                                                    Plant Location:(UNIT-1)
                          Department: Project
                                                                                  Reviewed By:
                                                    Fourth Floor
                            Damages due to use of                Ensure Tool Box Talk should be given by site supervisor according
                             defective tools and lack             to the work before starting the work.
 Site Preparation           of job clarity.                      Ensure working tools properly checked by site supervisor and site
                                                                  safety officer before starting the work.
                                                                  Under competent person will perform this activity.
 Barricading of work                                             Use of required PPEs as per company rules safety norms- safety
  area                      Personal injury                      shoes, safety helmet, safety goggle, reflective jacket.
                                                                 No any unauthorized material to be kept inside barricading area.
                                                                 10-meter area should be barricaded.
 Lifting and erection      Inadequate crane                    Obtain work permit prior to start work.
  work by 160 ton crane      working platform (due               All lift shall have a lifting plan prior to lift.
                             to soft/unstable soil,              Ground must be leveled and compacted.
                             outrigger not fully                 Weight shall be determined prior to any lifting to prevent from
                             deployed etc.)                       overload.
                            Over loading of crane               Rigger shall always consider the center of gravity and ensure right
                            Damage to lifting                    technique being followed.
                             equipment since                     Crane operator should have valid license and third party certified.
                             inspection                          Provide a certified flagman in the working area.
                            Unknown weight                      Operator shall check soil condition and see that outriggers are in
                            Pinch point                          position before starting lifting operations
                            Improper                            Crane to be operated within SWL
                             lifting/rigging/signal              Cranes shall have a valid safety inspection sticker issued by client
                            Personal crossing or                 prior to use.
                             under the suspended                 Crane operation shall stop or will not start when wind speed is
                             load                                 high and reaches minimum allowable wind speed of the cranes.
                                                                                                               Page 1 of 5
       Format No.:                       Effective Date:
                                                     Annexure-6
                                               JOB SAFETY ANALYSIS
                                                                                                      Page 2 of 5
       Format No.:                Effective Date:
                                                   Annexure-6
                                             JOB SAFETY ANALYSIS
                      Hot tabs end pieces of       Make sure fire extinguisher at site a deploy trained fire watcher.
                       welding rods.                Make sure spark containment is used such as a welding hood/fire
                                                     blanket.
                                                    Ensure that rod holder in good condition.
                                                    Ensure effective cable management (laying separately i.e. power &
                                                     welding cable/ overhead & buried with route marking).
                                                    The welder helper must be wear welding goggles.
                                                    Ensure proper ear thing system shall be made as per IE rules.
                                                    Ensure electrical work under the licensed electrician.
                                                    Use B class fire blanket as approved.
                                                    Ensure welding machine inspection done.
                                                                                                  Page 3 of 5
       Format No.:               Effective Date:
                                                          Annexure-6
                                                    JOB SAFETY ANALYSIS
 Dismantling of  Missing of sequence  Job specific tool box talk to be conducted before starting the work.
                                                                                                         Page 4 of 5
        Format No.:                    Effective Date:
                                                               Annexure-6
                                                         JOB SAFETY ANALYSIS
 Site Emergency               Confusion                     Emergency assembly point, emergency access should be defined &
                                                               always free from any obstructions.
                                                              Emergency contact details to be displayed at prominent locations
                                                               of site.
                                                              Emergency vehicle must be available at work locations during all
                                                               working hours.
                                                              All workers shall aware / trained about site emergency procedure.
                                                              Fire Team-4666
                                                              First aid -4777
Permit issuer
Permit acceptor
Prepared by- Permit Issuer and Permit Acceptor Reviewed by-Plant Manager/ Safety officer
Approved By HOD
                                                                                                                 Page 5 of 5