0% found this document useful (0 votes)
67 views3 pages

Earthwork - ITP

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
67 views3 pages

Earthwork - ITP

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 3

Inspection Parties / Type of Inspection

Work phase (description of Record (ICL, Test


NO Project Spec. Ref. Codes and Standards Test Method / Type of Inspection Acceptance Criteria Frequency (Internal Checking ,Witness or Hold Point)
Inspection / Testing) Report)

CONTRACTOR CONSULTANT RA

IFC Drawings & SOIL Once Before Work Shop Drawing


1 Approval of Shop Drawings IFC Drawings ………. ………. H H -----
REPORT Starting Submittal

DIV 02 / Section Spec. of Project & Soil Once Before Work Test Reports
2 Soil Report Specs Requirements Testing by Third Party H H -----
2300 Investigation Starting Submittals

DIV 02 / Section Spec. of Project & Soil Test Reports


3 PROCTOR TEST Specs Requirements Testing by Third Party perior to work H H -----
2301 Investigation Submittals

inspection request
DIV 02 / Section CHECK LEVEL & WIDTH & LONGTH AND SPEC. OF PROJECT &
4 EXCECAVATION BOTTOM Specs Requirements perior to work submited ( stru. & H H -----
2302 CLEANING GEOMATIC REPORT
survay )

DIV 02 / Section GEOTECHNICAL INVESTIGATION Spec. of Project & Soil


5 FLOODING ………. perior to work ----- H H -----
2303 REPORT Investigation

inspection request
DIV 02 / Section ASTM ( D1557, D4318, SPEC. OF PROJECT & Once Before Work
6 PLATE LOAD TEST VISUAL BY MIMAR & THIRD PART &Test Reports H H -----
2304 D2216, D422, D2487 ) SOIL REPORT Starting
Submittals)

SOIL REPORT
WATER FOR DIV 02 / Section RECOMMENDATION
7 ………. VISUAL BY MIMAR & THIRD PART perior to work ----- C W -----
COMPACTION 2305 AND SPEC. OF
PROJECT

SOIL REPORT
DIV 02 / Section RECOMMENDATION Test Report Document
8 COMPACTION TEST Specs Requirements THIRD PART ( VISUAL INSPECTION ) perior to work H H -----
2306 AND SPEC. OF Submittals
PROJECT

THIRD PART TO TAKE


Backfilling Works (Around & DIV 02 / Section Ensure Filling Material as Per The SPEC. OF PROJECT
9 Specs Requirements SAMPLES UNDER Each Layer H W -----
Above RC foundations) 2307 Approved Sample & ECP ANDBOQ
MIMAR INSPECTION

Sand Cone Test Inspection Request


Thickness of Layers and DIV 02 / Section (Ensure Layers Compacted 95% of Approval of Method Submittal &
10 Specs Requirements Each Layer H H -----
Compaction Works 2308 Modified Proctor around and above statements and ITP Test Report Document
foundations) Submittals

DIV 02 / Section PROJECT SPEC. AND


11 DUNPING BACKFILLING Specs Requirements VISUAL BY REDCON SPAIN Each Supply ----- H S -----
2309 B.O.Q

DISTRIBUTION:
VERIFICATION CODES
CONSTRUCTION MANAGER CONSULTANT OTHERS S - Surveillance W - Witness Point
C - Internal Checking Point H - Hold Point
777849276.xls
R - Review T - Test

777849276.xls
Remarks Responsibility

D.S & IR TECHNICAL OFFICE

Q.C ENGINEER AND


D.S & IR
PROJECT MANAGER

Q.C ENGINEER AND


D.S & IR
PROJECT MANAGER

IR ( STRUCTURE & Q.C ENGINEER AND SITE


SURVAY) MANAGER

Q.C ENGINEER AND SITE


IR STRUCTURE
ENGINEER

Q.C ENGINEER AND SITE


D.S & IR
ENGINEER

Q.C ENGINEER AND SITE


-----
ENGINEER

IR ( STRUCTURE & Q.C ENGINEER AND SITE


SURVAY) ENGINEER

Q.C ENGINEER AND SITE


D.S & IR
ENGINEER

Q.C ENGINEER AND SITE


D.S & IR
ENGINEER

Q.C ENGINEER AND THIRD


-----
PARTY

777849276.xls