Foundations and Basement 1 Layout Plan - Ph1: Town Square Project Parcel (A) Gizah - Egypt
Foundations and Basement 1 Layout Plan - Ph1: Town Square Project Parcel (A) Gizah - Egypt
NOTES:
M NOR
A G TH
NE
- DIMENSIONS ARE IN MILLIMETERS AND ELEVATION LEVELS ARE IN METERS.
TIC
- FOR GENERAL NOTES & ABBREVIATIONS REFER TO G-S001
N - FOR GENERAL DETAILS REF. TO G-S002 TO G-S005.
04 05 306 307 308 309 310 - ±0.00 F.F.L = 67.25 SITE SURVEY LEVEL
- - - - - - -
PH1 PH1 PH1 PH1 PH1 PH1 PH1 - MINIMUM COVER FOR ABOVE GROUND:
- FOR COLUMNS...........3.0 cm.
- FOR BEAMS................3.0 cm.
- FOR SLABS.................2.5 cm.
- MINIMUM CONCRETE STRENGTH IS AS THE FOLLOWING:
- Fcu = 40 MPa (FOR BEAMS & SLABS)
5200 5250 4950 6475 7250 4650 675 3900
- Fcu = 40 MPa (FOR COLUMNS & SHEAR WALLS)
- SIESMIC ADD. RFT ARE INDICATED ON PLANS, AND TO BE ADDED TO THE
200
Z OTHER NON-PT RFT RESULTING FROM PT DESIGN.
-
PH1 - ALL MEP WORK TO BE COORDINATED WITH STRUCTURAL ELEMENTS
BEFORE STARTING WORK.
125
Ø22@150 ADD TOP
D 350 mm THK.
D
5500
L=7500 LEGEND :
5500
FLAT SLAB W/RFT
4825
1 Ø16@150 E.W. BOTT.
DEPRESSED SLAB
PH1-P-S301 Ø16@150 E.W. TOP
ADDITIONAL RFT AS SHOWN
LIGHTWEIGHT CONCRETE
Y
- MACHINE PAD
4500
PH1 350 mm THK. CONSTRUCTION JOINT LOCATION
CONCRETE STRIP TO SUPPORT STEEL BEAMS FOR HVAC MACHINESPAD
3500 4000
FLAT SLAB W/RFT
Ø16@150 E.W. BOTT. UPSTAND
Ø16@150 ADD TOP Ø16@150 E.W. TOP
Ø16@150 ADD TOP 5000
ADDITIONAL RFT AS SHOWN F1
3500
4500
3000
-
PH2
Ø16@150 ADD TOP Ø16@150 ADD TOP
3000
3000
Ø16@150 ADD TOP
L=3000
600 THK.
4500
600 THK. 600 THK.
5000
L=8000
L=5000
Ø16@150 ADD TOP Ø16@150 ADD TOP
4000
3285 5845
X
5350
3500
250
3500
-
PH1
PC1* BS
-
500 THK. 5000 B02
600 THK.
500 THK.
L=5000
7700
4000
4000
L=6000 1200
305
14225
5000 1200
3500 3500 F4
959
Ø22@150 ADD TOP
BQ
-
Ø16@150 ADD TOP Ø16@150 ADD TOP B02
2500
250
4500
4500
W
250
3500
3500
4000
-
PH1
C PC1*
700 THK. C
500 THK. 500 THK. 1000 THK.
700 THK.
BP
259
Ø16@150 ADD BOT.
-
36330
125
L=5000
L=5000
7700
Ø22@150 ADD TOP
17790 6015 350 mm THK. L=8000
5000 FLAT SLAB W/RFT
57080
3500 3500 CONSTRUCTION JOINT LOCATION
Ø16@150 E.W. BOTT. 4000
6
312
Ø16@150 E.W. TOP
Ø25@150 ADD TOP 305
PH1-P-S301 Ø16@150 ADD TOP Ø22@150 ADD TOP ADDITIONAL RFT AS SHOWN BN
250 -
B02
250
3500
3500
4000
-
PH1 2500
59875
PC1*
A DETAILED DESIGN STAGE DEC 2022
BM
4500
4500
600 THK.
12751
-
L=4000
3500 B02
912
KEY PLAN
Ø16@150 ADD BOT.
M NO R
5
AG T
L=6000 250 16800
NE H
TIC
U 5000 PH2-P-S301
275
4500
N
- 2500
PH1 PC1* 3500
Ø16@150 ADD TOP
F5 P3 P2
Ø16@150 ADD TOP
5500
42280
T
4000
3500
5000
4500
-
PH1 Ø12@150 ADD BOT. DN
DN
600 THK.
600 THK.
L=8000
700 THK.
P1
800 THK. 1000 THK.
4000
L=6000
L=40000
Ø16@150 ADD TOP
2500
B B
10450
F5
4000
4500
600 THK.
ﻣﺸﺮﻭﻉ ﺗﺎﻭﻥ ﺳﻜﻮﻳﺮ
4000
3500 5000 ( ﻣﻨﻄﻘﺔ ) ﺃ
Ø25@150 ADD TOP 700 THK. 800 THK.
ﺟﻤﻬﻮﺭﻳﺔ ﻣﺼﺮ ﺍﻟﻌﺮﺑﻴﺔ- ﺍﻟﺠﻴﺰﺓ
Ø16@150 ADD TOP
15580
TOWN SQUARE PROJECT
Ø22@150 ADD TOP
-
PH1 Ø22@150 ADD TOP
PARCEL (A)
5000
Ø16@150-B
Ø12@150-T
Ø12@150-T
(W/FLOOR)
(W/FLOOR)
(W/STAIR)
8000
(W/STAIR)
B7*(250X1000)
4000
4500
B7*(250X1000)
B7*(250X1000)
B7*(250X1000)
5000
DESIGNER ﺍﻟﻤﺼﻤﻢ
Bays Water Tower,Business Bay Office 1910
3500 P.O.Box 57004 Dubai-UAE
Ø10@150-B
Ø25@150 ADD TOP 700 THK. Tel: +971(0)44516868
Ø16@150 ADD TOP 800 THK. Fax: +971(0)44516969
Ø12@150-T A E-mail: mail@whitespace.ae
Ø22@150 ADD TOP
-
Ø22@150 ADD TOP
1765
B1*(400X800)
CF4
600 THK. 700 THK.
4600
4500
Rabben/Herman Design Office
833 Dover Drive, Suite 9
Newport Beach, California, 92663
N
-
PH1 800 THK. CONSULTANT ﺍﻻﺳﺘﺸﺎﺭﻯ
1655
A PART LOCATED LEFT TO CONSTRUCTION JOINT(PHASE 1) MAY BE CASTED BEFORE RIGHT PART(PHASE 2) -
H
B01
A
PROPPING / SCAFFOLDING SHOULD BE MAINTAINED PARTIALLY AT LEFT PART
ZFP PROJECT NO.:
TO SUPPORT CONCRETE SLAB AND SHOULD BE REVIWED/APPROVED BY SUPERVISION BEFORE CONSTRUCTION. CONSTRUCTION JOINT LOCATION C20-00800
PM-KSA: ----- PA: ------ HV: ------ LC: ------
TITLE:
1 ﻣﺴﻘﻂ ﺃﻓﻘﻲ ﻟﻸﺳﺎﺳﺎﺕ ﻭ ﻫﻴﻜﻞ ﺇﻧﺸﺎﺋﻲ ﺑﺪﺭﻭﻡ
A FOUNDATIONS AND BASEMENT 1 LAYOUT PLAN - PH1
PH1-P-S105 1 : 100 FOUNDATIONS AND BASEMENT 1 LAYOUT PLAN
-
G
0 1 2 3 4 5 10
B01 SCALE: SHEET NO.: SHEET REVISION:
SCALE 1 : 100 METERS
REV. DATE:
1 : 100 PH1-P-S105
402
-
PH2
1 2 3 4
401
5
-
PH2