PREREQUISITE CHECKLIST (CIVILIMEP)
DLF                                         ONE MID TOWN
PROJECT
CONTRACTOR
                                    Details
Tower, Floor, Flat, Room
              T
                a-8o2
                                                                            Not   Remarks
                                                               Checked ok
            Work Activity List                                              ok
 SL
 No                                                   CIVIL
 A
            Prerequisite for MEP Work From
 1           Plumbing
                                           cleaning
 1.1         AllGrating cutting wth proper
             Cistern Plate
  1.2
             Cistern Cleaning
  1.3
             vvash Basin
     1.5
              Mixture Cutting
     1,6      Divertor Cutting
     1.7
              Angle valve cutting
              Kitchen sink cutting
     1.8
      1.9     Hole Repair
      1.10    IGL pipeline core cutting
      111      Utitytoilet Upstand for OWC
                                                                   NA
               Electrical
      2.1      Switch socket in stone &Tiles
      2.2      Edge finishes in POP areas
                                                                                       29}192y
       citen coven Ming
                o ( sTL)
2.3    False ceiling Light/Chimney pipe
2.4    DB/ONT box edge repair
3      HVAC
3.1    AC ply cutting/Alignment
3.2    Core hole/Cutout repair
3.3    Dish valve Cutting
3.4    Exhaust Fan cutting
3.5    Trap cutting
                                                        espTL)
3.6    Reiri(AC Automation core cutting)
       Fire Fighting
4.1    Boxing Alignment
       Modular Kitchen/Vanity
5.1    Switch Socket cutting
5.2    Sink cutting
5.3    Sink mixture cutting
5.4    Angle valve cutting
5.5    Drain cutting
5.6    Dish washer drain + power supply +water supply
5.7    LED light fixing &wire dressing
5.8    Hobb cutting
5.9    PNG pipe cutting
5.10   cutting for Smart WC power cord
B      Prerequisite for Civil Work From MEP
6      Water testing
       AC drainage test
8      Kitchen backsplash wall-grinding +finishing
       Calcium silicate boarding around rain-water pipe
10     CSP balcony boxing
C      Finish Check Points
11     Tile rectification including chipped off
12     Stone rectification including Coping
13     Cutting andcleaning clearance
14     UPVC Door/ Window Operation
15     Internal Door Operation
                                                          Signature and date
                                  Name
Dept
Contractor In-Charge
DLF Tower In-Charge
DLF MEP In-Charge