H-MCL-02 (Plu) - R1

Uploaded by

Arun Devan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 4

M&E ENGINEERING

H-MCL-02 (Version June 2016)

PLUMBING CHECKLIST

Project Title : Date :

Block: Unit/Area/Grid Line:

NO. DESCRIPTION / REQUIREMENT COMPLIED IF NO GIVE REASONS

A WATER MAIN

1 No structure beam is over the water main pipes. Yes / No


Under ground pipes are laid at a minimum 1 meter
2 Yes / No
deep.
Full and interval RC haunching is provided to pipes laid
3 Yes / No
under building / driveway and turf respectively.
No sanitary drainpipe or IC are installed above the
4 Yes / No
water pipes.
Minimum 300 mm clearance is provided for cables
5 Yes / No
crossing water pipes.

B BULK WATER METER CHAMBER

Meter chamber size / location is in accordance with the


1 Yes / No
drawing.
Drain hole / floor trap is provided inside the meter
2 Yes / No
chamber.
No water ponding is noted inside the meter chamber /
3 Yes / No
pump room.
Bulk meter sump has been cleaned, with no debris,
4 cement remnant, etc Yes / No

All pipes and Fittings have been printed and labeled


5 Yes / No
properly.

C TRANSFER WATER TANK / PUMP ROOM

Precast rings tanks arrangement is in accordance with


1 Yes / No
the drawing.
Correct number and size of pipes connection are
2 Yes / No
attached to each precast ring tank.
Fiberglass potable water tanks - Fiberglass reinforced
3 Yes / No
polyester is in compliance with SS245

4 No sanitary drainpipe is laid over domestic water tanks. Yes / No

Solenoid controlled pilot operated valve is used for the


5 Yes / No
PUB incoming water supply.
All drain / over flow / vent pipes are provided with anti-
6 mosquitoes SS netting, with aperture size of netting not Yes / No
exceeding 0.65mm.

7 Approved water level electrode control system is used. Yes / No

Page 1 of 4
M&E ENGINEERING

H-MCL-02 (Version June 2016)

NO. DESCRIPTION / REQUIREMENT COMPLIED IF NO GIVE REASONS

All gaps in water tank including gaps at the manhole


covers, between the electrode aluminium plate and
8 Yes / No
kerb, and between cover frame and tank have been
sealed up properly.
All tank inspection covers are secured by bolting /
9 fastening with SS brackets c/w high quality lock for Yes / No
which keys cannot be easily duplicated.

10 Tapered round nut has been used to secure bracket. Yes / No

Pump set data is in accordance with approved


11 Yes / No
submission.
Rubber flexible type coupling is provided between the
12 Yes / No
pump and the motor.
Pump system installation is in accordance with the
13 Yes / No
design drawing.

14 Double lock nut is provided at the water pump set base. Yes / No

All valves used in the system are of PUB approved


15 Yes / No
type.
Water sampling bib tap c/w lock is installed between
16 Yes / No
pump set and water tank suction line
All piping works are supported via floor mounting
17 Yes / No
brackets to prevent vibration tranmission.

Pipe sleeves are provided for pipe penetration through


18 Yes / No
wall and sealed with elastomeric fire stop sealant.

Acoustic treatment is provided to the aluminium


19 Yes / No
ventilating louvres for buiding of 30 storeys and above.
The system control panel is in accordance with the
20 Yes / No
approved submission.

21 TMS installation is provided. Yes / No

D ROOF WATER TANK / PUMP ROOM

Precast tanks arrangement is in accordance with the


1 Yes / No
drawing.
Correct number and size of pipes connection are
2 Yes / No
attached to each precast tank.

3 Each storage tank has been labelled properly. Yes / No

All drain / over flow / vent pipes are provided with anti-
4 mosquitoes SS netting, with aperture size of netting not Yes / No
exceeding 0.65mm.

5 Approved water level electrode control system is used. Yes / No

All gaps in water tank including gaps on the manhole


covers, between the electrode aluminium plate and
6 Yes / No
kerb, and between cover frame and tank have been
sealed up properly.

Page 2 of 4
M&E ENGINEERING

H-MCL-02 (Version June 2016)

NO. DESCRIPTION / REQUIREMENT COMPLIED IF NO GIVE REASONS


All tank inspection covers are secured by bolting /
7 fastening with SS brackets c/w high quality lock for Yes / No
which keys cannot be easily duplicated.

8 Tapered round nut has been used for secure bracket. Yes / No

Pump set data is in accordance with approved


9 Yes / No
submission.
Rubber flexible type coupling is provided between the
10 Yes / No
pump and the motor.
Pump system installation is in accordance with the
11 Yes / No
design drawing.

12 Double lock nut is provided at the water pump set base. Yes / No

All valves used in the system are of PUB approved


13 Yes / No
type.
All pipes, including warning pipes and by-pass, are
14 Yes / No
properly supported.
A tap with lock for sampling purposes to be installed at
the outlet of gravity feed outlet and washout outlet
15 Yes / No
before the gate valve.

The system control panel is in accordance with the


16 Yes / No
approved submission.
Fencing enclosure has been provided to house roof
17 Yes / No
water tanks

Discharge of overflow pipes from water tanks are within


18 Yes / No
the secured and locked tank/pump room enclosure

E WATER DISTRIBUTION SYSTEM

1 All pipes have been supported and secured properly. Yes / No

2 All pipes have been printed and labeled properly. Yes / No


Short pipe has been provided for RC end thrust
supports at both end of distribution
3 Yes / No
main

All pressure reducing valve (PRV) have been installed


4 Yes / No
according to the approved drawing and tested properly.

All pipe fittings with rust or cement remnant have been


5 Yes / No
cleaned and repainted.
End cap has been provided for the downfeed pipe and
6 end thrust support has been installed properly. Yes / No

Rubber pads should be provided between the "U" bolts


7 Yes / No
and the pipes.
The water spray from the flushing ring pipe should be
45 degree towards the chute wall. The four corners of
8 Yes / No
the flushing ring pipe should have holes for spray.

F CONCEALED PIPING

Page 3 of 4
M&E ENGINEERING

H-MCL-02 (Version June 2016)

NO. DESCRIPTION / REQUIREMENT COMPLIED IF NO GIVE REASONS

All main concealed pipe is located within the no-drill


1 Yes / No
zone area, and according to the approved sample unit.

Tap point for washing is installed at a height of


2 Yes / No
1000mm ± 50mm.

Ø28mm pipe is used for topmost 2 storeys and topmost


3 Yes / No
direct water supply. ø22mm is provided for other.

A maximum of Five (5) storeys are served by direct


4 Yes / No
water supply in a single stack.
Separate direct water supply stack is provided for 6
5 Yes / No
storey and above.
Table "Y" copper pipe of 1.2 mm thickness is used for
6 Yes / No
concealed piping.
All "Hot" water supply for bath mixer is installed on the
7 Yes / No
left hand side.
All concealed "Hot" and "Cold" water route is denoted
8 Yes / No
with colored tapes / marking to specification.
Every unit has been inspected and tested (to endorse
9 Yes / No
form DP-ME-02)

G OTHERS

Fire Hydrants have been installed and tested by


1 Yes / No
PUB/SCDF
Fire Hydrants installed with not less than 1 meter
2 Yes / No
clearance from the building.

Checked By:

……………………………………… ……………………………
Name of Contractor Signature

Witnessed by:

……………………………………… ……………………………
Name of RTO / Site Supervisor Signature

Endorsed by:

……………………………………… ……………………………
Engineer-In-Charge Signature

Page 4 of 4