Request For Inspection: Project No. & Title

Uploaded by

kareem Qamhawy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views1 page

Request For Inspection: Project No. & Title

Uploaded by

kareem Qamhawy
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Request For Inspection

Date: 14 Jul. 2024

Request no. RFI-CSCEC-01-A01-ME-ML-3055-05


Project No. & Title: E18066-0200S - The Central Business District of the New Administrative Capital of Egypt

Employer: Engineer: Contractor:

We request your attendance to inspect the following works : Inspection the insulation chilled water pipe at L29 and L29M

1. Type : Infrastructure Electrical Mechanical installations

2. Inspection Time : 10:00 AM Date :15 Jul. 2024


3. Location: Zone Road Stations Structure Other
as shown in drawing
4. Inspection : First Second Third

5. Purpose of Inspection :
1. Electrical 2. Mechanical
Setting out Light fittings Mechanical installations
Furniture elect. culvert Sub-stations Pumping stations
MV cables Civil works & finishings Civil works & finishings
Street lighting cables

Street lighting poles

Telephone duct Bank

TV cables

Others (specify) HVAC


Particular Details Inspection the insulation chilled water pipe at L29 and L29M as following:

L29 — Inspection the insulation chilled water pipe highlights on the drawings
L29M— Inspection the insulation chilled water pipe highlights on the drawings

Submitted by : Liao Shijie Signature:

6. Inspection report : Signature


Surveyor

Elect. Eng.

Mech. Eng.

Civil Eng.

Date/time of inspection :

7. Engineer's Representative Comments:

The works are : Approved Approved as Noted Rejected

Signature Date :

Attach all relevant particular test forms


Approval shall not relieve Contractor of his liabilities under the Contract or constitute authorization of any change to Contract Documents.

S-PRC-SS-02(F31) Rev 2