Project
Building 2 · Storey 1 · Administaition office (Light scene 1)
Summary
Ground area 241.44 m² Clearance height 4.000 m
Reflection factors Ceiling: 70.0 %, Mounting height 4.000 m
Walls: 50.0 %,
Floor: 50.0 % Height Working plane 0.800 m
Maintenance factor 0.80 (fixed) Wall zone Working plane 0.000 m
1
Project
Building 2 · Storey 1 · Administaition office (Light scene 1)
Summary
Results
Symbol Calculated Target Check Index
Working plane Ēperpendicular 524 lx ≥ 400 lx WP1
Uo (g1 ) 0.14 ≥ 0.60 WP1
Glare valuation(1) RUG, max 8 ≤ 19
Energy estimation(2) Consumption 3479 kWh/a max. 8500 kWh/a
Room Lighting power density 7.49 W/m² –
1.43 W/m²/100 lx –
(1) Based on a rectangular space of 19.800 m x 15.475 m and SHR of 0.25.
(2) Calculated using DIN:18599-4.
Utilisation profile: Educational premises - Educational buildings (44.22 Teachers rooms)
Luminaire list
pcs. Manufacturer Article No. Article name RUG P Φ Luminous efficacy
78 CDN Light DUBAI Downlight CEJ1095 G5 24W 3000K 8 23.2 W 1614 lm 69.7 lm/W
50D
2
Project
Building 2 · Storey 1 · corridor entrance (Light scene 1)
Summary
Ground area 125.16 m² Clearance height 4.000 m
Reflection factors Ceiling: 70.0 %, Mounting height 4.000 m
Walls: 50.0 %,
Floor: 20.0 % Height Working plane 0.000 m
Maintenance factor 0.80 (fixed) Wall zone Working plane 0.075 m
1
Project
Building 2 · Storey 1 · corridor entrance (Light scene 1)
Summary
Results
Symbol Calculated Target Check Index
Working plane Ēperpendicular 240 lx ≥ 150 lx WP3
Uo (g1 ) 0.054 ≥ 0.40 WP3
Lighting power density 5.53 W/m² –
2.31 W/m²/100 lx –
Glare valuation(1) RUG, max 8 ≤ 25
Energy estimation(2) Consumption 714 kWh/a max. 4400 kWh/a
Room Lighting power density 5.19 W/m² –
2.17 W/m²/100 lx –
(1) Based on a rectangular space of 7.763 m x 39.478 m and SHR of 0.25.
(2) Calculated using DIN:18599-4.
Utilisation profile: Educational premises - Educational buildings (44.19 Circulation areas, corridors)
Luminaire list
pcs. Manufacturer Article No. Article name RUG P Φ Luminous efficacy
28 CDN Light DUBAI Downlight CEJ1095 G5 24W 3000K 8 23.2 W 1614 lm 69.7 lm/W
50D
2
Project
Building 2 · Storey 1 · Office room (Light scene 1)
Summary
Ground area 132.09 m² Clearance height 4.000 m
Reflection factors Ceiling: 70.0 %, Mounting height 4.080 m
Walls: 50.0 %,
Floor: 20.0 % Height Working plane 0.800 m
Maintenance factor 0.80 (fixed) Wall zone Working plane 0.000 m
1
Project
Building 2 · Storey 1 · Office room (Light scene 1)
Summary
Results
Symbol Calculated Target Check Index
Working plane Ēperpendicular 407 lx ≥ 400 lx WP2
Uo (g1 ) 0.40 ≥ 0.60 WP2
Glare valuation(1) RUG, max 21 ≤ 19
Energy estimation(2) Consumption 1386 kWh/a max. 4650 kWh/a
Room Lighting power density 5.45 W/m² –
1.34 W/m²/100 lx –
(1) Based on a rectangular space of 12.040 m x 10.985 m and SHR of 0.25.
(2) Calculated using DIN:18599-4.
Utilisation profile: Educational premises - Educational buildings (44.22 Teachers rooms)
Luminaire list
pcs. Manufacturer Article No. Article name RUG P Φ Luminous efficacy
20 AIRAM 4207220 Clean 600x600 IP65 32W/830 ACO 21 36.0 W 3961 lm 110.0 lm/W