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL774
Procurement of Subcontractor for Lighting Control
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL775
Procurement of Subcontractor for Fire Alarm and Voice Evacuation System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL781
Procurement of Subcontractor for Scissor Lift/ Platform
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL782
Procurement of Subcontractor for Vertical Transportation/ Elevator Works
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL784
Procurement of Subcontractor for Movable Wall/ Folding Partition System
Project: SHBLUD150324 Activity: EP.PQ.GN.GNR.GNRL785
Procurement of Subcontractor for Media Screen System
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL100
Procurement of Subcontractor for MEP
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL101
Procurement of Waterproofing (Sub-Structure)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL103
Procurement of Steel Reinforcment
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL105
Procurement of Lightning Protection System - Structural Fix
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL108
Procurement of Underground Pipes and Access
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL112
Procurement of WS Pipe Insulation
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL113
Procurement of Conduits and Accessories
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL114
Procurement of Drain Pipes Acoustic Insulation
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL115
Procurement of Condensate Drain Pipes and Access
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL116
Procurement of Water Supply Pipes and Access.
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL117
Procurement of Above-ground Pipes and Access
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL120
Procurement of CAT6 Cable
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL123
Procurement of Local Water Heaters (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL124
Procurement of Internal Ducts
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL125
Procurement of Airlock Room/ Vestibule Entrance Slab
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL127
Procurement of BMS (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL128
Procurement of Chilled Water Pipes and Accessories (Incl. OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL131
Procurement of GRP Lining
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL132
Procurement of Cable Trays and Trunking
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL133
Procurement of DX Split Units (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL139
Procurement of External Stud Wall System
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL142
Procurement of FCUs (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL144
Procurement of Manhole Covers (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL145
Procurement of Idfs and Mdfs (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL154
Procurement of Energy Meter (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL159
Procurement of GRP Paneled Tanks (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL165
Procurement of UPS (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL166
Procurement of Roof Waterproof
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL167
Procurement of Wet Area Waterproof
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL168
Procurement of Balcony/ Terraces Waterproofing
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL181
Procurement of Vent. Fans (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL194
Procurement of External Ducts
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL197
Procurement of Vinyl Flooring
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL198
Procurement of HD Polyurethane Flooring
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL216
Procurement of GFRC Facade Panel Cladding
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL219
Procurement of Render to Stud Wall Framing System and EIFS System (Long
Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL220
Procurement of Roof Bar Pergola
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL223
Procurement Outdoor Exercise Shade
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL226
Procurement of Water Feature to All Day Dining (Long Lead) (OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL231
Procurement of Kids Pool Shade (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL235
Procurement of Polished Concrete Works
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL243
Procurement of Wall Guard (Garbage Room)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL244
Procurement Decorative/Specialty Plaster
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL249
Procurement of Lightning Protection System - Roof Fix (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL251
Procurement of Metal Doors
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL252
Procurement of Granite Stone Paving (OI) (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL253
Procurement of Road/ Pavement Marking
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL254
Procurement of Loose Gravel Aggregate Surfacing
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL255
Procurement of Hoggin Granitic Aggregate Surfacing
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL256
Procurement of Boulders
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL257
Procurement of External Porcelain and Granite Tiles
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL258
Procurement of Topcrete Flooring
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL259
Procurement of Concrete Kerbstones, Edgings & Interlock
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL260
Procurement of Cast-in-situ Concrete Pavements
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL261
Procurement of TPV Flooring
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL262
Procurement of Traffic Accessories/ Wheel Stoppers
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL264
Procurement of Media Screen Structure and Platforms
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL270
Procurement of Gypsum Lining to Internal Areas
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL271
Procurement of Acoustic Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL273
Procurement of Aluminum Cladding (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL274
Procurement of Pantries (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL275
Procurement of Counters (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL276
Procurement of Electric Car Charging System (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL277
Procurement of LV Cables (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL280
Procurement of Garbage Containers
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL282
Procurement of FP Cable (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL283
Procurement of Landscape Furniture (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL284
Procurement of Timber Doors (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL285
Procurement of Precast Seating Walls and Blocks (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL286
Procurement of Bike Wash (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL289
Procurement of External Painting Works
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL290
Procurement of Glass Balustrade Railing (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL291
Procurement of Sliding Panel (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL294
Procurement of Dry Wall Partition
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL295
Procurement of Aluminum Tile Ceiling
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL297
Procurement of Grills and Diffusers (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL298
Procurement of Tiling Works (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL299
Procurement of Pool Gazebos (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL300
Procurement of Cafeteria Vanity Counters (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL304
Procurement of ATS (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL305
Procurement of Capacitor Bank (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL308
Procurement of Bicycle Racks
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL309
Procurement of Climbing Bars and Basket Ball Hoop
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL312
Procurement Kids Swimming Pool (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL314
Procurement of Outdoor Swimming Pool (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL316
Procurement of Lighting Control (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL317
Procurement of Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL318
Procurement of Reception Counters (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL319
Procurement of FOH Pantries (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL320
Procurement of Guest Wooden Joinery/Other Furnish. (Incl. OI) (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL321
Procurement of Business Centre Furnishing (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL322
Procurement of Wooden Balustrade - Feature Stair (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL327
Procurement of Roof Access Hatch (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL329
Procurement of Ironmongery (Long Lead) - (Incl. OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL336
Procurement of Fire Curtains (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL337
Procurement of Roller Shutters (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL340
Procurement of Softscape (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL341
Procurement of Bronze Mirror Ceiling (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL342
Procurement of FOH Vanity Counters (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL343
Procurement of Irrigation (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL344
Procurement of GRG Curved Ceiling Panel (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL347
Procurement of Sanitary Wares and Accessories (Long Lead) (Incl. OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL351
Procurement of Generator (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL352
Procurement of LV Panels (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL353
Procurement of Folding Partition At MICE (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL354
Procurement of Foldable Acoustic Wall - Meeting Rooms (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL356
Procurement of Access Ladders (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL357
Procurement of Railings to Staircases (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL358
Procurement of Railings/ Access Control Gates/ Steel Bridges At Roof (Long
Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL359
Procurement of Paneled Cement Board Ceiling
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL360
Procurement of Kitchen Equipment (Long Lead) (OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL361
Procurement of Chain Link Fencing (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL366
Procurement of Stainless Steel Work (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL367
Procurement of Indoor Swimming Pool (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL368
Procurement of Shower Glass Enclosures (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL371
Procurement of Central Clock System (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL372
Procurement of Perforated Metal Mesh Ceiling (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL373
Procurement of Acoustic Wood Panel Suspended Ceiling (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL374
Procurement of Fire Extinguishers
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL375
Procurement of Facade Access System (Abseiling System/ Rope Access) (Long
Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL382
Procurement of Engineering Wood Flooring (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL383
Procurement of WC Cubicle Partition (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL384
Procurement of Staff Dining Equipment (Long Lead) (OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL385
Procurement of FOH Carpets (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL386
Procurement of Airlock Carpet (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL387
Procurement of Modular Carpet Flooring (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL388
Procurement of Stainless Steel PVD Ceiling (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL389
Procurement of Cedar Wood Ceiling (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL390
Procurement of Stainless Steel Curved Ceiling (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL398
Procurement of Facade Aluminum Louvres and Trellis (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL408
Procurement of Facade Vestibule Entrance (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL412
Procurement of Internal Stone Works (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL413
Procurement Media Screen System (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL414
Procurement of Scissor Lift/ Platform (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL415
Procurement of Laundry Equipment (Long Lead) (OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL416
Procurement of Bar Equipment (Long Lead) (OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL417
Procurement of FOH Metal Skirtings (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL418
Procurement of Solid Wood Timber Finish (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL423
Procurement of Sprinkler System (Incl. OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL424
Procurement of Facade Balcony Fascia (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL432
Procurement of 24 Hours Bulk Storage Tank (Long Lead) (OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL441
Procurement of Staircase (At Hotel Gym and Spa Building)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL443
Procurement of Pergola to All Day Dining (Long Lead) (OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL451
Procurement of Time and Attendance System (OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL457
Procurement of External Shade/ Pergola (OI)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL459
Procurement of Edge Switches (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL480 First
Delivery of Cast-in-situ Concrete Pavements
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL485
Procurement of Entrance Canopy
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL486
Procurement of Reception and Entrance FF&E (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL487
Procurement of All Day Dining Counters (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL488
Procurement of Cafe Retail Counters (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL489
Procurement of Business Centre Furnishing (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL490
Procurement of Roof Bar Counters (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL492
Procurement of Facade Aluminum External Shadow Feature (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL510
Procurement of Lobby Cafe Hub Counters (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL513
Procurement of Fire Pump (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL520
Procurement of Facade Aluminum Canopy (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL523
Procurement of Mirrors (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL543
Procurement of GFRC Planters (Long Lead)
Project: SHBLUD150324 Activity: EP.PR.GN.GNR.GNRL566
Procurement of Cladding and Fins to Shade/Overhang Canopy (OI) (Long Lead)
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL100 Prep.
& Sub. of Shop Drawings for Builders Works - Zone B - L01 Slab
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL110 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone B - L01 Slab
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL120 Prep.
& Sub. of Shop Drawings for Builders Works - Zone A - L01 Slab
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL140 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone A - L01 Slab
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL150 Rev. &
App. of Shop Drawings for Structural Concrete - Zone B - L01 Slab
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL180 Rev. &
App. of Shop Drawings for Structural Concrete - Zone A - L01 Slab
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL800
Submission of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL805
Approval of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL810
Submission of Wall Finishes layout
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL815
Submission of Floor Finishes layout
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL820
Submission of Reflected Ceiling layout
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL825
Approval of Wall Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL830
Approval of Floor Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.01.GNR.GNRL835
Approval of Reflected Ceiling Layout
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL110 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL130 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL150 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL800
Submission of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL805
Approval of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL810
Submission of Wall Finishes layout
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL815
Submission of Floor Finishes layout
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL820
Submission of Reflected Ceiling layout
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL825
Approval of Wall Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL830
Approval of Floor Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.02.GNR.GNRL835
Approval of Reflected Ceiling Layout
Project: SHBLUD150324 Activity: EP.SD.03.GNR.GNRL800
Submission of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.03.GNR.GNRL805
Approval of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.03.GNR.GNRL810
Submission of Wall Finishes layout
Project: SHBLUD150324 Activity: EP.SD.03.GNR.GNRL815
Submission of Floor Finishes layout
Project: SHBLUD150324 Activity: EP.SD.03.GNR.GNRL820
Submission of Reflected Ceiling layout
Project: SHBLUD150324 Activity: EP.SD.03.GNR.GNRL825
Approval of Wall Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.03.GNR.GNRL830
Approval of Floor Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.03.GNR.GNRL835
Approval of Reflected Ceiling Layout
Project: SHBLUD150324 Activity: EP.SD.04.GNR.GNRL800
Submission of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.04.GNR.GNRL805
Approval of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.04.GNR.GNRL810
Submission of Wall Finishes layout
Project: SHBLUD150324 Activity: EP.SD.04.GNR.GNRL815
Submission of Floor Finishes layout
Project: SHBLUD150324 Activity: EP.SD.04.GNR.GNRL820
Approval of Wall Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.04.GNR.GNRL825
Submission of Reflected Ceiling layout
Project: SHBLUD150324 Activity: EP.SD.04.GNR.GNRL830
Approval of Floor Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.04.GNR.GNRL835
Approval of Reflected Ceiling Layout
Project: SHBLUD150324 Activity: EP.SD.05.GNR.GNRL815
Submission of Floor Finishes layout
Project: SHBLUD150324 Activity: EP.SD.05.GNR.GNRL825
Submission of Reflected Ceiling layout
Project: SHBLUD150324 Activity: EP.SD.05.GNR.GNRL830
Approval of Floor Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.05.GNR.GNRL835
Approval of Reflected Ceiling Layout
Project: SHBLUD150324 Activity: EP.SD.06.GNR.GNRL800
Submission of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.06.GNR.GNRL805
Approval of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.06.GNR.GNRL810
Submission of Wall Finishes layout
Project: SHBLUD150324 Activity: EP.SD.06.GNR.GNRL815
Submission of Floor Finishes layout
Project: SHBLUD150324 Activity: EP.SD.06.GNR.GNRL820
Approval of Wall Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.06.GNR.GNRL825
Submission of Reflected Ceiling layout
Project: SHBLUD150324 Activity: EP.SD.06.GNR.GNRL830
Approval of Floor Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.06.GNR.GNRL835
Approval of Reflected Ceiling Layout
Project: SHBLUD150324 Activity: EP.SD.07.GNR.GNRL800
Submission of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.07.GNR.GNRL805
Approval of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.07.GNR.GNRL810
Submission of Wall Finishes layout
Project: SHBLUD150324 Activity: EP.SD.07.GNR.GNRL815
Submission of Floor Finishes layout
Project: SHBLUD150324 Activity: EP.SD.07.GNR.GNRL820
Approval of Wall Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.07.GNR.GNRL825
Submission of Reflected Ceiling layout
Project: SHBLUD150324 Activity: EP.SD.07.GNR.GNRL830
Approval of Floor Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.07.GNR.GNRL835
Approval of Reflected Ceiling Layout
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL150 Shop
Drawings Submittal for Waterproofing (Sub-Structure)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL152 Shop
Drawings Approval for Waterproofing (Sub-Structure)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL154 Shop
Drawings Submittal for Lightning Protection System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL156 Shop
Drawings Approval for Lightning Protection System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL160 Shop
Drawings Submittal for BMS
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL162 Shop
Drawings Submittal for FF System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL166 Shop
Drawings Submittal for Telecom and IPTV System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL170 Shop
Drawings Submittal for Drainage System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL174
Airlock Room/ Vestibule Entrance Slab - Shop Drawing Submission to Consultant
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL178 Shop
Drawings Approval for BMS
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL180 Shop
Drawings Approval for FF System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL184 Shop
Drawings Approval for Telecom and IPTV System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL188 Shop
Drawings Approval for Drainage System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL192
Airlock Room/ Vestibule Entrance Slab - Shop Drawing Approval from Consultant
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL194
Airlock Room/ Vestibule Entrance Slab - Shop Drawing Submission to 3rd Party
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL196
Airlock Room/ Vestibule Entrance Slab - Shop Drawing Approval from 3rd Party
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL198 Shop
Drawings Submittal for External Stud Wall System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL200
Airlock Room/ Vestibule Entrance Slab - Shop Drawing Submission to ADM
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL202
Airlock Room/ Vestibule Entrance Slab - Shop Drawing Approval from ADM
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL204 Shop
Drawings Approval for External Stud Wall System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL210 Shop
Drawings Submittal for GRP Lining
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL218 Shop
Drawings Submittal for Render to Stud Wall Framing System and EIFS System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL220 Shop
Drawings Submittal for Aluminum Cladding
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL226 Shop
Drawings Approval for GRP Lining
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL232 Shop
Drawings Submittal for Electric Car Charging System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL236 Shop
Drawings/ Design/ Calculation Submittal for GFRC Facade Panel Cladding
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL240 Shop
Drawings Approval for Render to Stud Wall Framing System and EIFS System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL242 Shop
Drawings Approval for Aluminum Cladding
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL248 Media
Screen Structure and Platforms -Shop drawing Submission to Consulatnt
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL254 Shop
Drawings Submittal for Tiling Works
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL256 Shop
Drawings Submittal for Pool Gazebos
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL258 Shop
Drawings Submittal for Roof Bar Pergola
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL260 Shop
Drawings Submittal Outdoor Exercise Shade
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL262 Shop
Drawings Submittal for Kids Pool Shade
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL266 Shop
Drawings Submittal for Pantries
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL268 Shop
Drawings Submittal for Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL270 Shop
Drawings Submittal for Cafeteria Vanity Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL276 Shop
Drawings Submittal for Roof Waterproof
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL278 Shop
Drawings Submittal for Wet Area Waterproof
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL282 Shop
Drawings Submittal for Vinyl Flooring
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL284 Shop
Drawings Submittal for Balcony/ Terraces Waterproofing
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL286 Shop
Drawings Submittal for Polished Concrete Works
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL288 Shop
Drawings Submittal for HD Polyurethane Flooring
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL292 Shop
Drawings Approval for Electric Car Charging System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL296 Shop
Drawings/ Design/ Calculation Approval for GFRC Facade Panel Cladding
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL298 Shop
Drawings Submittal for Perforated Metal Mesh Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL300 Shop
Drawings/ Design/ Calculation Submittal for Glass Balustrade Railing
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL304 Shop
Drawings Submittal for Acoustic Wood Panel Suspended Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL308 Shop
Drawings Approval for Tiling Works
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL310 Shop
Drawings Approval for Pool Gazebos
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL312 Shop
Drawings Approval for Roof Bar Pergola
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL314 Shop
Drawings Approval Outdoor Exercise Shade
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL316 Shop
Drawings Approval for Kids Pool Shade
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL320 Shop
Drawings Approval for Pantries
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL322 Shop
Drawings Approval for Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL324 Shop
Drawings Approval for Cafeteria Vanity Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL326 Shop
Drawings Submittal for Metal Doors
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL328 Shop
Drawings Submittal for Landscape Furniture
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL330 Shop
Drawings Submittal for Softscape
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL332 Shop
Drawings Submittal for Reception Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL334 Shop
Drawings Submittal for FOH Pantries
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL338 Shop
Drawings Approval for Roof Waterproof
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL340 Shop
Drawings Approval for Wet Area Waterproof
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL342 Shop
Drawings Submittal for Hardscape
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL346 Shop
Drawings Submittal for Bronze Mirror Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL348 Shop
Drawings Submittal for FOH Vanity Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL352 Shop
Drawings Approval for Vinyl Flooring
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL354 Shop
Drawings Approval for Balcony/ Terraces Waterproofing
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL358 Shop
Drawings Submittal for Roller Shutters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL362 Shop
Drawings Submittal for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL364 Shop
Drawings Submittal for Wooden Balustrade - Feature Stair
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL366 Shop
Drawings Approval for Polished Concrete Works
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL368 Shop
Drawings Approval for HD Polyurethane Flooring
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL370 Shop
Drawings Submittal for Irrigation
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL372 Shop
Drawings Submittal for GRG Curved Ceiling Panel
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL376 Media
Screen Structure and Platforms -Shop drawing Submission to 3rd Party
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL380 Shop
Drawings Approval for Perforated Metal Mesh Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL382 Shop
Drawings/ Design/ Calculation Approval for Glass Balustrade Railing
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL386 Shop
Drawings Approval for Acoustic Wood Panel Suspended Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL388 Shop
Drawings Submittal for Folding Partition At MICE
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL390 Shop
Drawings Submittal for Indoor Swimming Pool
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL392 Shop
Drawings Submittal Kids Swimming Pool
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL394 Shop
Drawings Submittal for Outdoor Swimming Pool
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL396 Shop
Drawings Submittal for Foldable Acoustic Wall - Meeting Rooms
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL398 Shop
Drawings Approval for Metal Doors
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL400 Shop
Drawings Approval for Landscape Furniture
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL402 Shop
Drawings Approval for Softscape
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL404 Shop
Drawings Approval for Reception Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL406 Shop
Drawings Approval for FOH Pantries
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL408 Shop
Drawings Approval for Hardscape
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL410 Shop
Drawings Approval for Bronze Mirror Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL412 Shop
Drawings Approval for FOH Vanity Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL416 Shop
Drawings Submittal for Facade Aluminum Louvres and Trellis
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL420 Shop
Drawings Approval for Roller Shutters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL424 Shop
Drawings Approval for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL426 Shop
Drawings Approval for Wooden Balustrade - Feature Stair
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL428 Shop
Drawings Approval for Irrigation
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL430 Shop
Drawings Approval for GRG Curved Ceiling Panel
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL432 Shop
Drawings Submittal for Dry Wall Partition
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL434 Shop
Drawings Submittal for Aluminum Tile Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL436 Shop
Drawings Submittal for Gypsum Lining to Internal Areas
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL438 Shop
Drawings Submittal for Acoustic Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL440 Shop
Drawings Submittal for Lighting Control
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL442 Shop
Drawings Submittal for Fire Alarm and Voice Evacuation System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL444 Shop
Drawings Submittal for Central Battery
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL446 Media
Screen Structure and Platforms -Shop drawing Submission to ADM
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL450 Shop
Drawings Submittal for Roof Access Hatch
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL454 Shop
Drawings Submittal for Facade Vestibule Entrance
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL456 Shop
Drawings Submittal for Stainless Steel Work
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL458 Shop
Drawings Approval for Folding Partition At MICE
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL460 Shop
Drawings Approval for Indoor Swimming Pool
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL462 Shop
Drawings Approval Kids Swimming Pool
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL464 Shop
Drawings Approval for Outdoor Swimming Pool
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL466 Shop
Drawings Approval for Foldable Acoustic Wall - Meeting Rooms
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL468
External Shade/ Pergola - Shop Drawing Submission to Consultant (OI)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL470 Shop
Drawings Approval for Facade Aluminum Louvres and Trellis
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL472 Shop
Drawings Approval for Dry Wall Partition
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL474 Shop
Drawings Approval for Aluminum Tile Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL476 Shop
Drawings Submittal for Shower Glass Enclosures
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL478 Shop
Drawings Submittal for Facade Balcony Fascia
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL480 Shop
Drawings Approval for Gypsum Lining to Internal Areas
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL482 Shop
Drawings Approval for Acoustic Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL484 Shop
Drawings Approval for Lighting Control
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL486 Shop
Drawings Approval for Fire Alarm and Voice Evacuation System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL488 Shop
Drawings Approval for Central Battery
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL492 Shop
Drawings Submittal for Ironmongery - (Incl. OI)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL494 Shop
Drawings/ Design/ Calculation Submittal for Access Ladders
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL496 Shop
Drawings/ Design/ Calculation Submittal for Railings to Staircases
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL498 Shop
Drawings Submittal for Wall Guard (Garbage Room)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL500 Shop
Drawings Submittal for Garbage Containers
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL502 Shop
Drawings Submittal for Engineering Wood Flooring
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL504 Shop
Drawings Submittal for WC Cubicle Partition
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL508 Shop
Drawings Submittal for Internal Stone Works
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL510 Shop
Drawings Submittal Media Screen System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL512 Shop
Drawings Submittal for Scissor Lift/ Platform
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL514 Shop
Drawings/ Design/ Calculation Submittal for Railings/ Access Control Gates/ Steel
Bridges At Roof
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL516 Shop
Drawings Submittal for Bicycle Racks
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL518 Shop
Drawings Approval for Roof Access Hatch
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL520 Shop
Drawings Submittal for Climbing Bars and Basket Ball Hoop
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL522 Shop
Drawings Submittal for Laundry Equipment (OI)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL524 Shop
Drawings Submittal for Staff Dining Equipment (OI)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL526 Shop
Drawings Submittal for Bar Equipment (OI)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL528 Shop
Drawings Submittal for Kitchen Equipment (OI)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL530 Shop
Drawings Submittal for FOH Metal Skirtings
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL532 Shop
Drawings Submittal for FOH Carpets
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL534 Shop
Drawings Submittal for Airlock Carpet
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL536 Shop
Drawings Submittal for Modular Carpet Flooring
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL538 Shop
Drawings/ Design/ Calculation Submittal for Chain Link Fencing
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL540 Shop
Drawings Submittal for Stainless Steel PVD Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL542 Shop
Drawings Submittal for Cedar Wood Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL544 Shop
Drawings Submittal for Stainless Steel Curved Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL546 Shop
Drawings Submittal for Solid Wood Timber Finish
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL550 Shop
Drawings Approval for Facade Vestibule Entrance
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL552 Shop
Drawings Approval for Stainless Steel Work
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL554 Shop
Drawings Submittal for Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL560 Shop
Drawings Approval for Shower Glass Enclosures
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL562 Shop
Drawings Submittal for Facade Access System (Abseiling System/ Rope Access)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL564 Shop
Drawings Approval for Facade Balcony Fascia
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL568 Shop
Drawings Approval for Ironmongery - (Incl. OI)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL570 Shop
Drawings/ Design/ Calculation Approval for Access Ladders
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL572 Shop
Drawings/ Design/ Calculation Approval for Railings to Staircases
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL574 Shop
Drawings Approval for Wall Guard (Garbage Room)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL576 Shop
Drawings Approval for Garbage Containers
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL578 Shop
Drawings Approval for Engineering Wood Flooring
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL580 Shop
Drawings Approval for WC Cubicle Partition
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL584 Shop
Drawings Approval for Internal Stone Works
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL586 Shop
Drawings Approval Media Screen System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL588 Shop
Drawings Approval for Scissor Lift/ Platform
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL590 Shop
Drawings/ Design/ Calculation Approval for Railings/ Access Control Gates/ Steel
Bridges At Roof
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL592 Shop
Drawings Approval for Bicycle Racks
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL594 Shop
Drawings Approval for Climbing Bars and Basket Ball Hoop
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL596 Shop
Drawings Approval for Laundry Equipment (OI)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL598 Shop
Drawings Approval for Staff Dining Equipment (OI)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL600 Shop
Drawings Approval for Bar Equipment (OI)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL602 Shop
Drawings Approval for Kitchen Equipment (OI)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL604 Shop
Drawings Approval for FOH Metal Skirtings
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL606 Shop
Drawings Approval for FOH Carpets
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL608 Shop
Drawings Approval for Airlock Carpet
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL610 Shop
Drawings Approval for Modular Carpet Flooring
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL612 Shop
Drawings/ Design/ Calculation Approval for Chain Link Fencing
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL614 Shop
Drawings Approval for Stainless Steel PVD Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL616 Shop
Drawings Approval for Cedar Wood Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL618 Shop
Drawings Approval for Stainless Steel Curved Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL620 Shop
Drawings Approval for Solid Wood Timber Finish
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL622
Entrance Canopy - Shop Drawing Submission to Consultant
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL624 Shop
Drawings Submittal for Facade Aluminum External Shadow Feature
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL626 Shop
Drawings Approval for Gypsum Board Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL628 Shop
Drawings Submittal for Central Clock System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL632
Staircase (At Hotel Gym and Spa Building) - Shop Drawing Submission to
Consultant
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL636 Shop
Drawings Approval for Facade Access System (Abseiling System/ Rope Access)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL638 Shop
Drawings Submittal for Paneled Cement Board Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL640
Entrance Canopy - Shop Drawing Approval from Consultant
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL642 Shop
Drawings Approval for Facade Aluminum External Shadow Feature
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL644 Shop
Drawings Approval for Central Clock System
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL646 Shop
Drawings Submittal for Reception and Entrance FF&E
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL648 Shop
Drawings Submittal for All Day Dining Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL650 Shop
Drawings Submittal for Lobby Cafe Hub Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL652 Shop
Drawings Submittal for Cafe Retail Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL654 Shop
Drawings Submittal for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL656 Shop
Drawings Submittal for Roof Bar Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL658
Staircase (At Hotel Gym and Spa Building) - Shop Drawing Appproval from
Consultant
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL662 Shop
Drawings Approval for Paneled Cement Board Ceiling
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL664 Shop
Drawings Submittal for Facade Aluminum Canopy
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL666
Staircase (At Hotel Gym and Spa Building) - Shop Drawing Submission to 3rd
Party
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL668
Entrance Canopy - Shop Drawing Submission to 3rd party
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL670 Shop
Drawings Approval for Reception and Entrance FF&E
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL672 Shop
Drawings Approval for All Day Dining Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL674 Shop
Drawings Approval for Lobby Cafe Hub Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL676 Shop
Drawings Approval for Cafe Retail Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL678 Shop
Drawings Approval for Business Centre Furnishing
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL680 Shop
Drawings Approval for Roof Bar Counters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL684 Shop
Drawings Approval for Facade Aluminum Canopy
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL686
Staircase (At Hotel Gym and Spa Building) - Shop Drawing Appproval from 3rd
Party
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL688
Staircase (At Hotel Gym and Spa Building) - Shop Drawing Submission to ADM
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL690
Entrance Canopy - Shop Drawing Approval from 3rd Party
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL692 Shop
Drawings Submittal for GFRC Planters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL696 Shop
Drawings/ Design/ Calculation Submittal for Mirrors
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL698
Staircase (At Hotel Gym and Spa Building) - Shop Drawing Appproval from ADM
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL700
Entrance Canopy - Shop Drawing Submission to ADM
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL702 Shop
Drawings Approval for GFRC Planters
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL704 Shop
Drawings/ Design/ Calculation Approval for Mirrors
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL706
Entrance Canopy - Shop Drawing Approval from ADM
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL711 Shop
Drawings Approval for Cladding and Fins to Shade/Overhang Canopy (OI)
Project: SHBLUD150324 Activity: EP.SD.GN.GNR.GNRL716 Shop
Drawings Submittal for Cladding and Fins to Shade/Overhang Canopy (OI)
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL140 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL210 Rev. &
App. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL800
Submission of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL805
Approval of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL810
Submission of Wall Finishes layout
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL815
Submission of Floor Finishes layout
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL820
Approval of Wall Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL825
Submission of Reflected Ceiling layout
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL830
Approval of Floor Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.HG.GNR.GNRL835
Approval of Reflected Ceiling Layout
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL100 Prep.
& Sub. of Shop Drawings for Builders Works - Zone B-Lift Pit & Core Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL110 Prep.
& Sub. of Shop Drawings for Builders Works - Zone A - Pile Cap, Strips Column &
Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL120 Prep.
& Sub. of Shop Drawings for Builders Works - Zone B - Pile Cap, Strips Column &
Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL130 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone B -Lift Pit & Core Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL140 Prep.
& Sub. of Shop Drawings for Builders Work - Zone A -Lift Pit & Core Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL150 Prep.
& Sub. of Shop Drawings for Reinforcement - Zone B -Lift Pit & Core Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL160 Prep.
& Sub. of Shop Drawings for Builders Works - Zone B - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL170 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone A - Pile Cap, Strips Column
& Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL180 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone B - Pile Cap, Strips Column
& Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL190 Prep.
& Sub. of Shop Drawings for Builders Works - Zone C - Pile Cap, Strips Column &
Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL200 Rev. &
App. of Shop Drawings for Structural Concrete - Zone B -Lift Pit & Core Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL210 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone A -Lift Pit & Core Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL220 Rev. &
App. of Shop Drawings for Reinforcement - Zone B-Lift Pit & Core Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL230 Prep.
& Sub. of Shop Drawings for Builders Works - Zone A - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL240 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone B - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL250 Prep.
& Sub. of Shop Drawings for Reinforcement - Zone A - Pile Cap, Strips Column & Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL260 Prep.
& Sub. of Shop Drawings for Reinforcement - Zone B - Pile Cap, Strips Column & Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL270 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone C - Pile Cap, Strips Column
& Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL280 Rev. &
App. of Shop Drawings for Structural Concrete - Zone B - Pile Cap, Strips Column &
Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL290 Rev. &
App. of Shop Drawings for Structural Concrete - Zone A -Lift Pit & Core Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL300 Prep.
& Sub. of Shop Drawings for Reinforcement - Zone A - Lift Pit & Core Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL310 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone A - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL320 Prep.
& Sub. of Shop Drawings for Reinforcement - Tie Slab - Zone B
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL330 Prep.
& Sub. of Shop Drawings for Builders Works - Zone C - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL340 Rev. &
App. of Shop Drawings for Structural Concrete - Zone A - Pile Cap, Strips Column &
Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL350 Prep.
& Sub. of Shop Drawings for Reinforcement - Zone C - Pile Cap, Strips Column & Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL360 Rev. &
App. of Shop Drawings for Reinforcement - Zone B - Pile Cap, Strips Column & Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL370 Rev. &
App. of Shop Drawings for Reinforcement - Zone A - Lift Pit & Core Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL380 Prep.
& Sub. of Shop Drawings for Reinforcement - Zone A - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL390 Rev. &
App. of Shop Drawings for Structural Concrete - Zone B - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL400 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone C - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL410 Rev. &
App. of Shop Drawings for Reinforcement - Zone A - Pile Cap, Strips Column & Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL420 Rev. &
App. of Shop Drawings for Structural Concrete - Zone C - Pile Cap, Strips Column &
Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL430 Rev. &
App. of Shop Drawings for Structural Concrete - Zone A - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL450 Prep.
& Sub. of Shop Drawings for Reinforcement - Zone C - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL460 Rev. &
App. of Shop Drawings for Reinforcement - Zone C - Pile Cap, Strips Column & Wall
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL470 Rev. &
App. of Shop Drawings for Reinforcement - Zone A - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL480 Rev. &
App. of Shop Drawings for Structural Concrete - Zone C - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL490 Rev. &
App. of Shop Drawings for Reinforcement - Zone C - Tie Slab
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL500 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL510 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL520 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL530 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL550 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL570 Rev. &
App. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL580 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL590 Rev. &
App. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL610 Prep.
& Sub. of Shop Drawings for Reinforcement
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL630 Rev. &
App. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL640 Rev. &
App. of Shop Drawings for Reinforcement
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL800
Submission of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL805
Approval of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL810
Submission of Wall Finishes layout
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL815
Submission of Floor Finishes layout
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL820
Approval of Wall Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL825
Submission of Reflected Ceiling layout
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL830
Approval of Floor Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.LG.GNR.GNRL835
Approval of Reflected Ceiling Layout
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL100 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL110 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL120 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL130 Prep.
& Sub. of Shop Drawings for Reinforcement
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL140 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL150 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL160 Rev. &
App. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL170 Prep.
& Sub. of Shop Drawings for Reinforcement
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL180 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL190 Rev. &
App. of Shop Drawings for Reinforcement
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL200 Rev. &
App. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL210 Prep.
& Sub. of Shop Drawings for Reinforcement
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL220 Rev. &
App. of Shop Drawings for Reinforcement
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL230 Rev. &
App. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.PP.GNR.GNRL240 Rev. &
App. of Shop Drawings for Reinforcement
Project: SHBLUD150324 Activity: EP.SD.UB.GNR.GNRL100 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.UB.GNR.GNRL110 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.UB.GNR.GNRL160 Rev. &
App. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.UB.GNR.GNRL800
Submission of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.UB.GNR.GNRL805
Approval of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.UB.GNR.GNRL810
Submission of Wall Finishes layout
Project: SHBLUD150324 Activity: EP.SD.UB.GNR.GNRL815
Submission of Floor Finishes layout
Project: SHBLUD150324 Activity: EP.SD.UB.GNR.GNRL820
Approval of Wall Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.UB.GNR.GNRL825
Submission of Reflected Ceiling layout
Project: SHBLUD150324 Activity: EP.SD.UB.GNR.GNRL830
Approval of Floor Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.UB.GNR.GNRL835
Approval of Reflected Ceiling Layout
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL100 Prep.
& Sub. of Shop Drawings for Builders Works - Zone B - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL110 Prep.
& Sub. of Shop Drawings for Builders Works - Zone A - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL120 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone B - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL130 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone A - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL150 Prep.
& Sub. of Shop Drawings for Builders Works - Zone C - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL160 Prep.
& Sub. of Shop Drawings for Reinforcement - Zone A - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL170 Rev. &
App. of Shop Drawings for Structural Concrete - Zone B - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL180 Prep.
& Sub. of Shop Drawings for Structural Concrete - Zone C - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL190 Rev. &
App. of Shop Drawings for Structural Concrete - Zone A - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL210 Prep.
& Sub. of Shop Drawings for Reinforcement - Zone C - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL230 Rev. &
App. of Shop Drawings for Structural Concrete - Zone C - UGF Slab
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL500 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL510 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL520 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL530 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL550 Prep.
& Sub. of Shop Drawings for Builders Works
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL570 Rev. &
App. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL580 Prep.
& Sub. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL610 Prep.
& Sub. of Shop Drawings for Reinforcement
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL630 Rev. &
App. of Shop Drawings for Structural Concrete
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL640 Rev. &
App. of Shop Drawings for Reinforcement
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL800
Submission of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL805
Approval of Block Work Layout
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL810
Submission of Wall Finishes layout
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL815
Submission of Floor Finishes layout
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL820
Approval of Wall Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL825
Submission of Reflected Ceiling layout
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL830
Approval of Floor Finishes Layout
Project: SHBLUD150324 Activity: EP.SD.UG.GNR.GNRL835
Approval of Reflected Ceiling Layout
Project: SHBLUD150324 Activity: IA.GN.GN.GNR.GNRL100 Upload
Documents to ADM System - Dewatering Design
Project: SHBLUD150324 Activity: IA.GN.GN.GNR.GNRL110
Approval by ADM - Dewatering Takeover
Project: SHBLUD150324 Activity: IA.GN.GN.GNR.GNRL120
Submission of Plumbing Drawings to ADM Plumbing
Project: SHBLUD150324 Activity: IA.GN.GN.GNR.GNRL140
Submission of Telecom Drawings to Etisalat
Project: SHBLUD150324 Activity: IA.GN.GN.GNR.GNRL150
Approval of Plumbing Drawings from ADM Plumbing
Project: SHBLUD150324 Activity: IA.GN.GN.GNR.GNRL170
Approval of Telecom Drawings from Etisalat
Project: SHBLUD150324 Activity: ML.GN.GN.GNR.GNRL100
Commencement Date
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL100
Snagging Works - Zone A- BOH - UGF
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL103 De-
Snagging Works - Zone A- BOH - UGF
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL106
Snagging Works - Zone A- BOH - L02
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL109
Snagging Works - Zone B- BOH - L02
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL112
Snagging Works - Zone B- BOH - L03
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL115 Apply
Inspection to Air Traffic Control Department
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL118
Snagging Works - Zone B- BOH - L04
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL121
Inspection and Approval from Air Traffic Control Department
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL124 De-
Snagging Works - Zone A- BOH - L02
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL127 De-
Snagging Works - Zone B- BOH - L02
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL130
Snagging Works - Zone A- BOH - L03
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL133
Snagging Works - Zone B- BOH - L05
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL136 De-
Snagging Works - Zone B- BOH - L03
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL139
Snagging Works - Zone A- BOH - L04
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL142 De-
Snagging Works - Zone B- BOH - L04
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL148 De-
Snagging Works - Zone A- BOH - L03
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL151
Snagging Works - Zone B- BOH - L06
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL154 De-
Snagging Works - Zone B- BOH - L05
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL163 De-
Snagging Works - Zone A- BOH - L04
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL169 De-
Snagging Works - Zone B- BOH - L06
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL172
Snagging Works - Pump/Plant Room Building
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL175 Apply
for Storm Water Inspection
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL178
Snagging Works - Zone A- Elevation
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL181 De-
Snagging Works - Pump/Plant Room Building
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL184
Inspection and Approval for Storm Water
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL187
Snagging Works - Utility Building
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL190
Snagging Works - Zone C- BOH - LRF
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL193
Snagging Works - Pool Bar Builidng
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL196
Snagging Works - Zone B- FOH - L01
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL199
Snagging Works - Zone B- FOH - L02
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL202
Snagging Works - Zone C- BOH - LGF
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL205 De-
Snagging Works - Utility Building
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL208 De-
Snagging Works - Elevation
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL226 Keys
and Permanent Cylinders
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL238 Apply
to Road Dept. for Entrances Inspection
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL241 Apply
to DOT for Inspection
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL244 De-
Snagging Works - Pool Bar Building
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL247
Snagging Works - Zone C- Elevation
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL250 Apply
to DOT for Inspection
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL253 De-
Snagging Works - Zone C- BOH - LGF
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL256 De-
Snagging Works - Zone C- FOH - LRF
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL265
Snagging Works - Zone C- FOH - UGF
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL274 De-
Snagging Works - Zone B- FOH - L01
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL283 De-
Snagging Works - Zone B- FOH - L02
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL307
Inspection and Approval from Road Dept.
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL310
Inspection and Approval
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL313
Inspection and Approval
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL355 De-
Snagging Works - Zone C- FOH - LUF
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL367 De-
Snagging Works - Zone C- Elevation
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL415
Snagging Works - Zone A- FOH - L01
Project: SHBLUD150324 Activity: PC.GN.GN.GNR.GNRL496 De-
Snagging Works - Zone A- FOH - L01
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL100
Decision by Client to Revert to Headboard Wall Finish
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL103
Receive 100% Design (IFC Drawings) from Client for Headboard Wall Finish
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL106
Decision by Client to Revert to Using Seamless Carbon Steel Pipes
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL109
Receive 100% Design (IFC Drawings) from Client for Using Seamless Carbon
Steel Pipes
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL118
Decision by Client to Revert to Corridor Wall Finish
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL121
Receive 100% Design (IFC Drawings) from Client for Corridor Wall Finish
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL124
Decision by Client to Revert to Specification Size of Tiles
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL127
Receive 100% Design (IFC Drawings) from Client for Specification Size of
Tiles
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL142
Decision by Client to Revert to Implementing Factory Test Witnesses
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL145
Receive 100% Design (IFC Drawings) from Client for Implementing Factory Test
Witnesses
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL148
Decision by Client to Revert to LSF Cable Insulation Instead of PVC
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL151
Receive 100% Design (IFC Drawings) from Client for LSF Cable Insulation
Instead of PVC
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL154
Decision by Client to Revert to Luminaires in the Lift Shafts
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL157
Receive 100% Design (IFC Drawings) from Client for Luminaires in the Lift
Shafts
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL175
Decision by Client to Revert to Incl. Water Feature to All Day Dining
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL178
Receive 100% Design (IFC Drawings) from Client for Incl. Water Feature to All
Day Dining
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL187
Decision by Client to Revert to Accessory Plate Finish
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL190
Receive 100% Design (IFC Drawings) from Client for Accessory Plate Finish
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL232
Decision by Client to Revert to Structural Steel for Concealed Hinges Instead
of Exposed Hinges
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL235
Receive 100% Design (IFC Drawings) from Client for Concealed Hinges Instead
of Exposed
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL280
Decision by Client to Revert to Structural Steel for Shade Canopies
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL283
Receive 100% Design (IFC Drawings) from Client for Structural Steel for Shade
Canopies
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL289
Decision by Client to Revert to Original Kitchen Equipment Brand Options
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL292
Receive 100% Design (IFC Drawings) from Client for Original Kitchen Equipment
Brand Options
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL298
Decision by Client to Revert to Redundant UPS Set Incl. Related Batteries
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL301
Receive 100% Design (IFC Drawings) from Client for Redundant UPS Set Incl.
Related Batteries
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL388
Decision by Client to Revert to Granite Paving Instead of Precast Concrete
Paver
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL391
Receive 100% Design (IFC Drawings) from Client for Granite Paving Instead of
Concrete Paver
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL394
Decision by Client to Revert to Original Specification for Fitting LA(1)
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL397
Receive 100% Design (IFC Drawings) from Client for Original Specification for
Fitting LA(1)
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL406
Decision by Client to Revert to Structural Steel for Swimming Pool Fins
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL409
Receive 100% Design (IFC Drawings) from Client for Swimming Pool Fins
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL412
Decision by Client to Revert to Powder Coated Stainless Steel
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL415
Receive 100% Design (IFC Drawings) from Client for Powder Coated Stainless
Steel
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL418
Decision by Client to Revert to Having LED Light and Mirror in the Bedroom
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL421
Receive 100% Design (IFC Drawings) from Client for Having LED Light and
Mirror in the Bedroom
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL424
Decision by Client to Revert to Original Specifications for Sanitaryware
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL427
Receive 100% Design (IFC Drawings) from Client for Original Specifications
for Sanitaryware
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL436
Decision by Client to Revert to Pergola to All Day Dining
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL439
Receive 100% Design (IFC Drawings) from Client for Pergola to All Day Dining
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL469
Decision by Client to Reintroduce 24 Hours Bulk Storage Tank
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL472
Receive 100% Design (IFC Drawings) from Client for 24 Hours Bulk Storage Tank
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL538
Decision by Client to Revert to Incl. Time and Attendance System
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL541
Receive 100% Design (IFC Drawings) from Client for Time and Attendance System
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL559
Decision by Client to Revert to the Supply of Spare Parts to Being 2 Years
Project: SHBLUD150324 Activity: PO.OP.GN.GNR.GNRL562
Receive 100% Design (IFC Drawings) from Client for the Supply of Spare Parts
to Being 2 Years
Project: SHBLUD150324 Activity: PO.PS.GN.GNR.GNRL120
Receive 100% Design (IFC Drawings) from Client for Edge Switches
Project: SHBLUD150324 Activity: PO.PS.GN.GNR.GNRL170 Review
IFC and Receive Clarification to Prepare Tender Documents for Edge Switches
Project: SHBLUD150324 Activity: PO.PS.GN.GNR.GNRL230
Prepare Tender Documents for Edge Switches
Project: SHBLUD150324 Activity: PO.PS.GN.GNR.GNRL275
Release Tender Documents for Edge Switches
Project: SHBLUD150324 Activity: PO.PS.GN.GNR.GNRL345
Tendering, Tenders Analysis, Clarification and Final Recommendation for Edge
Switches
Project: SHBLUD150324 Activity: PO.PS.GN.GNR.GNRL390 Client
Negotiation and Approval for Final Offer for Edge Switches
Project: SHBLUD150324 Activity: PO.PS.GN.GNR.GNRL435 Letter
of Award/ Notice to Proceed for Edge Switches
Project: SHBLUD150324 Activity: PO.PS.GN.GNR.GNRL510 Sub-
agreement with Subcontractor for Edge Switches
Project: SHBLUD150324 Activity: PO.PS.GN.GNR.GNRL580
Receiving the Client's instruction to proceed with the Edge Switches
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL100
Submission of Safety Management Plan
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL110 Shop
Drawings for Mobilization/ Offices
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL120 List
of Prequalification Packages
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL130 List
of Shop Drawing Submittals
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL140 List
of Material Submittals
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL150
Submission of QA/ QC Plan
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL160 Three
Month Lookahead Programme
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL170
Prepare and Submit Design for Tower Cranes Foundations
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL180 Review
& Approval of Design for Tower Cranes Foundations by Engineer
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL190 Review
& Approval of Design for Tower Cranes Foundations by 3rd Party
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL200
Procurement of Reinforcement & Embedded Structure
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL210
Procurement of Offices
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL220 TC-01
& 02 Foundation Work
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL250
Construction of Site Offices, Store, Laydown Areas, Etc.
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL260
Mobilization Ready to Use
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL270
Services Connections
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL280
Prepare and Submit Design for Passenger Hoist Foundations
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL290 Review
& Approval of Design for Passenger Hoist Foundations by Engineer
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL300 Review
& Approval of Design for Passenger Hoist Foundations by Authorities
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL340
Maintain Dewatering System
Project: SHBLUD150324 Activity: PR.GN.GN.GNR.GNRL390
Running Cost
Project: SHBLUD150324 Activity: SH-CN-FIN-BS-3540 Paint -
Stucco
Project: SHBLUD150324 Activity: SH-CN-FIN-BS-3570 Primer Coat
Project: SHBLUD150324 Activity: SH-CN-FIN-BS-3580 False
Ceiling Works & Painting
Project: SHBLUD150324 Activity: SH-CN-FIN-BS-3590 False
Ceiling Suspension and Gypsum Walls Framing
Project: SHBLUD150324 Activity: SH-CN-FIN-BS-3605 Specialty
Plaster
Project: SHBLUD150324 Activity: SH-CN-FIN-BS-3800 Wall
Finishes
Project: SHBLUD150324 Activity: SH-CN-FIN-BS-3980 Corian
Counter
Project: SHBLUD150324 Activity: SH-CN-FIN-BS-4350 Marble
Counters
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-AC2-180 HVAC -
2nd Fix (CHW Pipe, Duct Installation, FD, VCD, FCU)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-AC3-185 HVAC -
Final Fix (Grills, Diffusers, Thermostats)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-AC3-210 HVAC -
Final Fix (Grills, Louvers etc.)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-CA1-150 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-CA1-175 PAVA -
1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-CA2-150 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-CA2-175 PAVA -
2nd Fix (Wires, Cables)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-CA3-150 PAVA -
Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-CA3-175 PAVA -
Final Fix (Switches, Accessories)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-EL1-180
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-EL1-195
Electrical - 1st Fix - Wall (Containment, DB Enclosure)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-EL3-185
Electrical - Final Fix (Light Fitting, WA & Dressing & Termination) (OI)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-EL3-200
Electrical - Final Fix (Light Fitting, WA & Dressing & Termination) (OI)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-FA1-180 Fire
Alarm/ CBS & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-FA1-195 Fire
Alarm/ CBS & Detection - 1st Fix - Wall (Containment)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-FA2-180 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-FA2-195 Fire
Alarm/ CBS & Detection - 2nd Fix (Cables, etc.)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-FA3-180 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-FA3-195 Fire
Alarm/ CBS & Detection - Final Fix (Smoke & Heat Detectors, Voice Evacuation
Speakers)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-FF2-180 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-FF2-205 Fire
Fighting - 2nd Fix (Hangers and Supports, Pipes, Valves)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-FF3-140 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: SH-CN-MEP-BS-FF3-165 Fire
Fighting - Final Fix (Sprinklers, Fire Extinguisher, FHC, Fire Blanket)
Project: SHBLUD150324 Activity: SH-ENG-CLS-6175 Client
Selection Decorative/Specialty Plaster - Guest Corridors (OI)
Project: SHBLUD150324 Activity: SH-ENG-CLS-6180 Client
Selection Decorative/Specialty Plaster - Guest Room HB Walls (OI)
Project: SHBLUD150324 Activity: SH-ENG-CLS-6190 Client
Selection for Mirrors (OI)
Project: SHBLUD150324 Activity: SH-ENG-CLS-6195 Client
Selection for Landscape Lighting (Incl. OI)
Project: SHBLUD150324 Activity: SH-ENG-MSA-3405 Method
Statement Approval for Tiling Works - Guest Bath Tiles (OI)
Project: SHBLUD150324 Activity: SH-ENG-MSA-3410 Method
Statement Approval for Mirrors (OI)
Project: SHBLUD150324 Activity: SH-ENG-MSS-3405 Method
Statement Submittal for Tiling Works - Guest Bath Tiles (OI)
Project: SHBLUD150324 Activity: SH-ENG-MSS-3410 Method
Statement Submittal for Mirrors (OI)
Project: SHBLUD150324 Activity: SH-ENG-MTA-6210 Material
Approval Decorative/Specialty Plaster - Guest Corridors (OI)
Project: SHBLUD150324 Activity: SH-ENG-MTA-6215 Material
Approval Decorative/Specialty Plaster - Guest Room HB Walls (OI)
Project: SHBLUD150324 Activity: SH-ENG-MTA-6225 Material
Approval for Mirrors (OI)
Project: SHBLUD150324 Activity: SH-ENG-MTA-6230 Material
Approval for Landscape Lighting (Incl. OI)
Project: SHBLUD150324 Activity: SH-ENG-MTS-6000 Material
Submittal Decorative/Specialty Plaster - Guest Corridors (OI)
Project: SHBLUD150324 Activity: SH-ENG-MTS-6005 Material
Submittal Decorative/Specialty Plaster - Guest Room HB Walls (OI)
Project: SHBLUD150324 Activity: SH-ENG-MTS-6015 Material
Submittal for Mirrors (OI)
Project: SHBLUD150324 Activity: SH-ENG-MTS-6020 Material
Submittal for Landscape Lighting (Incl. OI)
Project: SHBLUD150324 Activity: SH-ENG-PR-6220 Procurement
Decorative/Specialty Plaster - Guest Corridors (OI)
Project: SHBLUD150324 Activity: SH-ENG-PR-6225 Procurement
Decorative/Specialty Plaster - Guest Room HB Walls (OI)
Project: SHBLUD150324 Activity: SH-ENG-PR-6235 Procurement
of Mirrors (Long Lead) (OI)
Project: SHBLUD150324 Activity: SH-ENG-PR-6240 Procurement
of Landscape Lighting (Incl. OI) (Long Lead)
Project: SHBLUD150324 Activity: SH-ENG-SDDA-1170 Media Screen
Structure and Platforms -Shop darwing Approval from ADM
Project: SHBLUD150324 Activity: SH-ENG-SDDA-1285 Shop
Drawings/ Design/ Calculation Approval for Mirrors (OI)
Project: SHBLUD150324 Activity: SH-ENG-SDDS-1220 Media Screen
Structure and Platforms -Shop darwing Approval from Consultant
Project: SHBLUD150324 Activity: SH-ENG-SDDS-1240 Media Screen
Structure and Platforms -Shop darwing Approval from 3rd party
Project: SHBLUD150324 Activity: SH-ENG-SDDS-1325 Shop
Drawings/ Design/ Calculation Submittal for Mirrors (OI)
Project: SHBLUD150324 Activity: SHCNBABLL01WP120 MEP
Works/Clearance for Waterproofing and Screed
Project: SHBLUD150324 Activity: SHCNBABLL02WP120 MEP
Works/Clearance for Waterproofing and Screed
Project: SHBLUD150324 Activity: SHCNBABLL03WP120 MEP
Works/Clearance for Waterproofing and Screed
Project: SHBLUD150324 Activity: SHCNBABLL04WP120 MEP
Works/Clearance for Waterproofing and Screed
Project: SHBLUD150324 Activity: SHCNBBFCP4FCD160 Installation
of Window Facade Shades
Project: SHBLUD150324 Activity: SHCNBBIF4FFHLLAC010 HVAC -
2nd Fix (CHW Pipe, FCU Installation and Valve Connection)
Project: SHBLUD150324 Activity: SHCNBBIF7FBHCSR065 Paint
- 1st Coat
Project: SHBLUD150324 Activity: SHCNBBIF7FBHSREL020
Electrical - Final Fix (Lights & Switch Socket etc.) (OI)
Project: SHBLUD150324 Activity: SHCNBBIF7FBHSRLE010 Tel &
IDF System (Containments, Cable Tray Cables & Wires Installation)
Project: SHBLUD150324 Activity: SHCNBBIF7FBHSRLE020 ID
Rack Installation (Telecom)
Project: SHBLUD150324 Activity: SHCNBBIF7FBHSRLE030 DDC
Panel Installation and Connection (BMS)
Project: SHBLUD150324 Activity: SHCNBBL07MP1190 HVAC - 2nd
Fix (CHW Pipe, FCU Installation, PICV, Valve, BTU Meter and Connection)
Project: SHBLUD150324 Activity: SHCNEXTP6LS410 Foundation
for Aluminum Bollards
Project: SHBLUD150324 Activity: SHCNEXTP6LS510 Foundation
for Gate Barrier
Project: SHBLUD150324 Activity: SHCNMRRFMBS-AC3-210 HVAC -
Final Fix (Grills, Louvers etc.)
Project: SHBLUD150324 Activity: SHCNMRRFUGFWP125 MEP
Foundations and Clearance for Waterproofing System
Project: SHBLUD150324 Activity: SHCNS1SSFNP4TS040
Waterproofing Incl. Protection Screed
Project: SHBLUD150324 Activity: SHCNS1SSFNP4TS060 Casting of
Footing
Project: SHBLUD150324 Activity: SHCNS3SSFNP4TS020 Anti-termite
Treatment Below Footing
Project: SHBLUD150324 Activity: SHCNS3SSFNP4TS030 PCC for
Footing
Project: SHBLUD150324 Activity: SHCNS3SSFNP4TS040
Waterproofing Incl. Protection Screed
Project: SHBLUD150324 Activity: SHCNS3SSFNP4TS050 Form Work
and Steel Fixing for Footing
Project: SHBLUD150324 Activity: SHCNS3SSFNP4TS060 Casting of
Footing
Project: SHBLUD150324 Activity: SHCNS3SSFNP4TS105 Form Work
and Steel Fixing for Footing
Project: SHBLUD150324 Activity: SHCNS3SSFNP4TS115 Casting of
Footing
Project: SHBLUD150324 Activity: SHCNS3SSFNP4TS65 Earthworks,
Leveling, Compaction for Footing
Project: SHBLUD150324 Activity: SHCNS3SSFNP4TS75 Anti-termite
Treatment and PCC
Project: SHBLUD150324 Activity: SHCNS3SSFNP4TS95
Waterproofing Incl. Protection Screed
Project: SHBLUD150324 Activity: SHCNSCCV100 MEP Foundations
Project: SHBLUD150324 Activity: SHCNSHSSFNP4TS015 Earthworks,
Leveling, Compaction for Footing
Project: SHBLUD150324 Activity: SHCNSHSULG060 Concrete
Casting of Slab
Project: SHBLUD150324 Activity: SHCNSPSSFNP5PC010 Earthworks
Levelling and Compaction Incl. Road Base
Project: SHBLUD150324 Activity: SHCNSPSSFNP5PC100 Steel
Reinforcement for RC Slab
Project: SHBLUD150324 Activity: SHCNSPSSFNP5PC105 Earthworks
Levelling and Compaction
Project: SHBLUD150324 Activity: SHCNSPSSFNP5PC110 Anti-termite
Treatment
Project: SHBLUD150324 Activity: SHCNSPSSFNP5PC115 PCC for
Pedestal Footing
Project: SHBLUD150324 Activity: SHCNSPSSFNP5PC120
Waterproofing Incl. Protection Screed
Project: SHBLUD150324 Activity: SHCNSPSSFNP5PC125 Shuttering
Around Footings
Project: SHBLUD150324 Activity: SHCNSPSSFNP5PC130 Steel
Reinforcement for Footing
Project: SHBLUD150324 Activity: SHCNSPSSFNP5PC135 Concrete for
Footing
Project: SHBLUD150324 Activity: SHCNSPSSFNP5PC70 Anti-termite
Treatment
Project: SHBLUD150324 Activity: SHCNSPSSFNP5PC75 PCC for RC
Slab
Project: SHBLUD150324 Activity: SHCNSPSSFNP5PC90 Concrete
Casting of Slab
Project: SHBLUD150324 Activity: SHCNSPSULG30 Concrete
Casting of Walls
Project: SHBLUD150324 Activity: SHCNSPSULG35 Shuttering
for Walls
Project: SHBLUD150324 Activity: SHCNSPSULG50 Steel Fixing
for Walls (Incl. Base Plate)
Project: SHBLUD150324 Activity: SHCNSPSULG55 Shuttering
for Walls
Project: SHBLUD150324 Activity: SHCNSPSULG60 Concrete
Casting of Walls
Project: SHBLUD150324 Activity: SHCNUBRFMP1080 HVAC - 2nd
Fix (Duct, Exhaust Fan and Damper Installation)
Project: SHBLUD150324 Activity: SHCNUBRFMP1090 HVAC - 2nd
Fix (CHW Pipe and Connection)
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL110
Balancing and Commissioning of Service Elevators
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL150
Testing and Commissioning of Hypoxic System
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL160
Energization of FDBs and Other Panels
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL170
Testing and Commissioning Low Current Systems
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL250
Testing and Commissioning of Time and Attendance System (OI)
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL260
Testing and Commissioning of Irrigation System
Project: SHBLUD150324 Activity: TC.GN.GN.GNR.GNRL300
Balancing and Commissioning of Scissor Platform Lift