0% found this document useful (0 votes)
12 views63 pages

Report

Uploaded by

alielardi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
12 views63 pages

Report

Uploaded by

alielardi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 63

Item1 Item2

A28860 Submission for Approval of Working Drawing for Zone 1


A28880 Submission for Approval of Working Drawing for Zone 2
A28900 Submission for Approval of Working Drawing for Zone 3
A28920 Submission for Approval of Working Drawing for Zone 4
Item1 Item2
EXV|11124Excavator
CMP|1112Compactor
DTR|11124Dump Truck
GRD|1112Grader
ASP|11124Asphalt Paver
MCR|1112Mobile Crane
LBR|11124Labor/Helper
SKL|11124Skilled Labor/Helper
FRM|1112Foreman
EQO|1112Eq. Operator
MAS|1112Mason
PLW|1112Pipe Laying Worker
31.1.1.1|1 Geotextile (non-woven)
31.1.2.1|1 Trench Excavation upto 1.5m
31.1.2.2|1 Trench Excavation above 1.5m
31.1.3.1|1 Bedding and Backfill for Pipes
31.1.3.2|1 Backfill for Utility Trenches
31.1.3.3|1 Subgrade Layer
32.1|1112 Curbs Reinstatement for Pier Trenches
32.2|1112 Curb Stone Tiles Reinstatement
32.3|1112 Curbs Reinstatement as per Authorities Instruction
32.4.1|11 Ordinary asphalting Type ""A""
32.4.2|11 Ordinary asphalting Type ""B""
32.4.3|11 Ordinary asphalting Type ""C""
32.4.4|11 Type ""A"" asphalting with spreading machine
32.4.5|11 Type ""B"" asphalting with spreading machine
32.4.6|11 Type ""C"" asphalting with spreading machine
32.4.7|11 Type ""A"" asphalting with spreading machine and milling machines
33.2.1.1|1 HDPE Pipe 110 mm dia
33.2.1.2|1 HDPE Pipe 160 mm dia
33.2.1.3|1 HDPE Pipe 200 mm dia
33.2.2.1|1 Ductile Iron Pipe 250 mm dia
33.1.4.1|1 Gate Valves dia 100 mm
33.1.4.1-A Gate Valves dia 150 mm
33.1.4.3|1 Gate Valves dia 200 mm
33.2.5.1|1 Supply and Install Butterfly valve dia. 250 mm
33.2.5.7|1 Supply and Install Butterfly valve Actuator
33.2.6.1|1 Supply and Install Air valve dia 40 mm on pipes dia<300mm
33.2.7.1|1 Washout Valve dia 100 mm on pipes dia 100 mm -400 mm
33.2.8.1|1 2- outlet fire hydrant (2X65mm)
33.2.9.1|1 Single isolating valve champter type 1
33.2.10.1 Air Valve Chamber Type (1)
33.2.11|1 Chamber for washout Valves
33.2.12.1 Relocating of Telephone Lines
33.2.12.2 Relocating of Fiber Optic Cables
33.2.12.3 Relocating of low voltage electrical cables (<500 V)
33.2.12.4 Relocating of low voltage electrical cables (>500 V)
33.2.12.5. Relocating existing water supply lines diameter up to 160 mm
33.2.12.5. Relocating existing water supply lines diameter between 160 mm to 300 mm
33.2.12.5. Relocating existing water supply lines diameter between 300 mm to 600 mm
33.2.12.6. Relocating existing drainage lines diameter 500 mm
33.2.12.7. Relocating existing sewer lines diameter 300 mm
33.2.12.7. Relocating existing sewer lines diameter 400 mm
33.2.12.7. Relocating existing sewer lines diameter 500 mm
33.2.12.8. Removal of Septic Tanks up to 20 sqm surface area
33.2.12.8. Removal of Septic Tanks greater 20 sqm surface area
33.2.12.9. Partial Removal of Septic Tanks
Item1 Item2
A10040 Notify clients and vendors (if any) at Zone 16 Area Water Supply Authorities
A10090 Site Clearing and Grubbing at Zone 17
A1010 Site Clearing and Grubbing at Zone 1
A10110 Notify clients and vendors at Zone 17 Area Telepone Lines Authorities
A10130 Joint Survey with Consultant at Zone 17
A10150 Notify clients and vendors at Zone 17 Area Fiber Optics Cable Authorities
A10180 Notify clients and vendors at Zone 17 Area Electrical Cable Authorities
A10210 Notify clients and vendors (if any) for Zone 17 Area Authorities
A10240 Notify clients and vendors (if any) for at Zone 17 Area Reponsible Organization
A10270 Notify clients and vendors (if any) at Zone 17 Area Drainage Authorities
A10450 Pressure Test at Zone 17 for 110 mm Pipe
A10490 Pressure Test at Zone 17 for 160 mm Pipe
A10500 Pressure Test at Zone 17 for 200 mm Pipe
A10510 Pressure Test at Zone 17 for 250 mm Pipe
A10590 Notify clients and vendors (if any) at Zone 17 Area Water Supply Authorities
A10640 Site Clearing and Grubbing at Zone 18
A10660 Notify clients and vendors at Zone 18 Area Telepone Lines Authorities
A10680 Joint Survey with Consultant at Zone 18
A10700 Notify clients and vendors at Zone 18 Area Fiber Optics Cable Authorities
A10730 Notify clients and vendors at Zone 18 Area Electrical Cable Authorities
A10760 Notify clients and vendors (if any) for Zone 18 Area Authorities
A10790 Notify clients and vendors (if any) for at Zone 18 Area Reponsible Organization
A10820 Notify clients and vendors (if any) at Zone 18 Area Drainage Authorities
A1090 Contractor Office and Accomodation Facilities for Staff
A1100 Survey Works
A11000 Pressure Test at Zone 18 for 110 mm Pipe
A11040 Pressure Test at Zone 18 for 160 mm Pipe
A11050 Pressure Test at Zone 18 for 200 mm Pipe
A11060 Pressure Test at Zone 18 for 250 mm Pipe
A11140 Notify clients and vendors (if any) at Zone 18 Area Water Supply Authorities
A11190 Site Clearing and Grubbing at Zone 19
A1120 Joint Survey with Consultant at Zone 1
A11210 Notify clients and vendors at Zone 19 Area Telepone Lines Authorities
A11230 Joint Survey with Consultant at Zone 19
A11250 Notify clients and vendors at Zone 19 Area Fiber Optics Cable Authorities
A11280 Notify clients and vendors at Zone 19 Area Electrical Cable Authorities
A1130 Yard Preparation
A11310 Notify clients and vendors (if any) for Zone 19 Area Authorities
A11340 Notify clients and vendors (if any) for at Zone 19 Area Reponsible Organization
A11370 Notify clients and vendors (if any) at Zone 19 Area Drainage Authorities
A1150 Notify clients and vendors at Zone 1 Area Telepone Lines Authorities
A11550 Pressure Test at Zone 19 for 110 mm Pipe
A11590 Pressure Test at Zone 19 for 160 mm Pipe
A11600 Pressure Test at Zone 19 for 200 mm Pipe
A11610 Pressure Test at Zone 19 for 250 mm Pipe
A11690 Notify clients and vendors (if any) at Zone 19 Area Water Supply Authorities
A1180 Notify clients and vendors at Zone 1 Area Fiber Optics Cable Authorities
A1210 Notify clients and vendors at Zone 1 Area Electrical Cable Authorities
A12290 Site Clearing and Grubbing at Zone 21
A12310 Notify clients and vendors at Zone 21 Area Telepone Lines Authorities
A12330 Joint Survey with Consultant at Zone 21
A12350 Notify clients and vendors at Zone 21 Area Fiber Optics Cable Authorities
A12380 Notify clients and vendors at Zone 21 Area Electrical Cable Authorities
A1240 Notify clients and vendors (if any) for Zone 1 Area Authorities
A12410 Notify clients and vendors (if any) for Zone 21 Area Authorities
A12440 Notify clients and vendors (if any) for at Zone 21 Area Reponsible Organization
A12470 Notify clients and vendors (if any) at Zone 21 Area Drainage Authorities
A12650 Pressure Test at Zone 21 for 110 mm Pipe
A12690 Pressure Test at Zone 21 for 160 mm Pipe
A1270 Notify clients and vendors (if any) for at Zone 1 Area Reponsible Organization
A12700 Pressure Test at Zone 21 for 200 mm Pipe
A12710 Pressure Test at Zone 21 for 250 mm Pipe
A12790 Notify clients and vendors (if any) at Zone 21 Area Water Supply Authorities
A12840 Site Clearing and Grubbing at Zone 22
A12860 Notify clients and vendors at Zone 22 Area Telepone Lines Authorities
A12880 Joint Survey with Consultant at Zone 22
A12900 Notify clients and vendors at Zone 22 Area Fiber Optics Cable Authorities
A12930 Notify clients and vendors at Zone 22 Area Electrical Cable Authorities
A12960 Notify clients and vendors (if any) for Zone 22 Area Authorities
A12990 Notify clients and vendors (if any) for at Zone 22 Area Reponsible Organization
A1300 Notify clients and vendors (if any) at Zone 1 Area Drainage Authorities
A13020 Notify clients and vendors (if any) at Zone 22 Area Drainage Authorities
A13200 Pressure Test at Zone 22 for 110 mm Pipe
A13240 Pressure Test at Zone 22 for 160 mm Pipe
A13250 Pressure Test at Zone 22 for 200 mm Pipe
A13260 Pressure Test at Zone 22 for 250 mm Pipe
A13340 Notify clients and vendors (if any) at Zone 22 Area Water Supply Authorities
A13390 Site Clearing and Grubbing at Zone 23
A13410 Notify clients and vendors at Zone 23 Area Telepone Lines Authorities
A13430 Joint Survey with Consultant at Zone 23
A13450 Notify clients and vendors at Zone 23 Area Fiber Optics Cable Authorities
A13480 Notify clients and vendors at Zone 23 Area Electrical Cable Authorities
A13510 Notify clients and vendors (if any) for Zone 23 Area Authorities
A13540 Notify clients and vendors (if any) for at Zone 23 Area Reponsible Organization
A13570 Notify clients and vendors (if any) at Zone 23 Area Drainage Authorities
A13750 Pressure Test at Zone 23 for 110 mm Pipe
A13790 Pressure Test at Zone 23 for 160 mm Pipe
A13800 Pressure Test at Zone 23 for 200 mm Pipe
A13810 Pressure Test at Zone 23 for 250 mm Pipe
A13890 Notify clients and vendors (if any) at Zone 23 Area Water Supply Authorities
A1390 Safety Management Establishment
A13940 Site Clearing and Grubbing at Zone 24
A13960 Notify clients and vendors at Zone 24 Area Telepone Lines Authorities
A13980 Joint Survey with Consultant at Zone 24
A14000 Notify clients and vendors at Zone 24 Area Fiber Optics Cable Authorities
A14030 Notify clients and vendors at Zone 24 Area Electrical Cable Authorities
A14060 Notify clients and vendors (if any) for Zone 24 Area Authorities
A14090 Notify clients and vendors (if any) for at Zone 24 Area Reponsible Organization
A14120 Notify clients and vendors (if any) at Zone 24 Area Drainage Authorities
A14300 Pressure Test at Zone 24 for 110 mm Pipe
A14340 Pressure Test at Zone 24 for 160 mm Pipe
A14350 Pressure Test at Zone 24 for 200 mm Pipe
A14360 Pressure Test at Zone 24 for 250 mm Pipe
A14440 Notify clients and vendors (if any) at Zone 24 Area Water Supply Authorities
A14490 Site Clearing and Grubbing at Zone 25
A14510 Notify clients and vendors at Zone 25 Area Telepone Lines Authorities
A14530 Joint Survey with Consultant at Zone 25
A14550 Notify clients and vendors at Zone 25 Area Fiber Optics Cable Authorities
A14580 Notify clients and vendors at Zone 25 Area Electrical Cable Authorities
A14610 Notify clients and vendors (if any) for Zone 25 Area Authorities
A14640 Notify clients and vendors (if any) for at Zone 25 Area Reponsible Organization
A14670 Notify clients and vendors (if any) at Zone 25 Area Drainage Authorities
A14850 Pressure Test at Zone 25 for 110 mm Pipe
A14890 Pressure Test at Zone 25 for 160 mm Pipe
A14900 Pressure Test at Zone 25 for 200 mm Pipe
A14910 Pressure Test at Zone 25 for 250 mm Pipe
A14990 Notify clients and vendors (if any) at Zone 25 Area Water Supply Authorities
A1500 Pressure Test at Zone 1 for 110 mm Pipe
A15040 Site Clearing and Grubbing at Zone 26
A15060 Notify clients and vendors at Zone 26 Area Telepone Lines Authorities
A15080 Joint Survey with Consultant at Zone 26
A15100 Notify clients and vendors at Zone 26 Area Fiber Optics Cable Authorities
A15130 Notify clients and vendors at Zone 26 Area Electrical Cable Authorities
A15160 Notify clients and vendors (if any) for Zone 26 Area Authorities
A15190 Notify clients and vendors (if any) for at Zone 26 Area Reponsible Organization
A15220 Notify clients and vendors (if any) at Zone 26 Area Drainage Authorities
A1540 Pressure Test at Zone 1 for 160 mm Pipe
A15400 Pressure Test at Zone 26 for 110 mm Pipe
A15440 Pressure Test at Zone 26 for 160 mm Pipe
A15450 Pressure Test at Zone 26 for 200 mm Pipe
A15460 Pressure Test at Zone 26 for 250 mm Pipe
A1550 Pressure Test at Zone 1 for 200 mm Pipe
A15540 Notify clients and vendors (if any) at Zone 26 Area Water Supply Authorities
A15590 Site Clearing and Grubbing at Zone 27
A1560 Pressure Test at Zone 1 for 250 mm Pipe
A15610 Notify clients and vendors at Zone 27 Area Telepone Lines Authorities
A15630 Joint Survey with Consultant at Zone 27
A15650 Notify clients and vendors at Zone 27 Area Fiber Optics Cable Authorities
A15680 Notify clients and vendors at Zone 27 Area Electrical Cable Authorities
A1570 Final Pressure Test and Handover to Employer of Zone 1
A15710 Notify clients and vendors (if any) for Zone 27 Area Authorities
A15740 Notify clients and vendors (if any) for at Zone 27 Area Reponsible Organization
A15770 Notify clients and vendors (if any) at Zone 27 Area Drainage Authorities
A1580 Signing the receipt reports
A15950 Pressure Test at Zone 27 for 110 mm Pipe
A15990 Pressure Test at Zone 27 for 160 mm Pipe
A16000 Pressure Test at Zone 27 for 200 mm Pipe
A16010 Pressure Test at Zone 27 for 250 mm Pipe
A16090 Notify clients and vendors (if any) at Zone 27 Area Water Supply Authorities
A16140 Site Clearing and Grubbing at Zone 28
A16160 Notify clients and vendors at Zone 28 Area Telepone Lines Authorities
A16180 Joint Survey with Consultant at Zone 28
A16200 Notify clients and vendors at Zone 28 Area Fiber Optics Cable Authorities
A16230 Notify clients and vendors at Zone 28 Area Electrical Cable Authorities
A16260 Notify clients and vendors (if any) for Zone 28 Area Authorities
A16290 Notify clients and vendors (if any) for at Zone 28 Area Reponsible Organization
A16320 Notify clients and vendors (if any) at Zone 28 Area Drainage Authorities
A1640 As built Drawing Preparation and Submission for Approval for Zone 1
A16500 Pressure Test at Zone 28 for 110 mm Pipe
A16540 Pressure Test at Zone 28 for 160 mm Pipe
A16550 Pressure Test at Zone 28 for 200 mm Pipe
A16560 Pressure Test at Zone 28 for 250 mm Pipe
A16640 Notify clients and vendors (if any) at Zone 28 Area Water Supply Authorities
A16690 Site Clearing and Grubbing at Zone 29
A16710 Notify clients and vendors at Zone 29 Area Telepone Lines Authorities
A16730 Joint Survey with Consultant at Zone 29
A16750 Notify clients and vendors at Zone 29 Area Fiber Optics Cable Authorities
A16780 Notify clients and vendors at Zone 29 Area Electrical Cable Authorities
A1680 Notify clients and vendors (if any) at Zone 1 Area Water Supply Authorities
A16810 Notify clients and vendors (if any) for Zone 29 Area Authorities
A16840 Notify clients and vendors (if any) for at Zone 29 Area Reponsible Organization
A16870 Notify clients and vendors (if any) at Zone 29 Area Drainage Authorities
A17050 Pressure Test at Zone 29 for 110 mm Pipe
A17090 Pressure Test at Zone 29 for 160 mm Pipe
A17100 Pressure Test at Zone 29 for 200 mm Pipe
A17110 Pressure Test at Zone 29 for 250 mm Pipe
A17190 Notify clients and vendors (if any) at Zone 29 Area Water Supply Authorities
A17240 Site Clearing and Grubbing at Zone 30
A17260 Notify clients and vendors at Zone 30 Area Telepone Lines Authorities
A17280 Joint Survey with Consultant at Zone 30
A17300 Notify clients and vendors at Zone 30 Area Fiber Optics Cable Authorities
A17330 Notify clients and vendors at Zone 30 Area Electrical Cable Authorities
A17360 Notify clients and vendors (if any) for Zone 30 Area Authorities
A17390 Notify clients and vendors (if any) for at Zone 30 Area Reponsible Organization
A17420 Notify clients and vendors (if any) at Zone 30 Area Drainage Authorities
A1750 Final Pressure Test and Handover to Employer of Zone 2
A17600 Pressure Test at Zone 30 for 110 mm Pipe
A17640 Pressure Test at Zone 30 for 160 mm Pipe
A17650 Pressure Test at Zone 30 for 200 mm Pipe
A17660 Pressure Test at Zone 30 for 250 mm Pipe
A1770 As built Drawing Preparation and Submission for Approval for Zone 2
A17740 Notify clients and vendors (if any) at Zone 30 Area Water Supply Authorities
A17790 Site Clearing and Grubbing at Zone 31
A1780 Site Clearing and Grubbing at Zone 2
A17810 Notify clients and vendors at Zone 31 Area Telepone Lines Authorities
A17830 Joint Survey with Consultant at Zone 31
A17850 Notify clients and vendors at Zone 31 Area Fiber Optics Cable Authorities
A17880 Notify clients and vendors at Zone 31 Area Electrical Cable Authorities
A17910 Notify clients and vendors (if any) for Zone 31 Area Authorities
A17940 Notify clients and vendors (if any) for at Zone 31 Area Reponsible Organization
A17970 Notify clients and vendors (if any) at Zone 31 Area Drainage Authorities
A1800 Notify clients and vendors at Zone 2 Area Telepone Lines Authorities
A18150 Pressure Test at Zone 31 for 110 mm Pipe
A18190 Pressure Test at Zone 31 for 160 mm Pipe
A1820 Joint Survey with Consultant at Zone 2
A18200 Pressure Test at Zone 31 for 200 mm Pipe
A18210 Pressure Test at Zone 31 for 250 mm Pipe
A18290 Notify clients and vendors (if any) at Zone 31 Area Water Supply Authorities
A18340 Site Clearing and Grubbing at Zone 32
A18360 Notify clients and vendors at Zone 32 Area Telepone Lines Authorities
A18380 Joint Survey with Consultant at Zone 32
A1840 Notify clients and vendors at Zone 2 Area Fiber Optics Cable Authorities
A18400 Notify clients and vendors at Zone 32 Area Fiber Optics Cable Authorities
A18430 Notify clients and vendors at Zone 32 Area Electrical Cable Authorities
A18460 Notify clients and vendors (if any) for Zone 32 Area Authorities
A18490 Notify clients and vendors (if any) for at Zone 32 Area Reponsible Organization
A18520 Notify clients and vendors (if any) at Zone 32 Area Drainage Authorities
A1870 Notify clients and vendors at Zone 2 Area Electrical Cable Authorities
A18700 Pressure Test at Zone 32 for 110 mm Pipe
A18740 Pressure Test at Zone 32 for 160 mm Pipe
A18750 Pressure Test at Zone 32 for 200 mm Pipe
A18760 Pressure Test at Zone 32 for 250 mm Pipe
A18840 Notify clients and vendors (if any) at Zone 32 Area Water Supply Authorities
A18890 Site Clearing and Grubbing at Zone 33
A18910 Notify clients and vendors at Zone 33 Area Telepone Lines Authorities
A18930 Joint Survey with Consultant at Zone 33
A18950 Notify clients and vendors at Zone 33 Area Fiber Optics Cable Authorities
A18980 Notify clients and vendors at Zone 33 Area Electrical Cable Authorities
A1900 Notify clients and vendors (if any) for Zone 2 Area Authorities
A19010 Notify clients and vendors (if any) for Zone 33 Area Authorities
A19040 Notify clients and vendors (if any) for at Zone 33 Area Reponsible Organization
A19070 Notify clients and vendors (if any) at Zone 33 Area Drainage Authorities
A19250 Pressure Test at Zone 33 for 110 mm Pipe
A19290 Pressure Test at Zone 33 for 160 mm Pipe
A1930 Notify clients and vendors (if any) for at Zone 2 Area Reponsible Organization
A19300 Pressure Test at Zone 33 for 200 mm Pipe
A19310 Pressure Test at Zone 33 for 250 mm Pipe
A19390 Notify clients and vendors (if any) at Zone 33 Area Water Supply Authorities
A19440 Site Clearing and Grubbing at Zone 34
A19460 Notify clients and vendors at Zone 34 Area Telepone Lines Authorities
A19480 Joint Survey with Consultant at Zone 34
A19500 Notify clients and vendors at Zone 34 Area Fiber Optics Cable Authorities
A19530 Notify clients and vendors at Zone 34 Area Electrical Cable Authorities
A19560 Notify clients and vendors (if any) for Zone 34 Area Authorities
A19590 Notify clients and vendors (if any) for at Zone 34 Area Reponsible Organization
A1960 Notify clients and vendors (if any) at Zone 2 Area Drainage Authorities
A19620 Notify clients and vendors (if any) at Zone 34 Area Drainage Authorities
A19800 Pressure Test at Zone 34 for 110 mm Pipe
A19840 Pressure Test at Zone 34 for 160 mm Pipe
A19850 Pressure Test at Zone 34 for 200 mm Pipe
A19860 Pressure Test at Zone 34 for 250 mm Pipe
A19940 Notify clients and vendors (if any) at Zone 34 Area Water Supply Authorities
A19990 Site Clearing and Grubbing at Zone 35
A20010 Notify clients and vendors at Zone 35 Area Telepone Lines Authorities
A20030 Joint Survey with Consultant at Zone 35
A20050 Notify clients and vendors at Zone 35 Area Fiber Optics Cable Authorities
A20080 Notify clients and vendors at Zone 35 Area Electrical Cable Authorities
A20110 Notify clients and vendors (if any) for Zone 35 Area Authorities
A20140 Notify clients and vendors (if any) for at Zone 35 Area Reponsible Organization
A20170 Notify clients and vendors (if any) at Zone 35 Area Drainage Authorities
A20350 Pressure Test at Zone 35 for 110 mm Pipe
A20390 Pressure Test at Zone 35 for 160 mm Pipe
A20400 Pressure Test at Zone 35 for 200 mm Pipe
A20410 Pressure Test at Zone 35 for 250 mm Pipe
A20490 Notify clients and vendors (if any) at Zone 35 Area Water Supply Authorities
A20540 Site Clearing and Grubbing at Zone 36
A20560 Notify clients and vendors at Zone 36 Area Telepone Lines Authorities
A20580 Joint Survey with Consultant at Zone 36
A20600 Notify clients and vendors at Zone 36 Area Fiber Optics Cable Authorities
A20630 Notify clients and vendors at Zone 36 Area Electrical Cable Authorities
A20660 Notify clients and vendors (if any) for Zone 36 Area Authorities
A20690 Notify clients and vendors (if any) for at Zone 36 Area Reponsible Organization
A20720 Notify clients and vendors (if any) at Zone 36 Area Drainage Authorities
A20900 Pressure Test at Zone 36 for 110 mm Pipe
A20940 Pressure Test at Zone 36 for 160 mm Pipe
A20950 Pressure Test at Zone 36 for 200 mm Pipe
A20960 Pressure Test at Zone 36 for 250 mm Pipe
A21040 Notify clients and vendors (if any) at Zone 36 Area Water Supply Authorities
A21090 Site Clearing and Grubbing at Zone 37
A21110 Notify clients and vendors at Zone 37 Area Telepone Lines Authorities
A21130 Joint Survey with Consultant at Zone 37
A21150 Notify clients and vendors at Zone 37 Area Fiber Optics Cable Authorities
A21180 Notify clients and vendors at Zone 37 Area Electrical Cable Authorities
A21210 Notify clients and vendors (if any) for Zone 37 Area Authorities
A21240 Notify clients and vendors (if any) for at Zone 37 Area Reponsible Organization
A21270 Notify clients and vendors (if any) at Zone 37 Area Drainage Authorities
A2140 Pressure Test at Zone 2 for 110 mm Pipe
A21450 Pressure Test at Zone 37 for 110 mm Pipe
A21490 Pressure Test at Zone 37 for 160 mm Pipe
A21500 Pressure Test at Zone 37 for 200 mm Pipe
A21510 Pressure Test at Zone 37 for 250 mm Pipe
A21590 Notify clients and vendors (if any) at Zone 37 Area Water Supply Authorities
A21640 Site Clearing and Grubbing at Zone 38
A21660 Notify clients and vendors at Zone 38 Area Telepone Lines Authorities
A21680 Joint Survey with Consultant at Zone 38
A21700 Notify clients and vendors at Zone 38 Area Fiber Optics Cable Authorities
A21730 Notify clients and vendors at Zone 38 Area Electrical Cable Authorities
A21760 Notify clients and vendors (if any) for Zone 38 Area Authorities
A21790 Notify clients and vendors (if any) for at Zone 38 Area Reponsible Organization
A2180 Pressure Test at Zone 2 for 160 mm Pipe
A21820 Notify clients and vendors (if any) at Zone 38 Area Drainage Authorities
A2190 Pressure Test at Zone 2 for 200 mm Pipe
A22000 Pressure Test at Zone 38 for 110 mm Pipe
A22040 Pressure Test at Zone 38 for 160 mm Pipe
A22050 Pressure Test at Zone 38 for 200 mm Pipe
A22060 Pressure Test at Zone 38 for 250 mm Pipe
A22140 Notify clients and vendors (if any) at Zone 38 Area Water Supply Authorities
A22190 Site Clearing and Grubbing at Zone 39
A22210 Notify clients and vendors at Zone 39 Area Telepone Lines Authorities
A22230 Joint Survey with Consultant at Zone 39
A22250 Notify clients and vendors at Zone 39 Area Fiber Optics Cable Authorities
A22280 Notify clients and vendors at Zone 39 Area Electrical Cable Authorities
A22310 Notify clients and vendors (if any) for Zone 39 Area Authorities
A22340 Notify clients and vendors (if any) for at Zone 39 Area Reponsible Organization
A22370 Notify clients and vendors (if any) at Zone 39 Area Drainage Authorities
A22550 Pressure Test at Zone 39 for 110 mm Pipe
A22590 Pressure Test at Zone 39 for 160 mm Pipe
A22600 Pressure Test at Zone 39 for 200 mm Pipe
A22610 Pressure Test at Zone 39 for 250 mm Pipe
A22690 Notify clients and vendors (if any) at Zone 39 Area Water Supply Authorities
A22740 Site Clearing and Grubbing at Zone 40
A22760 Notify clients and vendors at Zone 40 Area Telepone Lines Authorities
A22780 Joint Survey with Consultant at Zone 40
A2280 Notify clients and vendors (if any) at Zone 2 Area Water Supply Authorities
A22800 Notify clients and vendors at Zone 40 Area Fiber Optics Cable Authorities
A22830 Notify clients and vendors at Zone 40 Area Electrical Cable Authorities
A22860 Notify clients and vendors (if any) for Zone 40 Area Authorities
A22890 Notify clients and vendors (if any) for at Zone 40 Area Reponsible Organization
A22920 Notify clients and vendors (if any) at Zone 40 Area Drainage Authorities
A23100 Pressure Test at Zone 40 for 110 mm Pipe
A23140 Pressure Test at Zone 40 for 160 mm Pipe
A23150 Pressure Test at Zone 40 for 200 mm Pipe
A23160 Pressure Test at Zone 40 for 250 mm Pipe
A23240 Notify clients and vendors (if any) at Zone 40 Area Water Supply Authorities
A23290 Site Clearing and Grubbing at Zone 41
A2330 Site Clearing and Grubbing at Zone 3
A23310 Notify clients and vendors at Zone 41 Area Telepone Lines Authorities
A23330 Joint Survey with Consultant at Zone 41
A23350 Notify clients and vendors at Zone 41 Area Fiber Optics Cable Authorities
A23380 Notify clients and vendors at Zone 41 Area Electrical Cable Authorities
A23410 Notify clients and vendors (if any) for Zone 41 Area Authorities
A23440 Notify clients and vendors (if any) for at Zone 41 Area Reponsible Organization
A23470 Notify clients and vendors (if any) at Zone 41 Area Drainage Authorities
A2350 Notify clients and vendors at Zone 3 Area Telepone Lines Authorities
A23650 Pressure Test at Zone 41 for 110 mm Pipe
A23690 Pressure Test at Zone 41 for 160 mm Pipe
A2370 Joint Survey with Consultant at Zone 3
A23700 Pressure Test at Zone 41 for 200 mm Pipe
A23710 Pressure Test at Zone 41 for 250 mm Pipe
A23790 Notify clients and vendors (if any) at Zone 41 Area Water Supply Authorities
A23840 Site Clearing and Grubbing at Zone 42
A23860 Notify clients and vendors at Zone 42 Area Telepone Lines Authorities
A23880 Joint Survey with Consultant at Zone 42
A2390 Notify clients and vendors at Zone 3 Area Fiber Optics Cable Authorities
A23900 Notify clients and vendors at Zone 42 Area Fiber Optics Cable Authorities
A23930 Notify clients and vendors at Zone 42 Area Electrical Cable Authorities
A23960 Notify clients and vendors (if any) for Zone 42 Area Authorities
A23990 Notify clients and vendors (if any) for at Zone 42 Area Reponsible Organization
A24020 Notify clients and vendors (if any) at Zone 42 Area Drainage Authorities
A2420 Notify clients and vendors at Zone 3 Area Electrical Cable Authorities
A24200 Pressure Test at Zone 42 for 110 mm Pipe
A24240 Pressure Test at Zone 42 for 160 mm Pipe
A24250 Pressure Test at Zone 42 for 200 mm Pipe
A24260 Pressure Test at Zone 42 for 250 mm Pipe
A24340 Notify clients and vendors (if any) at Zone 42 Area Water Supply Authorities
A24390 Site Clearing and Grubbing at Zone 43
A24410 Notify clients and vendors at Zone 43 Area Telepone Lines Authorities
A24430 Joint Survey with Consultant at Zone 43
A24450 Notify clients and vendors at Zone 43 Area Fiber Optics Cable Authorities
A24480 Notify clients and vendors at Zone 43 Area Electrical Cable Authorities
A2450 Notify clients and vendors (if any) for Zone 3 Area Authorities
A24510 Notify clients and vendors (if any) for Zone 43 Area Authorities
A24540 Notify clients and vendors (if any) for at Zone 43 Area Reponsible Organization
A24570 Notify clients and vendors (if any) at Zone 43 Area Drainage Authorities
A24750 Pressure Test at Zone 43 for 110 mm Pipe
A24790 Pressure Test at Zone 43 for 160 mm Pipe
A2480 Notify clients and vendors (if any) for at Zone 3 Area Reponsible Organization
A24800 Pressure Test at Zone 43 for 200 mm Pipe
A24810 Pressure Test at Zone 43 for 250 mm Pipe
A24890 Notify clients and vendors (if any) at Zone 43 Area Water Supply Authorities
A24940 Site Clearing and Grubbing at Zone 44
A24960 Notify clients and vendors at Zone 44 Area Telepone Lines Authorities
A24980 Joint Survey with Consultant at Zone 44
A25000 Notify clients and vendors at Zone 44 Area Fiber Optics Cable Authorities
A25030 Notify clients and vendors at Zone 44 Area Electrical Cable Authorities
A25060 Notify clients and vendors (if any) for Zone 44 Area Authorities
A25090 Notify clients and vendors (if any) for at Zone 44 Area Reponsible Organization
A2510 Notify clients and vendors (if any) at Zone 3 Area Drainage Authorities
A25120 Notify clients and vendors (if any) at Zone 44 Area Drainage Authorities
A25300 Pressure Test at Zone 44 for 110 mm Pipe
A25340 Pressure Test at Zone 44 for 160 mm Pipe
A25350 Pressure Test at Zone 44 for 200 mm Pipe
A25360 Pressure Test at Zone 44 for 250 mm Pipe
A25440 Notify clients and vendors (if any) at Zone 44 Area Water Supply Authorities
A25490 Site Clearing and Grubbing at Zone 45
A25510 Notify clients and vendors at Zone 45 Area Telepone Lines Authorities
A25530 Joint Survey with Consultant at Zone 45
A25550 Notify clients and vendors at Zone 45 Area Fiber Optics Cable Authorities
A25580 Notify clients and vendors at Zone 45 Area Electrical Cable Authorities
A25610 Notify clients and vendors (if any) for Zone 45 Area Authorities
A25640 Notify clients and vendors (if any) for at Zone 45 Area Reponsible Organization
A25670 Notify clients and vendors (if any) at Zone 45 Area Drainage Authorities
A25850 Pressure Test at Zone 45 for 110 mm Pipe
A25900 Pressure Test at Zone 45 for 200 mm Pipe
A25910 Pressure Test at Zone 45 for 250 mm Pipe
A25990 Notify clients and vendors (if any) at Zone 45 Area Water Supply Authorities
A26040 Site Clearing and Grubbing at Zone 46
A26060 Notify clients and vendors at Zone 46 Area Telepone Lines Authorities
A26080 Joint Survey with Consultant at Zone 46
A26100 Notify clients and vendors at Zone 46 Area Fiber Optics Cable Authorities
A26130 Notify clients and vendors at Zone 46 Area Electrical Cable Authorities
A26160 Notify clients and vendors (if any) for Zone 46 Area Authorities
A26190 Notify clients and vendors (if any) for at Zone 46 Area Reponsible Organization
A26220 Notify clients and vendors (if any) at Zone 46 Area Drainage Authorities
A26400 Pressure Test at Zone 46 for 110 mm Pipe
A26440 Pressure Test at Zone 46 for 160 mm Pipe
A26450 Pressure Test at Zone 46 for 200 mm Pipe
A26460 Pressure Test at Zone 46 for 250 mm Pipe
A26540 Notify clients and vendors (if any) at Zone 46 Area Water Supply Authorities
A26590 Site Clearing and Grubbing at Zone 47
A26610 Notify clients and vendors at Zone 47 Area Telepone Lines Authorities
A26630 Joint Survey with Consultant at Zone 47
A26650 Notify clients and vendors at Zone 47 Area Fiber Optics Cable Authorities
A26680 Notify clients and vendors at Zone 47 Area Electrical Cable Authorities
A26710 Notify clients and vendors (if any) for Zone 47 Area Authorities
A26740 Notify clients and vendors (if any) for at Zone 47 Area Reponsible Organization
A26770 Notify clients and vendors (if any) at Zone 47 Area Drainage Authorities
A2690 Pressure Test at Zone 3 for 110 mm Pipe
A26950 Pressure Test at Zone 47 for 110 mm Pipe
A26990 Pressure Test at Zone 47 for 160 mm Pipe
A27000 Pressure Test at Zone 47 for 200 mm Pipe
A27010 Pressure Test at Zone 47 for 250 mm Pipe
A27090 Notify clients and vendors (if any) at Zone 47 Area Water Supply Authorities
A27140 Final Pressure Test and Handover to Employer of Zone 29
A27160 Final Pressure Test and Handover to Employer of Zone 4
A27180 Final Pressure Test and Handover to Employer of Zone 7
A27200 Final Pressure Test and Handover to Employer of Zone 12
A27220 Final Pressure Test and Handover to Employer of Zone 23
A27240 Final Pressure Test and Handover to Employer of Zone 5
A27260 Final Pressure Test and Handover to Employer of Zone 13
A27280 Final Pressure Test and Handover to Employer of Zone 26
A2730 Pressure Test at Zone 3 for 160 mm Pipe
A27300 Final Pressure Test and Handover to Employer of Zone 46
A27320 Final Pressure Test and Handover to Employer of Zone 8
A27340 Final Pressure Test and Handover to Employer of Zone 16
A27380 Final Pressure Test and Handover to Employer of Zone 32
A2740 Pressure Test at Zone 3 for 200 mm Pipe
A27400 Final Pressure Test and Handover to Employer of Zone 6
A27420 Final Pressure Test and Handover to Employer of Zone 17
A27440 Final Pressure Test and Handover to Employer of Zone 44
A27460 Final Pressure Test and Handover to Employer of Zone 42
A27480 Final Pressure Test and Handover to Employer of Zone 9
A2750 Pressure Test at Zone 3 for 250 mm Pipe
A27500 Final Pressure Test and Handover to Employer of Zone 21
A27520 Final Pressure Test and Handover to Employer of Zone 27
A27540 Final Pressure Test and Handover to Employer of Zone 38
A27560 Final Pressure Test and Handover to Employer of Zone 14
A27600 Final Pressure Test and Handover to Employer of Zone 40
A27640 Final Pressure Test and Handover to Employer of Zone 24
A27660 Final Pressure Test and Handover to Employer of Zone 34
A27680 Final Pressure Test and Handover to Employer of Zone 36
A27700 Final Pressure Test and Handover to Employer of Zone 39
A27720 Final Pressure Test and Handover to Employer of Zone 11
A27740 Final Pressure Test and Handover to Employer of Zone 22
A27800 Final Pressure Test and Handover to Employer of Zone 15
A27820 Final Pressure Test and Handover to Employer of Zone 25
A27840 Final Pressure Test and Handover to Employer of Zone 33
A27880 Final Pressure Test and Handover to Employer of Zone 18
A27900 Final Pressure Test and Handover to Employer of Zone 35
A27960 Final Pressure Test and Handover to Employer of Zone 28
A27980 Final Pressure Test and Handover to Employer of Zone 41
A28000 Final Pressure Test and Handover to Employer of Zone 45
A28040 Final Pressure Test and Handover to Employer of Zone 19
A28060 Final Pressure Test and Handover to Employer of Zone 43
A28120 Final Pressure Test and Handover to Employer of Zone 31
A28200 Final Pressure Test and Handover to Employer of Zone 37
A28260 Final Pressure Test and Handover to Employer of Zone 10
A28280 As built Drawing Preparation and Submission for Approval for Zone 30
A28290 As built Drawing Preparation and Submission for Approval for Zone 5
A2830 Notify clients and vendors (if any) at Zone 3 Area Water Supply Authorities
A28300 As built Drawing Preparation and Submission for Approval for Zone 8
A28310 As built Drawing Preparation and Submission for Approval for Zone 13
A28320 As built Drawing Preparation and Submission for Approval for Zone 24
A28330 As built Drawing Preparation and Submission for Approval for Zone 6
A28340 As built Drawing Preparation and Submission for Approval for Zone 14
A28350 As built Drawing Preparation and Submission for Approval for Zone 27
A28360 As built Drawing Preparation and Submission for Approval for Zone 47
A28370 As built Drawing Preparation and Submission for Approval for Zone 9
A28380 As built Drawing Preparation and Submission for Approval for Zone 17
A28390 As built Drawing Preparation and Submission for Approval for Zone 21
A28400 As built Drawing Preparation and Submission for Approval for Zone 33
A28410 As built Drawing Preparation and Submission for Approval for Zone 7
A28420 As built Drawing Preparation and Submission for Approval for Zone 18
A28430 As built Drawing Preparation and Submission for Approval for Zone 45
A28440 As built Drawing Preparation and Submission for Approval for Zone 43
A28450 As built Drawing Preparation and Submission for Approval for Zone 10
A28460 As built Drawing Preparation and Submission for Approval for Zone 22
A28470 As built Drawing Preparation and Submission for Approval for Zone 28
A28480 As built Drawing Preparation and Submission for Approval for Zone 39
A28490 As built Drawing Preparation and Submission for Approval for Zone 15
A28500 As built Drawing Preparation and Submission for Approval for Zone 31
A28510 As built Drawing Preparation and Submission for Approval for Zone 41
A28530 As built Drawing Preparation and Submission for Approval for Zone 25
A28540 As built Drawing Preparation and Submission for Approval for Zone 35
A28550 As built Drawing Preparation and Submission for Approval for Zone 37
A28560 As built Drawing Preparation and Submission for Approval for Zone 40
A28570 As built Drawing Preparation and Submission for Approval for Zone 12
A28580 As built Drawing Preparation and Submission for Approval for Zone 23
A28610 As built Drawing Preparation and Submission for Approval for Zone 16
A28620 As built Drawing Preparation and Submission for Approval for Zone 26
A28630 As built Drawing Preparation and Submission for Approval for Zone 34
A28650 As built Drawing Preparation and Submission for Approval for Zone 19
A28660 As built Drawing Preparation and Submission for Approval for Zone 36
A28690 As built Drawing Preparation and Submission for Approval for Zone 29
A28700 As built Drawing Preparation and Submission for Approval for Zone 42
A28710 As built Drawing Preparation and Submission for Approval for Zone 46
A28730 As built Drawing Preparation and Submission for Approval for Zone 20
A28740 As built Drawing Preparation and Submission for Approval for Zone 44
A28770 As built Drawing Preparation and Submission for Approval for Zone 32
A2880 Final Pressure Test and Handover to Employer of Zone 3
A28810 As built Drawing Preparation and Submission for Approval for Zone 38
A28840 As built Drawing Preparation and Submission for Approval for Zone 11
A28860 Submission for Approval of Working Drawing for Zone 1
A28870 Approval of Working Drawing for Zone 1
A28880 Submission for Approval of Working Drawing for Zone 2
A28890 Approval of Working Drawing for Zone 2
A28900 Submission for Approval of Working Drawing for Zone 3
A28910 Approval of Working Drawing for Zone 3
A28920 Submission for Approval of Working Drawing for Zone 4
A28930 Approval of Working Drawing for Zone 4
A28940 Submission for Approval of Working Drawing for Zone 5
A28950 Approval of Working Drawing for Zone 5
A28960 Submission for Approval of Working Drawing for Zone 6
A28970 Approval of Working Drawing for Zone 6
A28980 Submission for Approval of Working Drawing for Zone 7
A28990 Approval of Working Drawing for Zone 7
A2900 As built Drawing Preparation and Submission for Approval for Zone 3
A29060 Submission for Approval of Working Drawing for Zone 8
A29070 Approval of Working Drawing for Zone 8
A29080 Submission for Approval of Working Drawing for Zone 9
A29090 Approval of Working Drawing for Zone 9
A2910 Site Clearing and Grubbing at Zone 4
A29100 Submission for Approval of Working Drawing for Zone 10
A29110 Approval of Working Drawing for Zone 10
A29120 Submission for Approval of Working Drawing for Zone 11
A29130 Approval of Working Drawing for Zone 11
A29140 Submission for Approval of Working Drawing for Zone 12
A29150 Approval of Working Drawing for Zone 12
A29160 Submission for Approval of Working Drawing for Zone 13
A29170 Approval of Working Drawing for Zone 13
A29180 Submission for Approval of Working Drawing for Zone 14
A29190 Approval of Working Drawing for Zone 14
A29200 Submission for Approval of Working Drawing for Zone 15
A29210 Approval of Working Drawing for Zone 15
A29220 Submission for Approval of Working Drawing for Zone 16
A29230 Approval of Working Drawing for Zone 16
A29240 Submission for Approval of Working Drawing for Zone 17
A29250 Approval of Working Drawing for Zone 17
A29260 Submission for Approval of Working Drawing for Zone 18
A29270 Approval of Working Drawing for Zone 18
A29280 Submission for Approval of Working Drawing for Zone 19
A29290 Approval of Working Drawing for Zone 19
A2930 Notify clients and vendors at Zone 4 Area Telepone Lines Authorities
A29320 Submission for Approval of Working Drawing for Zone 21
A29330 Approval of Working Drawing for Zone 21
A29340 Submission for Approval of Working Drawing for Zone 22
A29350 Approval of Working Drawing for Zone 22
A29360 Submission for Approval of Working Drawing for Zone 23
A29370 Approval of Working Drawing for Zone 23
A29380 Submission for Approval of Working Drawing for Zone 24
A29390 Approval of Working Drawing for Zone 24
A29400 Submission for Approval of Working Drawing for Zone 25
A29410 Approval of Working Drawing for Zone 25
A29420 Submission for Approval of Working Drawing for Zone 26
A29430 Approval of Working Drawing for Zone 26
A29440 Submission for Approval of Working Drawing for Zone 27
A29450 Approval of Working Drawing for Zone 27
A29460 Submission for Approval of Working Drawing for Zone 28
A29470 Approval of Working Drawing for Zone 28
A29480 Submission for Approval of Working Drawing for Zone 29
A29490 Approval of Working Drawing for Zone 29
A2950 Joint Survey with Consultant at Zone 4
A29500 Submission for Approval of Working Drawing for Zone 30
A29510 Approval of Working Drawing for Zone 30
A29520 Submission for Approval of Working Drawing for Zone 31
A29530 Approval of Working Drawing for Zone 31
A29540 Submission for Approval of Working Drawing for Zone 32
A29550 Approval of Working Drawing for Zone 32
A29560 Submission for Approval of Working Drawing for Zone 33
A29570 Approval of Working Drawing for Zone 33
A29580 Submission for Approval of Working Drawing for Zone 34
A29590 Approval of Working Drawing for Zone 34
A29600 Submission for Approval of Working Drawing for Zone 35
A29610 Approval of Working Drawing for Zone 35
A29620 Submission for Approval of Working Drawing for Zone 36
A29630 Approval of Working Drawing for Zone 36
A29640 Submission for Approval of Working Drawing for Zone 37
A29650 Approval of Working Drawing for Zone 37
A29660 Submission for Approval of Working Drawing for Zone 38
A29670 Approval of Working Drawing for Zone 38
A29680 Submission for Approval of Working Drawing for Zone 39
A29690 Approval of Working Drawing for Zone 39
A2970 Notify clients and vendors at Zone 4 Area Fiber Optics Cable Authorities
A29700 Submission for Approval of Working Drawing for Zone 40
A29710 Approval of Working Drawing for Zone 40
A29720 Submission for Approval of Working Drawing for Zone 41
A29730 Approval of Working Drawing for Zone 41
A29740 Submission for Approval of Working Drawing for Zone 42
A29750 Approval of Working Drawing for Zone 42
A29760 Submission for Approval of Working Drawing for Zone 43
A29770 Approval of Working Drawing for Zone 43
A29780 Submission for Approval of Working Drawing for Zone 44
A29790 Approval of Working Drawing for Zone 44
A29800 Submission for Approval of Working Drawing for Zone 45
A29810 Approval of Working Drawing for Zone 45
A29820 Submission for Approval of Working Drawing for Zone 46
A29830 Approval of Working Drawing for Zone 46
A29840 Submission for Approval of Working Drawing for Zone 47
A29850 Approval of Working Drawing for Zone 47
A3000 Notify clients and vendors at Zone 4 Area Electrical Cable Authorities
A3030 Notify clients and vendors (if any) for Zone 4 Area Authorities
A3060 Notify clients and vendors (if any) for at Zone 4 Area Reponsible Organization
A3090 Notify clients and vendors (if any) at Zone 4 Area Drainage Authorities
A3270 Pressure Test at Zone 4 for 110 mm Pipe
A3310 Pressure Test at Zone 4 for 160 mm Pipe
A3320 Pressure Test at Zone 4 for 200 mm Pipe
A3330 Pressure Test at Zone 4 for 250 mm Pipe
A3410 Notify clients and vendors (if any) at Zone 4 Area Water Supply Authorities
A3480 As built Drawing Preparation and Submission for Approval for Zone 4
A3490 Site Clearing and Grubbing at Zone 5
A3510 Notify clients and vendors at Zone 5 Area Telepone Lines Authorities
A3530 Joint Survey with Consultant at Zone 5
A3550 Notify clients and vendors at Zone 5 Area Fiber Optics Cable Authorities
A3580 Notify clients and vendors at Zone 5 Area Electrical Cable Authorities
A3610 Notify clients and vendors (if any) for Zone 5 Area Authorities
A3640 Notify clients and vendors (if any) for at Zone 5 Area Reponsible Organization
A3670 Notify clients and vendors (if any) at Zone 5 Area Drainage Authorities
A3850 Pressure Test at Zone 5 for 110 mm Pipe
A3890 Pressure Test at Zone 5 for 160 mm Pipe
A3900 Pressure Test at Zone 5 for 200 mm Pipe
A3910 Pressure Test at Zone 5 for 250 mm Pipe
A3990 Notify clients and vendors (if any) at Zone 5 Area Water Supply Authorities
A4040 Site Clearing and Grubbing at Zone 6
A4060 Notify clients and vendors at Zone 6 Area Telepone Lines Authorities
A4080 Joint Survey with Consultant at Zone 6
A4100 Notify clients and vendors at Zone 6 Area Fiber Optics Cable Authorities
A4130 Notify clients and vendors at Zone 6 Area Electrical Cable Authorities
A4160 Notify clients and vendors (if any) for Zone 6 Area Authorities
A4190 Notify clients and vendors (if any) for at Zone 6 Area Reponsible Organization
A4220 Notify clients and vendors (if any) at Zone 6 Area Drainage Authorities
A4400 Pressure Test at Zone 6 for 110 mm Pipe
A4440 Pressure Test at Zone 6 for 160 mm Pipe
A4450 Pressure Test at Zone 6 for 200 mm Pipe
A4460 Pressure Test at Zone 6 for 250 mm Pipe
A4540 Notify clients and vendors (if any) at Zone 6 Area Water Supply Authorities
A4590 Site Clearing and Grubbing at Zone 7
A4610 Notify clients and vendors at Zone 7 Area Telepone Lines Authorities
A4630 Joint Survey with Consultant at Zone 7
A4650 Notify clients and vendors at Zone 7 Area Fiber Optics Cable Authorities
A4680 Notify clients and vendors at Zone 7 Area Electrical Cable Authorities
A4710 Notify clients and vendors (if any) for Zone 7 Area Authorities
A4740 Notify clients and vendors (if any) for at Zone 7 Area Reponsible Organization
A4770 Notify clients and vendors (if any) at Zone 7 Area Drainage Authorities
A4950 Pressure Test at Zone 7 for 110 mm Pipe
A4990 Pressure Test at Zone 7 for 160 mm Pipe
A5000 Pressure Test at Zone 7 for 200 mm Pipe
A5010 Pressure Test at Zone 7 for 250 mm Pipe
A5090 Notify clients and vendors (if any) at Zone 7 Area Water Supply Authorities
A5140 Site Clearing and Grubbing at Zone 8
A5160 Notify clients and vendors at Zone 8 Area Telepone Lines Authorities
A5180 Joint Survey with Consultant at Zone 8
A5200 Notify clients and vendors at Zone 8 Area Fiber Optics Cable Authorities
A5230 Notify clients and vendors at Zone 8 Area Electrical Cable Authorities
A5260 Notify clients and vendors (if any) for Zone 8 Area Authorities
A5290 Notify clients and vendors (if any) for at Zone 8 Area Reponsible Organization
A5320 Notify clients and vendors (if any) at Zone 8 Area Drainage Authorities
A5500 Pressure Test at Zone 8 for 110 mm Pipe
A5540 Pressure Test at Zone 8 for 160 mm Pipe
A5550 Pressure Test at Zone 8 for 200 mm Pipe
A5560 Pressure Test at Zone 8 for 250 mm Pipe
A5640 Notify clients and vendors (if any) at Zone 8 Area Water Supply Authorities
A5690 Site Clearing and Grubbing at Zone 9
A5710 Notify clients and vendors at Zone 9 Area Telepone Lines Authorities
A5730 Joint Survey with Consultant at Zone 9
A5750 Notify clients and vendors at Zone 9 Area Fiber Optics Cable Authorities
A5780 Notify clients and vendors at Zone 9 Area Electrical Cable Authorities
A5810 Notify clients and vendors (if any) for Zone 9 Area Authorities
A5840 Notify clients and vendors (if any) for at Zone 9 Area Reponsible Organization
A5870 Notify clients and vendors (if any) at Zone 9 Area Drainage Authorities
A6050 Pressure Test at Zone 9 for 110 mm Pipe
A6090 Pressure Test at Zone 9 for 160 mm Pipe
A6100 Pressure Test at Zone 9 for 200 mm Pipe
A6110 Pressure Test at Zone 9 for 250 mm Pipe
A6190 Notify clients and vendors (if any) at Zone 9 Area Water Supply Authorities
A6240 Site Clearing and Grubbing at Zone 10
A6260 Notify clients and vendors at Zone 10 Area Telepone Lines Authorities
A6280 Joint Survey with Consultant at Zone 10
A6300 Notify clients and vendors at Zone 10 Area Fiber Optics Cable Authorities
A6330 Notify clients and vendors at Zone 10 Area Electrical Cable Authorities
A6360 Notify clients and vendors (if any) for Zone 10 Area Authorities
A6390 Notify clients and vendors (if any) for at Zone 10 Area Reponsible Organization
A6420 Notify clients and vendors (if any) at Zone 10 Area Drainage Authorities
A6600 Pressure Test at Zone 10 for 110 mm Pipe
A6640 Pressure Test at Zone 10 for 160 mm Pipe
A6650 Pressure Test at Zone 10 for 200 mm Pipe
A6660 Pressure Test at Zone 10 for 250 mm Pipe
A6740 Notify clients and vendors (if any) at Zone 10 Area Water Supply Authorities
A6790 Site Clearing and Grubbing at Zone 11
A6810 Notify clients and vendors at Zone 11 Area Telepone Lines Authorities
A6830 Joint Survey with Consultant at Zone 11
A6850 Notify clients and vendors at Zone 11 Area Fiber Optics Cable Authorities
A6880 Notify clients and vendors at Zone 11 Area Electrical Cable Authorities
A6910 Notify clients and vendors (if any) for Zone 11 Area Authorities
A6940 Notify clients and vendors (if any) for at Zone 11 Area Reponsible Organization
A6970 Notify clients and vendors (if any) at Zone 11 Area Drainage Authorities
A7150 Pressure Test at Zone 11 for 110 mm Pipe
A7190 Pressure Test at Zone 11 for 160 mm Pipe
A7200 Pressure Test at Zone 11 for 200 mm Pipe
A7210 Pressure Test at Zone 11 for 250 mm Pipe
A7290 Notify clients and vendors (if any) at Zone 11 Area Water Supply Authorities
A7340 Site Clearing and Grubbing at Zone 12
A7360 Notify clients and vendors at Zone 12 Area Telepone Lines Authorities
A7380 Joint Survey with Consultant at Zone 12
A7400 Notify clients and vendors at Zone 12 Area Fiber Optics Cable Authorities
A7430 Notify clients and vendors at Zone 12 Area Electrical Cable Authorities
A7460 Notify clients and vendors (if any) for Zone 12 Area Authorities
A7490 Notify clients and vendors (if any) for at Zone 12 Area Reponsible Organization
A7520 Notify clients and vendors (if any) at Zone 12 Area Drainage Authorities
A7700 Pressure Test at Zone 12 for 110 mm Pipe
A7740 Pressure Test at Zone 12 for 160 mm Pipe
A7750 Pressure Test at Zone 12 for 200 mm Pipe
A7760 Pressure Test at Zone 12 for 250 mm Pipe
A7840 Notify clients and vendors (if any) at Zone 12 Area Water Supply Authorities
A7890 Site Clearing and Grubbing at Zone 13
A7910 Notify clients and vendors at Zone 13 Area Telepone Lines Authorities
A7930 Joint Survey with Consultant at Zone 13
A7950 Notify clients and vendors at Zone 13 Area Fiber Optics Cable Authorities
A7980 Notify clients and vendors at Zone 13 Area Electrical Cable Authorities
A8010 Notify clients and vendors (if any) for Zone 13 Area Authorities
A8040 Notify clients and vendors (if any) for at Zone 13 Area Reponsible Organization
A8070 Notify clients and vendors (if any) at Zone 13 Area Drainage Authorities
A8250 Pressure Test at Zone 13 for 110 mm Pipe
A8290 Pressure Test at Zone 13 for 160 mm Pipe
A8300 Pressure Test at Zone 13 for 200 mm Pipe
A8310 Pressure Test at Zone 13 for 250 mm Pipe
A8390 Notify clients and vendors (if any) at Zone 13 Area Water Supply Authorities
A8440 Site Clearing and Grubbing at Zone 14
A8460 Notify clients and vendors at Zone 14 Area Telepone Lines Authorities
A8480 Joint Survey with Consultant at Zone 14
A8500 Notify clients and vendors at Zone 14 Area Fiber Optics Cable Authorities
A8530 Notify clients and vendors at Zone 14 Area Electrical Cable Authorities
A8560 Notify clients and vendors (if any) for Zone 14 Area Authorities
A8590 Notify clients and vendors (if any) for at Zone 14 Area Reponsible Organization
A8620 Notify clients and vendors (if any) at Zone 14 Area Drainage Authorities
A8800 Pressure Test at Zone 14 for 110 mm Pipe
A8840 Pressure Test at Zone 14 for 160 mm Pipe
A8850 Pressure Test at Zone 14 for 200 mm Pipe
A8860 Pressure Test at Zone 14 for 250 mm Pipe
A8940 Notify clients and vendors (if any) at Zone 14 Area Water Supply Authorities
A8990 Site Clearing and Grubbing at Zone 15
A9010 Notify clients and vendors at Zone 15 Area Telepone Lines Authorities
A9030 Joint Survey with Consultant at Zone 15
A9050 Notify clients and vendors at Zone 15 Area Fiber Optics Cable Authorities
A9080 Notify clients and vendors at Zone 15 Area Electrical Cable Authorities
A9110 Notify clients and vendors (if any) for Zone 15 Area Authorities
A9140 Notify clients and vendors (if any) for at Zone 15 Area Reponsible Organization
A9170 Notify clients and vendors (if any) at Zone 15 Area Drainage Authorities
A9350 Pressure Test at Zone 15 for 110 mm Pipe
A9390 Pressure Test at Zone 15 for 160 mm Pipe
A9400 Pressure Test at Zone 15 for 200 mm Pipe
A9410 Pressure Test at Zone 15 for 250 mm Pipe
A9490 Notify clients and vendors (if any) at Zone 15 Area Water Supply Authorities
A9540 Site Clearing and Grubbing at Zone 16
A9560 Notify clients and vendors at Zone 16 Area Telepone Lines Authorities
A9580 Joint Survey with Consultant at Zone 16
A9600 Notify clients and vendors at Zone 16 Area Fiber Optics Cable Authorities
A9630 Notify clients and vendors at Zone 16 Area Electrical Cable Authorities
A9660 Notify clients and vendors (if any) for Zone 16 Area Authorities
A9690 Notify clients and vendors (if any) for at Zone 16 Area Reponsible Organization
A9720 Notify clients and vendors (if any) at Zone 16 Area Drainage Authorities
A9900 Pressure Test at Zone 16 for 110 mm Pipe
A9940 Pressure Test at Zone 16 for 160 mm Pipe
A9950 Pressure Test at Zone 16 for 200 mm Pipe
A9960 Pressure Test at Zone 16 for 250 mm Pipe
EN.HS.1 Hydraulic Study Development
EN.MS&A.1Material Submittal & Approval for Gate Valves 150 mm
EN.MS&A.1Material Submittal & Approval for Gate Valves 200 mm
EN.MS&A.1Material Submittal & Approval for Butterfly Valves 250 mm
EN.MS&A.1Material Submittal & Approval for Butterfly Valves Actuator
EN.MS&A.1Material Submittal & Approval for Air Valves
EN.MS&A.1Material Submittal & Approval for Wash-out Valves
EN.MS&A.1Material Submittal & Approval for fire Hydrants Supply
EN.MS&A.1Material Submittal & Approval for Service Box
EN.MS&A.1Material Submittal & Approval for marker posts, couplings
EN.MS&A.1Material Submittal & Approval for Non Woven Geotextile
EN.MS&A.1Material Submittal & Approval for HDPE PIPE PN16 110mm
EN.MS&A.1Material Submittal & Approval for HDPE PIPE PN16 250mm
EN.MS&A.1Material Submittal & Approval for Butterfly Valves (DI), [PN 16] 250 mm
EN.MS&A.1Material Submittal & Approval for Pipes, fittings and valves for PS
EN.MS&A.1Material Submittal & Approval for Gate Valves 100 mm
EN.PD.1 Submission for Approval of Project management plans
EN.PD.11 Approval of Project management plans
EN.PD.12 Submission for Approval of of Construction Method Statements
EN.PD.2 Approval of of Construction Method Statements
PR.LS.D.01Delivery to sitel for Pipes, fittings and valves for PS
PR.LS.D.01Delivery to site for Gate Valves 100 mm
PR.LS.D.11Delivery to site for Gate Valves 150 mm
PR.LS.D.11Delivery to site for Gate Valves 200 mm
PR.LS.D.11Delivery to site for Butterfly Valves 250 mm
PR.LS.D.11Delivery to sitel for Butterfly Valves Actuator
PR.LS.D.11Delivery to site for Air Valves
PR.LS.D.11Delivery to site for Wash-out Valves
PR.LS.D.11Delivery to site for fire Hydrants Supply
PR.LS.D.11Delivery to site for HDPE PIPE PN16 110mm
PR.LS.D.12Delivery to site for HDPE PIPE PN16 160mm
PR.LS.D.12Delivery to site for HDPE PIPE PN16 250mm
PR.LS.D.12Delivery to site for Ductile Iron Pipes, C-Class [PN 16] Bars 250 mm
PR.LS.D.13Delivery to site for Non Woven Geotextile
PR.LS.FR.0 Fabrication & Assembly for Pipes, fittings and valves for PS
PR.LS.FR.0 Fabrication & Assembly for Gate Valves 100 mm
PR.LS.FR.0 Fabrication & Assembly for Gate Valves 150 mm
PR.LS.FR.0 Fabrication & Assembly for Gate Valves 200 mm
PR.LS.FR.0 Fabrication & Assembly for Butterfly Valves 250 mm
PR.LS.FR.0 Fabrication & Assembly for Butterfly Valves Actuator
PR.LS.FR.0 Fabrication & Assembly for Air Valves
PR.LS.FR.0 Fabrication & Assembly for Wash-out Valves
PR.LS.FR.0 Fabrication & Assembly for fire Hydrants Supply
PR.LS.FR.1 Fabrication & Assembly for HDPE PIPE PN16 110mm
PR.LS.FR.1 Fabrication & Assembly for HDPE PIPE PN16 160mm
PR.LS.FR.1 Fabrication & Assembly for HDPE PIPE PN16 250mm
PR.LS.FR.1 Fabrication & Assembly for Ductile Iron Pipes, C-Class [PN 16] Bars 250 mm
PR.LS.FR.2 Fabrication & Assembly for Non Woven Geotextile
PR.LS.MI.0Material Inspection for Pipes, fittings and valves for PS
PR.LS.MI.0Material Inspection for Gate Valves 100 mm
PR.LS.MI.1Material Inspection for Gate Valves 150 mm
PR.LS.MI.1Material Inspection for Gate Valves 200 mm
PR.LS.MI.1Material Inspection for Butterfly Valves 250 mm
PR.LS.MI.1Material Inspection for Butterfly Valves Actuator
PR.LS.MI.1Material Inspection for Air Valves
PR.LS.MI.1Material Inspection for Wash-out Valves
PR.LS.MI.1Material Inspection for fire Hydrants Supply
PR.LS.MI.1Material Inspection for HDPE PIPE PN16 110mm
PR.LS.MI.1Material Inspection for HDPE PIPE PN16 160mm
PR.LS.MI.1Material Inspection for HDPE PIPE PN16 200mm
PR.LS.MI.1Material Inspection for Ductile Iron Pipes, C-Class [PN 16] Bars 250 mm
PR.LS.MI.1Material Inspection for Non Woven Geotextile
PR.LS.PO.1Purchasing Order for Pipes, fittings and valves for PS
PR.LS.PO.1Purchasing Order for Gate Valves 100 mm
PR.LS.PO.1Purchasing Order for Gate Valves 150 mm
PR.LS.PO.1Purchasing Order for HDPE PIPE PN16 110mm
PR.LS.PO.1Purchasing Order for HDPE PIPE PN16 160mm
PR.LS.PO.1Purchasing Order for HDPE PIPE PN16 250mm
PR.LS.PO.1Purchasing Order for Ductile Iron Pipes, C-Class [PN 16] Bars 250 mm
PR.LS.PO.1Purchasing Order for Gate Valves 200 mm
PR.LS.PO.1Purchasing Order for Non Woven Geotextile
PR.LS.PO.1Purchasing Order for Butterfly Valves 250 mm
PR.LS.PO.1Purchasing Order for Butterfly Valves Actuator
PR.LS.PO.1Purchasing Order for Air Valves
PR.LS.PO.1Purchasing Order for Wash-out Valves
PR.LS.PO.1Purchasing Order for fire Hydrants Supply
Item1 Item2
A10000 Geotextile installation at 250 mm Pipe at Zone 16
A10030 Identify the Existing Water Supply Line (if any) at Zone 16
A10040 Notify clients and vendors (if any) at Zone 16 Area Water Supply Authorities
A10080 Construction of Valves Chamber at Zone 16
A10450 Pressure Test at Zone 17 for 110 mm Pipe
A10580 Identify the Existing Water Supply Line (if any) at Zone 17
A10590 Notify clients and vendors (if any) at Zone 17 Area Water Supply Authorities
A10600 Relocate Existing Water Supply Line (if any) at Zone 17
A11130 Identify the Existing Water Supply Line (if any) at Zone 18
A11140 Notify clients and vendors (if any) at Zone 18 Area Water Supply Authorities
A11150 Relocate Existing Water Supply Line (if any) at Zone 18
A11410 Excavation for 200 mm Pipe at Zone 19
A11530 Installation of 200 mm Pipe at Zone 19
A11640 Geotextile installation at 200 mm Pipe at Zone 19
A11680 Identify the Existing Water Supply Line (if any) at Zone 19
A11690 Notify clients and vendors (if any) at Zone 19 Area Water Supply Authorities
A1230 Identify the Existing Septic Tanks (if any) at Zone 1
A1240 Notify clients and vendors (if any) for Zone 1 Area Authorities
A1250 Relocate Existing Septic Tanks (if any) at Zone 1
A12630 Installation of 200 mm Pipe at Zone 21
A12650 Pressure Test at Zone 21 for 110 mm Pipe
A12660 Subgrade Construction at Zone 21
A12670 Asphalt Works at Zone 21
A12680 Curbstone Reinstatement after Asphalt Works at Zone 21
A12700 Pressure Test at Zone 21 for 200 mm Pipe
A12760 Curbstone Tiles Reinstatement after Asphalt Works at Zone 21
A12770 Curbstone Reinstatement as per Authorities Regulations at Zone 21
A12780 Identify the Existing Water Supply Line (if any) at Zone 21
A12790 Notify clients and vendors (if any) at Zone 21 Area Water Supply Authorities
A12800 Relocate Existing Water Supply Line (if any) at Zone 21
A12810 Installation of Fire Hydrant at Zone 21
A13070 Excavation for 250 mm Pipe at Zone 22
A13110 Bed Preparation for 250 mm Pipe at Zone 22
A13180 Installation of 200 mm Pipe at Zone 22
A13190 Installation of 250 mm Pipe at Zone 22
A13300 Geotextile installation at 250 mm Pipe at Zone 22
A13330 Identify the Existing Water Supply Line (if any) at Zone 22
A13340 Notify clients and vendors (if any) at Zone 22 Area Water Supply Authorities
A13380 Construction of Valves Chamber at Zone 22
A13880 Identify the Existing Water Supply Line (if any) at Zone 23
A13890 Notify clients and vendors (if any) at Zone 23 Area Water Supply Authorities
A14310 Subgrade Construction at Zone 24
A14320 Asphalt Works at Zone 24
A14330 Curbstone Reinstatement after Asphalt Works at Zone 24
A14410 Curbstone Tiles Reinstatement after Asphalt Works at Zone 24
A14420 Curbstone Reinstatement as per Authorities Regulations at Zone 24
A14430 Identify the Existing Water Supply Line (if any) at Zone 24
A14440 Notify clients and vendors (if any) at Zone 24 Area Water Supply Authorities
A14450 Relocate Existing Water Supply Line (if any) at Zone 24
A14460 Installation of Fire Hydrant at Zone 24
A14830 Installation of 200 mm Pipe at Zone 25
A14980 Identify the Existing Water Supply Line (if any) at Zone 25
A14990 Notify clients and vendors (if any) at Zone 25 Area Water Supply Authorities
A15380 Installation of 200 mm Pipe at Zone 26
A15400 Pressure Test at Zone 26 for 110 mm Pipe
A15410 Subgrade Construction at Zone 26
A15420 Asphalt Works at Zone 26
A15430 Curbstone Reinstatement after Asphalt Works at Zone 26
A15450 Pressure Test at Zone 26 for 200 mm Pipe
A15510 Curbstone Tiles Reinstatement after Asphalt Works at Zone 26
A15520 Curbstone Reinstatement as per Authorities Regulations at Zone 26
A15530 Identify the Existing Water Supply Line (if any) at Zone 26
A15540 Notify clients and vendors (if any) at Zone 26 Area Water Supply Authorities
A15550 Relocate Existing Water Supply Line (if any) at Zone 26
A15560 Installation of Fire Hydrant at Zone 26
A1570 Final Pressure Test and Handover to Employer of Zone 1
A16080 Identify the Existing Water Supply Line (if any) at Zone 27
A16090 Notify clients and vendors (if any) at Zone 27 Area Water Supply Authorities
A1640 As built Drawing Preparation and Submission for Approval for Zone 1
A16500 Pressure Test at Zone 28 for 110 mm Pipe
A16510 Subgrade Construction at Zone 28
A16520 Asphalt Works at Zone 28
A16530 Curbstone Reinstatement after Asphalt Works at Zone 28
A16610 Curbstone Tiles Reinstatement after Asphalt Works at Zone 28
A16620 Curbstone Reinstatement as per Authorities Regulations at Zone 28
A16630 Identify the Existing Water Supply Line (if any) at Zone 28
A16640 Notify clients and vendors (if any) at Zone 28 Area Water Supply Authorities
A16650 Relocate Existing Water Supply Line (if any) at Zone 28
A16660 Installation of Fire Hydrant at Zone 28
A1670 Identify the Existing Water Supply Line (if any) at Zone 1
A1680 Notify clients and vendors (if any) at Zone 1 Area Water Supply Authorities
A17180 Identify the Existing Water Supply Line (if any) at Zone 29
A17190 Notify clients and vendors (if any) at Zone 29 Area Water Supply Authorities
A17230 Construction of Valves Chamber at Zone 29
A1740 Finishing Activity Related Zone 1 Finalization
A1750 Final Pressure Test and Handover to Employer of Zone 2
A1760 Finishing Activity Related Zone 2 Finalization
A1770 As built Drawing Preparation and Submission for Approval for Zone 2
A17730 Identify the Existing Water Supply Line (if any) at Zone 30
A17740 Notify clients and vendors (if any) at Zone 30 Area Water Supply Authorities
A18830 Identify the Existing Water Supply Line (if any) at Zone 32
A18840 Notify clients and vendors (if any) at Zone 32 Area Water Supply Authorities
A19380 Identify the Existing Water Supply Line (if any) at Zone 33
A19390 Notify clients and vendors (if any) at Zone 33 Area Water Supply Authorities
A19780 Installation of 200 mm Pipe at Zone 34
A19930 Identify the Existing Water Supply Line (if any) at Zone 34
A19940 Notify clients and vendors (if any) at Zone 34 Area Water Supply Authorities
A20480 Identify the Existing Water Supply Line (if any) at Zone 35
A20490 Notify clients and vendors (if any) at Zone 35 Area Water Supply Authorities
A21030 Identify the Existing Water Supply Line (if any) at Zone 36
A21040 Notify clients and vendors (if any) at Zone 36 Area Water Supply Authorities
A2120 Installation of 200 mm Pipe at Zone 2
A21580 Identify the Existing Water Supply Line (if any) at Zone 37
A21590 Notify clients and vendors (if any) at Zone 37 Area Water Supply Authorities
A21980 Installation of 200 mm Pipe at Zone 38
A22130 Identify the Existing Water Supply Line (if any) at Zone 38
A22140 Notify clients and vendors (if any) at Zone 38 Area Water Supply Authorities
A22530 Installation of 200 mm Pipe at Zone 39
A22680 Identify the Existing Water Supply Line (if any) at Zone 39
A22690 Notify clients and vendors (if any) at Zone 39 Area Water Supply Authorities
A2270 Identify the Existing Water Supply Line (if any) at Zone 2
A2280 Notify clients and vendors (if any) at Zone 2 Area Water Supply Authorities
A23230 Identify the Existing Water Supply Line (if any) at Zone 40
A23240 Notify clients and vendors (if any) at Zone 40 Area Water Supply Authorities
A23630 Installation of 200 mm Pipe at Zone 41
A23780 Identify the Existing Water Supply Line (if any) at Zone 41
A23790 Notify clients and vendors (if any) at Zone 41 Area Water Supply Authorities
A24880 Identify the Existing Water Supply Line (if any) at Zone 43
A24890 Notify clients and vendors (if any) at Zone 43 Area Water Supply Authorities
A25840 Installation of 250 mm Pipe at Zone 45
A25950 Geotextile installation at 250 mm Pipe at Zone 45
A2670 Installation of 200 mm Pipe at Zone 3
A27140 Final Pressure Test and Handover to Employer of Zone 29
A27150 Finishing Activity Related Zone 29 Finalization
A27160 Final Pressure Test and Handover to Employer of Zone 4
A27170 Finishing Activity Related Zone 4 Finalization
A27180 Final Pressure Test and Handover to Employer of Zone 7
A27190 Finishing Activity Related Zone 7 Finalization
A27200 Final Pressure Test and Handover to Employer of Zone 12
A27210 Finishing Activity Related Zone 12 Finalization
A27220 Final Pressure Test and Handover to Employer of Zone 23
A27230 Finishing Activity Related Zone 23 Finalization
A27240 Final Pressure Test and Handover to Employer of Zone 5
A27250 Finishing Activity Related Zone 5 Finalization
A27260 Final Pressure Test and Handover to Employer of Zone 13
A27270 Finishing Activity Related Zone 13 Finalization
A27280 Final Pressure Test and Handover to Employer of Zone 26
A27290 Finishing Activity Related Zone 26 Finalization
A27320 Final Pressure Test and Handover to Employer of Zone 8
A27330 Finishing Activity Related Zone 8 Finalization
A27340 Final Pressure Test and Handover to Employer of Zone 16
A27350 Finishing Activity Related Zone 16 Finalization
A27380 Final Pressure Test and Handover to Employer of Zone 32
A27390 Finishing Activity Related Zone 32 Finalization
A27400 Final Pressure Test and Handover to Employer of Zone 6
A27410 Finishing Activity Related Zone 6 Finalization
A27420 Final Pressure Test and Handover to Employer of Zone 17
A27430 Finishing Activity Related Zone 17 Finalization
A27460 Final Pressure Test and Handover to Employer of Zone 42
A27470 Finishing Activity Related Zone 42 Finalization
A27480 Final Pressure Test and Handover to Employer of Zone 9
A27490 Finishing Activity Related Zone 9 Finalization
A27500 Final Pressure Test and Handover to Employer of Zone 21
A27510 Finishing Activity Related Zone 21 Finalization
A27520 Final Pressure Test and Handover to Employer of Zone 27
A27530 Finishing Activity Related Zone 27 Finalization
A27540 Final Pressure Test and Handover to Employer of Zone 38
A27550 Finishing Activity Related Zone 38 Finalization
A27580 Final Pressure Test and Handover to Employer of Zone 30
A27590 Finishing Activity Related Zone 30 Finalization
A27600 Final Pressure Test and Handover to Employer of Zone 40
A27610 Finishing Activity Related Zone 40 Finalization
A27640 Final Pressure Test and Handover to Employer of Zone 24
A27650 Finishing Activity Related Zone 24 Finalization
A27660 Final Pressure Test and Handover to Employer of Zone 34
A27670 Finishing Activity Related Zone 34 Finalization
A27680 Final Pressure Test and Handover to Employer of Zone 36
A27690 Finishing Activity Related Zone 36 Finalization
A27700 Final Pressure Test and Handover to Employer of Zone 39
A27710 Finishing Activity Related Zone 39 Finalization
A27720 Final Pressure Test and Handover to Employer of Zone 11
A27730 Finishing Activity Related Zone 11 Finalization
A27740 Final Pressure Test and Handover to Employer of Zone 22
A27750 Finishing Activity Related Zone 22 Finalization
A27820 Final Pressure Test and Handover to Employer of Zone 25
A27830 Finishing Activity Related Zone 25 Finalization
A27840 Final Pressure Test and Handover to Employer of Zone 33
A27850 Finishing Activity Related Zone 33 Finalization
A27880 Final Pressure Test and Handover to Employer of Zone 18
A27890 Finishing Activity Related Zone 18 Finalization
A27900 Final Pressure Test and Handover to Employer of Zone 35
A27910 Finishing Activity Related Zone 35 Finalization
A27960 Final Pressure Test and Handover to Employer of Zone 28
A27970 Finishing Activity Related Zone 28 Finalization
A27980 Final Pressure Test and Handover to Employer of Zone 41
A27990 Finishing Activity Related Zone 41 Finalization
A28040 Final Pressure Test and Handover to Employer of Zone 19
A28050 Finishing Activity Related Zone 19 Finalization
A28120 Final Pressure Test and Handover to Employer of Zone 31
A28130 Finishing Activity Related Zone 31 Finalization
A2820 Identify the Existing Water Supply Line (if any) at Zone 3
A28200 Final Pressure Test and Handover to Employer of Zone 37
A28210 Finishing Activity Related Zone 37 Finalization
A28260 Final Pressure Test and Handover to Employer of Zone 10
A28270 Finishing Activity Related Zone 10 Finalization
A28280 As built Drawing Preparation and Submission for Approval for Zone 30
A28290 As built Drawing Preparation and Submission for Approval for Zone 5
A2830 Notify clients and vendors (if any) at Zone 3 Area Water Supply Authorities
A28300 As built Drawing Preparation and Submission for Approval for Zone 8
A28310 As built Drawing Preparation and Submission for Approval for Zone 13
A28320 As built Drawing Preparation and Submission for Approval for Zone 24
A28330 As built Drawing Preparation and Submission for Approval for Zone 6
A28350 As built Drawing Preparation and Submission for Approval for Zone 27
A28370 As built Drawing Preparation and Submission for Approval for Zone 9
A28380 As built Drawing Preparation and Submission for Approval for Zone 17
A28390 As built Drawing Preparation and Submission for Approval for Zone 21
A28400 As built Drawing Preparation and Submission for Approval for Zone 33
A28410 As built Drawing Preparation and Submission for Approval for Zone 7
A28420 As built Drawing Preparation and Submission for Approval for Zone 18
A28450 As built Drawing Preparation and Submission for Approval for Zone 10
A28460 As built Drawing Preparation and Submission for Approval for Zone 22
A28470 As built Drawing Preparation and Submission for Approval for Zone 28
A28480 As built Drawing Preparation and Submission for Approval for Zone 39
A28500 As built Drawing Preparation and Submission for Approval for Zone 31
A28510 As built Drawing Preparation and Submission for Approval for Zone 41
A28530 As built Drawing Preparation and Submission for Approval for Zone 25
A28540 As built Drawing Preparation and Submission for Approval for Zone 35
A28550 As built Drawing Preparation and Submission for Approval for Zone 37
A28560 As built Drawing Preparation and Submission for Approval for Zone 40
A28570 As built Drawing Preparation and Submission for Approval for Zone 12
A28580 As built Drawing Preparation and Submission for Approval for Zone 23
A28610 As built Drawing Preparation and Submission for Approval for Zone 16
A28620 As built Drawing Preparation and Submission for Approval for Zone 26
A28630 As built Drawing Preparation and Submission for Approval for Zone 34
A28650 As built Drawing Preparation and Submission for Approval for Zone 19
A28660 As built Drawing Preparation and Submission for Approval for Zone 36
A28690 As built Drawing Preparation and Submission for Approval for Zone 29
A28700 As built Drawing Preparation and Submission for Approval for Zone 42
A28730 As built Drawing Preparation and Submission for Approval for Zone 20
A28770 As built Drawing Preparation and Submission for Approval for Zone 32
A2880 Final Pressure Test and Handover to Employer of Zone 3
A28810 As built Drawing Preparation and Submission for Approval for Zone 38
A28840 As built Drawing Preparation and Submission for Approval for Zone 11
A2890 Finishing Activity Related Zone 3 Finalization
A28940 Submission for Approval of Working Drawing for Zone 5
A28950 Approval of Working Drawing for Zone 5
A28960 Submission for Approval of Working Drawing for Zone 6
A28970 Approval of Working Drawing for Zone 6
A28980 Submission for Approval of Working Drawing for Zone 7
A28990 Approval of Working Drawing for Zone 7
A2900 As built Drawing Preparation and Submission for Approval for Zone 3
A29060 Submission for Approval of Working Drawing for Zone 8
A29070 Approval of Working Drawing for Zone 8
A29080 Submission for Approval of Working Drawing for Zone 9
A29090 Approval of Working Drawing for Zone 9
A29100 Submission for Approval of Working Drawing for Zone 10
A29110 Approval of Working Drawing for Zone 10
A29120 Submission for Approval of Working Drawing for Zone 11
A29130 Approval of Working Drawing for Zone 11
A29140 Submission for Approval of Working Drawing for Zone 12
A29150 Approval of Working Drawing for Zone 12
A29160 Submission for Approval of Working Drawing for Zone 13
A29170 Approval of Working Drawing for Zone 13
A29180 Submission for Approval of Working Drawing for Zone 14
A29190 Approval of Working Drawing for Zone 14
A29200 Submission for Approval of Working Drawing for Zone 15
A29210 Approval of Working Drawing for Zone 15
A29240 Submission for Approval of Working Drawing for Zone 17
A29250 Approval of Working Drawing for Zone 17
A29260 Submission for Approval of Working Drawing for Zone 18
A29270 Approval of Working Drawing for Zone 18
A29280 Submission for Approval of Working Drawing for Zone 19
A29290 Approval of Working Drawing for Zone 19
A29320 Submission for Approval of Working Drawing for Zone 21
A29330 Approval of Working Drawing for Zone 21
A29340 Submission for Approval of Working Drawing for Zone 22
A29350 Approval of Working Drawing for Zone 22
A29360 Submission for Approval of Working Drawing for Zone 23
A29370 Approval of Working Drawing for Zone 23
A29390 Approval of Working Drawing for Zone 24
A29410 Approval of Working Drawing for Zone 25
A29430 Approval of Working Drawing for Zone 26
A29450 Approval of Working Drawing for Zone 27
A29470 Approval of Working Drawing for Zone 28
A29490 Approval of Working Drawing for Zone 29
A29520 Submission for Approval of Working Drawing for Zone 31
A29530 Approval of Working Drawing for Zone 31
A29540 Submission for Approval of Working Drawing for Zone 32
A29550 Approval of Working Drawing for Zone 32
A29560 Submission for Approval of Working Drawing for Zone 33
A29570 Approval of Working Drawing for Zone 33
A29580 Submission for Approval of Working Drawing for Zone 34
A29590 Approval of Working Drawing for Zone 34
A29600 Submission for Approval of Working Drawing for Zone 35
A29610 Approval of Working Drawing for Zone 35
A29620 Submission for Approval of Working Drawing for Zone 36
A29630 Approval of Working Drawing for Zone 36
A29640 Submission for Approval of Working Drawing for Zone 37
A29650 Approval of Working Drawing for Zone 37
A29660 Submission for Approval of Working Drawing for Zone 38
A29670 Approval of Working Drawing for Zone 38
A29680 Submission for Approval of Working Drawing for Zone 39
A29690 Approval of Working Drawing for Zone 39
A29700 Submission for Approval of Working Drawing for Zone 40
A29710 Approval of Working Drawing for Zone 40
A29720 Submission for Approval of Working Drawing for Zone 41
A29730 Approval of Working Drawing for Zone 41
A29740 Submission for Approval of Working Drawing for Zone 42
A29750 Approval of Working Drawing for Zone 42
A29760 Submission for Approval of Working Drawing for Zone 43
A29770 Approval of Working Drawing for Zone 43
A29780 Submission for Approval of Working Drawing for Zone 44
A29790 Approval of Working Drawing for Zone 44
A29800 Submission for Approval of Working Drawing for Zone 45
A29810 Approval of Working Drawing for Zone 45
A29820 Submission for Approval of Working Drawing for Zone 46
A29830 Approval of Working Drawing for Zone 46
A29840 Submission for Approval of Working Drawing for Zone 47
A29850 Approval of Working Drawing for Zone 47
A3250 Installation of 200 mm Pipe at Zone 4
A3400 Identify the Existing Water Supply Line (if any) at Zone 4
A3410 Notify clients and vendors (if any) at Zone 4 Area Water Supply Authorities
A3480 As built Drawing Preparation and Submission for Approval for Zone 4
A3830 Installation of 200 mm Pipe at Zone 5
A3980 Identify the Existing Water Supply Line (if any) at Zone 5
A3990 Notify clients and vendors (if any) at Zone 5 Area Water Supply Authorities
A4380 Installation of 200 mm Pipe at Zone 6
A4490 Geotextile installation at 200 mm Pipe at Zone 6
A4530 Identify the Existing Water Supply Line (if any) at Zone 6
A4540 Notify clients and vendors (if any) at Zone 6 Area Water Supply Authorities
A5080 Identify the Existing Water Supply Line (if any) at Zone 7
A5090 Notify clients and vendors (if any) at Zone 7 Area Water Supply Authorities
A5630 Identify the Existing Water Supply Line (if any) at Zone 8
A5640 Notify clients and vendors (if any) at Zone 8 Area Water Supply Authorities
A6030 Installation of 200 mm Pipe at Zone 9
A6180 Identify the Existing Water Supply Line (if any) at Zone 9
A6190 Notify clients and vendors (if any) at Zone 9 Area Water Supply Authorities
A6580 Installation of 200 mm Pipe at Zone 10
A6730 Identify the Existing Water Supply Line (if any) at Zone 10
A6740 Notify clients and vendors (if any) at Zone 10 Area Water Supply Authorities
A7280 Identify the Existing Water Supply Line (if any) at Zone 11
A7290 Notify clients and vendors (if any) at Zone 11 Area Water Supply Authorities
A7830 Identify the Existing Water Supply Line (if any) at Zone 12
A7840 Notify clients and vendors (if any) at Zone 12 Area Water Supply Authorities
A8230 Installation of 200 mm Pipe at Zone 13
A8380 Identify the Existing Water Supply Line (if any) at Zone 13
A8390 Notify clients and vendors (if any) at Zone 13 Area Water Supply Authorities
A8780 Installation of 200 mm Pipe at Zone 14
A8790 Installation of 250 mm Pipe at Zone 14
A8900 Geotextile installation at 250 mm Pipe at Zone 14
A8930 Identify the Existing Water Supply Line (if any) at Zone 14
A8940 Notify clients and vendors (if any) at Zone 14 Area Water Supply Authorities
A9330 Installation of 200 mm Pipe at Zone 15
A9480 Identify the Existing Water Supply Line (if any) at Zone 15
A9490 Notify clients and vendors (if any) at Zone 15 Area Water Supply Authorities
A9870 Installation of 160 mm Pipe at Zone 16
A9880 Installation of 200 mm Pipe at Zone 16
A9890 Installation of 250 mm Pipe at Zone 16
A9980 Geotextile installation at 160 mm Pipe at Zone 16
Item1 Item2
CL Closing the Project
Multiple WPR WBS Code should be used Only once
Item1 Item2
A10010 Curbstone Tiles Reinstatement after Asphalt Works at Zone 16
A10020 Curbstone Reinstatement as per Authorities Regulations at Zone 16
A10560 Curbstone Tiles Reinstatement after Asphalt Works at Zone 17
A10570 Curbstone Reinstatement as per Authorities Regulations at Zone 17
A11110 Curbstone Tiles Reinstatement after Asphalt Works at Zone 18
A11120 Curbstone Reinstatement as per Authorities Regulations at Zone 18
A11660 Curbstone Tiles Reinstatement after Asphalt Works at Zone 19
A11670 Curbstone Reinstatement as per Authorities Regulations at Zone 19
A12760 Curbstone Tiles Reinstatement after Asphalt Works at Zone 21
A12770 Curbstone Reinstatement as per Authorities Regulations at Zone 21
A13310 Curbstone Tiles Reinstatement after Asphalt Works at Zone 22
A13320 Curbstone Reinstatement as per Authorities Regulations at Zone 22
A13860 Curbstone Tiles Reinstatement after Asphalt Works at Zone 23
A13870 Curbstone Reinstatement as per Authorities Regulations at Zone 23
A14410 Curbstone Tiles Reinstatement after Asphalt Works at Zone 24
A14420 Curbstone Reinstatement as per Authorities Regulations at Zone 24
A14960 Curbstone Tiles Reinstatement after Asphalt Works at Zone 25
A14970 Curbstone Reinstatement as per Authorities Regulations at Zone 25
A15510 Curbstone Tiles Reinstatement after Asphalt Works at Zone 26
A15520 Curbstone Reinstatement as per Authorities Regulations at Zone 26
A16060 Curbstone Tiles Reinstatement after Asphalt Works at Zone 27
A16070 Curbstone Reinstatement as per Authorities Regulations at Zone 27
A1650 Curbstone Tiles Reinstatement after Asphalt Works at Zone 1
A1660 Curbstone Reinstatement as per Authorities Regulations at Zone 1
A16610 Curbstone Tiles Reinstatement after Asphalt Works at Zone 28
A16620 Curbstone Reinstatement as per Authorities Regulations at Zone 28
A17160 Curbstone Tiles Reinstatement after Asphalt Works at Zone 29
A17170 Curbstone Reinstatement as per Authorities Regulations at Zone 29
A17710 Curbstone Tiles Reinstatement after Asphalt Works at Zone 30
A17720 Curbstone Reinstatement as per Authorities Regulations at Zone 30
A18260 Curbstone Tiles Reinstatement after Asphalt Works at Zone 31
A18270 Curbstone Reinstatement as per Authorities Regulations at Zone 31
A18810 Curbstone Tiles Reinstatement after Asphalt Works at Zone 32
A18820 Curbstone Reinstatement as per Authorities Regulations at Zone 32
A19360 Curbstone Tiles Reinstatement after Asphalt Works at Zone 33
A19370 Curbstone Reinstatement as per Authorities Regulations at Zone 33
A19910 Curbstone Tiles Reinstatement after Asphalt Works at Zone 34
A19920 Curbstone Reinstatement as per Authorities Regulations at Zone 34
A20460 Curbstone Tiles Reinstatement after Asphalt Works at Zone 35
A20470 Curbstone Reinstatement as per Authorities Regulations at Zone 35
A21010 Curbstone Tiles Reinstatement after Asphalt Works at Zone 36
A21020 Curbstone Reinstatement as per Authorities Regulations at Zone 36
A21560 Curbstone Tiles Reinstatement after Asphalt Works at Zone 37
A21570 Curbstone Reinstatement as per Authorities Regulations at Zone 37
A22110 Curbstone Tiles Reinstatement after Asphalt Works at Zone 38
A22120 Curbstone Reinstatement as per Authorities Regulations at Zone 38
A2250 Curbstone Tiles Reinstatement after Asphalt Works at Zone 2
A2260 Curbstone Reinstatement as per Authorities Regulations at Zone 2
A22660 Curbstone Tiles Reinstatement after Asphalt Works at Zone 39
A22670 Curbstone Reinstatement as per Authorities Regulations at Zone 39
A23210 Curbstone Tiles Reinstatement after Asphalt Works at Zone 40
A23220 Curbstone Reinstatement as per Authorities Regulations at Zone 40
A23760 Curbstone Tiles Reinstatement after Asphalt Works at Zone 41
A23770 Curbstone Reinstatement as per Authorities Regulations at Zone 41
A24310 Curbstone Tiles Reinstatement after Asphalt Works at Zone 42
A24320 Curbstone Reinstatement as per Authorities Regulations at Zone 42
A24860 Curbstone Tiles Reinstatement after Asphalt Works at Zone 43
A24870 Curbstone Reinstatement as per Authorities Regulations at Zone 43
A25410 Curbstone Tiles Reinstatement after Asphalt Works at Zone 44
A25420 Curbstone Reinstatement as per Authorities Regulations at Zone 44
A25960 Curbstone Tiles Reinstatement after Asphalt Works at Zone 45
A25970 Curbstone Reinstatement as per Authorities Regulations at Zone 45
A26510 Curbstone Tiles Reinstatement after Asphalt Works at Zone 46
A26520 Curbstone Reinstatement as per Authorities Regulations at Zone 46
A27060 Curbstone Tiles Reinstatement after Asphalt Works at Zone 47
A27070 Curbstone Reinstatement as per Authorities Regulations at Zone 47
A2800 Curbstone Tiles Reinstatement after Asphalt Works at Zone 3
A2810 Curbstone Reinstatement as per Authorities Regulations at Zone 3
A3380 Curbstone Tiles Reinstatement after Asphalt Works at Zone 4
A3390 Curbstone Reinstatement as per Authorities Regulations at Zone 4
A3960 Curbstone Tiles Reinstatement after Asphalt Works at Zone 5
A3970 Curbstone Reinstatement as per Authorities Regulations at Zone 5
A4510 Curbstone Tiles Reinstatement after Asphalt Works at Zone 6
A4520 Curbstone Reinstatement as per Authorities Regulations at Zone 6
A5060 Curbstone Tiles Reinstatement after Asphalt Works at Zone 7
A5070 Curbstone Reinstatement as per Authorities Regulations at Zone 7
A5610 Curbstone Tiles Reinstatement after Asphalt Works at Zone 8
A5620 Curbstone Reinstatement as per Authorities Regulations at Zone 8
A6160 Curbstone Tiles Reinstatement after Asphalt Works at Zone 9
A6170 Curbstone Reinstatement as per Authorities Regulations at Zone 9
A6710 Curbstone Tiles Reinstatement after Asphalt Works at Zone 10
A6720 Curbstone Reinstatement as per Authorities Regulations at Zone 10
A7260 Curbstone Tiles Reinstatement after Asphalt Works at Zone 11
A7270 Curbstone Reinstatement as per Authorities Regulations at Zone 11
A7810 Curbstone Tiles Reinstatement after Asphalt Works at Zone 12
A7820 Curbstone Reinstatement as per Authorities Regulations at Zone 12
A8360 Curbstone Tiles Reinstatement after Asphalt Works at Zone 13
A8370 Curbstone Reinstatement as per Authorities Regulations at Zone 13
A8910 Curbstone Tiles Reinstatement after Asphalt Works at Zone 14
A8920 Curbstone Reinstatement as per Authorities Regulations at Zone 14
A9460 Curbstone Tiles Reinstatement after Asphalt Works at Zone 15
A9470 Curbstone Reinstatement as per Authorities Regulations at Zone 15
Item1 Item2
Missed WBMobilization MB WBS Code should be under PE WBS Code.
CL Closing the Project
Z1 Zone 1 (F-127)
Z2 Zone 2 (G-127)
Z3 Zone 3 (F-128)
Z4 Zone 4 (G-128)
Z5 Zone 5 (H-128)
Z6 Zone 6 (E-129)
Z7 Zone 7 (F-129)
Z8 Zone 8 (G-129)
Z9 Zone 9 (H-129)
Z10 Zone 10 (E-130)
Z11 Zone 11 (F-130)
Z12 Zone 12 (G-130)
Z13 Zone 13 (H-130)
Z14 Zone 14 (E-131)
Z15 Zone 15 (F-131)
Z16 Zone 16 (G-131)
Z17 Zone 17 (H-131)
Z18 Zone 18 (I-131)
Z19 Zone 19 (J-131)
Z20 Zone 20 (E-132)
Z21 Zone 21 (F-132)
Z22 Zone 22 (G-132)
Z23 Zone 23 (H-132)
Z24 Zone 24 (I-132)
Z25 Zone 25 (J-132)
Z26 Zone 26 (F-133)
Z27 Zone 27 (G-133)
Z28 Zone 28 (H-133)
Z29 Zone 29 (I-133)
Z30 Zone 30 (J-133)
Z31 Zone 31 (G-134)
Z32 Zone 32 (H-134)
Z33 Zone 33 (I-134)
Z34 Zone 34 (J-134)
Z35 Zone 35 (H-135)
Z36 Zone 36 (I-135)
Z37 Zone 37 (J-135)
38 Zone 38 (G-136)
Z39 Zone 39 (H-136)
Z40 Zone 40 (I-136)
Z41 Zone 41 (J-136)
Z42 Zone 42 (H-137)
Z43 Zone 43 (I-137)
Z44 Zone 44 (J-137)
Z45 Zone 45 (K-137)
Z46 Zone 46 (J-138)
Z47 Zone 47 (K-138)
Z1 Zone 1 (F-127)
Z2 Zone 2 ((G-127)
Z3 Zone 3 (F-128)
Z4 Zone 4 (G-128)
Z5 Zone 5 (H-128)
Z6 Zone 6 (E-129)
Z7 Zone 7 (F-129)
Z8 Zone 8 (G-129)
Z9 Zone 9 (H-129)
Z10 Zone 10 (E-130)
Z11 Zone 11 (F-130)
Z12 Zone 12 (G-130)
Z13 Zone 13 (H-130)
Z14 Zone 14 (E-131)
Z15 Zone 15 (F-131)
Z16 Zone 16 (G-131)
Z17 Zone 17 (H-131)
Z18 Zone 18 (I-131)
Z19 Zone 19 (J-131)
Z20 Zone 20 (E-132)
Z21 Zone 21 (F-132)
Z22 Zone 22 (G-132)
Z23 Zone 23 (H-132)
Z24 Zone 24 (I-132)
Z25 Zone 25 (J-132)
Z26 Zone 26 (F-133)
Z27 Zone 27 (G-133)
Z28 Zone 28 (H-133)
Z29 Zone 29 (I-133)
Z30 Zone 30 (J-133)
Z31 Zone 31 (G-134)
Z32 Zone 32 (H-134)
Z33 Zone 33 (I-134)
Z34 Zone 34 (J-134)
Z35 Zone 35 (H-135)
Z36 Zone 36 (I-135)
Z37 Zone 37 (J-135)
Z38 Zone 38 (G-136)
Z39 Zone 39 (H-136)
Z40 Zone 40 (I-136)
Z41 Zone 41 (J-136)
Z42 Zone 42 (H-137)
Z43 Zone 43 (I-137)
Z44 Zone 44 (J-137)
Z45 Zone 45 (K-137)
Z46 Zone 46 (J-138)
Z47 Zone 47 (K-138)
1 Contractor Mobilization
2 Safety Facility and Survey
PDS Project Documents Submittal & Approval
MSA Material Submittal & Approval
HDS Hydraulic Study
SDS Shop Drawing Submittal & Approval
SLI Short Lead Items
LLI Long Lead Items
Z21 Zone 21 (F-132)
Z22 Zone 22 (G-132)
Z23 Zone 23 (H-132)
Z24 Zone 24 (I-132)
Z25 Zone 25 (J-132)
Z26 Zone 26 (F-133)
Z27 Zone 27 (G-133)
Z28 Zone 28 (H-133)
Z29 Zone 29 (I-133)
Z30 Zone 30 (J-133)
Z31 Zone 31 (G-134)
Z32 Zone 32 (H-134)
Z33 Zone 33 (I-134)
Z34 Zone 34 (J-134)
Z35 Zone 35 (H-135)
Z36 Zone 36 (I-135)
Z37 Zone 37 (J-135)
Z38 Zone 38 (G-136)
Z39 Zone 39 (H-136)
Z40 Zone 40 (I-136)
Z41 Zone 41 (J-136)
Z42 Zone 42 (H-137)
Z43 Zone 43 (I-137)
Z44 Zone 44 (J-137)
Z45 Zone 45 (K-137)
Z46 Zone 46 (J-138)
Z47 Zone 47 (K-138)
Z1 Zone 1 (F-127)
Z2 Zone 2 (G-127)
Z3 Zone 3 (F-128)
Z4 Zone 4 (G-128)
Z5 Zone 5 (H-128)
Z6 Zone 6 (E-129)
Z7 Zone 7 (F-129)
Z8 Zone 8 (G-129)
Z9 Zone 9 (H-129)
Z10 Zone 10 (E-130)
Z11 Zone 11 (F-130)
Z12 Zone 12 (G-130)
Z13 Zone 13 (H-130)
Z14 Zone 14 (E-131)
Z15 Zone 15 (F-131)
Z16 Zone 16 (G-131)
Z17 Zone 17 (H-131)
Z18 Zone 18 (I-131)
Z19 Zone 19 (J-131)
PO Purchasing Order
FAB Fabrication & Assembly
DS Delivery to site
MI Material Inspection
PO Purchasing Order
FAB Fabrication & Assembly
DS Delivery to site
MI Material Inspection
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
PR Preliminary Works
CV Civil Works
MC Mechinical
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
33 Utility Relocation
31 Earthworks
3 Surface Reinstatement Works
1 Construction of Valves Chamber
1 Pipe Installation with Accessories
2 Pressure Test
Item1 Item2 Item3
EN.HS.1 Hydraulic 15
Item1 Item2
A10190 Relocate Electrical Cable at Zone 17
A10220 Relocate Existing Septic Tanks (if any) at Zone 17
A10250 Relocate Existing Sewer Line (if any) at Zone 17
A10420 Installation of 160 mm Pipe at Zone 17
A10440 Installation of 250 mm Pipe at Zone 17
A10470 Asphalt Works at Zone 17
A10740 Relocate Electrical Cable at Zone 18
A10770 Relocate Existing Septic Tanks (if any) at Zone 18
A10800 Relocate Existing Sewer Line (if any) at Zone 18
A10960 Installation of 110 mm Pipe at Zone 18
A10970 Installation of 160 mm Pipe at Zone 18
A10990 Installation of 250 mm Pipe at Zone 18
A11020 Asphalt Works at Zone 18
A11290 Relocate Electrical Cable at Zone 19
A11320 Relocate Existing Septic Tanks (if any) at Zone 19
A11350 Relocate Existing Sewer Line (if any) at Zone 19
A11520 Installation of 160 mm Pipe at Zone 19
A11570 Asphalt Works at Zone 19
A1220 Relocate Electrical Cable at Zone 1
A12390 Relocate Electrical Cable at Zone 21
A12420 Relocate Existing Septic Tanks (if any) at Zone 21
A12450 Relocate Existing Sewer Line (if any) at Zone 21
A1250 Relocate Existing Septic Tanks (if any) at Zone 1
A12620 Installation of 160 mm Pipe at Zone 21
A12670 Asphalt Works at Zone 21
A1280 Relocate Existing Sewer Line (if any) at Zone 1
A12940 Relocate Electrical Cable at Zone 22
A12970 Relocate Existing Septic Tanks (if any) at Zone 22
A13000 Relocate Existing Sewer Line (if any) at Zone 22
A13170 Installation of 160 mm Pipe at Zone 22
A13190 Installation of 250 mm Pipe at Zone 22
A13220 Asphalt Works at Zone 22
A13490 Relocate Electrical Cable at Zone 23
A13520 Relocate Existing Septic Tanks (if any) at Zone 23
A13550 Relocate Existing Sewer Line (if any) at Zone 23
A13720 Installation of 160 mm Pipe at Zone 23
A13770 Asphalt Works at Zone 23
A14040 Relocate Electrical Cable at Zone 24
A14070 Relocate Existing Septic Tanks (if any) at Zone 24
A14100 Relocate Existing Sewer Line (if any) at Zone 24
A14260 Installation of 110 mm Pipe at Zone 24
A14270 Installation of 160 mm Pipe at Zone 24
A14290 Installation of 250 mm Pipe at Zone 24
A14320 Asphalt Works at Zone 24
A14590 Relocate Electrical Cable at Zone 25
A14620 Relocate Existing Septic Tanks (if any) at Zone 25
A14650 Relocate Existing Sewer Line (if any) at Zone 25
A1470 Installation of 160 mm Pipe at Zone 1
A14820 Installation of 160 mm Pipe at Zone 25
A14870 Asphalt Works at Zone 25
A15140 Relocate Electrical Cable at Zone 26
A15170 Relocate Existing Septic Tanks (if any) at Zone 26
A1520 Asphalt Works at Zone 1
A15200 Relocate Existing Sewer Line (if any) at Zone 26
A15370 Installation of 160 mm Pipe at Zone 26
A15420 Asphalt Works at Zone 26
A15690 Relocate Electrical Cable at Zone 27
A15720 Relocate Existing Septic Tanks (if any) at Zone 27
A15750 Relocate Existing Sewer Line (if any) at Zone 27
A15910 Installation of 110 mm Pipe at Zone 27
A15920 Installation of 160 mm Pipe at Zone 27
A15940 Installation of 250 mm Pipe at Zone 27
A15970 Asphalt Works at Zone 27
A16240 Relocate Electrical Cable at Zone 28
A16270 Relocate Existing Septic Tanks (if any) at Zone 28
A16300 Relocate Existing Sewer Line (if any) at Zone 28
A16470 Installation of 160 mm Pipe at Zone 28
A16490 Installation of 250 mm Pipe at Zone 28
A16520 Asphalt Works at Zone 28
A16790 Relocate Electrical Cable at Zone 29
A16820 Relocate Existing Septic Tanks (if any) at Zone 29
A16850 Relocate Existing Sewer Line (if any) at Zone 29
A17020 Installation of 160 mm Pipe at Zone 29
A17070 Asphalt Works at Zone 29
A17340 Relocate Electrical Cable at Zone 30
A17370 Relocate Existing Septic Tanks (if any) at Zone 30
A1740 Finishing Activity Related Zone 1 Finalization
A17400 Relocate Existing Sewer Line (if any) at Zone 30
A17570 Installation of 160 mm Pipe at Zone 30
A17590 Installation of 250 mm Pipe at Zone 30
A1760 Finishing Activity Related Zone 2 Finalization
A17620 Asphalt Works at Zone 30
A17890 Relocate Electrical Cable at Zone 31
A17920 Relocate Existing Septic Tanks (if any) at Zone 31
A17950 Relocate Existing Sewer Line (if any) at Zone 31
A18120 Installation of 160 mm Pipe at Zone 31
A18140 Installation of 250 mm Pipe at Zone 31
A18170 Asphalt Works at Zone 31
A18440 Relocate Electrical Cable at Zone 32
A18470 Relocate Existing Septic Tanks (if any) at Zone 32
A18500 Relocate Existing Sewer Line (if any) at Zone 32
A18660 Installation of 110 mm Pipe at Zone 32
A18670 Installation of 160 mm Pipe at Zone 32
A18690 Installation of 250 mm Pipe at Zone 32
A18720 Asphalt Works at Zone 32
A1880 Relocate Electrical Cable at Zone 2
A18990 Relocate Electrical Cable at Zone 33
A19020 Relocate Existing Septic Tanks (if any) at Zone 33
A19050 Relocate Existing Sewer Line (if any) at Zone 33
A1910 Relocate Existing Septic Tanks (if any) at Zone 2
A19220 Installation of 160 mm Pipe at Zone 33
A19240 Installation of 250 mm Pipe at Zone 33
A19270 Asphalt Works at Zone 33
A1940 Relocate Existing Sewer Line (if any) at Zone 2
A19540 Relocate Electrical Cable at Zone 34
A19570 Relocate Existing Septic Tanks (if any) at Zone 34
A19600 Relocate Existing Sewer Line (if any) at Zone 34
A19760 Installation of 110 mm Pipe at Zone 34
A19770 Installation of 160 mm Pipe at Zone 34
A19790 Installation of 250 mm Pipe at Zone 34
A19820 Asphalt Works at Zone 34
A20090 Relocate Electrical Cable at Zone 35
A20120 Relocate Existing Septic Tanks (if any) at Zone 35
A20150 Relocate Existing Sewer Line (if any) at Zone 35
A20310 Installation of 110 mm Pipe at Zone 35
A20320 Installation of 160 mm Pipe at Zone 35
A20340 Installation of 250 mm Pipe at Zone 35
A20370 Asphalt Works at Zone 35
A20640 Relocate Electrical Cable at Zone 36
A20670 Relocate Existing Septic Tanks (if any) at Zone 36
A20700 Relocate Existing Sewer Line (if any) at Zone 36
A20870 Installation of 160 mm Pipe at Zone 36
A20890 Installation of 250 mm Pipe at Zone 36
A20920 Asphalt Works at Zone 36
A2110 Installation of 160 mm Pipe at Zone 2
A21190 Relocate Electrical Cable at Zone 37
A21220 Relocate Existing Septic Tanks (if any) at Zone 37
A21250 Relocate Existing Sewer Line (if any) at Zone 37
A21420 Installation of 160 mm Pipe at Zone 37
A21470 Asphalt Works at Zone 37
A2160 Asphalt Works at Zone 2
A21740 Relocate Electrical Cable at Zone 38
A21770 Relocate Existing Septic Tanks (if any) at Zone 38
A21800 Relocate Existing Sewer Line (if any) at Zone 38
A21970 Installation of 160 mm Pipe at Zone 38
A22020 Asphalt Works at Zone 38
A22290 Relocate Electrical Cable at Zone 39
A22320 Relocate Existing Septic Tanks (if any) at Zone 39
A22350 Relocate Existing Sewer Line (if any) at Zone 39
A22520 Installation of 160 mm Pipe at Zone 39
A22540 Installation of 250 mm Pipe at Zone 39
A22570 Asphalt Works at Zone 39
A22840 Relocate Electrical Cable at Zone 40
A22870 Relocate Existing Septic Tanks (if any) at Zone 40
A22900 Relocate Existing Sewer Line (if any) at Zone 40
A23070 Installation of 160 mm Pipe at Zone 40
A23120 Asphalt Works at Zone 40
A23390 Relocate Electrical Cable at Zone 41
A23420 Relocate Existing Septic Tanks (if any) at Zone 41
A23450 Relocate Existing Sewer Line (if any) at Zone 41
A23610 Installation of 110 mm Pipe at Zone 41
A23620 Installation of 160 mm Pipe at Zone 41
A23640 Installation of 250 mm Pipe at Zone 41
A23670 Asphalt Works at Zone 41
A23940 Relocate Electrical Cable at Zone 42
A23970 Relocate Existing Septic Tanks (if any) at Zone 42
A24000 Relocate Existing Sewer Line (if any) at Zone 42
A24160 Installation of 110 mm Pipe at Zone 42
A24190 Installation of 250 mm Pipe at Zone 42
A24220 Asphalt Works at Zone 42
A2430 Relocate Electrical Cable at Zone 3
A24490 Relocate Electrical Cable at Zone 43
A24520 Relocate Existing Septic Tanks (if any) at Zone 43
A24550 Relocate Existing Sewer Line (if any) at Zone 43
A2460 Relocate Existing Septic Tanks (if any) at Zone 3
A24720 Installation of 160 mm Pipe at Zone 43
A24740 Installation of 250 mm Pipe at Zone 43
A24770 Asphalt Works at Zone 43
A2490 Relocate Existing Sewer Line (if any) at Zone 3
A25040 Relocate Electrical Cable at Zone 44
A25070 Relocate Existing Septic Tanks (if any) at Zone 44
A25100 Relocate Existing Sewer Line (if any) at Zone 44
A25260 Installation of 110 mm Pipe at Zone 44
A25270 Installation of 160 mm Pipe at Zone 44
A25290 Installation of 250 mm Pipe at Zone 44
A25320 Asphalt Works at Zone 44
A25590 Relocate Electrical Cable at Zone 45
A25620 Relocate Existing Septic Tanks (if any) at Zone 45
A25650 Relocate Existing Sewer Line (if any) at Zone 45
A25840 Installation of 250 mm Pipe at Zone 45
A25870 Asphalt Works at Zone 45
A26140 Relocate Electrical Cable at Zone 46
A26170 Relocate Existing Septic Tanks (if any) at Zone 46
A26200 Relocate Existing Sewer Line (if any) at Zone 46
A26370 Installation of 160 mm Pipe at Zone 46
A26390 Installation of 250 mm Pipe at Zone 46
A26420 Asphalt Works at Zone 46
A2660 Installation of 160 mm Pipe at Zone 3
A26690 Relocate Electrical Cable at Zone 47
A26720 Relocate Existing Septic Tanks (if any) at Zone 47
A26750 Relocate Existing Sewer Line (if any) at Zone 47
A2680 Installation of 250 mm Pipe at Zone 3
A26920 Installation of 160 mm Pipe at Zone 47
A26940 Installation of 250 mm Pipe at Zone 47
A26970 Asphalt Works at Zone 47
A2710 Asphalt Works at Zone 3
A27150 Finishing Activity Related Zone 29 Finalization
A27170 Finishing Activity Related Zone 4 Finalization
A27190 Finishing Activity Related Zone 7 Finalization
A27210 Finishing Activity Related Zone 12 Finalization
A27230 Finishing Activity Related Zone 23 Finalization
A27250 Finishing Activity Related Zone 5 Finalization
A27270 Finishing Activity Related Zone 13 Finalization
A27290 Finishing Activity Related Zone 26 Finalization
A27310 Finishing Activity Related Zone 46 Finalization
A27330 Finishing Activity Related Zone 8 Finalization
A27350 Finishing Activity Related Zone 16 Finalization
A27390 Finishing Activity Related Zone 32 Finalization
A27410 Finishing Activity Related Zone 6 Finalization
A27430 Finishing Activity Related Zone 17 Finalization
A27450 Finishing Activity Related Zone 44 Finalization
A27470 Finishing Activity Related Zone 42 Finalization
A27490 Finishing Activity Related Zone 9 Finalization
A27510 Finishing Activity Related Zone 21 Finalization
A27530 Finishing Activity Related Zone 27 Finalization
A27550 Finishing Activity Related Zone 38 Finalization
A27570 Finishing Activity Related Zone 14 Finalization
A27590 Finishing Activity Related Zone 30 Finalization
A27610 Finishing Activity Related Zone 40 Finalization
A27650 Finishing Activity Related Zone 24 Finalization
A27670 Finishing Activity Related Zone 34 Finalization
A27690 Finishing Activity Related Zone 36 Finalization
A27710 Finishing Activity Related Zone 39 Finalization
A27730 Finishing Activity Related Zone 11 Finalization
A27750 Finishing Activity Related Zone 22 Finalization
A27810 Finishing Activity Related Zone 15 Finalization
A27830 Finishing Activity Related Zone 25 Finalization
A27850 Finishing Activity Related Zone 33 Finalization
A27890 Finishing Activity Related Zone 18 Finalization
A27910 Finishing Activity Related Zone 35 Finalization
A27970 Finishing Activity Related Zone 28 Finalization
A27990 Finishing Activity Related Zone 41 Finalization
A28010 Finishing Activity Related Zone 45 Finalization
A28050 Finishing Activity Related Zone 19 Finalization
A28070 Finishing Activity Related Zone 43 Finalization
A28130 Finishing Activity Related Zone 31 Finalization
A28140 Final Pressure Test and Handover to Employer of Zone 47
A28150 Finishing Activity Related Zone 47 Finalization
A28210 Finishing Activity Related Zone 37 Finalization
A28270 Finishing Activity Related Zone 10 Finalization
A2890 Finishing Activity Related Zone 3 Finalization
A3010 Relocate Electrical Cable at Zone 4
A3040 Relocate Existing Septic Tanks (if any) at Zone 4
A3070 Relocate Existing Sewer Line (if any) at Zone 4
A3240 Installation of 160 mm Pipe at Zone 4
A3260 Installation of 250 mm Pipe at Zone 4
A3290 Asphalt Works at Zone 4
A3590 Relocate Electrical Cable at Zone 5
A3620 Relocate Existing Septic Tanks (if any) at Zone 5
A3650 Relocate Existing Sewer Line (if any) at Zone 5
A3870 Asphalt Works at Zone 5
A4140 Relocate Electrical Cable at Zone 6
A4170 Relocate Existing Septic Tanks (if any) at Zone 6
A4200 Relocate Existing Sewer Line (if any) at Zone 6
A4420 Asphalt Works at Zone 6
A4690 Relocate Electrical Cable at Zone 7
A4720 Relocate Existing Septic Tanks (if any) at Zone 7
A4750 Relocate Existing Sewer Line (if any) at Zone 7
A4910 Installation of 110 mm Pipe at Zone 7
A4920 Installation of 160 mm Pipe at Zone 7
A4940 Installation of 250 mm Pipe at Zone 7
A4970 Asphalt Works at Zone 7
A5240 Relocate Electrical Cable at Zone 8
A5270 Relocate Existing Septic Tanks (if any) at Zone 8
A5300 Relocate Existing Sewer Line (if any) at Zone 8
A5460 Installation of 110 mm Pipe at Zone 8
A5470 Installation of 160 mm Pipe at Zone 8
A5490 Installation of 250 mm Pipe at Zone 8
A5520 Asphalt Works at Zone 8
A5790 Relocate Electrical Cable at Zone 9
A5820 Relocate Existing Septic Tanks (if any) at Zone 9
A5850 Relocate Existing Sewer Line (if any) at Zone 9
A6020 Installation of 160 mm Pipe at Zone 9
A6040 Installation of 250 mm Pipe at Zone 9
A6070 Asphalt Works at Zone 9
A6340 Relocate Electrical Cable at Zone 10
A6370 Relocate Existing Septic Tanks (if any) at Zone 10
A6400 Relocate Existing Sewer Line (if any) at Zone 10
A6560 Installation of 110 mm Pipe at Zone 10
A6570 Installation of 160 mm Pipe at Zone 10
A6590 Installation of 250 mm Pipe at Zone 10
A6620 Asphalt Works at Zone 10
A6890 Relocate Electrical Cable at Zone 11
A6920 Relocate Existing Septic Tanks (if any) at Zone 11
A6950 Relocate Existing Sewer Line (if any) at Zone 11
A7120 Installation of 160 mm Pipe at Zone 11
A7140 Installation of 250 mm Pipe at Zone 11
A7170 Asphalt Works at Zone 11
A7440 Relocate Electrical Cable at Zone 12
A7470 Relocate Existing Septic Tanks (if any) at Zone 12
A7500 Relocate Existing Sewer Line (if any) at Zone 12
A7660 Installation of 110 mm Pipe at Zone 12
A7670 Installation of 160 mm Pipe at Zone 12
A7690 Installation of 250 mm Pipe at Zone 12
A7720 Asphalt Works at Zone 12
A7990 Relocate Electrical Cable at Zone 13
A8020 Relocate Existing Septic Tanks (if any) at Zone 13
A8050 Relocate Existing Sewer Line (if any) at Zone 13
A8220 Installation of 160 mm Pipe at Zone 13
A8240 Installation of 250 mm Pipe at Zone 13
A8270 Asphalt Works at Zone 13
A8540 Relocate Electrical Cable at Zone 14
A8570 Relocate Existing Septic Tanks (if any) at Zone 14
A8600 Relocate Existing Sewer Line (if any) at Zone 14
A8770 Installation of 160 mm Pipe at Zone 14
A8790 Installation of 250 mm Pipe at Zone 14
A8820 Asphalt Works at Zone 14
A9090 Relocate Electrical Cable at Zone 15
A9120 Relocate Existing Septic Tanks (if any) at Zone 15
A9150 Relocate Existing Sewer Line (if any) at Zone 15
A9320 Installation of 160 mm Pipe at Zone 15
A9370 Asphalt Works at Zone 15
A9640 Relocate Electrical Cable at Zone 16
A9670 Relocate Existing Septic Tanks (if any) at Zone 16
A9700 Relocate Existing Sewer Line (if any) at Zone 16
A9870 Installation of 160 mm Pipe at Zone 16
A9890 Installation of 250 mm Pipe at Zone 16
A9920 Asphalt Works at Zone 16
Item1 Item2 Item3
10 8 Daily hours values in the Resources calendar are not the same as in the Activities calendar.
60 48 Weekly hours values in the Resources calendar are not the same as in the Activities calendar.
ctivities calendar.
Activities calendar.
Item1 Item2
A10320 Excavation for 250 mm Pipe at Zone 17
A10350 Bed Preparation for 200 mm Pipe at Zone 17
A10360 Bed Preparation for 250 mm Pipe at Zone 17
A10390 Backfilling after Pressure Test of 200 mm Pipe at Zone 17
A10610 Installation of Fire Hydrant at Zone 17
A10870 Excavation for 250 mm Pipe at Zone 18
A10880 Bed Preparation for 110 mm Pipe at Zone 18
A10900 Bed Preparation for 200 mm Pipe at Zone 18
A10910 Bed Preparation for 250 mm Pipe at Zone 18
A10920 Backfilling after Pressure Test of 110 mm Pipe at Zone 18
A10940 Backfilling after Pressure Test of 200 mm Pipe at Zone 18
A13070 Excavation for 250 mm Pipe at Zone 22
A13110 Bed Preparation for 250 mm Pipe at Zone 22
A17470 Excavation for 250 mm Pipe at Zone 30
A19670 Excavation for 250 mm Pipe at Zone 34
A19680 Bed Preparation for 110 mm Pipe at Zone 34
A19710 Bed Preparation for 250 mm Pipe at Zone 34
A19720 Backfilling after Pressure Test of 110 mm Pipe at Zone 34
A27580 Final Pressure Test and Handover to Employer of Zone 30
A28140 Final Pressure Test and Handover to Employer of Zone 47
A3140 Excavation for 250 mm Pipe at Zone 4
A3180 Bed Preparation for 250 mm Pipe at Zone 4
A5920 Excavation for 250 mm Pipe at Zone 9
A6470 Excavation for 250 mm Pipe at Zone 10
A7020 Excavation for 250 mm Pipe at Zone 11
A7050 Bed Preparation for 200 mm Pipe at Zone 11
A7060 Bed Preparation for 250 mm Pipe at Zone 11
A7090 Backfilling after Pressure Test of 200 mm Pipe at Zone 11
A9220 Excavation for 250 mm Pipe at Zone 15
A9770 Excavation for 250 mm Pipe at Zone 16
A9810 Bed Preparation for 250 mm Pipe at Zone 16