BT CALCULATIONS SAMPLES
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
31 views6 pages

BT Calculations

BT CALCULATIONS SAMPLES
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

NAME: Jhunbie Claire Revelo DATE: 11-18-24

Julie Mae Lucagbo SUBJECT: BT 4

COMPUTATION:

LENGTH WIDTH DEPTH CONCRETE SET MATBAR


COVER
F1 800 mm 800 mm 30mm 750mm 12 sets 12mm
BOTHWAYS

CONCRETE VOLUME= L x W x D

= (0.80) (0.80) (0.30)

= 0.192 cu. m

= 0.192 cu. m (12 sets)

= 2.304 cu. m

CUT LENGTH= W/L – (Concrete cover) (2) + (hook) (2)

= 0.80 – (0.75) (2) + (0.125) (2)


= 0.9 m

No. of mat pcs = 12 sets (5) (2 both ways)

= 120 pcs of 0.90m

No. of cut length per DRB= 6.00 / 0.90

= 6.67 or 6 pcs

WASTAGE= (excess %) ( cut length )

= ( .67) (0.90 m)
= 0.603 or 2,60 per DRG

No. cut length pre DRB= 7.50/0/090

= 8.33 M

WASTAGE= (excess %) (cut length)

= (.33) (0.90)

= 0.297 or 0.30 per DRB


F1 CUT LENGTH (CL): 12 PCS @ 0.90M

LENGTH OF CUT LENGTH # OF PCS PRODUCE WASTAGE


REBAR (m) PCS PCS LENGTH
(16mm) (m)
6.00 0.90 6.67 6.00 0.60
7.50 8.33 8.00 0.30

NO. OF PCS @ 12mm DIAMETER x 7.50 DRB= 120 pcs / 8pcs

= 15 pcs of DRB

WEIGTH @ 12mm DIAMETER x 7.50 DRB= 15 pcs (7.50) (0.888 kg/m)

= 99.9 kgs

TIRE WIRES

= 5 (horizontal) x 5 (vertical)

= 25 intersections

= 12 sets x 25 intersections

= 300 intersections

= 300 tying points x 0.30m

= 90 / 53 m/kl

= 1.698 kg or 1.7 kg of tire wire

SUMMARY:

FOOTING 1 (F-1): @ 12 SETS

Quantity of bar @ 12mm x 7.50 DRB = 15 pcs or 99.9 kgs

Quantity of tire wires = 1.7 kg or 1 ¾ kg

C1 @ 7.27m
MAIN VERTICL BAR CUT LENGTH

VBCL= (7.27M) (-0.075) (concrete cover footing) – (0.012m) (DB) (2) – (0.40) (concrete
cover column) + (0.20) (hook)
VBCL= 7.195 – 0.024 – 0.40 + 0.20
= 6.971 OR 7M
@ 10 sets of C1 @ 7.27 heigth

No. of VBCL pcs= (10 sets) (4pcs)

= 40pcs of 7.27m

C1 VERTICAL BAR CUT LENGTH (CL)= 40PCS @7.27M

No. of CL per DRB= 7.50 / 7.27

= 1.03

WASTAGE= (excess %) (cut length)

= (0.03) (7.27)

= 0.2181 or 0.22m

No. of pcs @ 12mm diameter x 7.50 DRB= 40 pcs (CL) / 1pc

= 40 pcs of DRB

WEIGTH @ 12mm DIAMETER x 7.50 DRB= 40 (7.50) (0.888 KG/M)

= 239.75 kgs

C1 LATEREAL TIES CUT LENGTH (LTCL)


A (side) 200 – (2) (40) = 120mm or 0.120mm

B (side) 200 – (2) (40) = 120mm or 0.120mm

LTCL= 2 (A (side)) + 2 (B (side)) + 2 (hooks)

= 2(0.120m) + 2 (0.120m) + 2 (0.10m)

= 0.68m

C1 effective Heigth @ GF:

= (3.90M) – (0.075) – (0.012 (2)) – 0.25

= 3.825 – 0.024 – 0.25


= 3.551 M
C1 EFFECTIVE HEIGTH @ 2F= (3.17) – (0.04M) – (0.00M)

= 3.13M

C1 MID-HEIGTH @ DF:
= (3.551M) – (4 (0.05M)) (2) – 6 (0.10) (2)

= 3.551M – 0.4 -1.2

= 1.951 or 2.00m

C1 MID-HEIGTH @ GF LATERAL TIE QUANTITY = 2.00M / 0.20M

= 10PCS

C1 MID-HEIGTH @ 2F = (3.13M) – (4 (0.05)) (2)


= 2.73M

C1 MID-HEIGTH @ 2F LATERAL TIE QUANTITY = 3.17 / 0.15

= 21.13 OR 21 PCS

QUANTITY LATERAL TIES /COLUMN @ GF:

= 1+4+6+10+6+4+1+3
= 35 PCS

QUANTITY LATERAL TIES/ COLUMN @ 2F= 1+4+10+4+1

= 20PCS

10 SETS OF C1 @ 7.27 M HEIGTH

No. of lateral ties (pcs) = (35pcs) + (20pcs) (10 sets)


= 550 pcs of 0.68 m

C1 lateral tie CL: 550 pcs @ 0/68m


No. of CL per DRB = 6.00 / 0.68M

= 8.82 PCS OR 8 PCS


WASTAGE:

= (0.03) (0.68M)

= 0.02 M

C1 VERTICAL BAR CUT LENGTH (CL): 550 PCS @ 0.68M

LENGTH OF CUT LENGTH # OF PCS PRODUCE WASTAGE


REBAR (m) PCS PCS LENGTH
(12mm) (m)
6.00 0.68 8.82 8.00 0.56
7.50 11.03 11.00 0.02

NO. OF PCS @ 12MM DIAMETER x 7.50M PER DRB= 550PCS /11 PCS

= 50 PCS OF DRB

WEIGHT OF 12MM DIAMETER x 7.50M = (50PCS) (7.50) (0.888 KG/M)

= 333 KGS

TIE WIRES:

For every intersection

= 4 (vertical bar) x 55 (lateral ties)

= 220 (intersections)
Add: 3 tie points @ hook / vertical bar

= 4 (vertical bar) x 3 (ties points)

= 220 + 12

= 232 intersections

For column 1 (c1) sets:

= 10 sets (232 intersections)

= 2,320 intersections

TOTAL THE WIRES NEEDED:

= 2,320 (tying points) x 0.30 m


= 696 / 53 m/kl

= 13.13 kgs of tie wires


C1 SUMMARY: @ 10 SETS

Quantity of vertical bar @ 12mm diameter x 7.50 m DRB

= 40 PCS OR 239.75 KGS

Quantity of lateral ties @ 12 mm diameter 7.50m DRB


= 50 PCS OR 333 KGS

Quantity of tie wire

= 13.13 kgs or 13 kgs