Complete Schedule - Tower 5A ( Created on 16-09-24)
Common Area
Aluminium
Toilet Tile Tile- Utility Staircase (1 Staircase (2
Block- Gypsum Plumbing Water Cistern/ Balcony Door and Staircase Staircase Staircase
Slab Level Structure Block Work IPS Flooring Flooring/ Drawing/ Tile Kitchen Balcony MS Balcony tile Brick Work Plumbing & FF nos) Tile nos) Tile
Conduiting Plaster (UPVC) Proofing Diverter Painting Window plaster Railing Painting
Cladding Dinning Railing Flooring Flooring
Frame only
Above Terrace Works
Terrace Floor Level Slab-36R
36 th Floor Level Slab ###
35 th Floor Level Slab ###
34 th Floor Level Slab ###
33 rd Floor Level Slab ###
32 nd Floor Level Slab ###
31 st Floor Level Slab-30R ###
30 th Floor Level Slab ###
29 th Floor Level Slab ###
28 th Floor Level Slab ###
27 th Floor Level Slab ###
26 th Floor Level Slab ###
25 th Floor Level Slab ###
24 th Floor Level Slab ###
23 rd Floor Level Slab ###
22 nd Floor Level Slab ###
21 st Floor Level Slab-20R ###
20 th Floor Level Slab-19R ###
19 th Floor Level Slab ###
18 th Floor Level Slab ###
17 th Floor Level Slab ###
16 th Floor Level Slab-15 Roof ###
15 th Floor Level Slab ###
14 th Floor Level Slab ###
13 th Floor Level Slab ###
12 th Floor Level Slab-11 Roof ###
11 th Floor Level Slab-10 Roof ###
10 th Floor Level Slab ###
9 th Floor Level Slab-8th Roof ###
8 th Floor Level Slab ###
7 th Floor Level Slab ###
6 th Floor Level Slab-5 roof ###
5 th Floor Level Slab ###
4 th Floor Level Slab ###
3 rd Floor Level Slab ###
2 nd Floor Level Slab-Mivan ###
1 st Floor Level Slab-Stilt Roof ###