WIDENING & OVERLAYING TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDER
CBR-8%, MSA-20 DETAIL AT 'A'
TCS - 1B
WIDENING & STRENGTHENING TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDER
CBR-8%, MSA-20
Drawn By: S.D.
CHIEF CONSTRUCTION ENGINEER
NH - CIRCLE, BERHAMPUR, ODISHA. Rotrans Infra Projects Pvt. Ltd. Widening & Strengthening of Existing 2 Lane to 2 Lane with
Design By: D.B. Typical Cross Section
Checked By: M.G.
Bhubaneswar, Odisha. Paved Shoulder from Km. 281.700 to Km. 311.700 of NH-326 in
Approved By: M.G. DWG. No.: DPR/NH-326/HW/TCS/ 01
Email:rippl018@gmail.com the State of Odisha under EPC Mode.
SUPERINTENDING ENGINEER, R0 OCT-24 FIRST SUBMISSION. Revision: R0
NH - DIVISION, SUNABEDA, ODISHA. Rev. Date Description Dated: OCT-24 SCALE: N.T.S.
TCS - 1C
RECONSTRUCTION OF EXISTING CARRIAGEWAY TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDER
CBR-8%, MSA-20
TCS - 1D
RECONSTRUCTION TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDER AT CUTTING SECTION
CBR-8%, MSA-20
Drawn By: S.D.
CHIEF CONSTRUCTION ENGINEER
NH - CIRCLE, BERHAMPUR, ODISHA. Rotrans Infra Projects Pvt. Ltd. Widening & Strengthening of Existing 2 Lane to 2 Lane with
Design By: D.B. Typical Cross Section
Checked By: M.G.
Bhubaneswar, Odisha. Paved Shoulder from Km. 281.700 to Km. 311.700 of NH-326 in
Approved By: M.G. DWG. No.: DPR/NH-326/HW/TCS/ 02
Email:rippl018@gmail.com the State of Odisha under EPC Mode.
SUPERINTENDING ENGINEER, R0 OCT-24 FIRST SUBMISSION. Revision: R0
NH - DIVISION, SUNABEDA, ODISHA. Rev. Date Description Dated: OCT-24 SCALE: N.T.S.
TCS - 2A
CONCENTRIC WIDENING & OVERLAYING TO 2 LANE CARRIAGEWAY WITH PAVED
SHOULDER IN BUILT-UP AREA
CBR-8%, MSA-20
TCS - 2B
CONCENTRIC WIDENING & OVERLAYING TO 2 LANE CARRIAGEWAY WITH PAVED
SHOULDER IN BUILT-UP AREA
CBR-8%, MSA-20
Drawn By: S.D.
CHIEF CONSTRUCTION ENGINEER
NH - CIRCLE, BERHAMPUR, ODISHA. Rotrans Infra Projects Pvt. Ltd. Widening & Strengthening of Existing 2 Lane to 2 Lane with
Design By: D.B. Typical Cross Section
Checked By: M.G.
Bhubaneswar, Odisha. Paved Shoulder from Km. 281.700 to Km. 311.700 of NH-326 in
Approved By: M.G. DWG. No.: DPR/NH-326/HW/TCS/ 03
Email:rippl018@gmail.com the State of Odisha under EPC Mode.
SUPERINTENDING ENGINEER, R0 OCT-24 FIRST SUBMISSION. Revision: R0
NH - DIVISION, SUNABEDA, ODISHA. Rev. Date Description Dated: OCT-24 SCALE: N.T.S.
TCS - 3
RECONSTRUCTION TO 2 LANE CARRIAGEWAY WITH PAVED SHOULDER AT CUTTING SECTION
CBR-8%, MSA-20
TCS - 4
NEW 2 LANE CARRIAGEWAY WITH PAVED SHOULDER (REALIGNMENT SECTION)
CBR-8%, MSA-20
Drawn By: S.D.
CHIEF CONSTRUCTION ENGINEER
NH - CIRCLE, BERHAMPUR, ODISHA. Rotrans Infra Projects Pvt. Ltd. Widening & Strengthening of Existing 2 Lane to 2 Lane with
Design By: D.B. Typical Cross Section
Checked By: M.G.
Bhubaneswar, Odisha. Paved Shoulder from Km. 281.700 to Km. 311.700 of NH-326 in
Approved By: M.G. DWG. No.: DPR/NH-326/HW/TCS/ 04
Email:rippl018@gmail.com the State of Odisha under EPC Mode.
SUPERINTENDING ENGINEER, R0 OCT-24 FIRST SUBMISSION. Revision: R0
NH - DIVISION, SUNABEDA, ODISHA. Rev. Date Description Dated: OCT-24 SCALE: N.T.S.
TCS-1A TCS-1B TCS-1C TCS-1D TCS-2A
Sl. Chainage Length Applicable Sl. Chainage Length Applicable Sl. Chainage Length Applicable Sl. Chainage Length Applicable Sl. Chainage Length Applicable
No. (m) TCS No. (m) TCS No. (m) TCS No. (m) TCS No. (m) TCS
From To From To From To From To From To
1 281700 281780 80 1A 1 282480 282560 80 1B 1 281780 281980 200 1C 1 283740 283820 80 1D 1 292500 293800 1300 2A
2 281980 282020 40 1A 2 286320 286400 80 1B 2 282020 282480 460 1C 2 283920 284000 80 1D 2 294480 294650 170 2A
3 282560 282800 240 1A 3 286900 287020 120 1B 3 282800 283080 280 1C 3 285700 286070 370 1D 3 305750 305850 100 2A
4 283080 283270 190 1A 4 291360 291480 120 1B 4 283270 283400 130 1C 4 286400 286700 300 1D 4 308800 309100 300 2A
5 283400 283740 340 1A 5 291700 291880 180 1B 5 284200 284315 115 1C 5 287020 287260 240 1D 5 309480 310370 890 2A
6 284000 284200 200 1A Total Length = 580.0 m 6 287920 288300 380 1C 6 287380 287460 80 1D Total Length = 2760.0 m
7 284315 285700 1385 1A Deduct Structure Length = 2.4 m 7 289520 289680 160 1C 7 287740 287920 180 1D Deduct Structure Length = 6.8 m
8 286070 286320 250 1A Net Length = 577.6 m 8 293880 294200 320 1C 8 289080 289200 120 1D Net Length = 2753.2 m
9 286700 286900 200 1A 9 294650 294780 130 1C 9 289360 289520 160 1D
10 287260 287380 120 1A 10 295255 295330 75 1C 10 289680 289760 80 1D
11 288300 289080 780 1A 11 297100 297340 240 1C 11 290080 290120 40 1D TCS-2B
12 289200 289360 160 1A 12 299440 300000 560 1C 12 290860 290960 100 1D Chainage Length Applicable
Sl.
13 290120 290860 740 1A 13 300340 300400 60 1C 13 291200 291280 80 1D No. (m) TCS
14 291280 291360 80 1A 14 302300 302440 140 1C 14 291880 292040 160 1D From To
15 291480 291700 220 1A 15 303300 303320 20 1C 15 296620 296860 240 1D 1 310370 311420 1050 2B
16 292040 292500 460 1A 16 303480 303600 120 1C 16 298760 298900 140 1D Total Length = 1050.0 m
17 293800 293880 80 1A 17 306300 306520 220 1C 17 300000 300080 80 1D Deduct Structure Length = 6.0 m
18 294200 294480 280 1A 18 306920 307040 120 1C 18 300280 300340 60 1D Net Length = 1044.0 m
19 294780 295255 475 1A Total Length = 3730.0 m 19 303160 303300 140 1D
20 295330 296620 1290 1A Deduct Structure Length = 76.8 m 20 303600 303780 180 1D
TCS-3
21 296860 297100 240 1A Net Length = 3653.2 m 21 304560 304780 220 1D
22 297340 297490 150 1A 22 306160 306300 140 1D Sl. Chainage Length Applicable
23 298090 298760 670 1A 23 306800 306920 120 1D No. (m) TCS
From To
24 298900 299440 540 1A 24 307040 307100 60 1D
1 283820 283920 100 3.0000
25 300500 302300 1800 1A 25 307340 307440 100 1D
2 287460 287740 280 3.0000
26 302440 303160 720 1A 26 307850 307920 70 1D
3 289760 290080 320 3.0000
27 303780 304560 780 1A Total Length = 3620.0 m
4 290960 291200 240 3.0000
28 304780 305750 970 1A Deduct Structure Length = 10.0 m
5 300080 300280 200 3.0000
29 305850 306160 310 1A Net Length = 3610.0 m 6 307100 307340 240 3.0000
30 306520 306800 280 1A
7 307920 308100 180 3.0000
31 307440 307850 410 1A
Total Length = 1560.0 m
32 308300 308800 500 1A
33 309100 309480 380 1A Deduct Structure Length = 4.0 m
Total Length = 15360.0 m Net Length = 1556.0 m
Deduct Structure Length = 220.1 m
Net Length = 15139.9 m TCS-4
Sl. Chainage Length Applicable
No. (m) TCS
From To
1 300400 300500 100 4.0000
2 303320 303480 160 4.0000
3 308100 308300 200 4.0000
Total Length = 460.0 m
Deduct Structure Length = 29.4 m
Net Length = 430.6 m
Drawn By: S.D.
CHIEF CONSTRUCTION ENGINEER
NH - CIRCLE, BERHAMPUR, ODISHA. Rotrans Infra Projects Pvt. Ltd. Widening & Strengthening of Existing 2 Lane to 2 Lane with
Design By: D.B. Typical Cross Section
Checked By: M.G.
Bhubaneswar, Odisha. Paved Shoulder from Km. 281.700 to Km. 311.700 of NH-326 in
Approved By: M.G. DWG. No.: DPR/NH-326/HW/TCS/ 05
Email:rippl018@gmail.com the State of Odisha under EPC Mode.
SUPERINTENDING ENGINEER, R0 OCT-24 FIRST SUBMISSION. Revision: R0
NH - DIVISION, SUNABEDA, ODISHA. Rev. Date Description Dated: OCT-24 SCALE: N.T.S.