0% found this document useful (0 votes)
36 views3 pages

Bishowjit - TA DA HRM 11

Uploaded by

Allama Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
36 views3 pages

Bishowjit - TA DA HRM 11

Uploaded by

Allama Hasan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

POWER GRID COMPANY OF BANGLADESH LTD.

QF-HRM-11
T.A / D.A Bill

Name : Bishowjit kumar Designation : Sub-Assistant Engineer (M) Haripur 230/132KV Grid S/S. Office/Dept. GMD, Dhaka-East, PGCB , Month: December/23

From To Mode of Distance Daily Purpose of visit


Journey Traveled Allowance
Place Date Time Place Date Time (km) claimed
Haripur 230/132 KV
08:00 Rampura 230/132
Grid SS 30.12.23 30.12.23 09.30
Kv Grid SS
01
Haripur 230/132 KV
Rampura 230/132
30.12.23 18:00 Grid SS 30.12.23
Kv Grid SS 19:30
হরিপুর গ্রিড উপকেন্দ্রে তিনটি সিঙ্গেল ফেজ
Haripur 230/132 KV
Grid SS
31.12.23 08:00
Rampura 230/132
31.12.23 09:30 অটোট্রান্সফরমার প্রতিস্থাপনের জন্য ,রামপুরা
Kv Grid SS
Departmental
car
01 ২৩০/১৩২ কেভি গ্রিড উপকেন্দ্র হতে উক্ত
Haripur 230/132 KV
Rampura 230/132
Kv Grid SS
31.12.23 17:00 Grid SS 31.12.23 18:30 ট্রান্সফরমার সমুহ ও তদসংশ্লিষ্ট প্রয়োজনীয় মালামাল
Haripur 230/132 KV রিসিভ করা এবং উক্ত কাজের তদারকি করা।
Rampura 230/132
Grid SS 01.01.24 08:00 01.01.24 09:30
Kv Grid SS
01
Haripur 230/132 KV
Rampura 230/132
01.01.24 17:00 Grid SS 01.01.24 18:30
Kv Grid SS

Total Distance Travelled 03


Claim for distance traveled = 00 km × Tk. 5.50/= per km = Tk.00/=
Claim for Daily Allowances = 03 days × Tk.1200/- +00 days × Tk 900/- per day = Tk. 3600/-
Total T.A / D.A Claim = Taka 3600/-/= (Three Thousand six Hundred taka ) only.

Certified By: Approved By:

_________________ ____________________ ___________________________


Signature Controlling Officer Departmental Head/Section Head
POWER GRID COMPANY OF BANGLADESH LTD. QF-HRM-11
T.A / D.A Bill

Name : Bishowjit kumar Designation : Sub-Assistant Engineer (M) , Haripur 230/132KV Grid S/S. Office/Dept. GMD, Dhaka-East, PGCB

From To Mode of Distance Daily Purpose of visit


Journey Traveled Allowance
Place Date Time Place Date Time (km) claimed
Nowbabapur For purchasing different goods in order to use emergency
Haripur SS 9:00
24.01.24 Dhaka 24.01.24 18:00 01 maintenance work at Haripur 230/1323 kV grid SS
Nowbabpur,Dhaka Departmental
Haripur SS
Car
Haripur SS Narsingdi Inspection of dead line checking work 132 Kv Haripur
05.02.24 9:00 05.02.24 18:00 01
Narsingdi Haripur SS Narsingdi TX.
Total Distance Travelled 02

Claim for distance traveled = 00 km × Tk. 5.50/= per km = Tk. 00/=


Claim for Daily Allowances = 01 days × Tk.1200/- + 01 days × Tk 900/- per day = Tk. 2100/-
Total T.A / D.A Claim = Taka 2100/-(Two Thousand One Hundred Taka only).

Certified By: Approved By:

_________________ ____________________ ___________________________


Signature Controlling Officer Departmental Head/Section Head
POWER GRID COMPANY OF BANGLADESH LTD. QF-HRM-11
T.A / D.A Bill

Name : Bishowjit kumar Designation : Sub-Assistant Engineer (M) Haripur 230/132KV Grid S/S. Office/Dept. GMD, Dhaka-East, PGCB , Month: March/24

From To Mode of Distance Daily Purpose of visit


Journey Traveled Allowance
Place Date Time Place Date Time (km) claimed
Haripur 230/132 KV 132 KV Haripur
08:00
Grid SS 03/03/24 Bhulta narsingdi 03/03/24 09.30
Transmission line 01
132 KV Haripur Haripur 230/132 KV
Bhulta narsingdi 03/03/24 18:00 Grid SS 03/03/24
19:30
Transmission line
Haripur 230/132 KV
Grid SS
06/03/24 08:00 Bitac,Tejgaon,Dhaka 06/03/24 09:30
Departmental
01 Different departmental work(Attached)
car
Haripur 230/132 KV
Bitac,Tejgaon,Dhaka 06/03/24 17:00 Grid SS 06/03/24 18:30

Haripur 230/132 KV
Grid SS 02/04/24 08:00 Bitac,Tejgaon,Dhaka 02/04/24 09:30
01
Haripur 230/132 KV
Bitac,Tejgaon,Dhaka 02/04/24 17:00 Grid SS 02/04/24 18:30

Total Distance Travelled 03


Claim for distance traveled = 00 km × Tk. 5.50/= per km = Tk.00/=
Claim for Daily Allowances = 02 days × Tk.1200/- +01 days × Tk 900/- per day = Tk. 3300/-
Total T.A / D.A Claim = Taka 3300/-/= (Three Thousand Three Hundred taka ) only.

Certified By: Approved By: