Item1    Item2
A28860   Submission for Approval of Working Drawing for Zone 1
A28880   Submission for Approval of Working Drawing for Zone 2
A28900   Submission for Approval of Working Drawing for Zone 3
A28920   Submission for Approval of Working Drawing for Zone 4
Item1      Item2
EXV|11124Excavator
CMP|1112Compactor
DTR|11124Dump Truck
GRD|1112Grader
ASP|11124Asphalt Paver
MCR|1112Mobile Crane
LBR|11124Labor/Helper
SKL|11124Skilled Labor/Helper
FRM|1112Foreman
EQO|1112Eq. Operator
MAS|1112Mason
PLW|1112Pipe Laying Worker
31.1.1.1|1 Geotextile (non-woven)
31.1.2.1|1 Trench Excavation upto 1.5m
31.1.2.2|1 Trench Excavation above 1.5m
31.1.3.1|1 Bedding and Backfill for Pipes
31.1.3.2|1 Backfill for Utility Trenches
31.1.3.3|1 Subgrade Layer
32.1|1112 Curbs Reinstatement for Pier Trenches
32.2|1112 Curb Stone Tiles Reinstatement
32.3|1112 Curbs Reinstatement as per Authorities Instruction
32.4.1|11 Ordinary asphalting Type ""A""
32.4.2|11 Ordinary asphalting Type ""B""
32.4.3|11 Ordinary asphalting Type ""C""
32.4.4|11 Type ""A"" asphalting with spreading machine
32.4.5|11 Type ""B"" asphalting with spreading machine
32.4.6|11 Type ""C"" asphalting with spreading machine
32.4.7|11 Type ""A"" asphalting with spreading machine and milling machines
33.2.1.1|1 HDPE Pipe 110 mm dia
33.2.1.2|1 HDPE Pipe 160 mm dia
33.2.1.3|1 HDPE Pipe 200 mm dia
33.2.2.1|1 Ductile Iron Pipe 250 mm dia
33.1.4.1|1 Gate Valves dia 100 mm
33.1.4.1-A Gate Valves dia 150 mm
33.1.4.3|1 Gate Valves dia 200 mm
33.2.5.1|1 Supply and Install Butterfly valve dia. 250 mm
33.2.5.7|1 Supply and Install Butterfly valve Actuator
33.2.6.1|1 Supply and Install Air valve dia 40 mm on pipes dia<300mm
33.2.7.1|1 Washout Valve dia 100 mm on pipes dia 100 mm -400 mm
33.2.8.1|1 2- outlet fire hydrant (2X65mm)
33.2.9.1|1 Single isolating valve champter type 1
33.2.10.1 Air Valve Chamber Type (1)
33.2.11|1    Chamber for washout Valves
33.2.12.1    Relocating of Telephone Lines
33.2.12.2    Relocating of Fiber Optic Cables
33.2.12.3    Relocating of low voltage electrical cables (<500 V)
33.2.12.4    Relocating of low voltage electrical cables (>500 V)
33.2.12.5.   Relocating existing water supply lines diameter up to 160 mm
33.2.12.5.   Relocating existing water supply lines diameter between 160 mm to 300 mm
33.2.12.5.   Relocating existing water supply lines diameter between 300 mm to 600 mm
33.2.12.6.   Relocating existing drainage lines diameter 500 mm
33.2.12.7.   Relocating existing sewer lines diameter 300 mm
33.2.12.7.   Relocating existing sewer lines diameter 400 mm
33.2.12.7.   Relocating existing sewer lines diameter 500 mm
33.2.12.8.   Removal of Septic Tanks up to 20 sqm surface area
33.2.12.8.   Removal of Septic Tanks greater 20 sqm surface area
33.2.12.9.   Partial Removal of Septic Tanks
Item1    Item2
A10040   Notify clients and vendors (if any) at Zone 16 Area Water Supply Authorities
A10090   Site Clearing and Grubbing at Zone 17
A1010    Site Clearing and Grubbing at Zone 1
A10110   Notify clients and vendors at Zone 17 Area Telepone Lines Authorities
A10130   Joint Survey with Consultant at Zone 17
A10150   Notify clients and vendors at Zone 17 Area Fiber Optics Cable Authorities
A10180   Notify clients and vendors at Zone 17 Area Electrical Cable Authorities
A10210   Notify clients and vendors (if any) for Zone 17 Area Authorities
A10240   Notify clients and vendors (if any) for at Zone 17 Area Reponsible Organization
A10270   Notify clients and vendors (if any) at Zone 17 Area Drainage Authorities
A10450   Pressure Test at Zone 17 for 110 mm Pipe
A10490   Pressure Test at Zone 17 for 160 mm Pipe
A10500   Pressure Test at Zone 17 for 200 mm Pipe
A10510   Pressure Test at Zone 17 for 250 mm Pipe
A10590   Notify clients and vendors (if any) at Zone 17 Area Water Supply Authorities
A10640   Site Clearing and Grubbing at Zone 18
A10660   Notify clients and vendors at Zone 18 Area Telepone Lines Authorities
A10680   Joint Survey with Consultant at Zone 18
A10700   Notify clients and vendors at Zone 18 Area Fiber Optics Cable Authorities
A10730   Notify clients and vendors at Zone 18 Area Electrical Cable Authorities
A10760   Notify clients and vendors (if any) for Zone 18 Area Authorities
A10790   Notify clients and vendors (if any) for at Zone 18 Area Reponsible Organization
A10820   Notify clients and vendors (if any) at Zone 18 Area Drainage Authorities
A1090    Contractor Office and Accomodation Facilities for Staff
A1100    Survey Works
A11000   Pressure Test at Zone 18 for 110 mm Pipe
A11040   Pressure Test at Zone 18 for 160 mm Pipe
A11050   Pressure Test at Zone 18 for 200 mm Pipe
A11060   Pressure Test at Zone 18 for 250 mm Pipe
A11140   Notify clients and vendors (if any) at Zone 18 Area Water Supply Authorities
A11190   Site Clearing and Grubbing at Zone 19
A1120    Joint Survey with Consultant at Zone 1
A11210   Notify clients and vendors at Zone 19 Area Telepone Lines Authorities
A11230   Joint Survey with Consultant at Zone 19
A11250   Notify clients and vendors at Zone 19 Area Fiber Optics Cable Authorities
A11280   Notify clients and vendors at Zone 19 Area Electrical Cable Authorities
A1130    Yard Preparation
A11310   Notify clients and vendors (if any) for Zone 19 Area Authorities
A11340   Notify clients and vendors (if any) for at Zone 19 Area Reponsible Organization
A11370   Notify clients and vendors (if any) at Zone 19 Area Drainage Authorities
A1150    Notify clients and vendors at Zone 1 Area Telepone Lines Authorities
A11550   Pressure Test at Zone 19 for 110 mm Pipe
A11590   Pressure Test at Zone 19 for 160 mm Pipe
A11600   Pressure Test at Zone 19 for 200 mm Pipe
A11610   Pressure Test at Zone 19 for 250 mm Pipe
A11690   Notify clients and vendors (if any) at Zone 19 Area Water Supply Authorities
A1180    Notify clients and vendors at Zone 1 Area Fiber Optics Cable Authorities
A1210    Notify clients and vendors at Zone 1 Area Electrical Cable Authorities
A12290   Site Clearing and Grubbing at Zone 21
A12310   Notify clients and vendors at Zone 21 Area Telepone Lines Authorities
A12330   Joint Survey with Consultant at Zone 21
A12350   Notify clients and vendors at Zone 21 Area Fiber Optics Cable Authorities
A12380   Notify clients and vendors at Zone 21 Area Electrical Cable Authorities
A1240    Notify clients and vendors (if any) for Zone 1 Area Authorities
A12410   Notify clients and vendors (if any) for Zone 21 Area Authorities
A12440   Notify clients and vendors (if any) for at Zone 21 Area Reponsible Organization
A12470   Notify clients and vendors (if any) at Zone 21 Area Drainage Authorities
A12650   Pressure Test at Zone 21 for 110 mm Pipe
A12690   Pressure Test at Zone 21 for 160 mm Pipe
A1270    Notify clients and vendors (if any) for at Zone 1 Area Reponsible Organization
A12700   Pressure Test at Zone 21 for 200 mm Pipe
A12710   Pressure Test at Zone 21 for 250 mm Pipe
A12790   Notify clients and vendors (if any) at Zone 21 Area Water Supply Authorities
A12840   Site Clearing and Grubbing at Zone 22
A12860   Notify clients and vendors at Zone 22 Area Telepone Lines Authorities
A12880   Joint Survey with Consultant at Zone 22
A12900   Notify clients and vendors at Zone 22 Area Fiber Optics Cable Authorities
A12930   Notify clients and vendors at Zone 22 Area Electrical Cable Authorities
A12960   Notify clients and vendors (if any) for Zone 22 Area Authorities
A12990   Notify clients and vendors (if any) for at Zone 22 Area Reponsible Organization
A1300    Notify clients and vendors (if any) at Zone 1 Area Drainage Authorities
A13020   Notify clients and vendors (if any) at Zone 22 Area Drainage Authorities
A13200   Pressure Test at Zone 22 for 110 mm Pipe
A13240   Pressure Test at Zone 22 for 160 mm Pipe
A13250   Pressure Test at Zone 22 for 200 mm Pipe
A13260   Pressure Test at Zone 22 for 250 mm Pipe
A13340   Notify clients and vendors (if any) at Zone 22 Area Water Supply Authorities
A13390   Site Clearing and Grubbing at Zone 23
A13410   Notify clients and vendors at Zone 23 Area Telepone Lines Authorities
A13430   Joint Survey with Consultant at Zone 23
A13450   Notify clients and vendors at Zone 23 Area Fiber Optics Cable Authorities
A13480   Notify clients and vendors at Zone 23 Area Electrical Cable Authorities
A13510   Notify clients and vendors (if any) for Zone 23 Area Authorities
A13540   Notify clients and vendors (if any) for at Zone 23 Area Reponsible Organization
A13570   Notify clients and vendors (if any) at Zone 23 Area Drainage Authorities
A13750   Pressure Test at Zone 23 for 110 mm Pipe
A13790   Pressure Test at Zone 23 for 160 mm Pipe
A13800   Pressure Test at Zone 23 for 200 mm Pipe
A13810   Pressure Test at Zone 23 for 250 mm Pipe
A13890   Notify clients and vendors (if any) at Zone 23 Area Water Supply Authorities
A1390    Safety Management Establishment
A13940   Site Clearing and Grubbing at Zone 24
A13960   Notify clients and vendors at Zone 24 Area Telepone Lines Authorities
A13980   Joint Survey with Consultant at Zone 24
A14000   Notify clients and vendors at Zone 24 Area Fiber Optics Cable Authorities
A14030   Notify clients and vendors at Zone 24 Area Electrical Cable Authorities
A14060   Notify clients and vendors (if any) for Zone 24 Area Authorities
A14090   Notify clients and vendors (if any) for at Zone 24 Area Reponsible Organization
A14120   Notify clients and vendors (if any) at Zone 24 Area Drainage Authorities
A14300   Pressure Test at Zone 24 for 110 mm Pipe
A14340   Pressure Test at Zone 24 for 160 mm Pipe
A14350   Pressure Test at Zone 24 for 200 mm Pipe
A14360   Pressure Test at Zone 24 for 250 mm Pipe
A14440   Notify clients and vendors (if any) at Zone 24 Area Water Supply Authorities
A14490   Site Clearing and Grubbing at Zone 25
A14510   Notify clients and vendors at Zone 25 Area Telepone Lines Authorities
A14530   Joint Survey with Consultant at Zone 25
A14550   Notify clients and vendors at Zone 25 Area Fiber Optics Cable Authorities
A14580   Notify clients and vendors at Zone 25 Area Electrical Cable Authorities
A14610   Notify clients and vendors (if any) for Zone 25 Area Authorities
A14640   Notify clients and vendors (if any) for at Zone 25 Area Reponsible Organization
A14670   Notify clients and vendors (if any) at Zone 25 Area Drainage Authorities
A14850   Pressure Test at Zone 25 for 110 mm Pipe
A14890   Pressure Test at Zone 25 for 160 mm Pipe
A14900   Pressure Test at Zone 25 for 200 mm Pipe
A14910   Pressure Test at Zone 25 for 250 mm Pipe
A14990   Notify clients and vendors (if any) at Zone 25 Area Water Supply Authorities
A1500    Pressure Test at Zone 1 for 110 mm Pipe
A15040   Site Clearing and Grubbing at Zone 26
A15060   Notify clients and vendors at Zone 26 Area Telepone Lines Authorities
A15080   Joint Survey with Consultant at Zone 26
A15100   Notify clients and vendors at Zone 26 Area Fiber Optics Cable Authorities
A15130   Notify clients and vendors at Zone 26 Area Electrical Cable Authorities
A15160   Notify clients and vendors (if any) for Zone 26 Area Authorities
A15190   Notify clients and vendors (if any) for at Zone 26 Area Reponsible Organization
A15220   Notify clients and vendors (if any) at Zone 26 Area Drainage Authorities
A1540    Pressure Test at Zone 1 for 160 mm Pipe
A15400   Pressure Test at Zone 26 for 110 mm Pipe
A15440   Pressure Test at Zone 26 for 160 mm Pipe
A15450   Pressure Test at Zone 26 for 200 mm Pipe
A15460   Pressure Test at Zone 26 for 250 mm Pipe
A1550    Pressure Test at Zone 1 for 200 mm Pipe
A15540   Notify clients and vendors (if any) at Zone 26 Area Water Supply Authorities
A15590   Site Clearing and Grubbing at Zone 27
A1560    Pressure Test at Zone 1 for 250 mm Pipe
A15610   Notify clients and vendors at Zone 27 Area Telepone Lines Authorities
A15630   Joint Survey with Consultant at Zone 27
A15650   Notify clients and vendors at Zone 27 Area Fiber Optics Cable Authorities
A15680   Notify clients and vendors at Zone 27 Area Electrical Cable Authorities
A1570    Final Pressure Test and Handover to Employer of Zone 1
A15710   Notify clients and vendors (if any) for Zone 27 Area Authorities
A15740   Notify clients and vendors (if any) for at Zone 27 Area Reponsible Organization
A15770   Notify clients and vendors (if any) at Zone 27 Area Drainage Authorities
A1580    Signing the receipt reports
A15950   Pressure Test at Zone 27 for 110 mm Pipe
A15990   Pressure Test at Zone 27 for 160 mm Pipe
A16000   Pressure Test at Zone 27 for 200 mm Pipe
A16010   Pressure Test at Zone 27 for 250 mm Pipe
A16090   Notify clients and vendors (if any) at Zone 27 Area Water Supply Authorities
A16140   Site Clearing and Grubbing at Zone 28
A16160   Notify clients and vendors at Zone 28 Area Telepone Lines Authorities
A16180   Joint Survey with Consultant at Zone 28
A16200   Notify clients and vendors at Zone 28 Area Fiber Optics Cable Authorities
A16230   Notify clients and vendors at Zone 28 Area Electrical Cable Authorities
A16260   Notify clients and vendors (if any) for Zone 28 Area Authorities
A16290   Notify clients and vendors (if any) for at Zone 28 Area Reponsible Organization
A16320   Notify clients and vendors (if any) at Zone 28 Area Drainage Authorities
A1640    As built Drawing Preparation and Submission for Approval for Zone 1
A16500   Pressure Test at Zone 28 for 110 mm Pipe
A16540   Pressure Test at Zone 28 for 160 mm Pipe
A16550   Pressure Test at Zone 28 for 200 mm Pipe
A16560   Pressure Test at Zone 28 for 250 mm Pipe
A16640   Notify clients and vendors (if any) at Zone 28 Area Water Supply Authorities
A16690   Site Clearing and Grubbing at Zone 29
A16710   Notify clients and vendors at Zone 29 Area Telepone Lines Authorities
A16730   Joint Survey with Consultant at Zone 29
A16750   Notify clients and vendors at Zone 29 Area Fiber Optics Cable Authorities
A16780   Notify clients and vendors at Zone 29 Area Electrical Cable Authorities
A1680    Notify clients and vendors (if any) at Zone 1 Area Water Supply Authorities
A16810   Notify clients and vendors (if any) for Zone 29 Area Authorities
A16840   Notify clients and vendors (if any) for at Zone 29 Area Reponsible Organization
A16870   Notify clients and vendors (if any) at Zone 29 Area Drainage Authorities
A17050   Pressure Test at Zone 29 for 110 mm Pipe
A17090   Pressure Test at Zone 29 for 160 mm Pipe
A17100   Pressure Test at Zone 29 for 200 mm Pipe
A17110   Pressure Test at Zone 29 for 250 mm Pipe
A17190   Notify clients and vendors (if any) at Zone 29 Area Water Supply Authorities
A17240   Site Clearing and Grubbing at Zone 30
A17260   Notify clients and vendors at Zone 30 Area Telepone Lines Authorities
A17280   Joint Survey with Consultant at Zone 30
A17300   Notify clients and vendors at Zone 30 Area Fiber Optics Cable Authorities
A17330   Notify clients and vendors at Zone 30 Area Electrical Cable Authorities
A17360   Notify clients and vendors (if any) for Zone 30 Area Authorities
A17390   Notify clients and vendors (if any) for at Zone 30 Area Reponsible Organization
A17420   Notify clients and vendors (if any) at Zone 30 Area Drainage Authorities
A1750    Final Pressure Test and Handover to Employer of Zone 2
A17600   Pressure Test at Zone 30 for 110 mm Pipe
A17640   Pressure Test at Zone 30 for 160 mm Pipe
A17650   Pressure Test at Zone 30 for 200 mm Pipe
A17660   Pressure Test at Zone 30 for 250 mm Pipe
A1770    As built Drawing Preparation and Submission for Approval for Zone 2
A17740   Notify clients and vendors (if any) at Zone 30 Area Water Supply Authorities
A17790   Site Clearing and Grubbing at Zone 31
A1780    Site Clearing and Grubbing at Zone 2
A17810   Notify clients and vendors at Zone 31 Area Telepone Lines Authorities
A17830   Joint Survey with Consultant at Zone 31
A17850   Notify clients and vendors at Zone 31 Area Fiber Optics Cable Authorities
A17880   Notify clients and vendors at Zone 31 Area Electrical Cable Authorities
A17910   Notify clients and vendors (if any) for Zone 31 Area Authorities
A17940   Notify clients and vendors (if any) for at Zone 31 Area Reponsible Organization
A17970   Notify clients and vendors (if any) at Zone 31 Area Drainage Authorities
A1800    Notify clients and vendors at Zone 2 Area Telepone Lines Authorities
A18150   Pressure Test at Zone 31 for 110 mm Pipe
A18190   Pressure Test at Zone 31 for 160 mm Pipe
A1820    Joint Survey with Consultant at Zone 2
A18200   Pressure Test at Zone 31 for 200 mm Pipe
A18210   Pressure Test at Zone 31 for 250 mm Pipe
A18290   Notify clients and vendors (if any) at Zone 31 Area Water Supply Authorities
A18340   Site Clearing and Grubbing at Zone 32
A18360   Notify clients and vendors at Zone 32 Area Telepone Lines Authorities
A18380   Joint Survey with Consultant at Zone 32
A1840    Notify clients and vendors at Zone 2 Area Fiber Optics Cable Authorities
A18400   Notify clients and vendors at Zone 32 Area Fiber Optics Cable Authorities
A18430   Notify clients and vendors at Zone 32 Area Electrical Cable Authorities
A18460   Notify clients and vendors (if any) for Zone 32 Area Authorities
A18490   Notify clients and vendors (if any) for at Zone 32 Area Reponsible Organization
A18520   Notify clients and vendors (if any) at Zone 32 Area Drainage Authorities
A1870    Notify clients and vendors at Zone 2 Area Electrical Cable Authorities
A18700   Pressure Test at Zone 32 for 110 mm Pipe
A18740   Pressure Test at Zone 32 for 160 mm Pipe
A18750   Pressure Test at Zone 32 for 200 mm Pipe
A18760   Pressure Test at Zone 32 for 250 mm Pipe
A18840   Notify clients and vendors (if any) at Zone 32 Area Water Supply Authorities
A18890   Site Clearing and Grubbing at Zone 33
A18910   Notify clients and vendors at Zone 33 Area Telepone Lines Authorities
A18930   Joint Survey with Consultant at Zone 33
A18950   Notify clients and vendors at Zone 33 Area Fiber Optics Cable Authorities
A18980   Notify clients and vendors at Zone 33 Area Electrical Cable Authorities
A1900    Notify clients and vendors (if any) for Zone 2 Area Authorities
A19010   Notify clients and vendors (if any) for Zone 33 Area Authorities
A19040   Notify clients and vendors (if any) for at Zone 33 Area Reponsible Organization
A19070   Notify clients and vendors (if any) at Zone 33 Area Drainage Authorities
A19250   Pressure Test at Zone 33 for 110 mm Pipe
A19290   Pressure Test at Zone 33 for 160 mm Pipe
A1930    Notify clients and vendors (if any) for at Zone 2 Area Reponsible Organization
A19300   Pressure Test at Zone 33 for 200 mm Pipe
A19310   Pressure Test at Zone 33 for 250 mm Pipe
A19390   Notify clients and vendors (if any) at Zone 33 Area Water Supply Authorities
A19440   Site Clearing and Grubbing at Zone 34
A19460   Notify clients and vendors at Zone 34 Area Telepone Lines Authorities
A19480   Joint Survey with Consultant at Zone 34
A19500   Notify clients and vendors at Zone 34 Area Fiber Optics Cable Authorities
A19530   Notify clients and vendors at Zone 34 Area Electrical Cable Authorities
A19560   Notify clients and vendors (if any) for Zone 34 Area Authorities
A19590   Notify clients and vendors (if any) for at Zone 34 Area Reponsible Organization
A1960    Notify clients and vendors (if any) at Zone 2 Area Drainage Authorities
A19620   Notify clients and vendors (if any) at Zone 34 Area Drainage Authorities
A19800   Pressure Test at Zone 34 for 110 mm Pipe
A19840   Pressure Test at Zone 34 for 160 mm Pipe
A19850   Pressure Test at Zone 34 for 200 mm Pipe
A19860   Pressure Test at Zone 34 for 250 mm Pipe
A19940   Notify clients and vendors (if any) at Zone 34 Area Water Supply Authorities
A19990   Site Clearing and Grubbing at Zone 35
A20010   Notify clients and vendors at Zone 35 Area Telepone Lines Authorities
A20030   Joint Survey with Consultant at Zone 35
A20050   Notify clients and vendors at Zone 35 Area Fiber Optics Cable Authorities
A20080   Notify clients and vendors at Zone 35 Area Electrical Cable Authorities
A20110   Notify clients and vendors (if any) for Zone 35 Area Authorities
A20140   Notify clients and vendors (if any) for at Zone 35 Area Reponsible Organization
A20170   Notify clients and vendors (if any) at Zone 35 Area Drainage Authorities
A20350   Pressure Test at Zone 35 for 110 mm Pipe
A20390   Pressure Test at Zone 35 for 160 mm Pipe
A20400   Pressure Test at Zone 35 for 200 mm Pipe
A20410   Pressure Test at Zone 35 for 250 mm Pipe
A20490   Notify clients and vendors (if any) at Zone 35 Area Water Supply Authorities
A20540   Site Clearing and Grubbing at Zone 36
A20560   Notify clients and vendors at Zone 36 Area Telepone Lines Authorities
A20580   Joint Survey with Consultant at Zone 36
A20600   Notify clients and vendors at Zone 36 Area Fiber Optics Cable Authorities
A20630   Notify clients and vendors at Zone 36 Area Electrical Cable Authorities
A20660   Notify clients and vendors (if any) for Zone 36 Area Authorities
A20690   Notify clients and vendors (if any) for at Zone 36 Area Reponsible Organization
A20720   Notify clients and vendors (if any) at Zone 36 Area Drainage Authorities
A20900   Pressure Test at Zone 36 for 110 mm Pipe
A20940   Pressure Test at Zone 36 for 160 mm Pipe
A20950   Pressure Test at Zone 36 for 200 mm Pipe
A20960   Pressure Test at Zone 36 for 250 mm Pipe
A21040   Notify clients and vendors (if any) at Zone 36 Area Water Supply Authorities
A21090   Site Clearing and Grubbing at Zone 37
A21110   Notify clients and vendors at Zone 37 Area Telepone Lines Authorities
A21130   Joint Survey with Consultant at Zone 37
A21150   Notify clients and vendors at Zone 37 Area Fiber Optics Cable Authorities
A21180   Notify clients and vendors at Zone 37 Area Electrical Cable Authorities
A21210   Notify clients and vendors (if any) for Zone 37 Area Authorities
A21240   Notify clients and vendors (if any) for at Zone 37 Area Reponsible Organization
A21270   Notify clients and vendors (if any) at Zone 37 Area Drainage Authorities
A2140    Pressure Test at Zone 2 for 110 mm Pipe
A21450   Pressure Test at Zone 37 for 110 mm Pipe
A21490   Pressure Test at Zone 37 for 160 mm Pipe
A21500   Pressure Test at Zone 37 for 200 mm Pipe
A21510   Pressure Test at Zone 37 for 250 mm Pipe
A21590   Notify clients and vendors (if any) at Zone 37 Area Water Supply Authorities
A21640   Site Clearing and Grubbing at Zone 38
A21660   Notify clients and vendors at Zone 38 Area Telepone Lines Authorities
A21680   Joint Survey with Consultant at Zone 38
A21700   Notify clients and vendors at Zone 38 Area Fiber Optics Cable Authorities
A21730   Notify clients and vendors at Zone 38 Area Electrical Cable Authorities
A21760   Notify clients and vendors (if any) for Zone 38 Area Authorities
A21790   Notify clients and vendors (if any) for at Zone 38 Area Reponsible Organization
A2180    Pressure Test at Zone 2 for 160 mm Pipe
A21820   Notify clients and vendors (if any) at Zone 38 Area Drainage Authorities
A2190    Pressure Test at Zone 2 for 200 mm Pipe
A22000   Pressure Test at Zone 38 for 110 mm Pipe
A22040   Pressure Test at Zone 38 for 160 mm Pipe
A22050   Pressure Test at Zone 38 for 200 mm Pipe
A22060   Pressure Test at Zone 38 for 250 mm Pipe
A22140   Notify clients and vendors (if any) at Zone 38 Area Water Supply Authorities
A22190   Site Clearing and Grubbing at Zone 39
A22210   Notify clients and vendors at Zone 39 Area Telepone Lines Authorities
A22230   Joint Survey with Consultant at Zone 39
A22250   Notify clients and vendors at Zone 39 Area Fiber Optics Cable Authorities
A22280   Notify clients and vendors at Zone 39 Area Electrical Cable Authorities
A22310   Notify clients and vendors (if any) for Zone 39 Area Authorities
A22340   Notify clients and vendors (if any) for at Zone 39 Area Reponsible Organization
A22370   Notify clients and vendors (if any) at Zone 39 Area Drainage Authorities
A22550   Pressure Test at Zone 39 for 110 mm Pipe
A22590   Pressure Test at Zone 39 for 160 mm Pipe
A22600   Pressure Test at Zone 39 for 200 mm Pipe
A22610   Pressure Test at Zone 39 for 250 mm Pipe
A22690   Notify clients and vendors (if any) at Zone 39 Area Water Supply Authorities
A22740   Site Clearing and Grubbing at Zone 40
A22760   Notify clients and vendors at Zone 40 Area Telepone Lines Authorities
A22780   Joint Survey with Consultant at Zone 40
A2280    Notify clients and vendors (if any) at Zone 2 Area Water Supply Authorities
A22800   Notify clients and vendors at Zone 40 Area Fiber Optics Cable Authorities
A22830   Notify clients and vendors at Zone 40 Area Electrical Cable Authorities
A22860   Notify clients and vendors (if any) for Zone 40 Area Authorities
A22890   Notify clients and vendors (if any) for at Zone 40 Area Reponsible Organization
A22920   Notify clients and vendors (if any) at Zone 40 Area Drainage Authorities
A23100   Pressure Test at Zone 40 for 110 mm Pipe
A23140   Pressure Test at Zone 40 for 160 mm Pipe
A23150   Pressure Test at Zone 40 for 200 mm Pipe
A23160   Pressure Test at Zone 40 for 250 mm Pipe
A23240   Notify clients and vendors (if any) at Zone 40 Area Water Supply Authorities
A23290   Site Clearing and Grubbing at Zone 41
A2330    Site Clearing and Grubbing at Zone 3
A23310   Notify clients and vendors at Zone 41 Area Telepone Lines Authorities
A23330   Joint Survey with Consultant at Zone 41
A23350   Notify clients and vendors at Zone 41 Area Fiber Optics Cable Authorities
A23380   Notify clients and vendors at Zone 41 Area Electrical Cable Authorities
A23410   Notify clients and vendors (if any) for Zone 41 Area Authorities
A23440   Notify clients and vendors (if any) for at Zone 41 Area Reponsible Organization
A23470   Notify clients and vendors (if any) at Zone 41 Area Drainage Authorities
A2350    Notify clients and vendors at Zone 3 Area Telepone Lines Authorities
A23650   Pressure Test at Zone 41 for 110 mm Pipe
A23690   Pressure Test at Zone 41 for 160 mm Pipe
A2370    Joint Survey with Consultant at Zone 3
A23700   Pressure Test at Zone 41 for 200 mm Pipe
A23710   Pressure Test at Zone 41 for 250 mm Pipe
A23790   Notify clients and vendors (if any) at Zone 41 Area Water Supply Authorities
A23840   Site Clearing and Grubbing at Zone 42
A23860   Notify clients and vendors at Zone 42 Area Telepone Lines Authorities
A23880   Joint Survey with Consultant at Zone 42
A2390    Notify clients and vendors at Zone 3 Area Fiber Optics Cable Authorities
A23900   Notify clients and vendors at Zone 42 Area Fiber Optics Cable Authorities
A23930   Notify clients and vendors at Zone 42 Area Electrical Cable Authorities
A23960   Notify clients and vendors (if any) for Zone 42 Area Authorities
A23990   Notify clients and vendors (if any) for at Zone 42 Area Reponsible Organization
A24020   Notify clients and vendors (if any) at Zone 42 Area Drainage Authorities
A2420    Notify clients and vendors at Zone 3 Area Electrical Cable Authorities
A24200   Pressure Test at Zone 42 for 110 mm Pipe
A24240   Pressure Test at Zone 42 for 160 mm Pipe
A24250   Pressure Test at Zone 42 for 200 mm Pipe
A24260   Pressure Test at Zone 42 for 250 mm Pipe
A24340   Notify clients and vendors (if any) at Zone 42 Area Water Supply Authorities
A24390   Site Clearing and Grubbing at Zone 43
A24410   Notify clients and vendors at Zone 43 Area Telepone Lines Authorities
A24430   Joint Survey with Consultant at Zone 43
A24450   Notify clients and vendors at Zone 43 Area Fiber Optics Cable Authorities
A24480   Notify clients and vendors at Zone 43 Area Electrical Cable Authorities
A2450    Notify clients and vendors (if any) for Zone 3 Area Authorities
A24510   Notify clients and vendors (if any) for Zone 43 Area Authorities
A24540   Notify clients and vendors (if any) for at Zone 43 Area Reponsible Organization
A24570   Notify clients and vendors (if any) at Zone 43 Area Drainage Authorities
A24750   Pressure Test at Zone 43 for 110 mm Pipe
A24790   Pressure Test at Zone 43 for 160 mm Pipe
A2480    Notify clients and vendors (if any) for at Zone 3 Area Reponsible Organization
A24800   Pressure Test at Zone 43 for 200 mm Pipe
A24810   Pressure Test at Zone 43 for 250 mm Pipe
A24890   Notify clients and vendors (if any) at Zone 43 Area Water Supply Authorities
A24940   Site Clearing and Grubbing at Zone 44
A24960   Notify clients and vendors at Zone 44 Area Telepone Lines Authorities
A24980   Joint Survey with Consultant at Zone 44
A25000   Notify clients and vendors at Zone 44 Area Fiber Optics Cable Authorities
A25030   Notify clients and vendors at Zone 44 Area Electrical Cable Authorities
A25060   Notify clients and vendors (if any) for Zone 44 Area Authorities
A25090   Notify clients and vendors (if any) for at Zone 44 Area Reponsible Organization
A2510    Notify clients and vendors (if any) at Zone 3 Area Drainage Authorities
A25120   Notify clients and vendors (if any) at Zone 44 Area Drainage Authorities
A25300   Pressure Test at Zone 44 for 110 mm Pipe
A25340   Pressure Test at Zone 44 for 160 mm Pipe
A25350   Pressure Test at Zone 44 for 200 mm Pipe
A25360   Pressure Test at Zone 44 for 250 mm Pipe
A25440   Notify clients and vendors (if any) at Zone 44 Area Water Supply Authorities
A25490   Site Clearing and Grubbing at Zone 45
A25510   Notify clients and vendors at Zone 45 Area Telepone Lines Authorities
A25530   Joint Survey with Consultant at Zone 45
A25550   Notify clients and vendors at Zone 45 Area Fiber Optics Cable Authorities
A25580   Notify clients and vendors at Zone 45 Area Electrical Cable Authorities
A25610   Notify clients and vendors (if any) for Zone 45 Area Authorities
A25640   Notify clients and vendors (if any) for at Zone 45 Area Reponsible Organization
A25670   Notify clients and vendors (if any) at Zone 45 Area Drainage Authorities
A25850   Pressure Test at Zone 45 for 110 mm Pipe
A25900   Pressure Test at Zone 45 for 200 mm Pipe
A25910   Pressure Test at Zone 45 for 250 mm Pipe
A25990   Notify clients and vendors (if any) at Zone 45 Area Water Supply Authorities
A26040   Site Clearing and Grubbing at Zone 46
A26060   Notify clients and vendors at Zone 46 Area Telepone Lines Authorities
A26080   Joint Survey with Consultant at Zone 46
A26100   Notify clients and vendors at Zone 46 Area Fiber Optics Cable Authorities
A26130   Notify clients and vendors at Zone 46 Area Electrical Cable Authorities
A26160   Notify clients and vendors (if any) for Zone 46 Area Authorities
A26190   Notify clients and vendors (if any) for at Zone 46 Area Reponsible Organization
A26220   Notify clients and vendors (if any) at Zone 46 Area Drainage Authorities
A26400   Pressure Test at Zone 46 for 110 mm Pipe
A26440   Pressure Test at Zone 46 for 160 mm Pipe
A26450   Pressure Test at Zone 46 for 200 mm Pipe
A26460   Pressure Test at Zone 46 for 250 mm Pipe
A26540   Notify clients and vendors (if any) at Zone 46 Area Water Supply Authorities
A26590   Site Clearing and Grubbing at Zone 47
A26610   Notify clients and vendors at Zone 47 Area Telepone Lines Authorities
A26630   Joint Survey with Consultant at Zone 47
A26650   Notify clients and vendors at Zone 47 Area Fiber Optics Cable Authorities
A26680   Notify clients and vendors at Zone 47 Area Electrical Cable Authorities
A26710   Notify clients and vendors (if any) for Zone 47 Area Authorities
A26740   Notify clients and vendors (if any) for at Zone 47 Area Reponsible Organization
A26770   Notify clients and vendors (if any) at Zone 47 Area Drainage Authorities
A2690    Pressure Test at Zone 3 for 110 mm Pipe
A26950   Pressure Test at Zone 47 for 110 mm Pipe
A26990   Pressure Test at Zone 47 for 160 mm Pipe
A27000   Pressure Test at Zone 47 for 200 mm Pipe
A27010   Pressure Test at Zone 47 for 250 mm Pipe
A27090   Notify clients and vendors (if any) at Zone 47 Area Water Supply Authorities
A27140   Final Pressure Test and Handover to Employer of Zone 29
A27160   Final Pressure Test and Handover to Employer of Zone 4
A27180   Final Pressure Test and Handover to Employer of Zone 7
A27200   Final Pressure Test and Handover to Employer of Zone 12
A27220   Final Pressure Test and Handover to Employer of Zone 23
A27240   Final Pressure Test and Handover to Employer of Zone 5
A27260   Final Pressure Test and Handover to Employer of Zone 13
A27280   Final Pressure Test and Handover to Employer of Zone 26
A2730    Pressure Test at Zone 3 for 160 mm Pipe
A27300   Final Pressure Test and Handover to Employer of Zone 46
A27320   Final Pressure Test and Handover to Employer of Zone 8
A27340   Final Pressure Test and Handover to Employer of Zone 16
A27380   Final Pressure Test and Handover to Employer of Zone 32
A2740    Pressure Test at Zone 3 for 200 mm Pipe
A27400   Final Pressure Test and Handover to Employer of Zone 6
A27420   Final Pressure Test and Handover to Employer of Zone 17
A27440   Final Pressure Test and Handover to Employer of Zone 44
A27460   Final Pressure Test and Handover to Employer of Zone 42
A27480   Final Pressure Test and Handover to Employer of Zone 9
A2750    Pressure Test at Zone 3 for 250 mm Pipe
A27500   Final Pressure Test and Handover to Employer of Zone 21
A27520   Final Pressure Test and Handover to Employer of Zone 27
A27540   Final Pressure Test and Handover to Employer of Zone 38
A27560   Final Pressure Test and Handover to Employer of Zone 14
A27600   Final Pressure Test and Handover to Employer of Zone 40
A27640   Final Pressure Test and Handover to Employer of Zone 24
A27660   Final Pressure Test and Handover to Employer of Zone 34
A27680   Final Pressure Test and Handover to Employer of Zone 36
A27700   Final Pressure Test and Handover to Employer of Zone 39
A27720   Final Pressure Test and Handover to Employer of Zone 11
A27740   Final Pressure Test and Handover to Employer of Zone 22
A27800   Final Pressure Test and Handover to Employer of Zone 15
A27820   Final Pressure Test and Handover to Employer of Zone 25
A27840   Final Pressure Test and Handover to Employer of Zone 33
A27880   Final Pressure Test and Handover to Employer of Zone 18
A27900   Final Pressure Test and Handover to Employer of Zone 35
A27960   Final Pressure Test and Handover to Employer of Zone 28
A27980   Final Pressure Test and Handover to Employer of Zone 41
A28000   Final Pressure Test and Handover to Employer of Zone 45
A28040   Final Pressure Test and Handover to Employer of Zone 19
A28060   Final Pressure Test and Handover to Employer of Zone 43
A28120   Final Pressure Test and Handover to Employer of Zone 31
A28200   Final Pressure Test and Handover to Employer of Zone 37
A28260   Final Pressure Test and Handover to Employer of Zone 10
A28280   As built Drawing Preparation and Submission for Approval for Zone 30
A28290   As built Drawing Preparation and Submission for Approval for Zone 5
A2830    Notify clients and vendors (if any) at Zone 3 Area Water Supply Authorities
A28300   As built Drawing Preparation and Submission for Approval for Zone 8
A28310   As built Drawing Preparation and Submission for Approval for Zone 13
A28320   As built Drawing Preparation and Submission for Approval for Zone 24
A28330   As built Drawing Preparation and Submission for Approval for Zone 6
A28340   As built Drawing Preparation and Submission for Approval for Zone 14
A28350   As built Drawing Preparation and Submission for Approval for Zone 27
A28360   As built Drawing Preparation and Submission for Approval for Zone 47
A28370   As built Drawing Preparation and Submission for Approval for Zone 9
A28380   As built Drawing Preparation and Submission for Approval for Zone 17
A28390   As built Drawing Preparation and Submission for Approval for Zone 21
A28400   As built Drawing Preparation and Submission for Approval for Zone 33
A28410   As built Drawing Preparation and Submission for Approval for Zone 7
A28420   As built Drawing Preparation and Submission for Approval for Zone 18
A28430   As built Drawing Preparation and Submission for Approval for Zone 45
A28440   As built Drawing Preparation and Submission for Approval for Zone 43
A28450   As built Drawing Preparation and Submission for Approval for Zone 10
A28460   As built Drawing Preparation and Submission for Approval for Zone 22
A28470   As built Drawing Preparation and Submission for Approval for Zone 28
A28480   As built Drawing Preparation and Submission for Approval for Zone 39
A28490   As built Drawing Preparation and Submission for Approval for Zone 15
A28500   As built Drawing Preparation and Submission for Approval for Zone 31
A28510   As built Drawing Preparation and Submission for Approval for Zone 41
A28530   As built Drawing Preparation and Submission for Approval for Zone 25
A28540   As built Drawing Preparation and Submission for Approval for Zone 35
A28550   As built Drawing Preparation and Submission for Approval for Zone 37
A28560   As built Drawing Preparation and Submission for Approval for Zone 40
A28570   As built Drawing Preparation and Submission for Approval for Zone 12
A28580   As built Drawing Preparation and Submission for Approval for Zone 23
A28610   As built Drawing Preparation and Submission for Approval for Zone 16
A28620   As built Drawing Preparation and Submission for Approval for Zone 26
A28630   As built Drawing Preparation and Submission for Approval for Zone 34
A28650   As built Drawing Preparation and Submission for Approval for Zone 19
A28660   As built Drawing Preparation and Submission for Approval for Zone 36
A28690   As built Drawing Preparation and Submission for Approval for Zone 29
A28700   As built Drawing Preparation and Submission for Approval for Zone 42
A28710   As built Drawing Preparation and Submission for Approval for Zone 46
A28730   As built Drawing Preparation and Submission for Approval for Zone 20
A28740   As built Drawing Preparation and Submission for Approval for Zone 44
A28770   As built Drawing Preparation and Submission for Approval for Zone 32
A2880    Final Pressure Test and Handover to Employer of Zone 3
A28810   As built Drawing Preparation and Submission for Approval for Zone 38
A28840   As built Drawing Preparation and Submission for Approval for Zone 11
A28860   Submission for Approval of Working Drawing for Zone 1
A28870   Approval of Working Drawing for Zone 1
A28880   Submission for Approval of Working Drawing for Zone 2
A28890   Approval of Working Drawing for Zone 2
A28900   Submission for Approval of Working Drawing for Zone 3
A28910   Approval of Working Drawing for Zone 3
A28920   Submission for Approval of Working Drawing for Zone 4
A28930   Approval of Working Drawing for Zone 4
A28940   Submission for Approval of Working Drawing for Zone 5
A28950   Approval of Working Drawing for Zone 5
A28960   Submission for Approval of Working Drawing for Zone 6
A28970   Approval of Working Drawing for Zone 6
A28980   Submission for Approval of Working Drawing for Zone 7
A28990   Approval of Working Drawing for Zone 7
A2900    As built Drawing Preparation and Submission for Approval for Zone 3
A29060   Submission for Approval of Working Drawing for Zone 8
A29070   Approval of Working Drawing for Zone 8
A29080   Submission for Approval of Working Drawing for Zone 9
A29090   Approval of Working Drawing for Zone 9
A2910    Site Clearing and Grubbing at Zone 4
A29100   Submission for Approval of Working Drawing for Zone 10
A29110   Approval of Working Drawing for Zone 10
A29120   Submission for Approval of Working Drawing for Zone 11
A29130   Approval of Working Drawing for Zone 11
A29140   Submission for Approval of Working Drawing for Zone 12
A29150   Approval of Working Drawing for Zone 12
A29160   Submission for Approval of Working Drawing for Zone 13
A29170   Approval of Working Drawing for Zone 13
A29180   Submission for Approval of Working Drawing for Zone 14
A29190   Approval of Working Drawing for Zone 14
A29200   Submission for Approval of Working Drawing for Zone 15
A29210   Approval of Working Drawing for Zone 15
A29220   Submission for Approval of Working Drawing for Zone 16
A29230   Approval of Working Drawing for Zone 16
A29240   Submission for Approval of Working Drawing for Zone 17
A29250   Approval of Working Drawing for Zone 17
A29260   Submission for Approval of Working Drawing for Zone 18
A29270   Approval of Working Drawing for Zone 18
A29280   Submission for Approval of Working Drawing for Zone 19
A29290   Approval of Working Drawing for Zone 19
A2930    Notify clients and vendors at Zone 4 Area Telepone Lines Authorities
A29320   Submission for Approval of Working Drawing for Zone 21
A29330   Approval of Working Drawing for Zone 21
A29340   Submission for Approval of Working Drawing for Zone 22
A29350   Approval of Working Drawing for Zone 22
A29360   Submission for Approval of Working Drawing for Zone 23
A29370   Approval of Working Drawing for Zone 23
A29380   Submission for Approval of Working Drawing for Zone 24
A29390   Approval of Working Drawing for Zone 24
A29400   Submission for Approval of Working Drawing for Zone 25
A29410   Approval of Working Drawing for Zone 25
A29420   Submission for Approval of Working Drawing for Zone 26
A29430   Approval of Working Drawing for Zone 26
A29440   Submission for Approval of Working Drawing for Zone 27
A29450   Approval of Working Drawing for Zone 27
A29460   Submission for Approval of Working Drawing for Zone 28
A29470   Approval of Working Drawing for Zone 28
A29480   Submission for Approval of Working Drawing for Zone 29
A29490   Approval of Working Drawing for Zone 29
A2950    Joint Survey with Consultant at Zone 4
A29500   Submission for Approval of Working Drawing for Zone 30
A29510   Approval of Working Drawing for Zone 30
A29520   Submission for Approval of Working Drawing for Zone 31
A29530   Approval of Working Drawing for Zone 31
A29540   Submission for Approval of Working Drawing for Zone 32
A29550   Approval of Working Drawing for Zone 32
A29560   Submission for Approval of Working Drawing for Zone 33
A29570   Approval of Working Drawing for Zone 33
A29580   Submission for Approval of Working Drawing for Zone 34
A29590   Approval of Working Drawing for Zone 34
A29600   Submission for Approval of Working Drawing for Zone 35
A29610   Approval of Working Drawing for Zone 35
A29620   Submission for Approval of Working Drawing for Zone 36
A29630   Approval of Working Drawing for Zone 36
A29640   Submission for Approval of Working Drawing for Zone 37
A29650   Approval of Working Drawing for Zone 37
A29660   Submission for Approval of Working Drawing for Zone 38
A29670   Approval of Working Drawing for Zone 38
A29680   Submission for Approval of Working Drawing for Zone 39
A29690   Approval of Working Drawing for Zone 39
A2970    Notify clients and vendors at Zone 4 Area Fiber Optics Cable Authorities
A29700   Submission for Approval of Working Drawing for Zone 40
A29710   Approval of Working Drawing for Zone 40
A29720   Submission for Approval of Working Drawing for Zone 41
A29730   Approval of Working Drawing for Zone 41
A29740   Submission for Approval of Working Drawing for Zone 42
A29750   Approval of Working Drawing for Zone 42
A29760   Submission for Approval of Working Drawing for Zone 43
A29770   Approval of Working Drawing for Zone 43
A29780   Submission for Approval of Working Drawing for Zone 44
A29790   Approval of Working Drawing for Zone 44
A29800   Submission for Approval of Working Drawing for Zone 45
A29810   Approval of Working Drawing for Zone 45
A29820   Submission for Approval of Working Drawing for Zone 46
A29830   Approval of Working Drawing for Zone 46
A29840   Submission for Approval of Working Drawing for Zone 47
A29850   Approval of Working Drawing for Zone 47
A3000    Notify clients and vendors at Zone 4 Area Electrical Cable Authorities
A3030    Notify clients and vendors (if any) for Zone 4 Area Authorities
A3060    Notify clients and vendors (if any) for at Zone 4 Area Reponsible Organization
A3090    Notify clients and vendors (if any) at Zone 4 Area Drainage Authorities
A3270    Pressure Test at Zone 4 for 110 mm Pipe
A3310    Pressure Test at Zone 4 for 160 mm Pipe
A3320    Pressure Test at Zone 4 for 200 mm Pipe
A3330    Pressure Test at Zone 4 for 250 mm Pipe
A3410    Notify clients and vendors (if any) at Zone 4 Area Water Supply Authorities
A3480    As built Drawing Preparation and Submission for Approval for Zone 4
A3490    Site Clearing and Grubbing at Zone 5
A3510    Notify clients and vendors at Zone 5 Area Telepone Lines Authorities
A3530    Joint Survey with Consultant at Zone 5
A3550    Notify clients and vendors at Zone 5 Area Fiber Optics Cable Authorities
A3580    Notify clients and vendors at Zone 5 Area Electrical Cable Authorities
A3610    Notify clients and vendors (if any) for Zone 5 Area Authorities
A3640    Notify clients and vendors (if any) for at Zone 5 Area Reponsible Organization
A3670    Notify clients and vendors (if any) at Zone 5 Area Drainage Authorities
A3850    Pressure Test at Zone 5 for 110 mm Pipe
A3890    Pressure Test at Zone 5 for 160 mm Pipe
A3900    Pressure Test at Zone 5 for 200 mm Pipe
A3910    Pressure Test at Zone 5 for 250 mm Pipe
A3990    Notify clients and vendors (if any) at Zone 5 Area Water Supply Authorities
A4040    Site Clearing and Grubbing at Zone 6
A4060    Notify clients and vendors at Zone 6 Area Telepone Lines Authorities
A4080   Joint Survey with Consultant at Zone 6
A4100   Notify clients and vendors at Zone 6 Area Fiber Optics Cable Authorities
A4130   Notify clients and vendors at Zone 6 Area Electrical Cable Authorities
A4160   Notify clients and vendors (if any) for Zone 6 Area Authorities
A4190   Notify clients and vendors (if any) for at Zone 6 Area Reponsible Organization
A4220   Notify clients and vendors (if any) at Zone 6 Area Drainage Authorities
A4400   Pressure Test at Zone 6 for 110 mm Pipe
A4440   Pressure Test at Zone 6 for 160 mm Pipe
A4450   Pressure Test at Zone 6 for 200 mm Pipe
A4460   Pressure Test at Zone 6 for 250 mm Pipe
A4540   Notify clients and vendors (if any) at Zone 6 Area Water Supply Authorities
A4590   Site Clearing and Grubbing at Zone 7
A4610   Notify clients and vendors at Zone 7 Area Telepone Lines Authorities
A4630   Joint Survey with Consultant at Zone 7
A4650   Notify clients and vendors at Zone 7 Area Fiber Optics Cable Authorities
A4680   Notify clients and vendors at Zone 7 Area Electrical Cable Authorities
A4710   Notify clients and vendors (if any) for Zone 7 Area Authorities
A4740   Notify clients and vendors (if any) for at Zone 7 Area Reponsible Organization
A4770   Notify clients and vendors (if any) at Zone 7 Area Drainage Authorities
A4950   Pressure Test at Zone 7 for 110 mm Pipe
A4990   Pressure Test at Zone 7 for 160 mm Pipe
A5000   Pressure Test at Zone 7 for 200 mm Pipe
A5010   Pressure Test at Zone 7 for 250 mm Pipe
A5090   Notify clients and vendors (if any) at Zone 7 Area Water Supply Authorities
A5140   Site Clearing and Grubbing at Zone 8
A5160   Notify clients and vendors at Zone 8 Area Telepone Lines Authorities
A5180   Joint Survey with Consultant at Zone 8
A5200   Notify clients and vendors at Zone 8 Area Fiber Optics Cable Authorities
A5230   Notify clients and vendors at Zone 8 Area Electrical Cable Authorities
A5260   Notify clients and vendors (if any) for Zone 8 Area Authorities
A5290   Notify clients and vendors (if any) for at Zone 8 Area Reponsible Organization
A5320   Notify clients and vendors (if any) at Zone 8 Area Drainage Authorities
A5500   Pressure Test at Zone 8 for 110 mm Pipe
A5540   Pressure Test at Zone 8 for 160 mm Pipe
A5550   Pressure Test at Zone 8 for 200 mm Pipe
A5560   Pressure Test at Zone 8 for 250 mm Pipe
A5640   Notify clients and vendors (if any) at Zone 8 Area Water Supply Authorities
A5690   Site Clearing and Grubbing at Zone 9
A5710   Notify clients and vendors at Zone 9 Area Telepone Lines Authorities
A5730   Joint Survey with Consultant at Zone 9
A5750   Notify clients and vendors at Zone 9 Area Fiber Optics Cable Authorities
A5780   Notify clients and vendors at Zone 9 Area Electrical Cable Authorities
A5810   Notify clients and vendors (if any) for Zone 9 Area Authorities
A5840   Notify clients and vendors (if any) for at Zone 9 Area Reponsible Organization
A5870   Notify clients and vendors (if any) at Zone 9 Area Drainage Authorities
A6050   Pressure Test at Zone 9 for 110 mm Pipe
A6090   Pressure Test at Zone 9 for 160 mm Pipe
A6100   Pressure Test at Zone 9 for 200 mm Pipe
A6110   Pressure Test at Zone 9 for 250 mm Pipe
A6190   Notify clients and vendors (if any) at Zone 9 Area Water Supply Authorities
A6240   Site Clearing and Grubbing at Zone 10
A6260   Notify clients and vendors at Zone 10 Area Telepone Lines Authorities
A6280   Joint Survey with Consultant at Zone 10
A6300   Notify clients and vendors at Zone 10 Area Fiber Optics Cable Authorities
A6330   Notify clients and vendors at Zone 10 Area Electrical Cable Authorities
A6360   Notify clients and vendors (if any) for Zone 10 Area Authorities
A6390   Notify clients and vendors (if any) for at Zone 10 Area Reponsible Organization
A6420   Notify clients and vendors (if any) at Zone 10 Area Drainage Authorities
A6600   Pressure Test at Zone 10 for 110 mm Pipe
A6640   Pressure Test at Zone 10 for 160 mm Pipe
A6650   Pressure Test at Zone 10 for 200 mm Pipe
A6660   Pressure Test at Zone 10 for 250 mm Pipe
A6740   Notify clients and vendors (if any) at Zone 10 Area Water Supply Authorities
A6790   Site Clearing and Grubbing at Zone 11
A6810   Notify clients and vendors at Zone 11 Area Telepone Lines Authorities
A6830   Joint Survey with Consultant at Zone 11
A6850   Notify clients and vendors at Zone 11 Area Fiber Optics Cable Authorities
A6880   Notify clients and vendors at Zone 11 Area Electrical Cable Authorities
A6910   Notify clients and vendors (if any) for Zone 11 Area Authorities
A6940   Notify clients and vendors (if any) for at Zone 11 Area Reponsible Organization
A6970   Notify clients and vendors (if any) at Zone 11 Area Drainage Authorities
A7150   Pressure Test at Zone 11 for 110 mm Pipe
A7190   Pressure Test at Zone 11 for 160 mm Pipe
A7200   Pressure Test at Zone 11 for 200 mm Pipe
A7210   Pressure Test at Zone 11 for 250 mm Pipe
A7290   Notify clients and vendors (if any) at Zone 11 Area Water Supply Authorities
A7340   Site Clearing and Grubbing at Zone 12
A7360   Notify clients and vendors at Zone 12 Area Telepone Lines Authorities
A7380   Joint Survey with Consultant at Zone 12
A7400   Notify clients and vendors at Zone 12 Area Fiber Optics Cable Authorities
A7430   Notify clients and vendors at Zone 12 Area Electrical Cable Authorities
A7460   Notify clients and vendors (if any) for Zone 12 Area Authorities
A7490   Notify clients and vendors (if any) for at Zone 12 Area Reponsible Organization
A7520   Notify clients and vendors (if any) at Zone 12 Area Drainage Authorities
A7700   Pressure Test at Zone 12 for 110 mm Pipe
A7740   Pressure Test at Zone 12 for 160 mm Pipe
A7750   Pressure Test at Zone 12 for 200 mm Pipe
A7760   Pressure Test at Zone 12 for 250 mm Pipe
A7840   Notify clients and vendors (if any) at Zone 12 Area Water Supply Authorities
A7890   Site Clearing and Grubbing at Zone 13
A7910   Notify clients and vendors at Zone 13 Area Telepone Lines Authorities
A7930   Joint Survey with Consultant at Zone 13
A7950   Notify clients and vendors at Zone 13 Area Fiber Optics Cable Authorities
A7980   Notify clients and vendors at Zone 13 Area Electrical Cable Authorities
A8010   Notify clients and vendors (if any) for Zone 13 Area Authorities
A8040   Notify clients and vendors (if any) for at Zone 13 Area Reponsible Organization
A8070   Notify clients and vendors (if any) at Zone 13 Area Drainage Authorities
A8250   Pressure Test at Zone 13 for 110 mm Pipe
A8290   Pressure Test at Zone 13 for 160 mm Pipe
A8300   Pressure Test at Zone 13 for 200 mm Pipe
A8310   Pressure Test at Zone 13 for 250 mm Pipe
A8390   Notify clients and vendors (if any) at Zone 13 Area Water Supply Authorities
A8440   Site Clearing and Grubbing at Zone 14
A8460   Notify clients and vendors at Zone 14 Area Telepone Lines Authorities
A8480   Joint Survey with Consultant at Zone 14
A8500   Notify clients and vendors at Zone 14 Area Fiber Optics Cable Authorities
A8530   Notify clients and vendors at Zone 14 Area Electrical Cable Authorities
A8560   Notify clients and vendors (if any) for Zone 14 Area Authorities
A8590   Notify clients and vendors (if any) for at Zone 14 Area Reponsible Organization
A8620   Notify clients and vendors (if any) at Zone 14 Area Drainage Authorities
A8800   Pressure Test at Zone 14 for 110 mm Pipe
A8840   Pressure Test at Zone 14 for 160 mm Pipe
A8850   Pressure Test at Zone 14 for 200 mm Pipe
A8860   Pressure Test at Zone 14 for 250 mm Pipe
A8940   Notify clients and vendors (if any) at Zone 14 Area Water Supply Authorities
A8990   Site Clearing and Grubbing at Zone 15
A9010   Notify clients and vendors at Zone 15 Area Telepone Lines Authorities
A9030   Joint Survey with Consultant at Zone 15
A9050   Notify clients and vendors at Zone 15 Area Fiber Optics Cable Authorities
A9080   Notify clients and vendors at Zone 15 Area Electrical Cable Authorities
A9110   Notify clients and vendors (if any) for Zone 15 Area Authorities
A9140   Notify clients and vendors (if any) for at Zone 15 Area Reponsible Organization
A9170   Notify clients and vendors (if any) at Zone 15 Area Drainage Authorities
A9350   Pressure Test at Zone 15 for 110 mm Pipe
A9390   Pressure Test at Zone 15 for 160 mm Pipe
A9400   Pressure Test at Zone 15 for 200 mm Pipe
A9410   Pressure Test at Zone 15 for 250 mm Pipe
A9490   Notify clients and vendors (if any) at Zone 15 Area Water Supply Authorities
A9540   Site Clearing and Grubbing at Zone 16
A9560     Notify clients and vendors at Zone 16 Area Telepone Lines Authorities
A9580     Joint Survey with Consultant at Zone 16
A9600     Notify clients and vendors at Zone 16 Area Fiber Optics Cable Authorities
A9630     Notify clients and vendors at Zone 16 Area Electrical Cable Authorities
A9660     Notify clients and vendors (if any) for Zone 16 Area Authorities
A9690     Notify clients and vendors (if any) for at Zone 16 Area Reponsible Organization
A9720     Notify clients and vendors (if any) at Zone 16 Area Drainage Authorities
A9900     Pressure Test at Zone 16 for 110 mm Pipe
A9940     Pressure Test at Zone 16 for 160 mm Pipe
A9950     Pressure Test at Zone 16 for 200 mm Pipe
A9960     Pressure Test at Zone 16 for 250 mm Pipe
EN.HS.1 Hydraulic Study Development
EN.MS&A.1Material Submittal & Approval for Gate Valves 150 mm
EN.MS&A.1Material Submittal & Approval for Gate Valves 200 mm
EN.MS&A.1Material Submittal & Approval for Butterfly Valves 250 mm
EN.MS&A.1Material Submittal & Approval for Butterfly Valves Actuator
EN.MS&A.1Material Submittal & Approval for Air Valves
EN.MS&A.1Material Submittal & Approval for Wash-out Valves
EN.MS&A.1Material Submittal & Approval for fire Hydrants Supply
EN.MS&A.1Material Submittal & Approval for Service Box
EN.MS&A.1Material Submittal & Approval for marker posts, couplings
EN.MS&A.1Material Submittal & Approval for Non Woven Geotextile
EN.MS&A.1Material Submittal & Approval for HDPE PIPE PN16 110mm
EN.MS&A.1Material Submittal & Approval for HDPE PIPE PN16 250mm
EN.MS&A.1Material Submittal & Approval for Butterfly Valves (DI), [PN 16] 250 mm
EN.MS&A.1Material Submittal & Approval for Pipes, fittings and valves for PS
EN.MS&A.1Material Submittal & Approval for Gate Valves 100 mm
EN.PD.1 Submission for Approval of Project management plans
EN.PD.11 Approval of Project management plans
EN.PD.12 Submission for Approval of of Construction Method Statements
EN.PD.2 Approval of of Construction Method Statements
PR.LS.D.01Delivery to sitel for Pipes, fittings and valves for PS
PR.LS.D.01Delivery to site for Gate Valves 100 mm
PR.LS.D.11Delivery to site for Gate Valves 150 mm
PR.LS.D.11Delivery to site for Gate Valves 200 mm
PR.LS.D.11Delivery to site for Butterfly Valves 250 mm
PR.LS.D.11Delivery to sitel for Butterfly Valves Actuator
PR.LS.D.11Delivery to site for Air Valves
PR.LS.D.11Delivery to site for Wash-out Valves
PR.LS.D.11Delivery to site for fire Hydrants Supply
PR.LS.D.11Delivery to site for HDPE PIPE PN16 110mm
PR.LS.D.12Delivery to site for HDPE PIPE PN16 160mm
PR.LS.D.12Delivery to site for HDPE PIPE PN16 250mm
PR.LS.D.12Delivery to site for Ductile Iron Pipes, C-Class [PN 16] Bars 250 mm
PR.LS.D.13Delivery to site for Non Woven Geotextile
PR.LS.FR.0 Fabrication & Assembly for Pipes, fittings and valves for PS
PR.LS.FR.0 Fabrication & Assembly for Gate Valves 100 mm
PR.LS.FR.0 Fabrication & Assembly for Gate Valves 150 mm
PR.LS.FR.0 Fabrication & Assembly for Gate Valves 200 mm
PR.LS.FR.0 Fabrication & Assembly for Butterfly Valves 250 mm
PR.LS.FR.0 Fabrication & Assembly for Butterfly Valves Actuator
PR.LS.FR.0 Fabrication & Assembly for Air Valves
PR.LS.FR.0 Fabrication & Assembly for Wash-out Valves
PR.LS.FR.0 Fabrication & Assembly for fire Hydrants Supply
PR.LS.FR.1 Fabrication & Assembly for HDPE PIPE PN16 110mm
PR.LS.FR.1 Fabrication & Assembly for HDPE PIPE PN16 160mm
PR.LS.FR.1 Fabrication & Assembly for HDPE PIPE PN16 250mm
PR.LS.FR.1 Fabrication & Assembly for Ductile Iron Pipes, C-Class [PN 16] Bars 250 mm
PR.LS.FR.2 Fabrication & Assembly for Non Woven Geotextile
PR.LS.MI.0Material Inspection for Pipes, fittings and valves for PS
PR.LS.MI.0Material Inspection for Gate Valves 100 mm
PR.LS.MI.1Material Inspection for Gate Valves 150 mm
PR.LS.MI.1Material Inspection for Gate Valves 200 mm
PR.LS.MI.1Material Inspection for Butterfly Valves 250 mm
PR.LS.MI.1Material Inspection for Butterfly Valves Actuator
PR.LS.MI.1Material Inspection for Air Valves
PR.LS.MI.1Material Inspection for Wash-out Valves
PR.LS.MI.1Material Inspection for fire Hydrants Supply
PR.LS.MI.1Material Inspection for HDPE PIPE PN16 110mm
PR.LS.MI.1Material Inspection for HDPE PIPE PN16 160mm
PR.LS.MI.1Material Inspection for HDPE PIPE PN16 200mm
PR.LS.MI.1Material Inspection for Ductile Iron Pipes, C-Class [PN 16] Bars 250 mm
PR.LS.MI.1Material Inspection for Non Woven Geotextile
PR.LS.PO.1Purchasing Order for Pipes, fittings and valves for PS
PR.LS.PO.1Purchasing Order for Gate Valves 100 mm
PR.LS.PO.1Purchasing Order for Gate Valves 150 mm
PR.LS.PO.1Purchasing Order for HDPE PIPE PN16 110mm
PR.LS.PO.1Purchasing Order for HDPE PIPE PN16 160mm
PR.LS.PO.1Purchasing Order for HDPE PIPE PN16 250mm
PR.LS.PO.1Purchasing Order for Ductile Iron Pipes, C-Class [PN 16] Bars 250 mm
PR.LS.PO.1Purchasing Order for Gate Valves 200 mm
PR.LS.PO.1Purchasing Order for Non Woven Geotextile
PR.LS.PO.1Purchasing Order for Butterfly Valves 250 mm
PR.LS.PO.1Purchasing Order for Butterfly Valves Actuator
PR.LS.PO.1Purchasing Order for Air Valves
PR.LS.PO.1Purchasing Order for Wash-out Valves
PR.LS.PO.1Purchasing Order for fire Hydrants Supply
Item1    Item2
A10000   Geotextile installation at 250 mm Pipe at Zone 16
A10030   Identify the Existing Water Supply Line (if any) at Zone 16
A10040   Notify clients and vendors (if any) at Zone 16 Area Water Supply Authorities
A10080   Construction of Valves Chamber at Zone 16
A10450   Pressure Test at Zone 17 for 110 mm Pipe
A10580   Identify the Existing Water Supply Line (if any) at Zone 17
A10590   Notify clients and vendors (if any) at Zone 17 Area Water Supply Authorities
A10600   Relocate Existing Water Supply Line (if any) at Zone 17
A11130   Identify the Existing Water Supply Line (if any) at Zone 18
A11140   Notify clients and vendors (if any) at Zone 18 Area Water Supply Authorities
A11150   Relocate Existing Water Supply Line (if any) at Zone 18
A11410   Excavation for 200 mm Pipe at Zone 19
A11530   Installation of 200 mm Pipe at Zone 19
A11640   Geotextile installation at 200 mm Pipe at Zone 19
A11680   Identify the Existing Water Supply Line (if any) at Zone 19
A11690   Notify clients and vendors (if any) at Zone 19 Area Water Supply Authorities
A1230    Identify the Existing Septic Tanks (if any) at Zone 1
A1240    Notify clients and vendors (if any) for Zone 1 Area Authorities
A1250    Relocate Existing Septic Tanks (if any) at Zone 1
A12630   Installation of 200 mm Pipe at Zone 21
A12650   Pressure Test at Zone 21 for 110 mm Pipe
A12660   Subgrade Construction at Zone 21
A12670   Asphalt Works at Zone 21
A12680   Curbstone Reinstatement after Asphalt Works at Zone 21
A12700   Pressure Test at Zone 21 for 200 mm Pipe
A12760   Curbstone Tiles Reinstatement after Asphalt Works at Zone 21
A12770   Curbstone Reinstatement as per Authorities Regulations at Zone 21
A12780   Identify the Existing Water Supply Line (if any) at Zone 21
A12790   Notify clients and vendors (if any) at Zone 21 Area Water Supply Authorities
A12800   Relocate Existing Water Supply Line (if any) at Zone 21
A12810   Installation of Fire Hydrant at Zone 21
A13070   Excavation for 250 mm Pipe at Zone 22
A13110   Bed Preparation for 250 mm Pipe at Zone 22
A13180   Installation of 200 mm Pipe at Zone 22
A13190   Installation of 250 mm Pipe at Zone 22
A13300   Geotextile installation at 250 mm Pipe at Zone 22
A13330   Identify the Existing Water Supply Line (if any) at Zone 22
A13340   Notify clients and vendors (if any) at Zone 22 Area Water Supply Authorities
A13380   Construction of Valves Chamber at Zone 22
A13880   Identify the Existing Water Supply Line (if any) at Zone 23
A13890   Notify clients and vendors (if any) at Zone 23 Area Water Supply Authorities
A14310   Subgrade Construction at Zone 24
A14320   Asphalt Works at Zone 24
A14330   Curbstone Reinstatement after Asphalt Works at Zone 24
A14410   Curbstone Tiles Reinstatement after Asphalt Works at Zone 24
A14420   Curbstone Reinstatement as per Authorities Regulations at Zone 24
A14430   Identify the Existing Water Supply Line (if any) at Zone 24
A14440   Notify clients and vendors (if any) at Zone 24 Area Water Supply Authorities
A14450   Relocate Existing Water Supply Line (if any) at Zone 24
A14460   Installation of Fire Hydrant at Zone 24
A14830   Installation of 200 mm Pipe at Zone 25
A14980   Identify the Existing Water Supply Line (if any) at Zone 25
A14990   Notify clients and vendors (if any) at Zone 25 Area Water Supply Authorities
A15380   Installation of 200 mm Pipe at Zone 26
A15400   Pressure Test at Zone 26 for 110 mm Pipe
A15410   Subgrade Construction at Zone 26
A15420   Asphalt Works at Zone 26
A15430   Curbstone Reinstatement after Asphalt Works at Zone 26
A15450   Pressure Test at Zone 26 for 200 mm Pipe
A15510   Curbstone Tiles Reinstatement after Asphalt Works at Zone 26
A15520   Curbstone Reinstatement as per Authorities Regulations at Zone 26
A15530   Identify the Existing Water Supply Line (if any) at Zone 26
A15540   Notify clients and vendors (if any) at Zone 26 Area Water Supply Authorities
A15550   Relocate Existing Water Supply Line (if any) at Zone 26
A15560   Installation of Fire Hydrant at Zone 26
A1570    Final Pressure Test and Handover to Employer of Zone 1
A16080   Identify the Existing Water Supply Line (if any) at Zone 27
A16090   Notify clients and vendors (if any) at Zone 27 Area Water Supply Authorities
A1640    As built Drawing Preparation and Submission for Approval for Zone 1
A16500   Pressure Test at Zone 28 for 110 mm Pipe
A16510   Subgrade Construction at Zone 28
A16520   Asphalt Works at Zone 28
A16530   Curbstone Reinstatement after Asphalt Works at Zone 28
A16610   Curbstone Tiles Reinstatement after Asphalt Works at Zone 28
A16620   Curbstone Reinstatement as per Authorities Regulations at Zone 28
A16630   Identify the Existing Water Supply Line (if any) at Zone 28
A16640   Notify clients and vendors (if any) at Zone 28 Area Water Supply Authorities
A16650   Relocate Existing Water Supply Line (if any) at Zone 28
A16660   Installation of Fire Hydrant at Zone 28
A1670    Identify the Existing Water Supply Line (if any) at Zone 1
A1680    Notify clients and vendors (if any) at Zone 1 Area Water Supply Authorities
A17180   Identify the Existing Water Supply Line (if any) at Zone 29
A17190   Notify clients and vendors (if any) at Zone 29 Area Water Supply Authorities
A17230   Construction of Valves Chamber at Zone 29
A1740    Finishing Activity Related Zone 1 Finalization
A1750    Final Pressure Test and Handover to Employer of Zone 2
A1760    Finishing Activity Related Zone 2 Finalization
A1770    As built Drawing Preparation and Submission for Approval for Zone 2
A17730   Identify the Existing Water Supply Line (if any) at Zone 30
A17740   Notify clients and vendors (if any) at Zone 30 Area Water Supply Authorities
A18830   Identify the Existing Water Supply Line (if any) at Zone 32
A18840   Notify clients and vendors (if any) at Zone 32 Area Water Supply Authorities
A19380   Identify the Existing Water Supply Line (if any) at Zone 33
A19390   Notify clients and vendors (if any) at Zone 33 Area Water Supply Authorities
A19780   Installation of 200 mm Pipe at Zone 34
A19930   Identify the Existing Water Supply Line (if any) at Zone 34
A19940   Notify clients and vendors (if any) at Zone 34 Area Water Supply Authorities
A20480   Identify the Existing Water Supply Line (if any) at Zone 35
A20490   Notify clients and vendors (if any) at Zone 35 Area Water Supply Authorities
A21030   Identify the Existing Water Supply Line (if any) at Zone 36
A21040   Notify clients and vendors (if any) at Zone 36 Area Water Supply Authorities
A2120    Installation of 200 mm Pipe at Zone 2
A21580   Identify the Existing Water Supply Line (if any) at Zone 37
A21590   Notify clients and vendors (if any) at Zone 37 Area Water Supply Authorities
A21980   Installation of 200 mm Pipe at Zone 38
A22130   Identify the Existing Water Supply Line (if any) at Zone 38
A22140   Notify clients and vendors (if any) at Zone 38 Area Water Supply Authorities
A22530   Installation of 200 mm Pipe at Zone 39
A22680   Identify the Existing Water Supply Line (if any) at Zone 39
A22690   Notify clients and vendors (if any) at Zone 39 Area Water Supply Authorities
A2270    Identify the Existing Water Supply Line (if any) at Zone 2
A2280    Notify clients and vendors (if any) at Zone 2 Area Water Supply Authorities
A23230   Identify the Existing Water Supply Line (if any) at Zone 40
A23240   Notify clients and vendors (if any) at Zone 40 Area Water Supply Authorities
A23630   Installation of 200 mm Pipe at Zone 41
A23780   Identify the Existing Water Supply Line (if any) at Zone 41
A23790   Notify clients and vendors (if any) at Zone 41 Area Water Supply Authorities
A24880   Identify the Existing Water Supply Line (if any) at Zone 43
A24890   Notify clients and vendors (if any) at Zone 43 Area Water Supply Authorities
A25840   Installation of 250 mm Pipe at Zone 45
A25950   Geotextile installation at 250 mm Pipe at Zone 45
A2670    Installation of 200 mm Pipe at Zone 3
A27140   Final Pressure Test and Handover to Employer of Zone 29
A27150   Finishing Activity Related Zone 29 Finalization
A27160   Final Pressure Test and Handover to Employer of Zone 4
A27170   Finishing Activity Related Zone 4 Finalization
A27180   Final Pressure Test and Handover to Employer of Zone 7
A27190   Finishing Activity Related Zone 7 Finalization
A27200   Final Pressure Test and Handover to Employer of Zone 12
A27210   Finishing Activity Related Zone 12 Finalization
A27220   Final Pressure Test and Handover to Employer of Zone 23
A27230   Finishing Activity Related Zone 23 Finalization
A27240   Final Pressure Test and Handover to Employer of Zone 5
A27250   Finishing Activity Related Zone 5 Finalization
A27260   Final Pressure Test and Handover to Employer of Zone 13
A27270   Finishing Activity Related Zone 13 Finalization
A27280   Final Pressure Test and Handover to Employer of Zone 26
A27290   Finishing Activity Related Zone 26 Finalization
A27320   Final Pressure Test and Handover to Employer of Zone 8
A27330   Finishing Activity Related Zone 8 Finalization
A27340   Final Pressure Test and Handover to Employer of Zone 16
A27350   Finishing Activity Related Zone 16 Finalization
A27380   Final Pressure Test and Handover to Employer of Zone 32
A27390   Finishing Activity Related Zone 32 Finalization
A27400   Final Pressure Test and Handover to Employer of Zone 6
A27410   Finishing Activity Related Zone 6 Finalization
A27420   Final Pressure Test and Handover to Employer of Zone 17
A27430   Finishing Activity Related Zone 17 Finalization
A27460   Final Pressure Test and Handover to Employer of Zone 42
A27470   Finishing Activity Related Zone 42 Finalization
A27480   Final Pressure Test and Handover to Employer of Zone 9
A27490   Finishing Activity Related Zone 9 Finalization
A27500   Final Pressure Test and Handover to Employer of Zone 21
A27510   Finishing Activity Related Zone 21 Finalization
A27520   Final Pressure Test and Handover to Employer of Zone 27
A27530   Finishing Activity Related Zone 27 Finalization
A27540   Final Pressure Test and Handover to Employer of Zone 38
A27550   Finishing Activity Related Zone 38 Finalization
A27580   Final Pressure Test and Handover to Employer of Zone 30
A27590   Finishing Activity Related Zone 30 Finalization
A27600   Final Pressure Test and Handover to Employer of Zone 40
A27610   Finishing Activity Related Zone 40 Finalization
A27640   Final Pressure Test and Handover to Employer of Zone 24
A27650   Finishing Activity Related Zone 24 Finalization
A27660   Final Pressure Test and Handover to Employer of Zone 34
A27670   Finishing Activity Related Zone 34 Finalization
A27680   Final Pressure Test and Handover to Employer of Zone 36
A27690   Finishing Activity Related Zone 36 Finalization
A27700   Final Pressure Test and Handover to Employer of Zone 39
A27710   Finishing Activity Related Zone 39 Finalization
A27720   Final Pressure Test and Handover to Employer of Zone 11
A27730   Finishing Activity Related Zone 11 Finalization
A27740   Final Pressure Test and Handover to Employer of Zone 22
A27750   Finishing Activity Related Zone 22 Finalization
A27820   Final Pressure Test and Handover to Employer of Zone 25
A27830   Finishing Activity Related Zone 25 Finalization
A27840   Final Pressure Test and Handover to Employer of Zone 33
A27850   Finishing Activity Related Zone 33 Finalization
A27880   Final Pressure Test and Handover to Employer of Zone 18
A27890   Finishing Activity Related Zone 18 Finalization
A27900   Final Pressure Test and Handover to Employer of Zone 35
A27910   Finishing Activity Related Zone 35 Finalization
A27960   Final Pressure Test and Handover to Employer of Zone 28
A27970   Finishing Activity Related Zone 28 Finalization
A27980   Final Pressure Test and Handover to Employer of Zone 41
A27990   Finishing Activity Related Zone 41 Finalization
A28040   Final Pressure Test and Handover to Employer of Zone 19
A28050   Finishing Activity Related Zone 19 Finalization
A28120   Final Pressure Test and Handover to Employer of Zone 31
A28130   Finishing Activity Related Zone 31 Finalization
A2820    Identify the Existing Water Supply Line (if any) at Zone 3
A28200   Final Pressure Test and Handover to Employer of Zone 37
A28210   Finishing Activity Related Zone 37 Finalization
A28260   Final Pressure Test and Handover to Employer of Zone 10
A28270   Finishing Activity Related Zone 10 Finalization
A28280   As built Drawing Preparation and Submission for Approval for Zone 30
A28290   As built Drawing Preparation and Submission for Approval for Zone 5
A2830    Notify clients and vendors (if any) at Zone 3 Area Water Supply Authorities
A28300   As built Drawing Preparation and Submission for Approval for Zone 8
A28310   As built Drawing Preparation and Submission for Approval for Zone 13
A28320   As built Drawing Preparation and Submission for Approval for Zone 24
A28330   As built Drawing Preparation and Submission for Approval for Zone 6
A28350   As built Drawing Preparation and Submission for Approval for Zone 27
A28370   As built Drawing Preparation and Submission for Approval for Zone 9
A28380   As built Drawing Preparation and Submission for Approval for Zone 17
A28390   As built Drawing Preparation and Submission for Approval for Zone 21
A28400   As built Drawing Preparation and Submission for Approval for Zone 33
A28410   As built Drawing Preparation and Submission for Approval for Zone 7
A28420   As built Drawing Preparation and Submission for Approval for Zone 18
A28450   As built Drawing Preparation and Submission for Approval for Zone 10
A28460   As built Drawing Preparation and Submission for Approval for Zone 22
A28470   As built Drawing Preparation and Submission for Approval for Zone 28
A28480   As built Drawing Preparation and Submission for Approval for Zone 39
A28500   As built Drawing Preparation and Submission for Approval for Zone 31
A28510   As built Drawing Preparation and Submission for Approval for Zone 41
A28530   As built Drawing Preparation and Submission for Approval for Zone 25
A28540   As built Drawing Preparation and Submission for Approval for Zone 35
A28550   As built Drawing Preparation and Submission for Approval for Zone 37
A28560   As built Drawing Preparation and Submission for Approval for Zone 40
A28570   As built Drawing Preparation and Submission for Approval for Zone 12
A28580   As built Drawing Preparation and Submission for Approval for Zone 23
A28610   As built Drawing Preparation and Submission for Approval for Zone 16
A28620   As built Drawing Preparation and Submission for Approval for Zone 26
A28630   As built Drawing Preparation and Submission for Approval for Zone 34
A28650   As built Drawing Preparation and Submission for Approval for Zone 19
A28660   As built Drawing Preparation and Submission for Approval for Zone 36
A28690   As built Drawing Preparation and Submission for Approval for Zone 29
A28700   As built Drawing Preparation and Submission for Approval for Zone 42
A28730   As built Drawing Preparation and Submission for Approval for Zone 20
A28770   As built Drawing Preparation and Submission for Approval for Zone 32
A2880    Final Pressure Test and Handover to Employer of Zone 3
A28810   As built Drawing Preparation and Submission for Approval for Zone 38
A28840   As built Drawing Preparation and Submission for Approval for Zone 11
A2890    Finishing Activity Related Zone 3 Finalization
A28940   Submission for Approval of Working Drawing for Zone 5
A28950   Approval of Working Drawing for Zone 5
A28960   Submission for Approval of Working Drawing for Zone 6
A28970   Approval of Working Drawing for Zone 6
A28980   Submission for Approval of Working Drawing for Zone 7
A28990   Approval of Working Drawing for Zone 7
A2900    As built Drawing Preparation and Submission for Approval for Zone 3
A29060   Submission for Approval of Working Drawing for Zone 8
A29070   Approval of Working Drawing for Zone 8
A29080   Submission for Approval of Working Drawing for Zone 9
A29090   Approval of Working Drawing for Zone 9
A29100   Submission for Approval of Working Drawing for Zone 10
A29110   Approval of Working Drawing for Zone 10
A29120   Submission for Approval of Working Drawing for Zone 11
A29130   Approval of Working Drawing for Zone 11
A29140   Submission for Approval of Working Drawing for Zone 12
A29150   Approval of Working Drawing for Zone 12
A29160   Submission for Approval of Working Drawing for Zone 13
A29170   Approval of Working Drawing for Zone 13
A29180   Submission for Approval of Working Drawing for Zone 14
A29190   Approval of Working Drawing for Zone 14
A29200   Submission for Approval of Working Drawing for Zone 15
A29210   Approval of Working Drawing for Zone 15
A29240   Submission for Approval of Working Drawing for Zone 17
A29250   Approval of Working Drawing for Zone 17
A29260   Submission for Approval of Working Drawing for Zone 18
A29270   Approval of Working Drawing for Zone 18
A29280   Submission for Approval of Working Drawing for Zone 19
A29290   Approval of Working Drawing for Zone 19
A29320   Submission for Approval of Working Drawing for Zone 21
A29330   Approval of Working Drawing for Zone 21
A29340   Submission for Approval of Working Drawing for Zone 22
A29350   Approval of Working Drawing for Zone 22
A29360   Submission for Approval of Working Drawing for Zone 23
A29370   Approval of Working Drawing for Zone 23
A29390   Approval of Working Drawing for Zone 24
A29410   Approval of Working Drawing for Zone 25
A29430   Approval of Working Drawing for Zone 26
A29450   Approval of Working Drawing for Zone 27
A29470   Approval of Working Drawing for Zone 28
A29490   Approval of Working Drawing for Zone 29
A29520   Submission for Approval of Working Drawing for Zone 31
A29530   Approval of Working Drawing for Zone 31
A29540   Submission for Approval of Working Drawing for Zone 32
A29550   Approval of Working Drawing for Zone 32
A29560   Submission for Approval of Working Drawing for Zone 33
A29570   Approval of Working Drawing for Zone 33
A29580   Submission for Approval of Working Drawing for Zone 34
A29590   Approval of Working Drawing for Zone 34
A29600   Submission for Approval of Working Drawing for Zone 35
A29610   Approval of Working Drawing for Zone 35
A29620   Submission for Approval of Working Drawing for Zone 36
A29630   Approval of Working Drawing for Zone 36
A29640   Submission for Approval of Working Drawing for Zone 37
A29650   Approval of Working Drawing for Zone 37
A29660   Submission for Approval of Working Drawing for Zone 38
A29670   Approval of Working Drawing for Zone 38
A29680   Submission for Approval of Working Drawing for Zone 39
A29690   Approval of Working Drawing for Zone 39
A29700   Submission for Approval of Working Drawing for Zone 40
A29710   Approval of Working Drawing for Zone 40
A29720   Submission for Approval of Working Drawing for Zone 41
A29730   Approval of Working Drawing for Zone 41
A29740   Submission for Approval of Working Drawing for Zone 42
A29750   Approval of Working Drawing for Zone 42
A29760   Submission for Approval of Working Drawing for Zone 43
A29770   Approval of Working Drawing for Zone 43
A29780   Submission for Approval of Working Drawing for Zone 44
A29790   Approval of Working Drawing for Zone 44
A29800   Submission for Approval of Working Drawing for Zone 45
A29810   Approval of Working Drawing for Zone 45
A29820   Submission for Approval of Working Drawing for Zone 46
A29830   Approval of Working Drawing for Zone 46
A29840   Submission for Approval of Working Drawing for Zone 47
A29850   Approval of Working Drawing for Zone 47
A3250    Installation of 200 mm Pipe at Zone 4
A3400    Identify the Existing Water Supply Line (if any) at Zone 4
A3410    Notify clients and vendors (if any) at Zone 4 Area Water Supply Authorities
A3480    As built Drawing Preparation and Submission for Approval for Zone 4
A3830    Installation of 200 mm Pipe at Zone 5
A3980    Identify the Existing Water Supply Line (if any) at Zone 5
A3990    Notify clients and vendors (if any) at Zone 5 Area Water Supply Authorities
A4380    Installation of 200 mm Pipe at Zone 6
A4490    Geotextile installation at 200 mm Pipe at Zone 6
A4530    Identify the Existing Water Supply Line (if any) at Zone 6
A4540    Notify clients and vendors (if any) at Zone 6 Area Water Supply Authorities
A5080    Identify the Existing Water Supply Line (if any) at Zone 7
A5090    Notify clients and vendors (if any) at Zone 7 Area Water Supply Authorities
A5630    Identify the Existing Water Supply Line (if any) at Zone 8
A5640    Notify clients and vendors (if any) at Zone 8 Area Water Supply Authorities
A6030    Installation of 200 mm Pipe at Zone 9
A6180    Identify the Existing Water Supply Line (if any) at Zone 9
A6190    Notify clients and vendors (if any) at Zone 9 Area Water Supply Authorities
A6580    Installation of 200 mm Pipe at Zone 10
A6730    Identify the Existing Water Supply Line (if any) at Zone 10
A6740    Notify clients and vendors (if any) at Zone 10 Area Water Supply Authorities
A7280    Identify the Existing Water Supply Line (if any) at Zone 11
A7290    Notify clients and vendors (if any) at Zone 11 Area Water Supply Authorities
A7830    Identify the Existing Water Supply Line (if any) at Zone 12
A7840    Notify clients and vendors (if any) at Zone 12 Area Water Supply Authorities
A8230    Installation of 200 mm Pipe at Zone 13
A8380    Identify the Existing Water Supply Line (if any) at Zone 13
A8390    Notify clients and vendors (if any) at Zone 13 Area Water Supply Authorities
A8780    Installation of 200 mm Pipe at Zone 14
A8790    Installation of 250 mm Pipe at Zone 14
A8900    Geotextile installation at 250 mm Pipe at Zone 14
A8930    Identify the Existing Water Supply Line (if any) at Zone 14
A8940    Notify clients and vendors (if any) at Zone 14 Area Water Supply Authorities
A9330    Installation of 200 mm Pipe at Zone 15
A9480   Identify the Existing Water Supply Line (if any) at Zone 15
A9490   Notify clients and vendors (if any) at Zone 15 Area Water Supply Authorities
A9870   Installation of 160 mm Pipe at Zone 16
A9880   Installation of 200 mm Pipe at Zone 16
A9890   Installation of 250 mm Pipe at Zone 16
A9980   Geotextile installation at 160 mm Pipe at Zone 16
Item1     Item2
CL        Closing the Project
Multiple WPR WBS Code should be used Only once
Item1    Item2
A10010   Curbstone Tiles Reinstatement after Asphalt Works at Zone 16
A10020   Curbstone Reinstatement as per Authorities Regulations at Zone 16
A10560   Curbstone Tiles Reinstatement after Asphalt Works at Zone 17
A10570   Curbstone Reinstatement as per Authorities Regulations at Zone 17
A11110   Curbstone Tiles Reinstatement after Asphalt Works at Zone 18
A11120   Curbstone Reinstatement as per Authorities Regulations at Zone 18
A11660   Curbstone Tiles Reinstatement after Asphalt Works at Zone 19
A11670   Curbstone Reinstatement as per Authorities Regulations at Zone 19
A12760   Curbstone Tiles Reinstatement after Asphalt Works at Zone 21
A12770   Curbstone Reinstatement as per Authorities Regulations at Zone 21
A13310   Curbstone Tiles Reinstatement after Asphalt Works at Zone 22
A13320   Curbstone Reinstatement as per Authorities Regulations at Zone 22
A13860   Curbstone Tiles Reinstatement after Asphalt Works at Zone 23
A13870   Curbstone Reinstatement as per Authorities Regulations at Zone 23
A14410   Curbstone Tiles Reinstatement after Asphalt Works at Zone 24
A14420   Curbstone Reinstatement as per Authorities Regulations at Zone 24
A14960   Curbstone Tiles Reinstatement after Asphalt Works at Zone 25
A14970   Curbstone Reinstatement as per Authorities Regulations at Zone 25
A15510   Curbstone Tiles Reinstatement after Asphalt Works at Zone 26
A15520   Curbstone Reinstatement as per Authorities Regulations at Zone 26
A16060   Curbstone Tiles Reinstatement after Asphalt Works at Zone 27
A16070   Curbstone Reinstatement as per Authorities Regulations at Zone 27
A1650    Curbstone Tiles Reinstatement after Asphalt Works at Zone 1
A1660    Curbstone Reinstatement as per Authorities Regulations at Zone 1
A16610   Curbstone Tiles Reinstatement after Asphalt Works at Zone 28
A16620   Curbstone Reinstatement as per Authorities Regulations at Zone 28
A17160   Curbstone Tiles Reinstatement after Asphalt Works at Zone 29
A17170   Curbstone Reinstatement as per Authorities Regulations at Zone 29
A17710   Curbstone Tiles Reinstatement after Asphalt Works at Zone 30
A17720   Curbstone Reinstatement as per Authorities Regulations at Zone 30
A18260   Curbstone Tiles Reinstatement after Asphalt Works at Zone 31
A18270   Curbstone Reinstatement as per Authorities Regulations at Zone 31
A18810   Curbstone Tiles Reinstatement after Asphalt Works at Zone 32
A18820   Curbstone Reinstatement as per Authorities Regulations at Zone 32
A19360   Curbstone Tiles Reinstatement after Asphalt Works at Zone 33
A19370   Curbstone Reinstatement as per Authorities Regulations at Zone 33
A19910   Curbstone Tiles Reinstatement after Asphalt Works at Zone 34
A19920   Curbstone Reinstatement as per Authorities Regulations at Zone 34
A20460   Curbstone Tiles Reinstatement after Asphalt Works at Zone 35
A20470   Curbstone Reinstatement as per Authorities Regulations at Zone 35
A21010   Curbstone Tiles Reinstatement after Asphalt Works at Zone 36
A21020   Curbstone Reinstatement as per Authorities Regulations at Zone 36
A21560   Curbstone Tiles Reinstatement after Asphalt Works at Zone 37
A21570   Curbstone Reinstatement as per Authorities Regulations at Zone 37
A22110   Curbstone Tiles Reinstatement after Asphalt Works at Zone 38
A22120   Curbstone Reinstatement as per Authorities Regulations at Zone 38
A2250    Curbstone Tiles Reinstatement after Asphalt Works at Zone 2
A2260    Curbstone Reinstatement as per Authorities Regulations at Zone 2
A22660   Curbstone Tiles Reinstatement after Asphalt Works at Zone 39
A22670   Curbstone Reinstatement as per Authorities Regulations at Zone 39
A23210   Curbstone Tiles Reinstatement after Asphalt Works at Zone 40
A23220   Curbstone Reinstatement as per Authorities Regulations at Zone 40
A23760   Curbstone Tiles Reinstatement after Asphalt Works at Zone 41
A23770   Curbstone Reinstatement as per Authorities Regulations at Zone 41
A24310   Curbstone Tiles Reinstatement after Asphalt Works at Zone 42
A24320   Curbstone Reinstatement as per Authorities Regulations at Zone 42
A24860   Curbstone Tiles Reinstatement after Asphalt Works at Zone 43
A24870   Curbstone Reinstatement as per Authorities Regulations at Zone 43
A25410   Curbstone Tiles Reinstatement after Asphalt Works at Zone 44
A25420   Curbstone Reinstatement as per Authorities Regulations at Zone 44
A25960   Curbstone Tiles Reinstatement after Asphalt Works at Zone 45
A25970   Curbstone Reinstatement as per Authorities Regulations at Zone 45
A26510   Curbstone Tiles Reinstatement after Asphalt Works at Zone 46
A26520   Curbstone Reinstatement as per Authorities Regulations at Zone 46
A27060   Curbstone Tiles Reinstatement after Asphalt Works at Zone 47
A27070   Curbstone Reinstatement as per Authorities Regulations at Zone 47
A2800    Curbstone Tiles Reinstatement after Asphalt Works at Zone 3
A2810    Curbstone Reinstatement as per Authorities Regulations at Zone 3
A3380    Curbstone Tiles Reinstatement after Asphalt Works at Zone 4
A3390    Curbstone Reinstatement as per Authorities Regulations at Zone 4
A3960    Curbstone Tiles Reinstatement after Asphalt Works at Zone 5
A3970    Curbstone Reinstatement as per Authorities Regulations at Zone 5
A4510    Curbstone Tiles Reinstatement after Asphalt Works at Zone 6
A4520    Curbstone Reinstatement as per Authorities Regulations at Zone 6
A5060    Curbstone Tiles Reinstatement after Asphalt Works at Zone 7
A5070    Curbstone Reinstatement as per Authorities Regulations at Zone 7
A5610    Curbstone Tiles Reinstatement after Asphalt Works at Zone 8
A5620    Curbstone Reinstatement as per Authorities Regulations at Zone 8
A6160    Curbstone Tiles Reinstatement after Asphalt Works at Zone 9
A6170    Curbstone Reinstatement as per Authorities Regulations at Zone 9
A6710    Curbstone Tiles Reinstatement after Asphalt Works at Zone 10
A6720    Curbstone Reinstatement as per Authorities Regulations at Zone 10
A7260    Curbstone Tiles Reinstatement after Asphalt Works at Zone 11
A7270    Curbstone Reinstatement as per Authorities Regulations at Zone 11
A7810    Curbstone Tiles Reinstatement after Asphalt Works at Zone 12
A7820   Curbstone Reinstatement as per Authorities Regulations at Zone 12
A8360   Curbstone Tiles Reinstatement after Asphalt Works at Zone 13
A8370   Curbstone Reinstatement as per Authorities Regulations at Zone 13
A8910   Curbstone Tiles Reinstatement after Asphalt Works at Zone 14
A8920   Curbstone Reinstatement as per Authorities Regulations at Zone 14
A9460   Curbstone Tiles Reinstatement after Asphalt Works at Zone 15
A9470   Curbstone Reinstatement as per Authorities Regulations at Zone 15
Item1    Item2
Missed WBMobilization MB WBS Code should be under PE WBS Code.
CL       Closing the Project
Z1       Zone 1 (F-127)
Z2       Zone 2 (G-127)
Z3       Zone 3 (F-128)
Z4       Zone 4 (G-128)
Z5       Zone 5 (H-128)
Z6       Zone 6 (E-129)
Z7       Zone 7 (F-129)
Z8       Zone 8 (G-129)
Z9       Zone 9 (H-129)
Z10      Zone 10 (E-130)
Z11      Zone 11 (F-130)
Z12      Zone 12 (G-130)
Z13      Zone 13 (H-130)
Z14      Zone 14 (E-131)
Z15      Zone 15 (F-131)
Z16      Zone 16 (G-131)
Z17      Zone 17 (H-131)
Z18      Zone 18 (I-131)
Z19      Zone 19 (J-131)
Z20      Zone 20 (E-132)
Z21      Zone 21 (F-132)
Z22      Zone 22 (G-132)
Z23      Zone 23 (H-132)
Z24      Zone 24 (I-132)
Z25      Zone 25 (J-132)
Z26      Zone 26 (F-133)
Z27      Zone 27 (G-133)
Z28      Zone 28 (H-133)
Z29      Zone 29 (I-133)
Z30      Zone 30 (J-133)
Z31      Zone 31 (G-134)
Z32      Zone 32 (H-134)
Z33      Zone 33 (I-134)
Z34      Zone 34 (J-134)
Z35      Zone 35 (H-135)
Z36      Zone 36 (I-135)
Z37      Zone 37 (J-135)
38       Zone 38 (G-136)
Z39      Zone 39 (H-136)
Z40      Zone 40 (I-136)
Z41   Zone 41 (J-136)
Z42   Zone 42 (H-137)
Z43   Zone 43 (I-137)
Z44   Zone 44 (J-137)
Z45   Zone 45 (K-137)
Z46   Zone 46 (J-138)
Z47   Zone 47 (K-138)
Z1    Zone 1 (F-127)
Z2    Zone 2 ((G-127)
Z3    Zone 3 (F-128)
Z4    Zone 4 (G-128)
Z5    Zone 5 (H-128)
Z6    Zone 6 (E-129)
Z7    Zone 7 (F-129)
Z8    Zone 8 (G-129)
Z9    Zone 9 (H-129)
Z10   Zone 10 (E-130)
Z11   Zone 11 (F-130)
Z12   Zone 12 (G-130)
Z13   Zone 13 (H-130)
Z14   Zone 14 (E-131)
Z15   Zone 15 (F-131)
Z16   Zone 16 (G-131)
Z17   Zone 17 (H-131)
Z18   Zone 18 (I-131)
Z19   Zone 19 (J-131)
Z20   Zone 20 (E-132)
Z21   Zone 21 (F-132)
Z22   Zone 22 (G-132)
Z23   Zone 23 (H-132)
Z24   Zone 24 (I-132)
Z25   Zone 25 (J-132)
Z26   Zone 26 (F-133)
Z27   Zone 27 (G-133)
Z28   Zone 28 (H-133)
Z29   Zone 29 (I-133)
Z30   Zone 30 (J-133)
Z31   Zone 31 (G-134)
Z32   Zone 32 (H-134)
Z33   Zone 33 (I-134)
Z34   Zone 34 (J-134)
Z35   Zone 35 (H-135)
Z36   Zone 36 (I-135)
Z37   Zone 37 (J-135)
Z38   Zone 38 (G-136)
Z39   Zone 39 (H-136)
Z40   Zone 40 (I-136)
Z41   Zone 41 (J-136)
Z42   Zone 42 (H-137)
Z43   Zone 43 (I-137)
Z44   Zone 44 (J-137)
Z45   Zone 45 (K-137)
Z46   Zone 46 (J-138)
Z47   Zone 47 (K-138)
1     Contractor Mobilization
2     Safety Facility and Survey
PDS   Project Documents Submittal & Approval
MSA   Material Submittal & Approval
HDS   Hydraulic Study
SDS   Shop Drawing Submittal & Approval
SLI   Short Lead Items
LLI   Long Lead Items
Z21   Zone 21 (F-132)
Z22   Zone 22 (G-132)
Z23   Zone 23 (H-132)
Z24   Zone 24 (I-132)
Z25   Zone 25 (J-132)
Z26   Zone 26 (F-133)
Z27   Zone 27 (G-133)
Z28   Zone 28 (H-133)
Z29   Zone 29 (I-133)
Z30   Zone 30 (J-133)
Z31   Zone 31 (G-134)
Z32   Zone 32 (H-134)
Z33   Zone 33 (I-134)
Z34   Zone 34 (J-134)
Z35   Zone 35 (H-135)
Z36   Zone 36 (I-135)
Z37   Zone 37 (J-135)
Z38   Zone 38 (G-136)
Z39   Zone 39 (H-136)
Z40   Zone 40 (I-136)
Z41   Zone 41 (J-136)
Z42   Zone 42 (H-137)
Z43   Zone 43 (I-137)
Z44   Zone 44 (J-137)
Z45   Zone 45 (K-137)
Z46   Zone 46 (J-138)
Z47   Zone 47 (K-138)
Z1    Zone 1 (F-127)
Z2    Zone 2 (G-127)
Z3    Zone 3 (F-128)
Z4    Zone 4 (G-128)
Z5    Zone 5 (H-128)
Z6    Zone 6 (E-129)
Z7    Zone 7 (F-129)
Z8    Zone 8 (G-129)
Z9    Zone 9 (H-129)
Z10   Zone 10 (E-130)
Z11   Zone 11 (F-130)
Z12   Zone 12 (G-130)
Z13   Zone 13 (H-130)
Z14   Zone 14 (E-131)
Z15   Zone 15 (F-131)
Z16   Zone 16 (G-131)
Z17   Zone 17 (H-131)
Z18   Zone 18 (I-131)
Z19   Zone 19 (J-131)
PO    Purchasing Order
FAB   Fabrication & Assembly
DS    Delivery to site
MI    Material Inspection
PO    Purchasing Order
FAB   Fabrication & Assembly
DS    Delivery to site
MI    Material Inspection
PR    Preliminary Works
CV    Civil Works
MC    Mechinical
PR    Preliminary Works
CV    Civil Works
MC    Mechinical
PR    Preliminary Works
CV    Civil Works
MC    Mechinical
PR    Preliminary Works
CV    Civil Works
MC    Mechinical
PR    Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
PR   Preliminary Works
CV   Civil Works
MC   Mechinical
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
33   Utility Relocation
31   Earthworks
3    Surface Reinstatement Works
1    Construction of Valves Chamber
1    Pipe Installation with Accessories
2    Pressure Test
Item1     Item2     Item3
EN.HS.1   Hydraulic       15
Item1    Item2
A10190   Relocate Electrical Cable at Zone 17
A10220   Relocate Existing Septic Tanks (if any) at Zone 17
A10250   Relocate Existing Sewer Line (if any) at Zone 17
A10420   Installation of 160 mm Pipe at Zone 17
A10440   Installation of 250 mm Pipe at Zone 17
A10470   Asphalt Works at Zone 17
A10740   Relocate Electrical Cable at Zone 18
A10770   Relocate Existing Septic Tanks (if any) at Zone 18
A10800   Relocate Existing Sewer Line (if any) at Zone 18
A10960   Installation of 110 mm Pipe at Zone 18
A10970   Installation of 160 mm Pipe at Zone 18
A10990   Installation of 250 mm Pipe at Zone 18
A11020   Asphalt Works at Zone 18
A11290   Relocate Electrical Cable at Zone 19
A11320   Relocate Existing Septic Tanks (if any) at Zone 19
A11350   Relocate Existing Sewer Line (if any) at Zone 19
A11520   Installation of 160 mm Pipe at Zone 19
A11570   Asphalt Works at Zone 19
A1220    Relocate Electrical Cable at Zone 1
A12390   Relocate Electrical Cable at Zone 21
A12420   Relocate Existing Septic Tanks (if any) at Zone 21
A12450   Relocate Existing Sewer Line (if any) at Zone 21
A1250    Relocate Existing Septic Tanks (if any) at Zone 1
A12620   Installation of 160 mm Pipe at Zone 21
A12670   Asphalt Works at Zone 21
A1280    Relocate Existing Sewer Line (if any) at Zone 1
A12940   Relocate Electrical Cable at Zone 22
A12970   Relocate Existing Septic Tanks (if any) at Zone 22
A13000   Relocate Existing Sewer Line (if any) at Zone 22
A13170   Installation of 160 mm Pipe at Zone 22
A13190   Installation of 250 mm Pipe at Zone 22
A13220   Asphalt Works at Zone 22
A13490   Relocate Electrical Cable at Zone 23
A13520   Relocate Existing Septic Tanks (if any) at Zone 23
A13550   Relocate Existing Sewer Line (if any) at Zone 23
A13720   Installation of 160 mm Pipe at Zone 23
A13770   Asphalt Works at Zone 23
A14040   Relocate Electrical Cable at Zone 24
A14070   Relocate Existing Septic Tanks (if any) at Zone 24
A14100   Relocate Existing Sewer Line (if any) at Zone 24
A14260   Installation of 110 mm Pipe at Zone 24
A14270   Installation of 160 mm Pipe at Zone 24
A14290   Installation of 250 mm Pipe at Zone 24
A14320   Asphalt Works at Zone 24
A14590   Relocate Electrical Cable at Zone 25
A14620   Relocate Existing Septic Tanks (if any) at Zone 25
A14650   Relocate Existing Sewer Line (if any) at Zone 25
A1470    Installation of 160 mm Pipe at Zone 1
A14820   Installation of 160 mm Pipe at Zone 25
A14870   Asphalt Works at Zone 25
A15140   Relocate Electrical Cable at Zone 26
A15170   Relocate Existing Septic Tanks (if any) at Zone 26
A1520    Asphalt Works at Zone 1
A15200   Relocate Existing Sewer Line (if any) at Zone 26
A15370   Installation of 160 mm Pipe at Zone 26
A15420   Asphalt Works at Zone 26
A15690   Relocate Electrical Cable at Zone 27
A15720   Relocate Existing Septic Tanks (if any) at Zone 27
A15750   Relocate Existing Sewer Line (if any) at Zone 27
A15910   Installation of 110 mm Pipe at Zone 27
A15920   Installation of 160 mm Pipe at Zone 27
A15940   Installation of 250 mm Pipe at Zone 27
A15970   Asphalt Works at Zone 27
A16240   Relocate Electrical Cable at Zone 28
A16270   Relocate Existing Septic Tanks (if any) at Zone 28
A16300   Relocate Existing Sewer Line (if any) at Zone 28
A16470   Installation of 160 mm Pipe at Zone 28
A16490   Installation of 250 mm Pipe at Zone 28
A16520   Asphalt Works at Zone 28
A16790   Relocate Electrical Cable at Zone 29
A16820   Relocate Existing Septic Tanks (if any) at Zone 29
A16850   Relocate Existing Sewer Line (if any) at Zone 29
A17020   Installation of 160 mm Pipe at Zone 29
A17070   Asphalt Works at Zone 29
A17340   Relocate Electrical Cable at Zone 30
A17370   Relocate Existing Septic Tanks (if any) at Zone 30
A1740    Finishing Activity Related Zone 1 Finalization
A17400   Relocate Existing Sewer Line (if any) at Zone 30
A17570   Installation of 160 mm Pipe at Zone 30
A17590   Installation of 250 mm Pipe at Zone 30
A1760    Finishing Activity Related Zone 2 Finalization
A17620   Asphalt Works at Zone 30
A17890   Relocate Electrical Cable at Zone 31
A17920   Relocate Existing Septic Tanks (if any) at Zone 31
A17950   Relocate Existing Sewer Line (if any) at Zone 31
A18120   Installation of 160 mm Pipe at Zone 31
A18140   Installation of 250 mm Pipe at Zone 31
A18170   Asphalt Works at Zone 31
A18440   Relocate Electrical Cable at Zone 32
A18470   Relocate Existing Septic Tanks (if any) at Zone 32
A18500   Relocate Existing Sewer Line (if any) at Zone 32
A18660   Installation of 110 mm Pipe at Zone 32
A18670   Installation of 160 mm Pipe at Zone 32
A18690   Installation of 250 mm Pipe at Zone 32
A18720   Asphalt Works at Zone 32
A1880    Relocate Electrical Cable at Zone 2
A18990   Relocate Electrical Cable at Zone 33
A19020   Relocate Existing Septic Tanks (if any) at Zone 33
A19050   Relocate Existing Sewer Line (if any) at Zone 33
A1910    Relocate Existing Septic Tanks (if any) at Zone 2
A19220   Installation of 160 mm Pipe at Zone 33
A19240   Installation of 250 mm Pipe at Zone 33
A19270   Asphalt Works at Zone 33
A1940    Relocate Existing Sewer Line (if any) at Zone 2
A19540   Relocate Electrical Cable at Zone 34
A19570   Relocate Existing Septic Tanks (if any) at Zone 34
A19600   Relocate Existing Sewer Line (if any) at Zone 34
A19760   Installation of 110 mm Pipe at Zone 34
A19770   Installation of 160 mm Pipe at Zone 34
A19790   Installation of 250 mm Pipe at Zone 34
A19820   Asphalt Works at Zone 34
A20090   Relocate Electrical Cable at Zone 35
A20120   Relocate Existing Septic Tanks (if any) at Zone 35
A20150   Relocate Existing Sewer Line (if any) at Zone 35
A20310   Installation of 110 mm Pipe at Zone 35
A20320   Installation of 160 mm Pipe at Zone 35
A20340   Installation of 250 mm Pipe at Zone 35
A20370   Asphalt Works at Zone 35
A20640   Relocate Electrical Cable at Zone 36
A20670   Relocate Existing Septic Tanks (if any) at Zone 36
A20700   Relocate Existing Sewer Line (if any) at Zone 36
A20870   Installation of 160 mm Pipe at Zone 36
A20890   Installation of 250 mm Pipe at Zone 36
A20920   Asphalt Works at Zone 36
A2110    Installation of 160 mm Pipe at Zone 2
A21190   Relocate Electrical Cable at Zone 37
A21220   Relocate Existing Septic Tanks (if any) at Zone 37
A21250   Relocate Existing Sewer Line (if any) at Zone 37
A21420   Installation of 160 mm Pipe at Zone 37
A21470   Asphalt Works at Zone 37
A2160    Asphalt Works at Zone 2
A21740   Relocate Electrical Cable at Zone 38
A21770   Relocate Existing Septic Tanks (if any) at Zone 38
A21800   Relocate Existing Sewer Line (if any) at Zone 38
A21970   Installation of 160 mm Pipe at Zone 38
A22020   Asphalt Works at Zone 38
A22290   Relocate Electrical Cable at Zone 39
A22320   Relocate Existing Septic Tanks (if any) at Zone 39
A22350   Relocate Existing Sewer Line (if any) at Zone 39
A22520   Installation of 160 mm Pipe at Zone 39
A22540   Installation of 250 mm Pipe at Zone 39
A22570   Asphalt Works at Zone 39
A22840   Relocate Electrical Cable at Zone 40
A22870   Relocate Existing Septic Tanks (if any) at Zone 40
A22900   Relocate Existing Sewer Line (if any) at Zone 40
A23070   Installation of 160 mm Pipe at Zone 40
A23120   Asphalt Works at Zone 40
A23390   Relocate Electrical Cable at Zone 41
A23420   Relocate Existing Septic Tanks (if any) at Zone 41
A23450   Relocate Existing Sewer Line (if any) at Zone 41
A23610   Installation of 110 mm Pipe at Zone 41
A23620   Installation of 160 mm Pipe at Zone 41
A23640   Installation of 250 mm Pipe at Zone 41
A23670   Asphalt Works at Zone 41
A23940   Relocate Electrical Cable at Zone 42
A23970   Relocate Existing Septic Tanks (if any) at Zone 42
A24000   Relocate Existing Sewer Line (if any) at Zone 42
A24160   Installation of 110 mm Pipe at Zone 42
A24190   Installation of 250 mm Pipe at Zone 42
A24220   Asphalt Works at Zone 42
A2430    Relocate Electrical Cable at Zone 3
A24490   Relocate Electrical Cable at Zone 43
A24520   Relocate Existing Septic Tanks (if any) at Zone 43
A24550   Relocate Existing Sewer Line (if any) at Zone 43
A2460    Relocate Existing Septic Tanks (if any) at Zone 3
A24720   Installation of 160 mm Pipe at Zone 43
A24740   Installation of 250 mm Pipe at Zone 43
A24770   Asphalt Works at Zone 43
A2490    Relocate Existing Sewer Line (if any) at Zone 3
A25040   Relocate Electrical Cable at Zone 44
A25070   Relocate Existing Septic Tanks (if any) at Zone 44
A25100   Relocate Existing Sewer Line (if any) at Zone 44
A25260   Installation of 110 mm Pipe at Zone 44
A25270   Installation of 160 mm Pipe at Zone 44
A25290   Installation of 250 mm Pipe at Zone 44
A25320   Asphalt Works at Zone 44
A25590   Relocate Electrical Cable at Zone 45
A25620   Relocate Existing Septic Tanks (if any) at Zone 45
A25650   Relocate Existing Sewer Line (if any) at Zone 45
A25840   Installation of 250 mm Pipe at Zone 45
A25870   Asphalt Works at Zone 45
A26140   Relocate Electrical Cable at Zone 46
A26170   Relocate Existing Septic Tanks (if any) at Zone 46
A26200   Relocate Existing Sewer Line (if any) at Zone 46
A26370   Installation of 160 mm Pipe at Zone 46
A26390   Installation of 250 mm Pipe at Zone 46
A26420   Asphalt Works at Zone 46
A2660    Installation of 160 mm Pipe at Zone 3
A26690   Relocate Electrical Cable at Zone 47
A26720   Relocate Existing Septic Tanks (if any) at Zone 47
A26750   Relocate Existing Sewer Line (if any) at Zone 47
A2680    Installation of 250 mm Pipe at Zone 3
A26920   Installation of 160 mm Pipe at Zone 47
A26940   Installation of 250 mm Pipe at Zone 47
A26970   Asphalt Works at Zone 47
A2710    Asphalt Works at Zone 3
A27150   Finishing Activity Related Zone 29 Finalization
A27170   Finishing Activity Related Zone 4 Finalization
A27190   Finishing Activity Related Zone 7 Finalization
A27210   Finishing Activity Related Zone 12 Finalization
A27230   Finishing Activity Related Zone 23 Finalization
A27250   Finishing Activity Related Zone 5 Finalization
A27270   Finishing Activity Related Zone 13 Finalization
A27290   Finishing Activity Related Zone 26 Finalization
A27310   Finishing Activity Related Zone 46 Finalization
A27330   Finishing Activity Related Zone 8 Finalization
A27350   Finishing Activity Related Zone 16 Finalization
A27390   Finishing Activity Related Zone 32 Finalization
A27410   Finishing Activity Related Zone 6 Finalization
A27430   Finishing Activity Related Zone 17 Finalization
A27450   Finishing Activity Related Zone 44 Finalization
A27470   Finishing Activity Related Zone 42 Finalization
A27490   Finishing Activity Related Zone 9 Finalization
A27510   Finishing Activity Related Zone 21 Finalization
A27530   Finishing Activity Related Zone 27 Finalization
A27550   Finishing Activity Related Zone 38 Finalization
A27570   Finishing Activity Related Zone 14 Finalization
A27590   Finishing Activity Related Zone 30 Finalization
A27610   Finishing Activity Related Zone 40 Finalization
A27650   Finishing Activity Related Zone 24 Finalization
A27670   Finishing Activity Related Zone 34 Finalization
A27690   Finishing Activity Related Zone 36 Finalization
A27710   Finishing Activity Related Zone 39 Finalization
A27730   Finishing Activity Related Zone 11 Finalization
A27750   Finishing Activity Related Zone 22 Finalization
A27810   Finishing Activity Related Zone 15 Finalization
A27830   Finishing Activity Related Zone 25 Finalization
A27850   Finishing Activity Related Zone 33 Finalization
A27890   Finishing Activity Related Zone 18 Finalization
A27910   Finishing Activity Related Zone 35 Finalization
A27970   Finishing Activity Related Zone 28 Finalization
A27990   Finishing Activity Related Zone 41 Finalization
A28010   Finishing Activity Related Zone 45 Finalization
A28050   Finishing Activity Related Zone 19 Finalization
A28070   Finishing Activity Related Zone 43 Finalization
A28130   Finishing Activity Related Zone 31 Finalization
A28140   Final Pressure Test and Handover to Employer of Zone 47
A28150   Finishing Activity Related Zone 47 Finalization
A28210   Finishing Activity Related Zone 37 Finalization
A28270   Finishing Activity Related Zone 10 Finalization
A2890    Finishing Activity Related Zone 3 Finalization
A3010    Relocate Electrical Cable at Zone 4
A3040    Relocate Existing Septic Tanks (if any) at Zone 4
A3070    Relocate Existing Sewer Line (if any) at Zone 4
A3240    Installation of 160 mm Pipe at Zone 4
A3260    Installation of 250 mm Pipe at Zone 4
A3290    Asphalt Works at Zone 4
A3590    Relocate Electrical Cable at Zone 5
A3620    Relocate Existing Septic Tanks (if any) at Zone 5
A3650    Relocate Existing Sewer Line (if any) at Zone 5
A3870    Asphalt Works at Zone 5
A4140    Relocate Electrical Cable at Zone 6
A4170    Relocate Existing Septic Tanks (if any) at Zone 6
A4200    Relocate Existing Sewer Line (if any) at Zone 6
A4420    Asphalt Works at Zone 6
A4690    Relocate Electrical Cable at Zone 7
A4720    Relocate Existing Septic Tanks (if any) at Zone 7
A4750   Relocate Existing Sewer Line (if any) at Zone 7
A4910   Installation of 110 mm Pipe at Zone 7
A4920   Installation of 160 mm Pipe at Zone 7
A4940   Installation of 250 mm Pipe at Zone 7
A4970   Asphalt Works at Zone 7
A5240   Relocate Electrical Cable at Zone 8
A5270   Relocate Existing Septic Tanks (if any) at Zone 8
A5300   Relocate Existing Sewer Line (if any) at Zone 8
A5460   Installation of 110 mm Pipe at Zone 8
A5470   Installation of 160 mm Pipe at Zone 8
A5490   Installation of 250 mm Pipe at Zone 8
A5520   Asphalt Works at Zone 8
A5790   Relocate Electrical Cable at Zone 9
A5820   Relocate Existing Septic Tanks (if any) at Zone 9
A5850   Relocate Existing Sewer Line (if any) at Zone 9
A6020   Installation of 160 mm Pipe at Zone 9
A6040   Installation of 250 mm Pipe at Zone 9
A6070   Asphalt Works at Zone 9
A6340   Relocate Electrical Cable at Zone 10
A6370   Relocate Existing Septic Tanks (if any) at Zone 10
A6400   Relocate Existing Sewer Line (if any) at Zone 10
A6560   Installation of 110 mm Pipe at Zone 10
A6570   Installation of 160 mm Pipe at Zone 10
A6590   Installation of 250 mm Pipe at Zone 10
A6620   Asphalt Works at Zone 10
A6890   Relocate Electrical Cable at Zone 11
A6920   Relocate Existing Septic Tanks (if any) at Zone 11
A6950   Relocate Existing Sewer Line (if any) at Zone 11
A7120   Installation of 160 mm Pipe at Zone 11
A7140   Installation of 250 mm Pipe at Zone 11
A7170   Asphalt Works at Zone 11
A7440   Relocate Electrical Cable at Zone 12
A7470   Relocate Existing Septic Tanks (if any) at Zone 12
A7500   Relocate Existing Sewer Line (if any) at Zone 12
A7660   Installation of 110 mm Pipe at Zone 12
A7670   Installation of 160 mm Pipe at Zone 12
A7690   Installation of 250 mm Pipe at Zone 12
A7720   Asphalt Works at Zone 12
A7990   Relocate Electrical Cable at Zone 13
A8020   Relocate Existing Septic Tanks (if any) at Zone 13
A8050   Relocate Existing Sewer Line (if any) at Zone 13
A8220   Installation of 160 mm Pipe at Zone 13
A8240   Installation of 250 mm Pipe at Zone 13
A8270   Asphalt Works at Zone 13
A8540   Relocate Electrical Cable at Zone 14
A8570   Relocate Existing Septic Tanks (if any) at Zone 14
A8600   Relocate Existing Sewer Line (if any) at Zone 14
A8770   Installation of 160 mm Pipe at Zone 14
A8790   Installation of 250 mm Pipe at Zone 14
A8820   Asphalt Works at Zone 14
A9090   Relocate Electrical Cable at Zone 15
A9120   Relocate Existing Septic Tanks (if any) at Zone 15
A9150   Relocate Existing Sewer Line (if any) at Zone 15
A9320   Installation of 160 mm Pipe at Zone 15
A9370   Asphalt Works at Zone 15
A9640   Relocate Electrical Cable at Zone 16
A9670   Relocate Existing Septic Tanks (if any) at Zone 16
A9700   Relocate Existing Sewer Line (if any) at Zone 16
A9870   Installation of 160 mm Pipe at Zone 16
A9890   Installation of 250 mm Pipe at Zone 16
A9920   Asphalt Works at Zone 16
Item1   Item2   Item3
10      8       Daily hours values in the Resources calendar are not the same as in the Activities calendar.
60      48      Weekly hours values in the Resources calendar are not the same as in the Activities calendar.
ctivities calendar.
 Activities calendar.
Item1    Item2
A10320   Excavation for 250 mm Pipe at Zone 17
A10350   Bed Preparation for 200 mm Pipe at Zone 17
A10360   Bed Preparation for 250 mm Pipe at Zone 17
A10390   Backfilling after Pressure Test of 200 mm Pipe at Zone 17
A10610   Installation of Fire Hydrant at Zone 17
A10870   Excavation for 250 mm Pipe at Zone 18
A10880   Bed Preparation for 110 mm Pipe at Zone 18
A10900   Bed Preparation for 200 mm Pipe at Zone 18
A10910   Bed Preparation for 250 mm Pipe at Zone 18
A10920   Backfilling after Pressure Test of 110 mm Pipe at Zone 18
A10940   Backfilling after Pressure Test of 200 mm Pipe at Zone 18
A13070   Excavation for 250 mm Pipe at Zone 22
A13110   Bed Preparation for 250 mm Pipe at Zone 22
A17470   Excavation for 250 mm Pipe at Zone 30
A19670   Excavation for 250 mm Pipe at Zone 34
A19680   Bed Preparation for 110 mm Pipe at Zone 34
A19710   Bed Preparation for 250 mm Pipe at Zone 34
A19720   Backfilling after Pressure Test of 110 mm Pipe at Zone 34
A27580   Final Pressure Test and Handover to Employer of Zone 30
A28140   Final Pressure Test and Handover to Employer of Zone 47
A3140    Excavation for 250 mm Pipe at Zone 4
A3180    Bed Preparation for 250 mm Pipe at Zone 4
A5920    Excavation for 250 mm Pipe at Zone 9
A6470    Excavation for 250 mm Pipe at Zone 10
A7020    Excavation for 250 mm Pipe at Zone 11
A7050    Bed Preparation for 200 mm Pipe at Zone 11
A7060    Bed Preparation for 250 mm Pipe at Zone 11
A7090    Backfilling after Pressure Test of 200 mm Pipe at Zone 11
A9220    Excavation for 250 mm Pipe at Zone 15
A9770    Excavation for 250 mm Pipe at Zone 16
A9810    Bed Preparation for 250 mm Pipe at Zone 16