INTERNSHIP PRESENTATION ON
GARMENTS PRODUCTION
By;
Ayaz ali khuhro
Mohammed Naseer algzbe
Muhammad yahya
INDUSTRIAL ENGINEERING
Industrial engineering work to donate waste of time,mony,matrial,man hours,
machine and other resources.
Industrial engineering focuses on improving process.
IE Objectives
Elminate waste
Increase productivity
Reduce production cost
Improve process
IE Working
Cutting
Stitching
Finshing
CUTTING DEPARTMENT
Cutting department is one of most
essential section of garments
manufacturing.
Cutting is started after inspection
and fabric spreading.
Cutting is depends upon method of
cutting,for making quality
garments,they have follow the
procedure and continue the work.
METHOD OF FABRIC CUTTING
In artistic industry use the
manual method for cutting.
Here cutting process is done by
using scissor, knife,and dril e.t.c
Advantavges of manual cutting
Easy process to cutting
Educational man power is not
required
Low maintenance cost
DISADVANTAGE OF MANUAL
CUTTING
Slow process
Not suitable for large production
Cutting speed can not be controlled
Higher labor cost than computerized cutting method.
STITCHING DEPARTMENT
FRONT PANEL
In front section there are almost 22
operations applied on front
panel.for expamle coin
pkt,hem,pkt attach,facing,linning
etc
BACK PANEL
In back section there are 8 to 9
operations applied like back pkt
hem , pkt attach , pkt guider etc
ASSEMBLY SECTION
In assembly section there are17 opration applied to assembly
front and back panel like inseam feedo , side top , loop attacher.
STITCHING; It is process where by fabric is
fashioned in to a diffirent product by means of diffirent
sewing techniques.
SEWING DEFECT
FINSHING DEPARTMENT
The finshing department is the last section in the garment production prior to packing and dispatch it
plays important role in the final appearance.
FINSHING TOOLS
button attach machine
Label attach
Fabric sucking
press fabric
Remove metal
Carton staple machine
Checking box
Measurment pant
packing.
FINSHING
Inventory room; after wash garment shifted the
inventory room for some measurments.
Finshing; add any additional detail likes eivets,
buttons, and labels to complete the jeans.
DEFFECT OF FINSHING
SAM ( STANDARD ALLOWED MINUTES)
SAM=ASCT/60 (1+PF+MD)
Sam represent the amount of time in minutes that skilled should
take complete specific operaton using method and equipment.
EFFICENCY; Effiency is the ablity to acchive to
maxium output or result with the least amout of
resources ,including time, and matrial.
EFFIENCY= PRODUCTION * SAM/TIME * OPERATORS
THANK YOU