AUTHORITIES ELECTRONIC STAMP
1
30001
1 2 3 4 5 6 7 8 9 10
KEY PLAN
61675
5480 10570 6850 3750 3500 7750 3050 8425 12300
2
8 3
60113 FAC
60012 61005
8000
700 350
B
200 650
Lift Machine Rm. FFL +168.000
SSL +167.700
37-201
35 m²
1150
WBS AH-22 Line of runway
1800
150 36-102A
WBS
FD- XX beam above 200
GENERAL NOTES
750
Double leaf
2565
23300
trapdoor
7400
DN
upwards 200
WBS 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
MEP 200
2700
FFL +168.100 37-202 3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
SSL +168.000 16 m²
WBS
200
4. ALL SPOT LEVELS ARE IN METERS AS PER DMD UNLESS NOTED
DS-22
FFL +168.100 OTHERWISE.
37-203C SSL +168.000
2635
FD60 AC1
5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
2 DS-04 DS-04 FFL +168.350 2 PROJECT SPECIFICATIONS, SCHEDULES AND DRAWINGS.
1630
1450
37-101B 37-203B
FD90 A FFL +168.100 FD60 C1 WBT SSL +167.700
30001 200 30001 6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
SSL +168.000 SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
400
DS-103 DS-104
ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
200
37-101A 37-203A
FD90 B FD- C
100 1100 100 1550 800 1200 5250 350 7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR
APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF
C ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
3050
FFL +168.000
ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN.
COORDINATION TRACKER
4850
FORMAL ISSUE
SELECT GROUP
Offices 1601 & 1606, 16th Floor Marina Plaza, Al Marsa
Street, Dubai Marina, UAE
3 4 5
TEL:+971 4 368 3355
WEB:www.select-group.ae
2
60113 FAC LEAD CONSULTANT:
200
TEL: +971 4 3554447
B design EMAIL: info@killadesign.com
WEB: www.killadesign.com
TOW +172.750
CONSULTANT:
7550
TEL: +971 4 3554447
TYPE THICKNESS FIRE RATING ACOUSTIC SCOPE OF WORKS
(MM) RATING
TOR +172.600 design EMAIL: info@killadesign.com
WEB: www.killadesign.com
WD-200-A Refer to ID Consultant Package
200 60 MIN 58 DB
(Dry Wall)
TOW +172.750 PROJECT:
WD-100-A
(Dry Wall)
100 30 MIN 47 DB
PENINSULA PLOT F
WBL-100
100 120/60 MIN -
(Solid Block-Light Weight) DRAWING NAME :
WBS-150 NOTES
(Solid Block Wall)
150 120/60 MIN 55 DB TOW +172.750
Top of roof floor plan
1. All room areas shown in the drawings are measured to center line of the partition walls. C
200
WBS-200 2. Wall thicknesses shown in drawings do not include interior finishes and plaster. AUTHORITIES DRAWING NUMBER : NUMBER SEQUENCE:
200 120/60 MIN 59 DB
(Solid Block Wall) 3. For all FOH areas, refer to ID consultant drawings.
WBT-200
200 120/60 MIN 40 DB
4. For all shafts, builders work and sleeves openings refer to MEP and Structural drawings. A-07-015 10037
(Thermal Block Wall) 5. For drainage, sand trap and sewage pump levels refer to MEP and Structural drawings.
6. Facade zone is 350mm for Ground Floor to Podium and 300mm for Typical floors. SCALE @ A1: DRAWN: CHECKED: APPROVED:
7. For landscape areas in ground floor and podium level 3, refer to landscape drawings. 1:100 CS BV DD
8. Cutting plane is set at 1200mm from FFL level. For accurate fins dimensions and setting out, please refer to architecture
part sections ARC 55000 series. PROJECT NO.: DESIGNED BY: DATE OF ISSUE:
Top of Roof 9. For architectural finishes, refer to architecture finishes schedule ARC 90000 series.
Top of Roof Level 2256 KLD 03-Feb-2023
1 1 : 100
2 1 : 100
DRAWING NO.: REV:
2256-PF-KLD-ARC-DWG-10037 0
© Copyright KILLA ARCHITECTURAL DESIGN
Form Rev. 2 / 20-Aug-2020
320.028°
AUTHORITIES ELECTRONIC STAMP
h
ort
1 2 3 4 5 6 7 8 9 10
eN
1
Tru
1 1
30001
11004-01 11004-02 Qi b
la
61675 258.19°
5480 10570 6850 3750 3500 7750 3050 8425 12300
KEY PLAN
P2
P1
8800
.65
128589
O T L IMIT
PL
PLO
353
LOT L
53336.64
Lands c
IMIT
A
ape to
LIMIT
be alte
P LO T
LAP POOL
8000
25450 WL +26.95
red
BL +25.45
3400 3450 4250 3000 2900 4850 3600
500 2500 400 3450 500 3250 500 3000 500 2400 500 4350 500 2500 600
FFL +27.05
B. ADJUSTABLE
MULTI POWER
Fireman's Lift
1770
LEG EXTE
NSION
04-102 STRENGTH
ARTIS SS
4375
DID-01 SSL +26.900 SH
OU
LDER
AR
DS-04
FFL +27.050 TIS
IT Couples
23300
2100
7400
SETBA
treatment room BTU Meter Water
04-203 DS-21 DS-21 Meter Gymnasium
B. ADJUSTABLE
IDF Rm. Lift Lobby AH-03 DS-04 AH-03
DID-04
04-201 PE-01 04-001 PE-02 AH-03 1. DO NOT SCALE FROM DRAWINGS. DIMENSIONS GOVERN.
UP DN UP
DID-10
UP FFL +27.050 FREE WEIGHTS
2245
DF-250
SSL +26.900 Garbage
Slo
pe
FFL +27.050 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
PAS
Slo
pe
Stair-01 Room DS-03 BOH Stair-02 CABLE STATION - 4
SSL +26.900
B. ADJUSTABLE
2 04-101 Corridor 04-105
FUNCTIONAL TRAINING 2
Outdoor DS-04 Fire Curtain with
DID-10 AH-02
Egress Door 3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
30001 Seating 04-104 30001
1195
150
7875
150
OUTDOOR EXERCISE
Terrace DID-04 DID-12 DID-09 DID-10 DID-26 DID-10 DID-09 DID-04
DF-216
Hair+Nail salon DID-10 Corridor FFL +27.050 OTHERWISE.
2045
FFL +27.050 04-006 FFL +27.050 FFL +27.050 DID-32
SSL +26.270
SSL +26.900 SSL +26.900 SSL +26.900 FFL +27.05
Technogym Bench
Technogym Bench
5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
22600
PROJECT SPECIFICATIONS, SCHEDULES AND DRAWINGS.
D MEP relax
Slo
SKILLTOOLS STORAGE
pe
area
Slo
pe
jacuzzi
Water
DID-04
3650
DID-04 4300
1200
5100
Egress Door 6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
Pool-02 Pool-01 Lockers SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
6200 10795
4850
Canopy Line
LOW
ss neck
massage
Pool &
1400 ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
4480
1200
Drainage
Changing 1 DID-04 2100 1200 2900 MEP Toilet 750 Lockers Above
UNIVERSAL STORAGE
ss relax
AB OUTLINE BE
lounge Air/Hydro
jets massage
jacuzzi
Water
KETTLEBELL
Glass
baluster
RACK
jacuzzi
Water
HOT pool
h: 90 cm
APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF
1500
changing
MEP
water RECLINE PERSONAL
ss relax Body
DN
massage
Rm. Toilet ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
3578
FFL +26.570
TECHNOGYM RIDE SKIL
BIKE PERSONAL
DID-16 DID-16 BIKE
LRO
W
DID-01
1300
CR
Lobby
OSS
PERS
1275
5605
to be altered
DID-01 DID-01
ONAL
3120
AL SL
Sauna Steam Pool-02 3350 1350 2550 CARDIO
UNIT Y 7000
Shower Steam
C LIM
DID-01 UNITY 7000
SKIL LRUN B AR
TIS
ALD ER WOO D BEN CH
INDIRECT SKILLRUN
2450 9. ALL MATERIALS SHALL BE APPROVED BY THE ARCHITECT/ENGINEER PRIOR
LIGHT A
UNITY 7000
Head rest
SKILLRUN
ALD ER WOO D BEN CH
NEW STRUCTUR
ALDER
BACK REST
Head rest
Head rest
DF-211 Changing 2 DID-01
Landscape
Pool-01 4100
FFL +27.04 10. THIS PROJECT WAS PRODUCED IN REVIT VERSION 2020.2.1(BIM).
2015
2345
Cold pool
h: 126
cm. water
Sauna
FFL +27.05
PLOT L
294
944
98
49.
9.4
SE 5,00 COORDINATION TRACKER
45
IMIT
TB 0 m Glass Fence
AC m
K rad Canopy Line
LIM ia REV VER DESCRIPTION DATE & TIME OF PRINT
IT l Above
KID'S POOL
WL +26.95
BL +26.30
FFL +27.05
FFL +27.05
1,0
00
,
PL 0 0 0
OT m
13
9 LIMm ra 03-Feb-2023 Client Issued for Construction
PL 097 IT dial
OT mm 1 03-Feb-2023 Client Tender Addendum Issue
LIM 0 06-Dec-2022 Client Issued for Tender
IT
7 REV DATE ISSUED TO DESCRIPTION
3886.4
ADULT POOL IMIT
PLOT L
WL +26.95
Issued for Construction
BL +25.35
PLOT #: PLOT OWNER:
3460190 Capitol 4 Limited
CLIENT:
SELECT GROUP
Offices 1601 & 1606, 16th Floor Marina Plaza, Al Marsa
88 Street, Dubai Marina, UAE
00
P11
TEL:+971 4 368 3355
WEB:www.select-group.ae
88
00 LEAD CONSULTANT:
4
IT
8.1
LIM
85
38
41
12 88
OT
5 00
PL
TEL: +971 4 3554447
design EMAIL: info@killadesign.com
WEB: www.killadesign.com
P9 PK
CONSULTANT:
1:200 CS BV DD
PROJECT NO.: DESIGNED BY: DATE OF ISSUE:
h
ort
eN
Tru
Qi b
la
1
258.19°
30001
1 2 3 4 5 6 7 8 9 10
KEY PLAN
61675
5480 10570 6850 3750 3500 7750 3050 8425 12300
7 1 7
60011 61003 60011
8000
25450
500 2500 400 3450 500 3250 500 3000 500 2400 500 4350 500 2500 600
WBS
150
1700
Technogym Bench
B
column
1400 6700
1050
1200
3645
450
DID-03
05-026B
FD- ID
5775
WBS
Elec. Room Toilet 150
Fireman's
2050
05-202 05-026 Personal Training Rm
1995
SKILLBIKE
Lift Lobby SE-01 PE-03
1800
1800
1500
WBS WBS
2850
150 7 m² 150
BY ID 05-028
05-102 SKILLROW
PERSONAL
9650 850 1950 1100 1300 BY ID TRAINING RM. WBS
18 m² DS-04
150
DID-03
4405
4330
FFL +33.050 WBS 05-202A 05-026A
150 FD60 C1 FD- ID
SSL +32.975 FFL +33.050
600
GENERAL NOTES
1500
DAP
SSL +32.900
1350
WBS WBS
1350
BTU Meter DS-21 Water Meter 150 200
RACK
DN
23300
UNIVERSAL STORAGE
7400
1500
05-203 FD60
05-203A
AD
DS-21 05-205 DID-03
KETTLEBELL
1. DO NOT SCALE FROM DRAWINGS. DIMENSIONS GOVERN.
7150
05-205A FFL +33.050 WBS
1600 2650 3 m² FD60 AD 2 m² 05-024A
FD- ID 150
DS-04 SSL +32.900 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
WBS IDF Rm. Lift Lobby AH-03 05-104C AH-03 WBS WBS DID-213
1500
1500
PE-01 PE-02 05-203B FD- C 05-205B 150
150 05-001 AH-03 150 05-028A
1790
05-201
850
UP
FD90 XX
05-104C
FD90 XX
UP FD- ID 3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
9 m² BY ID 1750 FD90 XX 1200 1100
9650 850 4450 2000 400
WBS WBS
Corridor STRETCHING 4. ALL SPOT LEVELS ARE IN METERS AS PER DMD UNLESS NOTED
150 DID-03
Sl
e
05-024B 12350
op
PAS
e
DS-03 FD- ID
3345
2100
AH-02 5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
BOH
3250
Outdoor Seating Terrace Stair-01 05-102A 2 m² FD60 E1
Stair-02 05-024
2250
2250
FD90 C1 PROJECT SPECIFICATIONS, SCHEDULES AND DRAWINGS.
1790
2
05-001 05-101 DS-04
05-101B
Corridor WBS
05-105 2
WBS WBS
WBS 150 BY ID
30001 53 m²
FD90 A 150 150
150 05-104 WBS
30001 6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
200
4 m² 1700 1200
B. ABD.CRUNCH
SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
DID-04 DID-12 DID-09 DID-10 DID-26 DID-10 DID-09 DID-04
05-101A 05-102A 05-005A 05-201A 05-005C 05-104B 05-005E 05-105A DID-10
Gymnasium ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
WBS
250
DF-250 FD90 ID FD60 ID FD- ID FD60 ID FD60 ID FD00 ID FD- ID FD90 ID 05-023A
6605
200 FD- ID
FFL +33.040 05-001A
FD- FAC
05-021 7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR
SSL +32.900 850 100 1100 100 1700 1300 400 900 500 1100 100 2400 490 3020 490 2400 1950 1100 300 900 100 100 1100 100 1200 WBS
BY ID
Library 200 APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF
C 05-002
500 400 500 500 ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
3050
2000
B. LOWER BACK
18370
BY ID 05-002A 05-021A FFL +33.050 ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN.
FD- ID WBS 05-005 WBS FFL +33.050 WBS FD60 ID
SSL +32.900
3550
200 200 SSL +32.975 200
BY ID 8. THE CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND
WBS
FFL +33.050 FFL +33.050
200 WBS APPROVED SHOP DRAWINGS.
SSL +32.975 200 SSL +32.900
600 250
1355
DID-105 DID-105 DID-11 WBS TO UNDERTAKING ANY WORKS.
05-014A 05-015A 05-017A 200
Sl
e
op
Sl
e
3200
3200
150 BY ID BY ID 150
BY ID BY ID
COORDINATION TRACKER
3900
3900
4850
WBS
200 FFL +33.050 FFL +33.050 AV
FFL +33.050 FFL +33.050
SSL +32.975 SSL +32.975 SPEAKER SPEAKER
SSL +32.975 SSL +32.975
3425 3025 6700 2925 3015 REV VER DESCRIPTION DATE & TIME OF PRINT
150
WBS 05-019A FORMAL ISSUE
150 FD- AN
WBS WBS
150 150
Void
FFL +33.050
SWING SAFETY ZONE SSL +32.975
3300
10335
WBS Cinema Room Games / Kids Room
BACK OF SIMULATOR
WBS
AV CABINET
THIN CLADDING BY XGOLF
200
Meeting Rm 01 BY ID BY ID
CEILING CABLE LAN
A
05-016 CEILING CABLE POWER
BY ID FFL +33.050
1150
6985
SPEAKER SPEAKER
7185
05-016A
FD- ID WBS
FFL +33.050 150
STORAGE FOR
130
GOLF CLUBS
SSL +32.975 WBS
150
CINEMA SCREEN
BOOTH ENCLOSURE
WBS
200 FFL +33.050 WBS WBS WBS
SSL +32.975 150 200 200
GOLF SCREEN
Cinema Storage C
SCREEN SAFETY ZONE
05-030 9950 03-Feb-2023 Client Issued for Construction
14 m² 1 03-Feb-2023 Client Tender Addendum Issue
0 06-Dec-2022 Client Issued for Tender
REV DATE ISSUED TO DESCRIPTION
SELECT GROUP
Offices 1601 & 1606, 16th Floor Marina Plaza, Al Marsa
Street, Dubai Marina, UAE
LEAD CONSULTANT:
CONSULTANT:
Amenities level 05 9. For architectural finishes, refer to architecture finishes schedule ARC 90000 series.
2256 KLD 03-Feb-2023
1 1 : 100
DRAWING NO.: REV:
2256-PF-KLD-ARC-DWG-10005 1
© Copyright KILLA ARCHITECTURAL DESIGN
Form Rev. 2 / 20-Aug-2020
320.028°
AUTHORITIES ELECTRONIC STAMP
h
ort
eN
Tru
Qi b
la
1
30001 258.19°
1 2 3 4 5 6 7 8 9 10
KEY PLAN
61675
5480 10570 6850 3750 3500 7750 3050 8425 12300
8 2 2 2 2
8
60011 60113 FAC 61003 60122 FAC
60113 FAC 60021
8000
25450
5 4
3400 3550 4050 3200 3200 4550 3500
80015 ARC 80015 ARC
500 2500 400 3550 400 3250 400 3200 400 2400 400 4550 400 2500 600
5
80015 ARC
Bedroom
Master
bedroom
B WBL
1050
WBL 100
1200
WBL 100
650
100
3090
3270
WBS
4600
DID-01 150
Elec. Rm.
2250
XX-001P Fireman's
3350 FD- ID XX-202 2000 100 1200 100 1300 200 1200 100 1800 100 2425 100
Lift Lobby
3050
WBS WBS WBL
1800
1800
1500
WBL
100 SE-01 PE-03 150 8 m² 150 100
XX-102 WBL
3745
WBL WD 100
WBL 1100 100 200B
5200 18 m²
3360
100 DS-04
Bath
1885
WBS XX-202A
Bedroom FD60 C1
3750
150 WBL
Study
600
WBL
BTU Meter 1200 100
100 GENERAL NOTES
1500
1350
1105 550 XX-203 Water Meter WBL DID-01
23300
1500
DID-62 XX-003I
7400
100
2600
2800
200A DS-21
4500 2000 1350 DID-03 3 m² XX-203A DS-21 XX-205 WBS XX-003F DID-15 bath FD- ID
DID-01 1. DO NOT SCALE FROM DRAWINGS. DIMENSIONS GOVERN.
AH-03 FD- ID
7550
XX-001Q 1600 2650 FD60 AD XX-205A 150 XX-003H 3025 XX-003J 1200
FD- ID XX-203A FD60 AD FD- ID
1720
WBS FD90 XX FD- ID
WD DN DID-03 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
150 Lift Lobby DS-04
7015
1500
1500
XX-205A 100
2800
150
XX-001L XX-001M M/W FD- ID PE-01 XX-005 PE-02 AH-03 FD- C Bath 100
3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
850
FD- ID FD- ID IDF Rm. XX-104B FD90 XX DID-04 DID-04
2265
2280
WBL DID-01
60136 100 WBL BY ID 1850 FD90 XX 1200 XX-003E XX-003G
FAC 100 XX-201 XX-003C
FD- ID
FD- ID WD FD- ID pe
WBS 200A WBL WBS WBL WD Slo 4. ALL SPOT LEVELS ARE IN METERS AS PER DMD UNLESS NOTED
9 m² WBL
1000
(Y) FFL
100 1100
100 150 100 200B
Sl
e
OTHERWISE.
Slo
150
op
150
pe
e
1050
(Y-0.075) SSL DS-03
XX-003
DID-04
XX-001O AH-02
XX-204 XX-104B DID-03
XX-003B
70 DID-04
XX-003K 5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
Stair-01 FD60 E1 Stair-02
2015
BOH
Kitchen
2250
2250
WBL
Dining
DB
2 WBL DS-04 FD90 C1 WBS 2
XX-101 XX-105 100
Maid's
1080
1380
XX-101B Corridor
1350
WBL F
room
100 Powder WBS WBS WBS 150 WD
HCC
WBL FD90 A
150 150 150 WBL Powder 100
6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
30001 30001
1725
200B
900
Pantry 100 Room XX-104 100
1825
2680
DID-04 DID-04 DID-06 DID-07 DID-04 DID-24 DID-07 DID-04
XX-003 AH-01 FD- ID ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
3080
DF-250 XX-001N DID-03 XX-101A XX-102A XX-006A XX-201A XX-006C XX-006E XX-105A DID-05
XX-001A FD90 ID FD60 ID FD- ID FD60 ID FD60 ID FD- ID FD90 ID
Kitchen
XX-001A FD- ID FD90 XX XX-001S XX-003A DID-102
WBL
FD- FAC FD- ID FD60 ID 150 XX-003L 7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR
100
500 1100 100 1600 100 1300 400 900 500 1100 100 2400 90 3020 90 2400 400 2050 1100 300 900 200 100 1100 100 1200 WBS
1200 180 520 FD- ID Laundry/
645 2050 1200 200 WBL DF-250 APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF
Pantry
C 3 Bed-Type A 100 400 400
Corridor
400 400 600 5000 WBS
100 WBL
100 WBL
XX-003A
ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
3050
XX-001 10485 150 DID-41 150 200 200 200 ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN.
9605
XX-003M 200
100
XX-001A XX-006 FD- ID W/D WINE COOLER
800 2250 1200 FD60 ID WBS
WBL WBS WD BY ID AH-01 (Y-0.075) SSL WBS WBS WBS Dining Balcony
200
8. THE CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND
1200
XX-002A 150 200 150 AH-01
100 150 200B WBS WBS
HCC DB FD90 XX XX-003B XX-005
800
10350 1200 3625 2500 700 2550 100 650 1250 2325 450 2950 350 1200 50 FD90 XX M/W
150 200 APPROVED SHOP DRAWINGS.
2150 1770 810
WBL DID-05
WBL 100 XX-004A 9. ALL MATERIALS SHALL BE APPROVED BY THE ARCHITECT/ENGINEER PRIOR
D 100 FD60 ID M/W WINE COOLER F/F TO UNDERTAKING ANY WORKS.
2400
WBL
DB
Maid's 2300 1100 300 1250 100 PantryW/D
Sl
950
2100
DID-41
op
WBL
200
100
550
op
WBS
800
Maid's W/D
1400
Sl
WBS DID-102 DID-04 WBL 150 10. THIS PROJECT WAS PRODUCED IN REVIT VERSION 2020.2.1(BIM).
Powder
WBL FD60 ID WBL 2100 WBS WBS 4040 100
Room
150 XX-001K XX-001B 100 room 750 150 200
HCC
100 100
FD- ID FD- ID Powder WBS
2400
WBL WD Master WBL
2500
WBL 650 1250 1825 Maid's DID-03 150 Kitchen
2150
100 200B WBL 100 DID-02 WD
HCC DB
Room
DB
bath XX-004B
1750
DID-04 DID-01 DID-01 100 XX-004L
100 Pantry room FD- ID 200B AH-01
1600
1450
1700
XX-001I XX-001C XX-001D Study FD- ID DF-250
HCC
1400
DID-03 WD DID-04 XX-004A
XX-001J FD- ID 200A FD- ID FD- ID WBL DID-01 DID-03 DID-03 WBS WBL WBL WBL XX-004A
WBL XX-002C 100 WBL FD90 XX
FD- ID XX-002J XX-002L XX-002B 150 100 FD- FAC
Living 100
3200 FD- ID 1000 1125 FD- ID 2100 100 FD- ID 100 WBL 100
WBL
1100
1300
FD- ID WBL
Master 100 COORDINATION TRACKER
4850
1150
XX-001H 3625 1600 1500 2650 900 1450 1300 3475
1100
XX-001E
1050
DID-04 WBL
2100 FD- ID FD- ID 3000 REV VER DESCRIPTION DATE & TIME OF PRINT
1500
600
WBL
XX-002K 100
WBL
WBL WBL 2 Bed-Type B
1250 1000 FD- ID 2500 500 WBL 2 Bed-Type C
100 100
100
100
100 DID-04 DID-04 XX-004 FORMAL ISSUE
Sl
e
XX-004H XX-004D
4445
op
XX-002
op
WBL DID-01 DID-01 FD- ID FD- ID
Sl
1100 2600
e
1700
830
2850 100 100 1200 WBL DID-04 XX-004J XX-004K 7225
1200
100 1000
430
100 XX-002D FD- ID FD- ID
WBS FD- ID
4150 WBS WBL DID-01
150
WBL DID-62 150 DID-01 100 XX-004F
2400
1100
1100
150 FD- ID FD- ID 10200 DID-62 DID-81 DID-03 WBL
bath
1000
5900
FD- ID
1660
100
1300
FD- ID FD- ID
1400
XX-002E
FD- ID
Bedroom DID-01 WBL Bath Dining
WD
100 Bath Study
830
XX-001G WBL
1130
200A WBS
FD- ID 150 100
100
4265
WD
2050 1250 600
300
3775
WBL 200A
WBL WBL
100 WBL 100
100
DID-15 100 450 1900 1200 550 WBL WBS
Living
1125
2675
7105
XX-001F 100 150
1700 Living
FD- ID
Bath WBL
100 600 750 1150 2
1800
4450 1 60141 FAC
3935
3340
bedroom 100
Master bedroom
5 3900 DF-250
4100 3675
WBL XX-002AA
80015 ARC
WBL 100 FD- FAC
Sl WBL
WBL
100
Bedroom WBL
100
100 e
3380 op op
Sl
100
e WBL
Balcony Master 100
SELECT GROUP
Offices 1601 & 1606, 16th Floor Marina Plaza, Al Marsa
Street, Dubai Marina, UAE
LEAD CONSULTANT:
CONSULTANT:
Tier 01 floor plan (L06 to L10) 8. Cutting plane is set at 1200mm from FFL level. For accurate fins dimensions and setting out, please refer to architecture
2256 KLD 03-Feb-2023
1 1 : 100 9.
part sections ARC 55000 series.
For architectural finishes, refer to architecture finishes schedule ARC 90000 series. DRAWING NO.: REV:
2256-PF-KLD-ARC-DWG-10006 1
© Copyright KILLA ARCHITECTURAL DESIGN
Form Rev. 2 / 20-Aug-2020
320.028°
AUTHORITIES ELECTRONIC STAMP
h
ort
eN
Tru
Qi b
la
1
30001
258.19°
1 2 3 4 5 6 7 8 9 10
KEY PLAN
61675
5480 10570 6850 3750 3500 7750 3050 8425 12300
1 2 3 1 2
1
60012 60181 FAC 61003 60125 FAC
60113 FAC
60022
8000
25450
5 4
3400 3550 4050 3200 3200 4550 3500
1 5 80015 ARC 80015 ARC
500 2500 400 3550 400 3250 400 3200 400 2400 400 4550 400 2500 600
60140 FAC 80015 ARC
Bedroom Bedroom
B
1050
Master
1200
WBL
650
100
WBS
3575 bath 3310
3935
150 850 1100 1360
3790
Fireman's
2250
DID-01 WBL WBL
XX-001P Elec. Rm. 4100
600
100 100
WBL WBL
FD- ID Lift Lobby
3050
1800
1800
1500
WBS WBS
100 100
Bath
SE-01 PE-03 150 XX-202 150 DID-01
XX-102
1820
8 m² WBL 1350 XX-003M 1260
3415
800 750 18 m² FD- ID
WBS 100
1145
Bedroom DS-04
1350
3150
150 WBL
XX-202A DID-01
Study WBL
WBS
FD60 C1 600 1600 700 1200 1200 2375 100
XX-003N
WD
1885
3750
150 200B
600
100 FD- ID
DID-03 GENERAL NOTES
BTU Meter
1500
XX-003E
1350
5520
FD- ID DID-03
23300
DID-62
1500
DS-21 WBL
XX-203 XX-203A Water Meter
WBL
XX-003H
7400
7550
XX-205A Bath 100 200A 200A
FD60 AD XX-205
4550 3350 FD- ID
1520
AH-03 WD 1400
2770
WBS
200
2600
2600
DID-51 200B
2150
150
1200 XX-001C WBS Lift Lobby FD90 XX DS-04 AH-03
1 WINE COOLER IDF Rm. XX-104C
1500
1500
XX-205A 1100 1260
2800
DID-52 DID-52 FD- ID 150 DID-01
M/W PE-01 XX-005 PE-02 AH-03 FD- C Master
850
WBL XX-001L WD XX-001M
XX-201 XX-104B
FD90 XX XX-003D 3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
2280
60136 100 FD- ID 200A FD- ID BY ID 1850 1200 1200 FD- ID Bath bedroom
750
WD FD90 XX WBL WD
900
FAC 9 m² DID-04 DID-04
200A 100 XX-003F XX-003G 200B pe 4. ALL SPOT LEVELS ARE IN METERS AS PER DMD UNLESS NOTED
WBS DID-52 Slo
1100
FD- ID FD- ID WBS WBL
(Y) FFL
Sl
e
Slo
WBL 150 XX-003O
op
UP
690
1032
100 W/D 1800 1350 1300 FD- ID
Sl
150
pe
e
1100
BOH WBL
1200
FD60 E1 Maid's
Kitchen
2250
2250
2 XX-001O Powder DS-04 FD90 C1
Corridor WBL WBL W/D
2 PROJECT SPECIFICATIONS, SCHEDULES AND DRAWINGS.
Pantry XX-101 WBS
XX-105 room 100 F/F MW
1350
FD- ID XX-101B WBS WBS 100
1980
2300
150
Room WBS
XX-104
2500
FD90 A 150 150
900
30001 AH-01 150 30001 6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
1725
WBL
WBL WD Kitchen
2000
2100
XX-001A 100
4 m² Pantry
1300
F/F 100 200B SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
Balcony FD90 C1
DID-04 DID-06 DID-07 DID-04 DID-24 DID-04 DID-07 DID-04
WBL
100
DID-03
XX-003C DID-04
Powder ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
1200
XX-003 DF-250 DID-04
WBL
100
DID-03 XX-101A
FD90 ID
XX-102A
FD60 ID
XX-006A
FD- ID
XX-201A
FD60 ID
XX-006C
FD60 ID
XX-104A
FD- ID
XX-006E
FD- ID
XX-105A
FD90 ID
FD- ID
DID-03 DID-04
WBL
100
XX-003P
FD- ID
XX-001A XX-001N
FD- ID
XX-001R
FD- ID
DID-102
XX-003B
Room XX-003J XX-003K
FD- FAC FD- ID FD- ID WBL 7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR
1960 750 1200 1850 100 1100 100 1600 100 1300 400 900 500 1100 100 2400 90 3020 90 2400 2050 1100 300 900 200 100 1100 100 1200 DB FD- ID 100
APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF
C 500 400 400 400 400 400 600 950 1100 2150 1200 680 970 925 1100 2230 4295 ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
3050
3 Bed-Type A WBL 150 WBL DID-41 150 200 Corridor 200 200 (Y) FFL WBL
ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN.
100 100 XX-001A DID-41 100 Balcony
XX-001 FD60 ID XX-006 (Y-0.075) SSL XX-003A WBS 3 Bed-Type B
800 2250 1200 FD60 ID WBS WBL 150 XX-005 8. THE CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND
HCC DB BY ID 25050
150 100 XX-003 DF-260
450 1250 2100 1100 1100 1675 575 500 6650 XX-003A APPROVED SHOP DRAWINGS.
FD- FAC
2150
300
DID-41 HCC
9. ALL MATERIALS SHALL BE APPROVED BY THE ARCHITECT/ENGINEER PRIOR
D
800
XX-002A
Maid's FD60 ID
WBS TO UNDERTAKING ANY WORKS.
2300
150
Sl
2300 1100
2100
850
WD WBL
op
700
room WBL AH-01 WINE COOLER
op
WBL WBL
100
Sl
1400
W/D Maid's
Pantry / FD90 C1 WBL
1800
XX-001K XX-001B Powder WBL
750
WBS WBL WBL AH-01
100
2500
FD- ID FD- ID 1450 1400 450 550 2500 100
150 WBS
room Dining
2500
100
Laundry 100 XX-003A
700
2150
2300
150 Room 1100 1400 FD90 C1
HCC DB
DID-04 DID-01 DID-01 WBS WBS
DID-03 Kitchen
1450
XX-001I XX-001C XX-001D DID-04 150 150 DID-03
XX-001J FD- ID WD FD- ID FD- ID WBL
FD- ID WBL DID-62 WD 100 XX-002S XX-002D DID-01 DID-01
200A DID-01 DID-01
100 XX-002Q 200A FD- ID 1500 FD- ID XX-002F XX-002G
Living XX-002O XX-002P
1100
4100
2350
2850 Master XX-002B XX-002C 100
1900
WBL bath WBL FD- ID FD- ID
2590
DID-62
2490
1700
100 XX-001H
DID-62 100 bath 400 2875 4700 1000 1625 Bath
1300
XX-001E DID-04
1200
DID-04 WBL
WBL
FD- ID FD- ID 2400 600 3750 WD
XX-002R 100 XX-002E WBL
WBS
200
REV VER DESCRIPTION DATE & TIME OF PRINT
200A FD- ID
WBL 100 FD- ID 50 1100 2750 100
WD
100 900 200 900 1050 3 Bed-Type C DID-04 DID-15
FORMAL ISSUE
Sl
e
DID-62
4520
op
XX-002K XX-002H
op
3030
XX-002N
XX-002
Sl
FD- ID FD- ID
e
FD- ID WD WBL
8250
DID-50
1100
200A 100
1300
700
XX-002M
WBS
150
FD- ID Dining
WBS
1630
150 2050 DID-01
E Bedroom 1800
1100 3400 XX-002J
WBL
1000
WBL FD- ID
100 10200 100
860
4135
700
4900
FD- ID 900 3000 900 Living
1040
4785 Bath
Bath 1935
3730
WBL
5080
100
3580
DID-03
4570
XX-002I
6650
DID-15
XX-001F Master FD- ID
FD- ID WBL
bedroom
4500 DID-52
100
1
XX-002L 3875
FD- ID 4150 60184 FAC
Master
3300
WBL Study
bedroom 100 DF-250 3900 WBL
715
XX-002A 100
5 FD- FAC WBL Bedroom
op
e Sl
op 100 3875 1
2374
80015 WD Sl e
ARC Balcony
200A 60188 FAC
XX-004 Bedroom 03-Feb-2023 Client Issued for Construction
1 03-Feb-2023 Client Tender Addendum Issue
0 06-Dec-2022 Client Issued for Tender
REV DATE ISSUED TO DESCRIPTION
SELECT GROUP
Offices 1601 & 1606, 16th Floor Marina Plaza, Al Marsa
Street, Dubai Marina, UAE
LEAD CONSULTANT:
CONSULTANT:
h
ort
eN
Tru
1 Qi b
la
30001
258.19°
1 2 3 4 5 6 7 8 9 10
KEY PLAN
61675
5480 10570 6850 3750 3500 7750 3050 8425 12300
2 4 2 2
60012 61003 60113 60022
FAC
8000
25450
500 2500 400 3550 400 3250 400 3200 400 2400 400 4550 400 2500 600
1050
1200
2830
875 Elec. Rm.
Fireman's
16-202
2250
Lift Lobby
10 m² WBS
650
WBS SE-01 PE-03
3050
16-102
1800
1800
1500
WBS WBS 200
150 150 150
18 m²
2050 1110 1390
2050 FFL/SSL +79.050 WBS FAHU Room
DS-04
4288
150
WBS WBS
150
16-202A
FD60 C1
16-205
150
600
169 m² GENERAL NOTES
2000
DS-23
Storage
1500
1350
16-205A
800
1700
FFL/SSL +79.050 FD60 AC1
23300
LI 16-203
7400
7550
GSM Rm. 2050 1100 1400 WBS
150
1950 16-217 Lift Lobby DS-04 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
IDF Rm. 16-104C
25 m²
WBS 16-005 AH-03
1500
1500
FD- E1 AH-03
2800
150 PE-01 FFL/SSL +79.050 PE-02 16-203A AH-03
16-201
850
26 m² FD90 XX 16-104B
16-203B LI 3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
WBS 1200 FD90 XX 1200
750
3850
WBS
LI
Sl
e
OTHERWISE.
Slo
150
op
Storage WBS
op
UP UP
1032
1800 DS-03
Sl
150
pe
e
16-104B LI
WBS
AH-02 16-204 FD- E1 WBS 2850 3650 5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
150
Stair-01 16-102A BOH Stair-02
2120
2 m² 150
FAHU
2250
2250
2
AH-01 DS-04 FD90 C1
Corridor WBS 2 PROJECT SPECIFICATIONS, SCHEDULES AND DRAWINGS.
16-216B 16-105
16-101
1350
16-101B WBS WBS WBS
16-216 FD90 C1 FD90 A WBS
150 150 16-104
150
WBS 200
6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
6110
30001 150 200 30001
103 m² 1050 4 m² SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
DS-23 DS-04 DS-06 DS-02 DS-04 DS-124 DS-04 DS-02 DS-04
16-101A 16-102A 16-006A 16-201A 16-005A 16-104A 16-006C 16-105A ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
540
16-217A LI
202 1100 202620
DF-250 FD60 AC1 FD90 A FD60 C1 FD- J FD60 C1 FD60 XX FD- C FD- J FD90 A
BOH Balcony 16-215A
800 2000 200 100 1100 100 7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR
FD- FAC 1600 100 1300 400 900 500 1100 100 2400 90 3020 90 2400 400 2050 1100 300 900 200 100 1100 1300 Heat Exchange Room
16-215 APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF
C 52 m²
FFL/SSL +79.050 500 400 400 400 400 600 16-206 ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
3050
1810
DS-04 WBS WBS DS-42
FFL +79.180 16-216A
FFL/SSL +79.050 150 200 200 200
FFL/SSL +79.050 16-205A Room ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN.
SSL +79.040
FD60 C1 FD60 AC1 FFL/SSL +79.050 BOH Balcony
BOH Corridor WBS
WBS
WBS
16-207 8. THE CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND
200 150 DF-260
16-006 200
16-207A 67 m² APPROVED SHOP DRAWINGS.
350
FD- FAC
DS-23 71 m² AH-01 FFL +79.180
16-206A
16-214A DS-42 DS-42 DS-41 FD90 C1 SSL +79.040 9. ALL MATERIALS SHALL BE APPROVED BY THE ARCHITECT/ENGINEER PRIOR
D LI FD60 ID 16-212A
FD60 AC1
16-211A
FD60 AC1
16-209A
FD60 AC1 TO UNDERTAKING ANY WORKS.
Sl
700
700
op
op
900
WBS WBS
Sl
WBS DS-23
e
WBS 200
150 150
16-208A 10. THIS PROJECT WAS PRODUCED IN REVIT VERSION 2020.2.1(BIM).
1850
150
Slab Line Above FD90 AC1 2250 1100 2250 7150
1100
1100
DS-04 WBS
16-211B WBS LI
200 150
FD60 C1 WBS WBS WBS WBS WBS
200 200 150 150 150
2000
DS-23
16-213A
LI COORDINATION TRACKER
4850
FD60 AC1
1050 3000
7032
1700
1925 1250
REV VER DESCRIPTION DATE & TIME OF PRINT
790 200
WBS LI
WBS
150
Fire Pump Room FORMAL ISSUE
Sl
e
Domestic Water Tank & Domestic Water Tank
op
800
op
200
Storage MCC Room GRP Fire Water Tank Room 16-218
Sl
e
Storage Transfer Pump Room Room 61 m²
16-214 WBS 16-209 16-208
700
5735
150 Slab Line Above
1810
LI
4300
5000 5000
1290
WBS
200
5300
WBS
DF-101 DF-101 200
1040
SELECT GROUP
Offices 1601 & 1606, 16th Floor Marina Plaza, Al Marsa
Street, Dubai Marina, UAE
LEAD CONSULTANT:
CONSULTANT:
MEP level floor plan (L16) 9. For architectural finishes, refer to architecture finishes schedule ARC 90000 series.
2256 KLD 03-Feb-2023
1 1 : 100
DRAWING NO.: REV:
2256-PF-KLD-ARC-DWG-10016 1
© Copyright KILLA ARCHITECTURAL DESIGN
Form Rev. 2 / 20-Aug-2020
320.028°
AUTHORITIES ELECTRONIC STAMP
h
ort
eN
Tru
Qi b
la
1
30001 258.19°
1 2 3 4 5 6 7 8 9 10
KEY PLAN
61675
5480 10570 6850 3750 3500 7750 3050 8425 12300
1
2
2 2
60113 FAC
60012 61004 60022
8000
25450
500 2500 400 3550 400 3250 400 3200 400 2400 400 4550 400 2500 600
1050
4550
650
Fireman's
Lift Lobby Elec. Rm.
2250
WBS 17-102 SE-01 PE-03 17-202
3050
1800
1800
1500
WBS WBS
150 18 m² 150 10 m² 150
2050 1100 1400
FFL +83.050 DS-04
WBS 17-202A
WBS
150 SSL +82.975 FD60 C1
150
600
GENERAL NOTES
1500
1350
WBS
23300
150
1500
LE DS-21 DS-21 WBS
WBS
7400
7350
FD60 AD FD60 AD
1600 2650 17-208A
FD90 XX
DS-04 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
VOID WBS
Lift Lobby 17-104C
LE
1500
1500
PE-01 PE-02 FD- C AH-03
150 IDF Rm. 17-005 AH-03 17-209A VOID
850
17-104B FD90 XX
3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
WBS (GSM Below) 17-201 BY ID 1850 FD90 XX 1200 1200
150 (FAHU Room Below) pe
4150
9 m² Slo 4. ALL SPOT LEVELS ARE IN METERS AS PER DMD UNLESS NOTED
WBS Garbage
Sl
e
OTHERWISE.
Slo
150
op
UP
op
LE UP Room
1032
1800 DS-03
Sl
pe
e
17-104B LE
WBS
150 Stair-01 AH-02 17-204 FD60 E1 BOH 5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
17-102A
2250
2250
2 m² PROJECT SPECIFICATIONS, SCHEDULES AND DRAWINGS.
2 17-101 DS-04
17-101B
FD90 C1
WBS
Corridor WBS 2
WBS WBS 150
30001
WBS
150
WBS
150
FD90 A
150 100 150 17-104 30001 6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
4 m² SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
350
DS-04 DS-06 DS-02 DS-04 DID-24 DID-04 DID-07 DID-04
BOH Balcony 17-101A 17-102A 17-106B 17-201A 17-006B 17-104A 17-006D 17-105A ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
DF-124 WBS FD90 A FD60 C1 FD- J FD60 C1 FD60 ID FD- ID FD- ID FD90 ID LE
17-207 17-207A 150
52 m²
FD- FAC
100 1100 100 1600 100 1300 400 900 500 1100 100 1650 200 950 90 3020 90 2400 400 2050 1100 300 900 200 100 1100 100 1200 7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR
APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF
C VOID
WBS 400 400 400 ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
3050
150
1800
WBS WBS WBS WBS
FFL +83.040 FFL +83.050 150 200 200 200 BOH Balcony ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN.
SSL +82.975
DID-42
DID-42 Corridor FFL +83.050
SSL +82.900 (FAHU Below) 17-006A
17-006A WBS 17-206
FD- IDID
FD- 200 17-006 SSL +82.975 WBS 8. THE CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND
150
MEP Below DF-124 67 m²
8950 BY ID 17-206A APPROVED SHOP DRAWINGS.
350
FD- FAC FFL +83.040
LE DID-41 SSL +82.900 9. ALL MATERIALS SHALL BE APPROVED BY THE ARCHITECT/ENGINEER PRIOR
D 17-001A
FD60 ID WBS
150
TO UNDERTAKING ANY WORKS.
Sl
3250 1200 1125 100 2300 100 1500 1000 700 2550 650 950
op
op
WBS
Maid's W/D
Sl
e
WBS WBS 150 10. THIS PROJECT WAS PRODUCED IN REVIT VERSION 2020.2.1(BIM).
150 150 100 150 150
WBL room WBL
100
WBS WBS
2250
Powder Study
2250
2350
100 150 150
DB
Master bath WBS WBS LE
Room
HCC
150 200
WBL
WBL DID-01 WBL
WBL
DID-03
17-001L
DID-03 DID-04
17-001C
Pantry
WBL
100 17-001K 100 17-001B FD- ID
100 100 FD- ID FD- ID 100
FD- ID COORDINATION TRACKER
4850
100
100 17-001I 17-001J 17-001M
FD- ID FD- ID FD- ID WINE COOLER
MW F/F
1050
1150
800 WBL WBL REV VER DESCRIPTION DATE & TIME OF PRINT
WBL
WBL 17-001G
100100 FD- ID 100 100 LE
(Storage Below) (Storage Below) DID-04
WBS FORMAL ISSUE
Sl
e
op
17-001D VOID
op
800
200
Sl
FD- ID 2 Bed-Type C
e
WBL
100 1100
WBS WBL
WBL
100
150 100
100 17-001 (GRP Fire Water Tank Room Below)
WBS
DID-62 DID-01 BY ID LE
2400
150
E 17-001H
FD- ID
17-001F
FD- ID FFL +83.050
1900
Bath
5695
1250 DID-03
17-001E SSL +82.975
1500
FD- ID LE
WBL
100 Dining
100
WBL
WBL
100
100
2100 1250 600
600
WBL
100
3950 1700 1200 Living
3380
3380
10200
3965
Master bedroom
Bedroom
3795
DF-250
17-001AA
WBS FD- FAC
200 Sl
op
e Balcony op
Sl e
WBL
17-214
100 27 m² 03-Feb-2023 Client Issued for Construction
FFL +83.040 1 03-Feb-2023 Client Tender Addendum Issue
SSL +82.900 0 06-Dec-2022 Client Issued for Tender
REV DATE ISSUED TO DESCRIPTION
SELECT GROUP
Offices 1601 & 1606, 16th Floor Marina Plaza, Al Marsa
Street, Dubai Marina, UAE
LEAD CONSULTANT:
CONSULTANT:
MEP level floor plan (L17) 9. For architectural finishes, refer to architecture finishes schedule ARC 90000 series.
2256 KLD 03-Feb-2023
1 1 : 100
DRAWING NO.: REV:
2256-PF-KLD-ARC-DWG-10017 1
© Copyright KILLA ARCHITECTURAL DESIGN
Form Rev. 2 / 20-Aug-2020
320.028°
AUTHORITIES ELECTRONIC STAMP
h
ort
eN
Tru
Qi b
la
1
30001 258.19°
1 2 3 4 5 6 7 8 9 10
KEY PLAN
61675
5480 10570 6850 3750 3500 7750 3050 8425 12300
3 2 2 1 2 3
60012 60181 FAC 61004 60125 FAC
60113 FAC 60022
8000
25100
5 4
3250 7600 3300 3100 7850
1 5 80015 ARC 80015 ARC
400 2500 350 3650 350 3250 350 3300 2750 350 4650 350 2500 350
60140 FAC 80015 ARC
1850
800 1050
Bedroom
Bedroom
B
1050
700
WBL
WBL 100
100 DID-01 WBS Elec. Rm.
3675
XX-001S
3790
150
FD- ID Fireman's
2300
XX-202 WBL
100
Lift Lobby SE-01 PE-03 8 m²
3100
3350 3850 3375
1800
1800
1500
WBS WBS
XX-102 150 4650 150
4660
WBL 19 m²
3555
WD WBL
100 WBL 200B DS-04 WBL 100
2800 100 1200
100 WBS XX-202A 1100 2750
FD60 C1
1885
3750
150
Bath Family
600
DID-03
Water Meter XX-003D WBS GENERAL NOTES
1500
Living
1350
FD- ID
1400
150
3350 BTU Meter XX-205
23300
1500
Study DS-21 WD
7400
1600
Bedroom XX-203B DS-21 2 m²
1400
DID-03 XX-203 FD60 AD XX-205A AH-03
200B 2150 AH-01
XX-003A
1. DO NOT SCALE FROM DRAWINGS. DIMENSIONS GOVERN.
WBL XX-001Q 1650 2700 AH-03
3 m² FD60 AD XX-205A 100 2000 DID-03
FD90 C1 WBL WBL
2420
100 FD- ID XX-203A XX-003G
WBS FD90 XX DS-04 FD90 XX FD- ID
Bath DID-01
1850
100
1525
100
1350 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
DID-52 DID-51 XX-104C Bath DID-01 XX-003H 2825
7115
1500
1500
XX-001M XX-001P FD- C
2800
FD- ID
3870
XX-001L M/W WBL 150 AH-03
1120
WBL FD- ID
850
WD FD- ID
FD- ID 100 XX-201 XX-005 3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
1120
XX-104B
100
2280
200A
1000
WBL
1900 1200 1250
2140
60136 FAC 9 m² BY ID
FD90 XX WBL
100 DID-04
100
DID-04 DID-04 F/F WINE COOLER MW XX-003J pe
1440
WBS XX-003E XX-003I DW FD- ID Slo 4. ALL SPOT LEVELS ARE IN METERS AS PER DMD UNLESS NOTED
(Y) FFL
Sl
e
FD- ID OTHERWISE.
Slo
150
Garbage Room
op
200A 150 DW
pe
e
1050
(Y-0.075) SSL DS-03 Pantry 2800 DID-04
XX-003 DID-04 AH-02 XX-204 XX-104B WBL XX-003F 5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
XX-001O Stair-01 XX-102A 2 m² FD60 E1 BOH Stair-02 100 FD- ID 2600
Kitchen
2250
2250
FD- ID PROJECT SPECIFICATIONS, SCHEDULES AND DRAWINGS.
Powder Room
Dining
WBL FD90 C1
2 XX-101 DS-04 Corridor WBS XX-105 2
2250
DID-15 DID-04
1350
100 XX-101B WBS
2450
1000 WBS 150
2550
WBS WBS XX-003B XX-003K
Pantry AH-01
WBL FD90 A 150 150 XX-104
900
150 150 6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
30001 30001
1725
2500
1555
1555
1555
100 WBL 150 200
Corridor 200 200 (Y) FFL XX-005A 100
ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN.
3 Bed-Type A 100 XX-001A
FD60 ID
800 2250 1300 FD60 ID
XX-006 (Y-0.075) SSL XX-003 Balcony
XX-001 700 1900 1200 650 2400 1200 750
8. THE CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND
HCC DB WD WBS BY ID WBS WBS DID-102 DF-260 XX-005
APPROVED SHOP DRAWINGS.
52050
150 150 150 XX-003Q WBL XX-003A
200B FD- FAC
WBS Powder WBS FD- ID 100
150 DID-03 150 WBL
room WD
1370
DID-41 9. ALL MATERIALS SHALL BE APPROVED BY THE ARCHITECT/ENGINEER PRIOR
1445
XX-003W 100
D
1575
Maid's XX-002A
125 1100 125
700
2100
room 1200
Sl
e
op
WBL
Maid's
op
900
WBL W/D 2300
Sl
DID-04 100
e
1350
DID-102 AH-01 10. THIS PROJECT WAS PRODUCED IN REVIT VERSION 2020.2.1(BIM).
1450
2300
2300
150 100 XX-003R XX-003L
2400
2400
2400
2100 650 1250
2300
1000 1125
DB
DID-04 Room FD- ID DID-71 FD- ID
DID-03 DID-01 DID-01 WBL
1700
XX-001I Master
HCC
XX-003P
1400
1750
1350
XX-001J FD- ID XX-001C XX-001D DID-03 DID-03 DID-04 100
FD- ID FD- ID FD- ID WBL WBL WBL FD- ID
bath XX-002C WBL
2305
WBL XX-002L DID-101 Pantry
1500
100 DID-01 100 100 XX-002B
Living WBL 100 XX-002K FD- ID XX-002M FD- ID FD- ID 100
WBL
1200 900
COORDINATION TRACKER
14305
DID-01
4850
Master bath WD
1550
100 FD- ID FD- ID 7050
1685
DID-15 100
1350
WBL WBL XX-002I 200B
100 FD- ID XX-002J 1400 900 WBL
WD
DID-62 100 FD- ID DID-01 DID-01 100
2490
1050
DID-04
1150
1150
WBL FD- ID FD- ID FD- ID REV VER DESCRIPTION DATE & TIME OF PRINT
4655
1700 FD- ID 3000 XX-002G 3825 DID-01
4955
2750
100 WBL
FD- ID 100 XX-003O
2025 1250 DID-04 625 9650 1245 FD- ID
XX-002D DID-81
FORMAL ISSUE
Sl
e
2625
XX-003T
op
FD- ID DID-62
4430
2950 1200
op
Bath
Sl
FDN ID XX-003N
e
1700 1275 WBS WBL
2 Bed-Type C
1100
FD- ID
1000
WBS DID-60 100
2350
2150
150
4150 WBS 150 Master bath XX-003S Formal
9305
150 XX-002 FD- ID
DID-01
XX-003M
WD WBL WBS
WBL 2400 DID-62 DID-01
WD FD- ID Living
200A 100 150 XX-002F
E WBL
100
1100 3425 100 XX-002H
FD- ID FD- ID 200A WBL
100
WD
3200
5695
5695
1925 WBL DID-03
1200
WBL 200A
100 XX-002E
100 FD- ID
Bedroom DID-01 WD 2200 650 1850 1100 850 2200 1350
XX-001G 200A
FD- ID WBL
4280
WBS
3445
2125 1250 600 WBL 100
150
WBL
600
Bath 100 WBL
5085
100 100
DID-15 WBL
XX-001F WBL
100
FD- ID 2200 4525 100
1
3185
4350
WBL
3985
100
5405
WBL
100
60184 FAC
3135
SELECT GROUP
Offices 1601 & 1606, 16th Floor Marina Plaza, Al Marsa
Street, Dubai Marina, UAE
LEAD CONSULTANT:
CONSULTANT:
Tier 03 floor plan (L18 & L30) 8. Cutting plane is set at 1200mm from FFL level. For accurate fins dimensions and setting out, please refer to architecture
2256 KLD 03-Feb-2023
1 1 : 100
9.
part sections ARC 55000 series.
For architectural finishes, refer to architecture finishes schedule ARC 90000 series. DRAWING NO.: REV:
2256-PF-KLD-ARC-DWG-10018 1
© Copyright KILLA ARCHITECTURAL DESIGN
Form Rev. 2 / 20-Aug-2020
320.028°
AUTHORITIES ELECTRONIC STAMP
h
ort
eN
Tru
Qi b
la
1
30001 258.19°
1 2 3 4 5 6 7 8 9 10
KEY PLAN
61675
5480 10570 6850 3750 3500 7750 3050 8425 12300
4 2 3 1 2 4
60012 60181 FAC 61004 60125 FAC
60113 FAC 60022
3
80015 ARC
8000
25050
4
3200 7600 3300 10950
1 80015 ARC
350 2500 350 3650 350 3250 350 3300 350 2400 350 4650 350 2500 350
60140 FAC
Bedroom WBL
100
1050
3225
1200
1000
700
4750 3275 DW
Elec. Rm.
Kitchen
Fireman's XX-202 WBL WBL
2300
100 100
Lift Lobby 8 m² WBL
100
3100
WBS WBS 2050 100
1800
1800
1500
XX-102 SE-01 PE-03 150 150
1930
DID-04
19 m² 2100 1110 1440 XX-002I
Family living DS-04
FD- ID
W/D
Family
830
900
1255
WBL
WBS XX-202A 100 WBL living
150 FD60 C1 100
DID-01
600
1800 GENERAL NOTES
375
XX-002F
1500
1350
DID-73 FD- ID
BTU Meter DS-21 Water Meter
23300
1500
XX-001AC
Laundry
7400
DID-81
1300
1200 3550 1200 4200 DID-15
1000
FD- ID XX-203A
XX-203 FD60 DS-21 XX-205 WBL
1. DO NOT SCALE FROM DRAWINGS. DIMENSIONS GOVERN.
1200
AD XX-002E XX-002G
2075
1650 2700 XX-205A 100
FD- ID
3 m² FD60 AD 2 m² FD- ID
Bath
DS-04 DID-01 WBL 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
DID-73 WINE COOLER WBS IDF Rm. Lift Lobby AH-03 XX-104C AH-03 XX-002D 100
1 DW XX-203A FD- C XX-205A 1800 2100 3575
450
FD- ID
1500
1500
F/F
XX-005
2800
XX-001AB 150 AH-03
PE-01 PE-02
1345
XX-201 FD90 XX FD90 XX 3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
850
FD- ID WBL WBL
WBL WBL XX-104B WBL WBL
60136 100
100 100 DW 9 m² BY ID 1900 FD90 XX 1200 100 1200 Slope
FAC 100 1250 100 WINE COOLER M/W
595
W/D F/F
1200 3550 1200 950 3150 4. ALL SPOT LEVELS ARE IN METERS AS PER DMD UNLESS NOTED
2660
WBS
DID-04 DID-04 DID-04
150 (Y) FFL Garbage Room WBS XX-002K OTHERWISE.
Dining XX-002H XX-002J
Kitchen
FD- ID
Maid's
1050
1800 150 1350 1350 150
DS-03 FD- ID FD- ID Kitchen
3960
WBL
Kitchen UP (Y-0.075) SSL XX-204 XX-104B UP 100
Slope
Stair-01 AH-02
2 m² FD60 E1 BOH Stair-02 Room 8525 100
5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
Sl
XX-102A
e
op
2250
2250
2 W/D XX-101 DS-04 FD90 C1 Corridor XX-105 2
Sl
M/W WBS
e
DID-03
2325
XX-101B
1350
WBS WBS 150
WBS
WBL FD90 A 150 150 XX-104 XX-002C
1685
30001 150 FD- ID 30001 6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
900
100
WBS 4 m² WBS DW
150 AH-01 DID-04 WBL SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
1200
200
XX-001A XX-001AD DID-04 DID-06 DID-07 DID-04 DID-24 DID-04 DID-07 DID-04
?-? 100
FD90 C1 FD- ID XX-101A XX-102A XX-006A XX-201A XX-006C XX-104A XX-006E ??
XX-105A ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
DF-250 FD90 ID FD60 ID FD- ID FD60 ID FD60 ID FD- ID FD- ID FD? ID?
FD90 DID-102
520
605
200
XX-001A XX-002B
FD- FAC FD- ID 5 Bed-Lower Duplex 7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR
Balcony 900 1150 1100 1100 100 1100 100 1550 150 1300 400 900 500 1100 150 2400 140 3020 140 2400 2100 1100 300 900 250 100 1100 100 1200 APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF
C XX-003 350 350 350 350 350 350 350
1460 1100 990 XX-002
ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
3050
Corridor
1825
DID-41 ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN.
1500
XX-001A 150 200 200 200 WBL
Half Penthouse FD60 ID XX-002A 100 Balcony
XX-006 (Y-0.075) SSL FD60 ID
XX-001 11540 1760 BY ID 11350 2300 1100 450 DF-260
XX-004 8. THE CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND
DID-04 XX-002A APPROVED SHOP DRAWINGS.
480
395
DB HCC XX-002Q FD- FAC
DID-41 FD- ID
9. ALL MATERIALS SHALL BE APPROVED BY THE ARCHITECT/ENGINEER PRIOR
870
D XX-001H
Sl
FD60 ID
op
845
WBSWD WBS 1200
850
150 150 WBS
840
WBL WBL WBS 10. THIS PROJECT WAS PRODUCED IN REVIT VERSION 2020.2.1(BIM).
Maid's 100 100 WBL
150
Powder DID-03
WD
Maid's 150
970
Powder Room XX-002P
2100
2100
200B 100
2200
2000
450
HCC DB
Room WBL
DID-03 Room WBL WBL
WBL
Room FD- ID
1700
100 100
970
970
100 DID-102 DID-03 1265 100 DID-04
Laundry
Sl
50
DID-03 XX-001F WBL
970
op
DID-03 XX-001C FD- ID DID-04 XX-002O
100 FD- ID DID-102 100 2475
e
WBL XX-001B FD- ID XX-001I 2000 FD- ID
1500
FD- ID XX-001G
100 FD- ID FD- ID
285
900
280
FD- ID WBL
1210
DID-81
COORDINATION TRACKER
90
4850
100
XX-001J
4750
DID-01
Formal 370 970 260 2540 1100 3355 1100 1405 DID-04
FD- ID DID-01 DID-01 XX-002N
DID-04 XX-001K XX-001L FD- ID
living
1150
e
DID-15
1495
1070
100
op
Bath XX-002M
Sl
FD- ID
WBS DID-04
1500 DID-04 DID-04 WBL
WBS
200 2000 FORMAL ISSUE
100 WBL 1700 100 DID-62
1000
150 XX-001V
950
XX-001Y XX-001P
1100
WBS
100 Master DID-01
1190
XX-001M
1250
2750
FD- ID FD- ID 150 WBS FD- ID FD- ID XX-002L
DID-01 150
XX-001X
2400 DID-01 DID-01 bath FD- ID
6450
XX-001T XX-001R
2400
FD- ID
1175
FD- ID FD- ID
2115
E DID-71
3105
WBL
2125 1375 600 2300 WD 3150 XX-001N WD
WBS
DID-03 150 Formal living
1300
1300
1000
650 1450 100 200B FD- ID 200A
970
Bath
100 1100
WBL Bath XX-001Q
1600
FD- ID
1785
100 WBL
100 1800 Bath
2290
525
100 1100
WBL DID-03 WBL
DID-03 XX-001U 2250
680
100
100 Study XX-001W FD- ID WBL 600 1400 100 1200
1750
FD- ID WBL 100
Room 500 1500
1900
25
1070 30
WBL 100
100 300 1075 3000 WBL
DID-04 WBL 100
1120
WBL
750
XX-001AA 100 WBL
WBL
FD- ID Gym 100 100
4035
100
3285
1
50
1000
1000
3150
450
4220
3300 60184
5265
3450 6600 FAC
4905
4225 4075
4315
Bedroom WBL
3415
WBL WBL WBS
100
1945
100 100 200
1990
1990
Master Bedroom
Bedroom WBL
Bedroom
100
03-Feb-2023 Client Issued for Construction
Bedroom 1 03-Feb-2023 Client Tender Addendum Issue
0 06-Dec-2022 Client Issued for Tender
5 3
REV DATE ISSUED TO DESCRIPTION
80015 ARC 80015 ARC
SELECT GROUP
Offices 1601 & 1606, 16th Floor Marina Plaza, Al Marsa
Street, Dubai Marina, UAE
1000
3275 DW DW LEAD CONSULTANT:
Kitchen
WBL
100 WBL
KILLA ARCHITECTURAL DESIGN
100 Office 3103, Burj Al Salam Tower,
1930
DID-04
XX-002I
Sheikh Zayed Road, PO Box 26642, Dubai, UAE
FD- ID
W/D W/D
830
1255
WBL
100
1800 TEL: +971 4 3554447
375
DID-81 Laundry
design EMAIL: info@killadesign.com
WEB: www.killadesign.com
1000
1200
XX-002G
2075
FD- ID
CONSULTANT:
1800 2100
450
1345
WINE COOLER WINE COOLER
KILLA ARCHITECTURAL DESIGN
595
W/D F/F W/D F/F
DID-04 DID-04 Office 3103, Burj Al Salam Tower,
XX-002H
FD- ID
XX-002J
FD- ID
Sheikh Zayed Road, PO Box 26642, Dubai, UAE
WALL TYPES LEGEND Tier 4 - Level Schedule
TEL: +971 4 3554447
TYPE THICKNESS FIRE RATING ACOUSTIC
(MM) RATING
Name Elevation 1
design EMAIL: info@killadesign.com
WEB: www.killadesign.com
30001
WD-200-A 31st Floor +139.05
200 60 MIN 58 DB
(Dry Wall) 33rd Floor +148.05
L31 - Laundry Room L33 - Laundry Room PROJECT:
WD-100-A
(Dry Wall)
100 30 MIN 47 DB 2 1 : 100
3 1 : 100 PENINSULA PLOT F
WBL-100
100 120/60 MIN -
(Solid Block-Light Weight) DRAWING NAME :
Tier 4 - Level Schedule Signage Code
WBS-150
(Solid Block Wall)
150 120/60 MIN 55 DB
Name Level Code Value NOTES
Tier 04 floor plan - L31 & L33
SCOPE OF WORKS
WBS-200 AUTHORITIES DRAWING NUMBER : NUMBER SEQUENCE:
200 120/60 MIN 59 DB
(Solid Block Wall) 31st Floor XX 31 Refer to ID Consultant Package 1. All room areas shown in the drawings are measured to center line of the partition walls.
WBT-200
200 120/60 MIN 40 DB 33rd Floor XX 32 2. Wall thicknesses shown in drawings do not include interior finishes and plaster. A-07-011 10031
(Thermal Block Wall) 3. For all FOH areas, refer to ID consultant drawings.
4. For all shafts, builders work and sleeves openings refer to MEP and Structural drawings. SCALE @ A1: DRAWN: CHECKED: APPROVED:
5. For drainage, sand trap and sewage pump levels refer to MEP and Structural drawings. 1:100 CS BV DD
6. Facade zone is 350mm for Ground Floor to Podium and 300mm for Typical floors.
7. For landscape areas in ground floor and podium level 3, refer to landscape drawings. PROJECT NO.: DESIGNED BY: DATE OF ISSUE:
Tier 04 floor plan (L31 & L33) 8. Cutting plane is set at 1200mm from FFL level. For accurate fins dimensions and setting out, please refer to architecture
2256 KLD 03-Feb-2023
1 1 : 100 9.
part sections ARC 55000 series.
For architectural finishes, refer to architecture finishes schedule ARC 90000 series. DRAWING NO.: REV:
2256-PF-KLD-ARC-DWG-10031 1
© Copyright KILLA ARCHITECTURAL DESIGN
Form Rev. 2 / 20-Aug-2020
320.028°
AUTHORITIES ELECTRONIC STAMP
h
ort
eN
Tru
Qi b
la
1
30001
258.19°
1 2 3 4 5 6 7 8 9 10
KEY PLAN
61675
5480 10570 6850 3750 3500 7750 3050 8425 12300
5 2 4 1 2 5
60012 60181 FAC 61004 60125 FAC
60113 FAC 60022
8000
25050
5 4
3200 7600 3300 10950
1 1 80015 ARC 80015 ARC
350 2500 350 3650 350 3250 350 3300 350 2400 350 4650 350 2500 350
60140 FAC 60188 FAC
Bedroom WBL
100 1375
3440 3010
1545
B
1050
DID-01
1200
XX-002F
700
3020
FD- ID
Elec. Rm. Master bath
Fireman's
XX-202
2300
Lift Lobby WD DID-01
1200
8 m² WBL WD
3100
DID-52
1800
1800
1500
WBS WBS 200A XX-002G 200B
XX-102 SE-01 PE-03 150 150
2140 XX-002H FD- ID
100
19 m² FD- ID 1650
2100 1100 1450 WBL
Family living DS-04
100
WBL
600
655
WBS XX-202A 1860 1100 1050 100
WBL WBL 150 FD60 C1
600
100 100 GENERAL NOTES
1500
WBS
1350
WBL 150
BTU Meter DS-21 Water Meter
980
23300
1500
100
1350
WAB
7400
4280
DS-04 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
WINE COOLER FD90 XX XX-104C 2140 1200
1 DID-73 DID-73 DW 3150 WBS IDF Rm. XX-005 AH-03
1500
1500
FD- C
1500
2800
XX-001AB F/F 150 XX-205A WBL 1910 1100 1000 600
XX-001AC PE-01 PE-02 AH-03
850
WBL FD- ID WBL
FD- ID
WBL XX-201 BY ID 1900 XX-104B 1200 FD90 XX 100 DID-15
XX-002D
WBL 3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
60136 100 100 1250
1100
100 DW FD90 XX 120 1100 8640 100
FAC WBL 9 m² FD- ID
1200 3550 1200 950 100 WBS DID-01 4. ALL SPOT LEVELS ARE IN METERS AS PER DMD UNLESS NOTED
2660
WBS DID-04
150 (Y) FFL Garbage Room 150 XX-002C XX-002J OTHERWISE.
Dining FD- ID
Kitchen
FD- ID
1800 150 1350 1350
Sl
e
1032
3960
DS-03
900
op
Kitchen UP
925
Bath WBL
Sl
100
e
AH-02
BOH DID-04 5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
WBS Stair-01 XX-102A 2 m² FD60 E1 Stair-02 XX-002B
100
2250
2250
DS-04 FD90 C1 PROJECT SPECIFICATIONS, SCHEDULES AND DRAWINGS.
2 150
M/W W/D
XX-101 Corridor WBS
XX-105 FD- ID 2
1350
XX-101B WBS WBS 150
645
645
WBL WBS WBL 1450 1100 140 1340
FD90 A 150 150 XX-104
900
30001 100 150 100
DW 30001 6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
WBS AH-01 4 m² SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
1200
150 XX-001B DID-04 DID-06 DID-07 DID-04 DID-24 DID-04 DID-07 DID-04 WBS
ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
950
950
FD90 C1 XX-101A XX-102A XX-006A XX-201A XX-006C XX-104A XX-006E XX-105A 150
DF-250 DID-04 FD90 ID FD60 ID FD- ID FD60 ID FD60 ID FD- ID FD- ID FD90 ID
Balcony XX-001A XX-001AD
FD- ID 7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR
FD- FAC 100 1100 100 1550 150 1300 400 900 500 1100 150 2400 140 3020 140 2400 2100 1100 300 900 250 100 1100 100 1200
XX-003 1100 1100 APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF
C 350 350 350 350 350 350 350 850 5 Bed-Upper Duplex ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
3050
5085
11540 1760 11350 8. THE CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND
850 1700 APPROVED SHOP DRAWINGS.
WBS
e
150
850
WBL WBL WD WBS
850
DID-41
Sl
WBL
e
WD 100 WBS
100
200B Maid's XX-001H
150
WBS
150
WBL 10. THIS PROJECT WAS PRODUCED IN REVIT VERSION 2020.2.1(BIM).
Powder Maid's FD60 ID WBL 150 100
DB
Room
2100
2100
2100
100 VOID
2200
2000
2325
HCC DB
WBL
100
Room 100 DID-03 DID-03 Room
970
WBL
DID-03 WBL DID-102 XX-001E XX-001F WBL Laundry WBL
970
DID-03 100
1700
XX-001C 100 XX-001D FD- ID FD- ID DID-102 100 100 DID-01 WBL WBL
1915
XX-001B DID-81
1500
FD- ID FD- ID XX-001G XX-001K 100 100
1600
FD- ID
280
FD- ID XX-001J FD- ID
DID-04 DID-01 WBS
COORDINATION TRACKER
90
FD- ID
4850
4750
Formal 370 970 260
100 2540 1100 3355 1100 1405 FD- ID
DID-04
FD- ID
Bath
3115
living
1150
100
DID-04 XX-001O 880 1000 1030
WBS XX-001Z WBS FD- ID
150 600FD- ID 1000 150
3590 REV VER DESCRIPTION DATE & TIME OF PRINT
650 1100 2250 925 100 1100 2425 3350 650 650 1800 1100 100 DID-04
DID-04 DID-04 WBL
XX-002M
1275
XX-001V XX-001P WBL 100 DID-15
WBS WBL XX-002L FD- ID FORMAL ISSUE
FD- ID FD- ID 100
DID-04 1500DID-01 DID-01 1700 FD- ID
1050
WBS 1710 DID-62 150 100
1000
1000
XX-001Y
1100
150
1250
2750
FD- ID XX-001X WBS XX-001M
2400
100 FD- ID 100
FD- ID FD- ID DID-01
140
150
bath
900 100
XX-002K
DID-01
2400
FD- ID
XX-001R
625 800 700
E 1375 600 1550 550 3150 1100 DID-71 1100
3105
1000
FD- ID
XX-001N WD
DID-03 1700
1300
1300
1300
FD- ID 200A
970
Bath
100 1100
3700
WBL WBL WBL Bath XX-001Q
1600
100 FD- ID
1785
100 100
Bath
2290
100
600 1700
600
WD
DID-03 200B
5075
XX-001U 2250
680
Study DID-03 FD- ID WBL WBS WBL
1850
WBL 100
Room XX-001W 150 100
1900
WBL
7525
100
1070 30
4035
100
3285
1
50
1000
4220
5265
FAC
4315
Bedroom
3415
WBL WBL
100 100 WBL
100
1990
Master
Bedroom WBL
100
Bedroom Bedroom
WBS
03-Feb-2023 Client Issued for Construction
Bedroom 200 1 03-Feb-2023 Client Tender Addendum Issue
0 06-Dec-2022 Client Issued for Tender
3 REV DATE ISSUED TO DESCRIPTION
80015 ARC
SELECT GROUP
Offices 1601 & 1606, 16th Floor Marina Plaza, Al Marsa
Street, Dubai Marina, UAE
LEAD CONSULTANT:
CONSULTANT:
h
ort
eN
Tru
1 Qi b
la
30001
258.19°
1 2 3 4 5 6 7 8 9 10
KEY PLAN
61675
5480 10570 6850 3750 3500 7750 3050 8425 12300
6 2 1 1 2 6
60012 60181 FAC 61005 60125 FAC
60113 FAC 60022
8000
25050
80015 ARC
1050
1200
700
Twin Bedroom
Bedroom
Fireman's Elec. Rm.
2300
3985
Lift Lobby Trapdoor 35-202 Library / Study
3100
2670 PE-03 WBS WBS
1800
1800
1500
35-102 SE-01 1600x1600 150 8 m² 150
5090
WBL
100 19 m² above 5450
1970
600
GENERAL NOTES
1500
1350
BTU Meter Water Meter
23300
DS-21
7400
1000
1500
Master bath WBL WBL
35-203 35-203A DS-21 35-205
35-205A
DID-71
WD 1. DO NOT SCALE FROM DRAWINGS. DIMENSIONS GOVERN.
100 FD60 AD WBL 35-001C
DID-01 100 1650 2700 3 m² FD60 AD 2 m² DID-53 200A DID-53
35-001AC 100 FD- ID WBL 35-001G 35-001H
4400 4150 100
Sl
FD- ID FD- ID FD- ID 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
Lift Lobby op
2100
WBL 2450 700 DS-04 DID-04
WBL WBS
IDF Rm. e
1 AH-03 35-104C
1500
1500
100 AH-03 35-001F
2800
150
100
PE-01 35-005 PE-02 35-203A AH-03 FD- C WBL 3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
850
35-205A FD- ID
1400
35-201
1700
FD90 XX 35-104B
1965
100
1270
Slope
1032
1950 1350 1350 DS-03
UP AH-02 S.S.L. +150.56 35-204 35-104B UP DID-01
35-001B
DID-01
35-001E Balcony
1085 1700 3365
Stair-01 35-102A 5 m² FD60 E1 BOH Stair-02 FD- ID FD- ID
5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
Sl
e
35-002
600 330
op
2250
2250
2 770 1000 680 DS-04 FD90 C1 Corridor 2
Sl
WBS
35-101 35-105
e
1270
35-101B WBS
1350
1350
WBS 150
WBS 150
Bath
35-001AD FD90 A
150
150 150 35-104 6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
30001 30001
900
1105
FD- ID
4 m² WBL F.F.L. +150.62
WBL
DID-81 WBS 100 WBL S.S.L. +150.48 SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
Balcony 100
100
35-001Z DID-04 DID-06 DID-07 DID-04 DID-24 DID-04 DID-07 DID-04 150 100
ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
610
FD- ID DID-01 35-101A 35-102A 35-006A 35-201A 35-006C 35-104A 35-006E 35-105A
450
5385
F.F.L. +150.63
2210
1500
1975
DID-01 350 350 350 350 350 350 350 DID-41 living ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
3050
WBL
Master 100 WBL
FD- ID 150 200
WBS
200 200 FD60 ID
WBL ANY FITTINGS, FIXTURES AND COMPONENTS SHOWN.
WBS
bedroom 100 200 200 4650 100
330 600 3000 330
6525 450 6875 450 4150 1725 450 3775 250
Penthouse DF-260
8. THE CONTRACTOR SHALL ONLY WORK FROM COORDINATED AND
DID-04
5200
35-002A APPROVED SHOP DRAWINGS.
e
35-001AG
35-001
op
2200
2200
2400
2100
2100
2100
WBL FD60 ID
100 100
100 DID-27 100
AH-01 35-001AQ DID-03 WBL
3275 1100 220 1100 1255 1100 3175 750 4000 1600 DID-03 W/D 10. THIS PROJECT WAS PRODUCED IN REVIT VERSION 2020.2.1(BIM).
Maid's room 35-001AJ
35-001A FD- ID 35-001AL 100
FD90 C1 FD- ID Maid's room DID-102 DID-04 Powder
Sl
HCC
DID-87 35-001W 35-001U 35-001T 35-001Q 100 1275 2400
e
100
100 1600 2100 1100 1650 450 1950 3375 1100 350 1100 1400 op
e
1980
330 600
DID-62
2200
Store DID-56
1600
1600
100 100 150 100
WBL 35-001V
2600
1085 1700 965 1800 550 1900 WBS DID-03 Bath 35-001I
100 FD- ID 150 DID-01 FD- ID
8000
35-001P
35-001O Sauna Steam
FD- ID 1325 1100 550 650 5250 1550 3975 600 35 1100 40
FD- ID REV VER DESCRIPTION DATE & TIME OF PRINT
1850 DID-04 DID-04 1885
35-001L 35-001J
1200
FD- ID FD- ID
5355
DW
600
WBL
3150 1200 100
WBL
100 DID-111 DID-111
WBS WBL
W/D W/D FORMAL ISSUE
e
150 WBL
Sl
op
35-001N 35-001M 100 WBL
DID-01
op
100
Sl
35-001S FD- ID FD- ID WBL 100
e
2250
2050
WBL WBL FD- ID 100
100 100 Kitchen
DID-15 WBL
2860
2760
DID-04
2600
4350 35-001K
FD- ID
WBL
100 WBL
8915
Bar
Bedroom WBL
100
Formal
F/F
5990
6040
DID-01
WBL 35-001R GYM
100 FD- ID
WBL
100
WBL Family living Family dining
1
1740
100 Bedroom
4275 6975 60184 FAC
DW
3
WBL
80015 ARC
100
WINE COOLER
M/W 03-Feb-2023 Client Issued for Construction
WBL
4 100 1 03-Feb-2023 Client Tender Addendum Issue
0 06-Dec-2022 Client Issued for Tender
80015 ARC
REV DATE ISSUED TO DESCRIPTION
LEAD CONSULTANT:
1
CONSULTANT:
30001
KILLA ARCHITECTURAL DESIGN
Office 3103, Burj Al Salam Tower,
Sheikh Zayed Road, PO Box 26642, Dubai, UAE
WALL TYPES LEGEND
h
ort
eN
Tru
Qi b
la
1
30001 258.19°
1 2 3 4 5 6 7 8 9 10
KEY PLAN
61675
5480 10570 6850 3750 3500 7750 3050 8425 12300
7 2 2 1 7
60012 60181 FAC 61005 60125 FAC 60022
8000
1
60134 FAC
1050
700
WBS
Elec. Rm.
Fireman's 200 36-203
Lift Lobby Line of runway
1800
1800
WBS WBS
SE-01 beam above 150
8 m² 150
36-102
19 m² 2100 1100 1450
DS-04
WBS 36-203A
Trapdoor 150
Double leaf
FD60 C1
600
GENERAL NOTES
750
1600x1600 above trapdoor BOH Corridor
1700
23300
1600x1600 36-103
7400
WBS WBS
open 150
8 m²
150
TOW +162.800 1. DO NOT SCALE FROM DRAWINGS. DIMENSIONS GOVERN.
1650 2700 upwards WBS
Lift Machine DS-04 200 2. ALL DIMENSIONS TO BE VERIFIED ON SITE.
WBS AH-03 36-104C AH-03
1 IDF Rm. Rm. 36-103A FD- C 36-103B 5 Ja
2700
2800
150
Pla cuzz
FD90 XX AH-03 FD90 XX
36-202 WBS
36-104B 3. ALL DIMENSIONS ARE IN MILLIMETERS UNLESS NOTED OTHERWISE.
60136 UP 36-201 1 150
FD90 XX WBS 67001 nt R i
FAC
9 m² 29 m²
80111
150
36- oom 4. ALL SPOT LEVELS ARE IN METERS AS PER DMD UNLESS NOTED
WBS WBS WBS 209
150 150 FFL/SSL +163.550 150 Storage 5 m² OTHERWISE.
1800 150 1350 1350 DS-03
UP
WBS
150 36-204 36-104B
AH-02 FD60 E1 BOH AH-20 5. THIS DRAWING MUST BE READ IN CONJUNCTION WITH ALL RELEVANT
Stair-01 36-102A 2 m² Stair-02 36-209A PROJECT SPECIFICATIONS, SCHEDULES AND DRAWINGS.
FFL +161.900
2250
2 36-101
DS-04
36-101B
FD90 C1 Corridor 36-105
FD60 XX 2
1350
WBS WBT SSL +161.600
30001 700 FD90 A
150 FFL/SSL +162.000 200 36-104 30001 6. ANY DISCREPANCY IN OR BETWEEN THE DRAWINGS, SPECIFICATIONS AND
4 m² SCHEDULES MUST BE BROUGHT TO THE IMMEDIATE ATTENTION OF THE
DS-04 DS-06 DS-02 DS-04 DS-23 DS-04 DS-02 DS-04
36-101A 36-102A 36-106A 36-201A 36-202A 36-104A 36-106A 36-105A ARCHITECT/ENGINEER PRIOR TO UNDERTAKING ANY WORKS.
75
WBS
700
200
FD90 A FD60 C1 FD- J FD60 C1 FD60 AC1 FD- C FD- J FD90 A
100 1100 1650 150 1300 400 900 500 1100 150 2400 650 2000 650 2400 2100 1100 300 900 250 100 1100 7. THE CONTRACTOR SHALL SUBMIT COORDINATED SHOP DRAWINGS FOR
APPROVAL (BASED ON SITE DIMENSIONS) PRIOR TO COMMENCEMENT OF
C 350
DS-122 350 350 350 350 350 DS-122
1800
1950
WBS FFL +162.000 WBS WBT
ANY SITE WORKS OR PLACING OF ANY ORDERS AND OR MANUFACTURE OF
3050
750
WBT 6575 3675 WBT 9. ALL MATERIALS SHALL BE APPROVED BY THE ARCHITECT/ENGINEER PRIOR
D 200 200
3300 2875 WBT
TO UNDERTAKING ANY WORKS.
700
200
TOW +162.800 10. THIS PROJECT WAS PRODUCED IN REVIT VERSION 2020.2.1(BIM).
4000
3675
3950
MCC Room GSM Room
BOH Roof
4200
36-207 36-206 Booster Pump Rm.
WBT
27 m² WBT 16 m² WBS
WBT 36-208
WBT
200
200 36-205 200
200 801 m²
2750
COORDINATION TRACKER
4850
700
36-205A
FD60 AD GRP MEP FORMAL ISSUE
Tank FAHU
WBT WBT WBT
200 200 200
10850 3325 3275 1025
WBS
E 200
FFL +161.900
SSL +161.600
CONSULTANT:
Roof floor plan 9. For architectural finishes, refer to architecture finishes schedule ARC 90000 series.
2256 KLD 03-Feb-2023
1 1 : 100
DRAWING NO.: REV:
2256-PF-KLD-ARC-DWG-10036 1
© Copyright KILLA ARCHITECTURAL DESIGN