INSPECTION CHECKLIST FOR
BACKFILLING
Project : Diplomatic Residences, Sector - 111, Gurgaon, Haryana WO Ref. No. : PCPL/PROJECTS/DR/2024/WO-009
Owner : M/s Puri Construction Pvt. Ltd. (PCPL) Reference No. : VCL/DIPLOMATIC/CL/BF/
Contractor : M/s Varindera Constructions Limited (VCL) Date :
Location :
Type of Structure :
Reference Document / Drawing No. :
Grid:
Status
S No. Acceptance Criteria Remarks
Pass Fail
Satisfactory Backfill/Fill materials are tested and approved for use as
1
per project specification. Soil Classification Test Report is available.
Backfill materials have no oversize and are properly graded prior to
2
use.
Subgrade should be clean and free from any debris prior to start
3 backfilling works. Subgrade should be aerated or sprayed with water
before placing of backfill materials.
Markings for each layer should be visible in the four comers and
4 edges in the area to be backfilled for easy identification and
monitoring.
rd
Field Density Testing is done by approved 3 party agency. FDT
5
Test reports are available.
Thickness of layer should not exceed the maximum requirement as
6
per project specification. Each layer is compacted per specification.
Compaction Field Density Test performed using approved method
7 as per project specifications. Subgrade compaction satisfies the
minimum requirement as per project specifications.
Remarks :
Contractor's Representative Client's Representative
Name : Name :
Designation : Designation :
Signature : Signature :