Ground Floor Framing Partial Plan - Ph1: Town Square Project Parcel (A) Gizah - Egypt
Ground Floor Framing Partial Plan - Ph1: Town Square Project Parcel (A) Gizah - Egypt
NOTES:
M NOR
A G TH
NE
- DIMENSIONS ARE IN MILLIMETERS AND ELEVATION LEVELS ARE IN METERS.
TIC
- FOR GENERAL NOTES & ABBREVIATIONS REFER TO G-S001
- FOR GENERAL DETAILS REF. TO G-S002 TO G-S005.
N - ±0.00 F.F.L = 67.25 SITE SURVEY LEVEL
- MINIMUM COVER FOR ABOVE GROUND:
- FOR COLUMNS...........3.0 cm.
- FOR BEAMS................3.0 cm.
- FOR SLABS.................2.5 cm.
04 05 306 307 308 309 310 401 402 - MINIMUM CONCRETE STRENGTH IS AS THE FOLLOWING:
- - - - - - - - - - Fcu = 40 MPa (FOR BEAMS & SLABS)
PH1 PH1 PH1 PH1 PH1 PH1 PH1 PH2 PH2
- Fcu = 40 MPa (FOR COLUMNS & SHEAR WALLS)
- SIESMIC ADD. RFT ARE INDICATED ON PLANS, AND TO BE ADDED TO THE
OTHER NON-PT RFT RESULTING FROM PT DESIGN.
- ALL MEP WORK TO BE COORDINATED WITH STRUCTURAL ELEMENTS
5200 5250 4950 6475 7250 4650 675 3900
BEFORE STARTING WORK.
Z
-
PH1
D 1050 1100 4Ø22. TOP&BOTT. D LEGEND :
4Ø16. TOP&BOTT.
4Ø16. TOP&BOTT.
PH2-P-S201 T.O.S.S.
300 mm THK.
L=8000
4825
PH1-P-S301
3200
LIGHTWEIGHT CONCRETE
FLAT SLAB W/RFT
3 Ø16@165 E.W. BOTT. & TOP
ADDITIONAL RFT AS SHOWN MACHINE PAD
PH1-P-S301 31885
CONCRETE STRIP TO SUPPORT STEEL BEAMS FOR HVAC MACHINESPAD
Y
-
UPSTAND
PH1 4000 4000 4000 4000 4Ø22. TOP&BOTT.
375
COMPACTED FILL
DA L=4000
4000
4000
4000
4000
-
18695
11400
11400
PH2
Ø22@165 ADD BOT.
.7)
8900
-0
600 THK. 600 THK. 600 THK. 600 THK. 800 THK.
L.
(E
)
25
@
3.
)
-
00
L.
12
(E
Ø12@165 ADD BOT.
@
00
4000
(5
0)
L=4000
0*
0
5300
12
B1
X
00
(5
Ø25@80 ADD. TOP
0*
Ø25@165 ADD. TOP
B1
7400
B2*(400X800) B2*(400X800) -0
X (EL.
4000
Ø22@165 ADD BOT.
@
3500
0 0)
- 0X12
PH1 B10 *(50 Ø22@165 ADD BOT. 1000
.25)
L. -3
1700
1700
@ ( E
BS 600 THK. 0X12
00) 800 THK.
- ( 5 0 1000 THK.
B02 B10*
BR
1000
1025 2975
B5*(500X900) W/FLOOR
B5*(500X900) W/RAMP
B3*(400X900) W/RAMP
-
Ø12@165 . TOP&BOTTOM
B02 Ø12@165 ADD BOT.
L=6000
3457
7700
Ø22@165 ADD. TOP
.7)
(EL. -0
5)
L=8000
.2
Ø22@165 ADD BOT.
(EL. -3
5500
200) @
8350
0) @
BQ Ø25@80 ADD. TOP
500X1
-
Ø16@165 . TOP&BOTTOM
20
B02
B10*(
B11*(500X1200) B11*(500X1200)
4000
W 2931
B10*(
-
PH1
19875
Ø22@165 ADD BOT.
2350
1000 THK.
CONSTRUCTION JOINT LOCATION
BP
-
800 THK.
B02
B3*(400X900) W/RAMP
Ø22@165 . TOP&BOTTOM
B5*(500X900) W/FLOOR
260mm THK. RAMP 260mm THK. RAMP 3000
B5*(500X900) W/RAMP
B5*(500X900) W/RAMP
Ø22@165 ADD. TOP
B5*(500X900) W/RAMP
L=8000
7700
5240
1:6.653
L=10000
5000
5000
-
PH1 REV. ISSUED FOR DATE BY CHECK
4000
BM
-
B5*(500X900) W/RAMP
Ø16@165 . TOP&BOTTOM
B02 KEY PLAN
1:7.467
800 THK.
B5*(500X900) W/FLOOR
4850
M NO R
AG T
1000 THK.
NE H
2500
TIC
BL
-
N
B02 Ø22@165 ADD. TOP
1756
350mm THK. RAMP 2500 L=8000 10000
1000
U
-
P3 P2
PH1 Ø25@165 ADD. TOP
B2*(400X800) W/FLOOR 4500 B2*(400X800) W/FLOOR CB2*(400X2000) Ø22@165 . TOP&BOTTOM
Ø16@165 ADD BOT.
2850
15700
Ø22@165 ADD. TOP
DN
DN
4800
CB1*(500X900) B4*(500X900)
B6*(500X900/1990) W/RAMP&FLOOR
T P1
3500
5700
-
5700
PH1
B5*(500X900) W/FLOOR
10489
B5*(500X900) W/RAMP
B 350mm THK. RAMP
B
L=8000
L=6000
EMAAR MISR
9300
10450
4000
600 THK.
Ø22@165 ADD. TOP
2100
S
-
B5*(500X900) B5*(500X900) GIZAH - EGYPT
3500
4 800 THK.
7575 2425 BASEMENT - PHASE (2)
4Ø16. TOP&BOTT. Ø12@150-T
PH1-P-S301
1475 8525
Ø16@150-B Ø25@165 ADD. TOP
B7*(250X1000) (W/FLOOR)
B7*(250X1000) (W/STAIR)
UP
DESIGNER ﺍﻟﻤﺼﻤﻢ
Ø16@150-B
Ø16@150-B
Ø12@150-T
Ø12@150-T
L=6000
4Ø16. TOP&BOTT.
4000
8125
Tel: +971(0)44516868
1475 8525 Fax: +971(0)44516969
E-mail: mail@whitespace.ae
Ø10@150-B URL: www.whitespcae.ae
Ø25@165 ADD. TOP 800 THK.
A Ø12@150-T INTERIOR DESIGN CONSULTANT: ﺍﺳﺘﺸﺎﺭﻱ ﺍﻟﺘﺼﻤﻴﻢ ﺍﻟﺪﺍﺧﻠﻲ
-
Ø22@165 ADD. TOP
2200
B01 Ø16@150-B
310
B1*(400X800)
Q
-
4Ø16. TOP&BOTT. B7*(250X1000)
PH1 (W/STAIR)
1800
(W/FLOOR) 4500
EL. -0.700 LANDSCAPE CONSULTANT ﺍﺳﺘﺸﺎﺭﻱ ﺍﻟﻼﻧﺪﺳﻜﻴﺐ
600 THK. T.O.S.S.
Ø22@165 ADD. TOP Rabben/Herman Design Office
4600
CONSULTANT ﺍﻻﺳﺘﺸﺎﺭﻯ
N
- 800 THK.
PH1
A 1000
A
H
-
ZFP PROJECT NO.:
C20-00800
B01
PART LOCATED LEFT TO CONSTRUCTION JOINT(PHASE 1) MAY BE CASTED BEFORE RIGHT PART(PHASE 2) PM-KSA: ----- PA: ------ HV: ------ LC: ------
PROPPING / SCAFFOLDING SHOULD BE MAINTAINED PARTIALLY AT LEFT PART PD: ----- ID: ------ PG: ------ CE: ------
TO SUPPORT CONCRETE SLAB AND SHOULD BE REVIWED/APPROVED BY SUPERVISION BEFORE CONSTRUCTION. PM: ----- SE: ------ HC: ------ LS: ------