0% found this document useful (0 votes)
73 views4 pages

RIG Inspection Report

sample rig inspection report format for knowledge purpose.

Uploaded by

Kabir Pant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
73 views4 pages

RIG Inspection Report

sample rig inspection report format for knowledge purpose.

Uploaded by

Kabir Pant
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Rig # VR-10 Inspection Report

Rig Carrier
Name: - VR-10, Make: - ZYT,50T
*Drillometer: - Charged & valid calibration certificate is available with rig. Tested with 5T load. Found
Ok.
*Travelling block: - ZYT,50T, serviced & valid NDT reports available with rig, Last date of test-
29/11/2023
*Mast: - Ht-72ft from ground, Valid NDT reports available with rig
*Engine: - Cummins 350HP, Serviced last week as per maintenance record, RPM gauge & temperature
gauge is ok. Exhaust covered with insulation
*Draw work: -ZYT,300HP, brake shoe looks in healthy condition & effective during test, New 22mm
casing line, cat line(5T) 14mm.NDT reports of dead line anchor found ok & line anchored with 5 nos of
U clamp.
*Crown Block: - ZYT,50T, valid NDT reports available with rig. Greasing done.
*Crown-o-Matic:- installed with rig & found ok
*Floor-o-Matic: - Not installed
*Mast up test:- Found smooth mast up & down, No leakage from anu hydraulic cylinder & jacks.
*Air tank:- having valid hydro test & PSV certificate(tested pressyre140psi)
*Sub structure:- having valid MPI certificate

Mud Pump
*Model no :- 3ZB- 265,Stroke length-5’’,liner od 4.5’’ Discharge rate @ 976l/m @ 250SPM
*Engine:- Cummins,350HP Maximum SPM 350,servicing done
*Spare:- required seals are available with rig & cross checked
*Pop-off valve set at 3000psi. Found ok during test,bleed line fitted with web-check. Dampener pressure
is 650psi
*Mud pump running test:- Run at 1500psi for 1 hrs. No leakage found. calibration certificate for main
pressure gauge is available with rig, NDT reports ok. Suction line 4’’ & discharge line 2’’Approx. 40ft
length 2’’ steel line available with NDT reports, 40ft flexible hose tested @ 3kpsi.
* Manifold equipped with 4 nos gate valve & Lo-torque valve. Tested & 3000psi. Ok
*Haskal pump & chart recorder: - having valid certificate till jan 2024. Function test ok(gauge 6000psi)

BOP
*13 5/8’’ 5 k Annular BOP: - BOP test certificate Valid till feb 2024
Function test- closer time 24sec, pressure test- 300psi for 5 mins & 1500psi for 10mins. Found holding.
Redress kit available except element seal.
*13 5/8’’ Variable Ram BOP: - Pipe ram BOP equipped with 2 7/8’’ to 5’’ variable ram. BOP certificate
valid till july 2024.
Function test: - OK, closer time- 4-5sec, Pressure test 300psi/3500psi hold for 5/10mins. Holding
*13 5/8’’ Shear Ram; - BOP test certificate Valid till july 2024. Function test Ok. Closing time 9-10
seconds. Pressure test 300psi/3500psi hold for 5/10mins.
*changeover spool: - 13 5/8’’ X 7 1/16’’, 13 5/8’’ X 13 5/8’’ & 13 5/8’’ X 11’’ with certificate.
*Spare: - sufficient spare parts such as ram block, top seal, packer seal, rig gasket available with rig

Sensitivity:
Internal (C3)
*Crossover- 2 1/16’’(5K) flange 2’’ 15o2 , 2 9/16’’(5K) flange to 2’’ 15o2,4 1/16’’ X 4 1/16’’, 4 1/16’’X
3 1/8’’

Koomey Unit:-
*Calibration certificate for all pressure gauges is available with rig. Electric motor: -40HP
*Hydraulic tank; - top up with hydraulic oil

Sensitivity:
Internal (C3)
*Accumulator pressure tested at 4500psi.Hydro test @4500psi.Relief valve set at 3300psi
*16 nos of 11gal capacity accumulator bottle available with 1100psi pre charge pressure.
*Accumulator pressure Build-up test: - By Electrically pressure build up to 3000psi pressure in 9mins &
hold. Pneumatically pressure build up to 3000psi in 40mins & hold
* Electro-hydro switch is functioning well & cut-off set at 2600psi & 3000psi.
* Functioning of 3 position 4-way valve observed ok.
* Valid Pressure test certificate for 1’’ coflex(45ft) hoses available with rig
*Drawdown test: - After Close(annular) & open /Close (Ram) accumulator pressure dropped from
3000psi to 1200psi & hold.

Tanks
*Fire Tank; - 330bbl capacity equipped with 40hp pump
*Brine tank; - 150bbl insulated 2 nos of brine tank available with rig without agitator.
*Trip Tank: - 30bbl capacity equipped with agitator.
*Mixing tank: - 50bbl capacity equipped with agitator.
*Mobile Insulated tank: - 3 nos 24kl mobile insulated tank available with rig (RJ46GA4526,
RJ46GA4434,RJ23GB1053). Vehicle red tag & other docs are ready.

Power Source
*DG set: - 125KV – 1 nos, 45KV – 1 nos. Function test ok. 2 nos of electrical panel equipped with
RCCV.
*Torquing Unit: - ½’’ hose connected with external air tank. Pressure limit 2000psi.
*External Compressor unit: - 300psi capacity air tank equipped with 20hp motor. Function test ok.

Hoisting Equipment
*Hydra: - 15 ton, RJ04 EA 3097
*Crane: - 60ton capacity, RJ20EA2648, function test &
*GD : - H2S, Multi gas detector with calibration certificate.
*Lifting tool & tackle: - having valid MPI certificate

Heating Units
*HOC Unit: - 2 burner, registered no. GJ18SS0411, equipped with 40hp motor, having valid documents
as per Crain policy

#Lux meter & Earthing tester/insulation tester: - having valid certificate

#Fishing Tools: - Available with rig as per contract

HSE compliances: -
1. IWCF/IADC; - having valid certificate with TP/NTP & Driller
2. Lifting Supervisor: - having valid certificate with TP & NTP

Sensitivity:
Internal (C3)
3. First Aid: - having valid certificate with suraj prasad,Ram kumar,antanu roy
4. Firefighting: - having valid certificate with all crew
5. MVT training:- having valid certificate with Suraj prasad(TP)

Sensitivity:
Internal (C3)