0% found this document useful (0 votes)
271 views9 pages

PSIPL-PRD-17 Work Instruction

Uploaded by

cghodake1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
271 views9 pages

PSIPL-PRD-17 Work Instruction

Uploaded by

cghodake1
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 9

Document No. PSIPL/PRD/20/00/01.01.

2018
Issue Date:- 01.01.2018
WORK INSTRUCTION FOR OPERATOR Rev. No.:- 00

PREMIER SEALS INDIA PVT LTD


Rev. Date:- ------

Purpose:- Optimum process for Part Inspection ,Marking and Packing Online

Part Name:- Part No:-

4) Now verify the parts visualy for any


defects as per ''Eye sequence chart''

5) Now mark the OK parts with


''Date'' ,''Shift'' and ''Name''

6) Now pack the parts in Clean Polythene


bags

6) Now keep the parts in the box

Prepared by : Mangesh Kawade Approved by : Sampat Thakre


Premier seals (i)
pvt. Ltd. Chakan WORK INSTRUCTION FOR OPERATOR
pune

Purpose:- Optimum process for Part Deflashing opration.

Part Name:- Induction Pipe Part No:- 1B0033

1)Before starting the process ensure


opration area 5'S And hand gloves ,
cutter, pencil and material loading
trolley if applicable avialable at work
station.

2)Take part from trolley. And part put


on the opration table.

3) Use the sharp cutter for deflashing.


Start deflashing from parting line ,
ballon cutting area, bracket and slot
inside and nipple side area.
ballon cutting area, bracket and slot
inside and nipple side area.

5) Verify the deflashing part area for


proper deflashing. & kept in WIP
trolley..

Prepared by : Pankaj pawar Approved by :


Document No. PSIPL/PU/PRD/28

Issue Date:- 18/08/2015


R OPERATOR
Rev. No.:- 00

Rev. Date:- ------

Piaggio vehicles pvt.


Customer name
Ltd.

1B003395 Rev. no & date -


oved by : Deepak kumar
Premier seals (i)
pvt. Ltd. Chakan WORK INSTRUCTION FOR OPERATOR
pune

Purpose:- Optimum process for Part Ballon cutting.

Part Name:- Induction Pipe Part No:- 1B0033

1)Before Band saw( Machine) switch ON


ensure machine area 5'S

2)Ballon cutting fixture guide at band


saw machine & take part from trolley

3)Part kept on ballon cutting fixture &


slide the fixture to band saw
cutter(blade) ensure blade touch at part
ballon groove.
cutter(blade) ensure blade touch at part
ballon groove.

5) Verify ballon cutting section area

6)Part remove from ballon fixture after


completed the operation & kept in WIP
trolley..

Prepared by : Pankaj pawar Approved by :


Document No. PSIPL/PU/PRD/28

Issue Date:- 18/08/2015


R OPERATOR
Rev. No.:- 00

Rev. Date:- ------

Piaggio vehicles pvt.


Customer name
Ltd.

1B003395 Rev. no & date -