Erection Work by 160 Ton Crane

Erection work by 160 ton crane

Uploaded by

AKBAR ALI
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

Annexure-6

JOB SAFETY ANALYSIS

Job Title: Hot , height JSA NO. Department / Routine/ Non


New/ Revised
& rigging work Activity/ No… Routine
Reference work
Permit no:

Supervisor:
Prepared By:
JOB SAFETY ANALYSIS

Plant Location:(UNIT-1)
Department: Project
Reviewed By:
Fourth Floor

Job Description: Lifting & erection of pipe line/pipe rack/equipment and


column by 160 ton crane, welding, grinding, gas cutting and scaffolding
Approved By:
erection/dismantling.

SEQUENCE OF TASK POTENIAL HAZARDS PREVENTIVE MEASURES

 Damages due to use of  Ensure Tool Box Talk should be given by site supervisor according
defective tools and lack to the work before starting the work.
 Site Preparation of job clarity.  Ensure working tools properly checked by site supervisor and site
safety officer before starting the work.
 Under competent person will perform this activity.
 Barricading of work  Use of required PPEs as per company rules safety norms- safety
area  Personal injury shoes, safety helmet, safety goggle, reflective jacket.
 No any unauthorized material to be kept inside barricading area.
 10-meter area should be barricaded.

 Lifting and erection  Inadequate crane  Obtain work permit prior to start work.
work by 160 ton crane working platform (due  All lift shall have a lifting plan prior to lift.
to soft/unstable soil,  Ground must be leveled and compacted.
outrigger not fully  Weight shall be determined prior to any lifting to prevent from
deployed etc.) overload.
 Over loading of crane  Rigger shall always consider the center of gravity and ensure right
 Damage to lifting technique being followed.
equipment since  Crane operator should have valid license and third party certified.
inspection  Provide a certified flagman in the working area.
 Unknown weight  Operator shall check soil condition and see that outriggers are in
 Pinch point position before starting lifting operations
 Improper  Crane to be operated within SWL
lifting/rigging/signal  Cranes shall have a valid safety inspection sticker issued by client
 Personal crossing or prior to use.
under the suspended  Crane operation shall stop or will not start when wind speed is
load high and reaches minimum allowable wind speed of the cranes.

Page 1 of 5
Format No.: Effective Date:
Annexure-6
JOB SAFETY ANALYSIS

 High wind  Do not lift when wind speed exceeds 32km/h.


 Personnel having body  Daily inspection of the crane to be carried out prior to start work.
part trapped by load  Valid third party certification with clear SWL chart.
 Moving crane/load  All rigging, singing and lifting to be done by competent person
hitting people / assets  All lifting/rigging tools shall be inspected and checked by a
 Material stacked too competent person prior to each lift.
high  All lifting/rigging tools shall have a valid third party certification
 Failure of lifting/rigging with clear SWL marking.
tools cause failing of  Only competent rigger are carrying out rigging activity.
load leads to severe  Ensure sufficient room for operation
personal injury/fatality  Tag line to be attached to load to prevent swinging
 The material not to be stacked too high
 Good housekeeping to be maintained
 Barricade the working area & prevent unauthorized personnel of
entry.
 Keep away your hand from pinch point
 Work at height  Personal Injury  Barricade the area if some critical work is in progress at height &
 Fall / Slip of persons remove workers working under it.
from height  Proper working platform.
 Collapse of scaffold  Provide warning sign “Men working above” and tools to be string
 Damage to property secured.
due to struck against by  No loose/unsecured materials allowed at height.
materials while lifting  Never leave unprotected floor openings leading edges unattended.
 Fall of materials  Secure floor openings when temporarily removed and provide
 Fall hazards to handrails.
personnel working at  Lowering/raising of tools by rope/bucket only, no throwing
height. permitted.
 Unguarded floor  No crossing into barricaded area.
openings/edge  Maintain good housekeeping at elevated structures.
structures.  Full Body harness to be worn at all times.
 Unsecured materials.  Ensure that temporary supports installed are stable.
 Incomplete access  100% tie off at unprotected elevated structures.
stairs.  Install life line where guard rail system is not possible.
 Hard hat to be protected by chin strap.
 Scaffold under use is to be inspected by competent person.
 All hand tools to be inspected prior to use at height /elevated
areas.
 All tools/loose materials to be stored in containers.
 Lifeline and full body harness need to ensure.
Procedure needs to be followed.
 Electric shock.  Before starting welding make sure the area is clear of all types of
 Welding work.  Burn injury combustible material.
 Inhalation problem with  Ensure use good condition of cable at site.
toxic fumes, which  Wear mandatory PPEs at site.
fumes produced in  Ensure electrical equipment properly checked by electrician
welding work. before starting the work.
 Irritation and redness in  Ensure inspection tag is display
eyes with toxic fumes.  Ensure all electrical connections routed through rated RCCB /
 Fire hazard. ELCB.

Page 2 of 5
Format No.: Effective Date:
Annexure-6
JOB SAFETY ANALYSIS

 Hot tabs end pieces of  Make sure fire extinguisher at site a deploy trained fire watcher.
welding rods.  Make sure spark containment is used such as a welding hood/fire
blanket.
 Ensure that rod holder in good condition.
 Ensure effective cable management (laying separately i.e. power &
welding cable/ overhead & buried with route marking).
 The welder helper must be wear welding goggles.
 Ensure proper ear thing system shall be made as per IE rules.
 Ensure electrical work under the licensed electrician.
 Use B class fire blanket as approved.
 Ensure welding machine inspection done.

 Burns  Deploy trained fire watcher at hot working area.


 Damaged or leaking  Inspect the cylinder & hoses before starting the work.
 Gas Cutting work cylinders or hoses  Ensure inspection tag must be displayed on the cutting set.
 Fire & Explosion due to  Ensure competent/ designated person will perform this activity.
mishandling of Gas  Follow gas cutting safety procedures & handling of compressed
cutting Set gas cylinders.
 Fire hazard due to bad  Wear mandatory PPEs like cutting goggles, safety shoes, apron,
housekeeping such as helmet etc.
paper, wooden  FBA & NRV should be fixed for gas cutting set.
material, chemical  All cylinder should be secured with trolley.
material available near  Ensure compressed gas leakage system is provided
about hot work area  Ensure competent/ designated person will perform this activity.
 Ensure remove flammable material from working area before
starting the work.
 Cordoning of the area.
 Ensure near man hole and drain properly covered with fire blanket
before starting the work (if applicable)
 Ensure proper cylinder trolley
 Ensure fire extinguisher at cutting area.
 Make sure spark containment is used such as a fire blanket.
 Ensure All electrical cable over had.
 Use of job specific PPE
 Grinding Work  Physical cut injury  Grinding & Cutting wheel properly checked before starting the
 Electric shock due to work.
use  Make sure guards are fitted to all moving parts.
 Damage grinding disc  Ensure proper use of guard
 Electrocution  Ensure Wheel RPM match with machine RPM.
 Flying object/eye injury  Make sure that disc is compatible with grinding machine.
 damage cable use at site  Correct installation of grinder wheel.
 Fire hazard  Ensure inspection tag must be displayed to the machine.
 Rotating equipment  Ensure competent/ designated person will perform this activity.
spark  Ensure industrial plug and cable condition properly checked
before starting the work.
 Make sure rated ELCB / RCCB properly checked before starting the
work.
 Only experienced personnel to use the equipment.

Page 3 of 5
Format No.: Effective Date:
Annexure-6
JOB SAFETY ANALYSIS

 Ensure remove flammable material from working area before


starting the work.
 Deploy a fire watcher at site.
 Make sure fire extinguishers are available on site
 Ensure fire blanket at location.
 Ensure all electrical cable overhead.
 All loose pipe when cutting/grinding follow the locking system
 All loose pipe/structure when cutting/grinding follow the locking
system
 Wear sufficient PPEs like leather gloves, face shield, ear plug/muff,
helmet, apron etc.
 Erection of scaffolding  Use of defective hand  Scaffolding is erected as per standard procedure.
tools(hammers and  Only inspected hand tools are used.
spanners) may cause of  TBT is given to erection crew before start of activity
bodily injury  Don’t used rusted and damage material.
 Fall of material from  Only medically fit for height and trained worker must be deploy for
height lead to bodily erection work.
injury  Line of fire must be follow strictly.
 Collapse of scaffolding  Only nominated scaffolders to do the erection of scaffolding.
due to improper  Activity is done under continuous supervision
erection/uneven surface  Put RED tag on scaffold during erection
 Worker fall from height  The ground on which the scaffolding is erected is thoroughly
due to improper leveled and compacted, don't use bricks/stones, wooden things
working platform etc. below base.
 Overhead power cable  Proper packing for the sole plate to that it should not slip.
 Ensure no gaps and toe boards are fitted on the working platform
 Standard size of base plate (150 mm for normal surface and
150mm with additional planks for soft surface) is ensured
irrespective of the foundation surface.
 Scaffolding erection is carried out by competent person under
close supervision.
 Additional care is taken for the erecting a scaffold near excavated
area.
 The ratio of the minimum base dimension to the height of the
working platform does not exceed 1:4, unless the scaffold is
secured to another permanent structure at all times.
 Free-standing scaffolds is not used above 4m unless tied with
adequate bracing.
 Follow the sequence of scaffolding erection.
 Platforms are constructed with grating & tied with binding wire
(double) and supported properly.
 Working platform should not be over loaded by material.
 Working platform secured by mid rail and top railing with
adequate specification.
 Ensure no any defectes identified in working platform.
 Provide working platform, safe access & use of full body safety
harness above 1.8mtr from ground level.

 Dismantling of  Missing of sequence  Job specific tool box talk to be conducted before starting the work.

Page 4 of 5
Format No.: Effective Date:
Annexure-6
JOB SAFETY ANALYSIS

scaffolding manually leading to collapse of  Follow the sequence of operation.


scaffolding  Fall area is barricaded at ground level.
 Fall of scaffolding  Dismantling scaffolding pipes should be bringing down by rope
material from height pulley/rope.
may cause severe bodily  Tools to be tied with string.
injury  Follow the step of scaffolding dismantling procedures.
 Hit by scaffolding  Ensuring that trained examined scaffolders are only involved in the
material mentioned process.
 Fall of person  Ensure use of mandatory PPE.
 Only medically fit and trained worker must be deployed for
dismantling work.
 Proper anchorage point or if required life line provided.
 Only nominated scaffolders does the dismantling of scaffolding.
 Display visual control safety signage board.
 Activity to be done under continuous supervision.

 Site Emergency  Confusion  Emergency assembly point, emergency access should be defined &
always free from any obstructions.
 Emergency contact details to be displayed at prominent locations
of site.
 Emergency vehicle must be available at work locations during all
working hours.
 All workers shall aware / trained about site emergency procedure.
 Fire Team-4666
 First aid -4777

Day-1 Day-2 Day-3

Permit issuer

Permit acceptor

Prepared by- Permit Issuer and Permit Acceptor Reviewed by-Plant Manager/ Safety officer

Approved By HOD

Page 5 of 5