Slab Estimates

The document provides detailed calculations for slab reinforcement, including the number of ties, main bar and temperature bar spacing, and the required lengths and weights of rebar for various slab configurations. It specifies the use of different diameters of rebar and includes wastage calculations for each type of bar. Additionally, it outlines the total weight of tie wire needed for the reinforcement process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
53 views5 pages

Slab Estimates

The document provides detailed calculations for slab reinforcement, including the number of ties, main bar and temperature bar spacing, and the required lengths and weights of rebar for various slab configurations. It specifies the use of different diameters of rebar and includes wastage calculations for each type of bar. Additionally, it outlines the total weight of tie wire needed for the reinforcement process.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 5

÷ SLAB REINFORCEMENT # OF TIES = # OF MAIN BAR X # OF

TEMPERATURE BAR (SEE DETAILS FOR


SLAB THICKNESS(h)= 200mm INTERSECTIONS)
CONCRET COVER = 20mm = 11 X 26 + 11
# OF TIES = 297 pcs of #16 tie wire
MAIN BAR SPACING WT. OF TIES = 297X 0.3 X (1/53) = 1.68kg
OPTION1: 3h=3(200) = 600mm
AREA = 3.3 X 2.1
OPTION 2: 450mm
# OF REBAR NEEDED WITH A LENGTH OF 3.3m

= 5.6667 say 6 pcs @12mm ⌀ 3.3m


= (2.1/0.45) + 1
MAIN BAR MAXIMUM SPACING= 450mm O.C

TEMPERATURE BAR SPACING # OF REBAR NEEDED WITH A LENGTH OF 2.1m

= 8.333 say 9pcs @12mm ⌀ 2.1m


OPTION1: 5h=5(200) = 1000mm = (3.3/0.45) + 1
OPTION 2: 450mm

TEMPERATURE BAR MAXIMUM SPACING= @3.3m LENGTH OF BAR


450mm O.C USE 6m length of rebar

# OF REBAR = 6pcs @12mm ⌀ X 6m


WASTAGE LENGTH = 6m – 3.3m = 2.7m

MAIN BAR- USE 12mm ⌀ 0.45m O.C


NOTE: ONE-WAY SLAB
WT. OF REBAR = 6pcs x 6m x 0.888kg/m = 31.968kg
DISTRIBUTION BAR – USE 10mm ⌀ 0.45m O.C
@2.1 LENGTH OF BAR
USE 6m length of rebar
SLAB ON GRADE WASTAGE LENGTH = 6m – 1.8(2) = 2.4m

pcs @12mm ⌀ X 6m
# OF REBAR =use wastage from 3.3m bar length + 2

= 8pcs@12mm ⌀ X 6m
AREA = 4.3 X 11.1
# OF REBAR NEEDED WITH A LENGTH OF 4.3m
WEIGHT = 2pcs x 6m x 0.888kg/m = 10.656kg
= 25.667 say 26pcs @12mm ⌀ 4.3m
= (11.1/0.45) + 1
TIE WIRE
# OF TIES = # OF MAIN BAR X # OF
# OF REBAR NEEDED WITH A LENGTH OF 11.1m
TEMPERATURE BAR
= 10.5556 say 11pcs @12mm ⌀ 11.1m
= (4.3/0.45) + 1
=6x8
# OF TIES = 48 pcs of #16 tie wire
WT. OF TIE WIRE = 48pcs X 0.3m X (1kg/53m) =
@4.3m LENGTH OF BAR
0.27169kg
USE 6m length of rebar

# OF REBAR = 26pcs @12mm ⌀ X 6m


WASTAGE LENGTH = 6m – 4.3m = 1.7m
AREA = 1m x 9m
# OF REBAR NEEDED WITH A LENGTH OF 1m
WT. OF REBAR = 26pcs x 6m x 0.888kg/m =
= 21 pcs @12mm ⌀ x 1m
= (9/0.45) + 1
138.528kg

@11.1m LENGTH OF BAR


# OF REBAR NEEDED WITH A LENGTH OF 9m
USE 6m length of rebar
= 3.222 say 4pcs @12mm ⌀ x 9m
= (1/0.45) + 1
L= 11.1m -6m + 0.4m = 5.5m
WASTAGE LENGTH =6m – 5.5 = 0.5m
# OF REBAR= 11pcs @12mm x 6m + 11pcs
@1m length of bar (do not include to the total number of
= 22 pcs @12mm ⌀ X 6m
@12mm x 5.5m
bars just use wastage from 4.3m length

# OF REBAR = 21 pcs @12mm ⌀ x 1m


USE 6m length of rebar
WT. OF REBAR = 22pcs x 6m x 0.888kg/m =
117.216kg
WT. OF REBAR = 21pcs x 1m x 0.888kg/m =
18.648kg
TIE WIRE
LENGTH OF TIE WIRE = 0.3m
@9m length of bar
1kg = 53m
USE 6m length of rebar
L = 9 – 6 + 0.4 = 3.4m WT. OF REBAR = 10pcs X 6m X 0.888kg/m= 53.28kg

# OF REBAR = 4pcs @12mm ⌀ x 6m + 3.4 say


WASTAGE LENGTH = 6m – 1.8(2) = 2.4m

4pcs @12mm ⌀ x 3.4m


L4 = 4 + 0.195(2) = 4.39m

= 8pcs @12mm ⌀ x 6m
# OF REBARS = (2.7/0.45) + 1 = 7PCS
WASTAGE = 6m – 4.39 = 1.61 m
WT. OF REBAR = 8pcs x 6m x 0.888kg/m = 42.624kg WT. OF REBAR = 7pcs X 6m X 0.888kg/m= 37.296kg

TIE WIRE TIE WIRE


# OF TIES = # OF MAIN BAR X # OF # OF TIES = 7 x 10 = 70 PCS
TEMPERATURE BAR WT. OF TIE WIRE = 70pcs X 0.3m X (1kg/53m) =
# OF TIES = 21 x 8 0.396kg
# OF TIES =168 pcs of #16 tie wire
WT. OF TIE WIRE = 168pcs X 0.3m X (1kg/53m) =

TOP STRAIGHT BARS @ 12mm⌀ x 6m


0.951kg

L3 = 2.7 + 0.195(2) = 3.09m


# OF REBARS = (1/0.45) + 1 = 3.222 SAY 4 PCS X 2
SECOND FLOOR AND ROOF TWO-WAY SLAB = 8PCS
WASTAGE LENGTH= 2.91m
WT. OF REBAR = 8pcs X 6m X 0.888kg/m =
TWO-WAY SLAB = 2.7 / 4 = 0.675
42.624kg/m
AREA = 2.7 X 4 m
L4 = 4 + 0.195(2) = 4.39m
@LONG DIRECTION
# OF REBARS = (0.675 / 0.45) + 1 = 2.5 X 2 = 5 PCS
L/4 = 4/4 = 1m
WASTAGE LENGTH = 1.61m
L/2 = 4/2 = 2m
WT. OF REBAR = 5pcs x m x 0.888g/m = 26.6kg
@ SHORT DIRECTION
W/4 = 2.7/4 = 0.675m
TIE WIRE
W/2 = 2.7/2 = 1.35m
# OF TIES = 8 x 5 = 40 PCS
BENT BARS @ 12mm⌀ x 6m
WT. OF TIE WIRE = 40pcs X 0.3m X (1kg/53m) =
0.226kg
L1 = 2.7m + (H x 2 + BEND
H @ 12mm = 0.195m
@200 mm thk slab = 200-2(20)-12 = 0.148m
CUT BARS / EXTRA BARS
L/5 = (2.7/3) + 0.195 = 1.095m
L1 = 2.7m + 0.195 x 2 +0 .148 = 3.238m
# OF REBARS = 6-1=5x2 = 10PCS
# OF REBARS = (2/0.45) + 1 = 5.444 SAY 6PCS
WASTAGE LENGTH = USE WASTAGE FROM BST
WASTAGE = 6 – 3.238 = 2.762m
@ 3.09m and 4.39
WT. OF REBAR = 6pcs X 6m X 0.888kg/m =
WT. OF REBAR = 10pcs X 1.095 X 0.888kg/m =
31.968kg
9.7236kg
L2 = 4m +0.195(2) +0.148m = 4.538m
L6 = (4/3) + 0.195 = 1.5283m
# OF REBARS = (1.35/0.45) + 1 = 4PCS
# OF REBARS = 4-1=3x2 = 6PCS
WASTAGE = 6 – 4.538 = 1.462m
WASTAGE LENGTH = USE WASTAGE FROM TST
WT. OF REBAR = 4pcs X 6m X 0.888kg/m =
@ 3.09m
21.312kg
WT. OF REBAR = 6pcs x 1.5283m x
0.888g/m=81427kg
TIE WIRE
# OF TIES = 6 X 4 = 24PCS
TIE WIRE
WT. OF TIE WIRE = 24pcs X 0.3m X (1kg/53m) =
# OF TIES = 10 x 6 = 60 PCS
0.27169kg = 0.1358kg
WT. OF TIE WIRE = 60pcs X 0.3m X (1kg/53m) =
0.3396kg
BOTTOM STRAIGHT BARS @ 12mm⌀ x 6m TWO-WAY SLAB = 1.8/ 4 = 0.45
L3 = 2.7 + 0.195(2) = 3.09m AREA = 1.8m X 4 m
# OF REBARS = (4/0.45) + 1 = 9.89 SAY 10 PCS
WASTAGE = 6m – 3.09 = 2.91m
@LONG DIRECTION L4 = 4 + 0.195(2) = 4.39m
L/4 = 4/4 = 1m # OF REBARS = (0.45 / 0.45) + 1 = 2X 2 = 4 PCS
L/2 = 4/2 = 2m WASTAGE LENGTH =6-4.39m = 1.61m
@ SHORT DIRECTION WT. OF REBAR = 4pcs x 6 m x 0.888g/m = 21.312kg
W/4 = 1.8/4 = 0.45m
W/2 = 1.8/2 = 0.9m TIE WIRE

BENT BARS @ 12mm⌀ x 6m


# OF TIES = 8 x 4 = 32 PCS
WT. OF TIE WIRE = 32pcs X 0.3m X (1kg/53m) =
L1 = 1m + (H x 2 + BEND 0.1811kg
H @ 12mm = 0.195m
@200 mm thk slab = 200-2(20)-12 = 0.148m
CUT BARS / EXTRA BARS
L1 = 1.8m + 0.195 x 2 +0 .148 = 2.338m L/5 = (1.8/3) + 0.195 = 0.795m
# OF REBARS = (2/0.45) + 1 = 5.444 SAY 6PCS # OF REBARS = 6-1=5x2 = 10PCS
WASTAGE = 6 – 2.338 = 3.662m WASTAGE LENGTH = USE WASTAGE FROM BST
WT. OF REBAR = 6pcs X 6m X 0.888kg/m = @ 2.19 m
31.968kg WT. OF REBAR = 10pcs X 0.795 X 0.888kg/m =
9.7236kg
L2 = 4m +0.195(2) +0.148m = 4.538m
# OF REBARS = (0.9/0.45) + 1 = 3 PCS L6 = (4/3) + 0.195 = 1.5283m
WASTAGE = 6 – 4.538 = 1.462m # OF REBARS = 3-1=2x2 = 4PCS
WT. OF REBAR = 3pcs X 6m X 0.888kg/m = WASTAGE LENGTH = USE WASTAGE FROM TSB
15.984kg @ 2.19m
WT. OF REBAR = 4pcs x 1.5283m x 0.888g/m =
TIE WIRE 5.4285kg
# OF TIES = 3 X 6 = 18PCS
WT. OF TIE WIRE = 18pcs X 0.3m X (1kg/53m) = TIE WIRE
0.101886kg # OF TIES = 10 x 4 = 40 PCS
WT. OF TIE WIRE = 40pcs X 0.3m X (1kg/53m) =

BOTTOM STRAIGHT BARS @ 12mm⌀ x 6m


0.2264kg

L3 = 1.8 + 0.195(2) = 2.19m TIE WIRE


# OF REBARS = (4/0.45) + 1 = 9.89 SAY 10 PCS # OF TIES = 4 x 10 = 40 PCS
WASTAGE = 6m – 2.19 = 3.81m WT. OF TIE WIRE = 32pcs X 0.3m X (1kg/53m) =
WT. OF REBAR = 10pcs X 6m X 0.888kg/m= 53.28kg 0.1811kg

L4 = 4 + 0.195(2) = 4.39m TWO-WAY SLAB = 1/ 1.8 = 0.56


# OF REBARS = (1.8/0.45) + 1 = 5PCS AREA = 1m X 1.8 m
WASTAGE = 6m – 4.39 = 1.61 m
WT. OF REBAR = 5pcs X 6m X 0.888kg/m= 26.64kg @LONG DIRECTION
L/4 = 1.8/4 = 0.45m
TIE WIRE L/2 = 1.8/2 = 0.9m
# OF TIES = 5 x 10 = 50 PCS @ SHORT DIRECTION
WT. OF TIE WIRE = 50pcs X 0.3m X (1kg/53m) = W/4 = 1/4 = 0.25m
0.283kg W/2 = 1/2 = 0.5m

BENT BARS @ 12mm⌀ x 6m

TOP STRAIGHT BARS @ 12mm⌀ x 6m


L1 = 1m + (H x 2 + BEND
H @ 12mm = 0.195m
L3 = 1.8 + 0.195(2) = 2.19m @200 mm thk slab = 200-2(20)-12 = 0.148m
# OF REBARS = (1/0.45) + 1 = 3.222 SAY 4 PCS X 2
= 8PCS L1 = 1m + 0.195 x 2 +0 .148 = 1.538m
WASTAGE LENGTH=6- 2.91 =3.09 m # OF REBARS = (0.9/0.45) + 1 = 3 pcs
WT. OF REBAR = 8pcs X 6m X 0.888kg/m = WASTAGE = 6 – 1.538 = 4.462m
42.624kg/m WT. OF REBAR = 3pcs X 6m X 0.888kg/m =
15.984kg
WASTAGE LENGTH = USE WASTAGE FROM BB
L2 = 1.8m +0.195(2) +0.148m = 2.338m @ 1.538 m
# OF REBARS = (0.5/0.45) + 1 = 3 PCS WT. OF REBAR = 4pcs X 0.5283 X 0.888kg/m =
WASTAGE = 6 – 2.338 = 3.662m 1.8765kg
WT. OF REBAR = 3pcs X 6m X 0.888kg/m =
15.984kg L6 = (1.8/3) + 0.195 = 0.795m
# OF REBARS = 3-1=2x2 = 4PCS
TIE WIRE WASTAGE LENGTH = USE WASTAGE FROM TSB
# OF TIES = 3 X 3 = 9PCS @ 1.39m
WT. OF TIE WIRE = 9pcs X 0.3m X (1kg/53m) = WT. OF REBAR = 4pcs x 0.795m x 0.888g/m =
0.1kg 2.8238kg

BOTTOM STRAIGHT BARS @ 12mm⌀ x 6m


TIE WIRE
# OF TIES = 4 x 4 = 16 PCS
L3 = 1 + 0.195(2) = 1.39m WT. OF TIE WIRE = 16pcs X 0.3m X (1kg/53m) =
# OF REBARS = (1.8/0.45) + 1 = 5pcs 0.1kg
WASTAGE = USE WASTAGE FROM BB @ 2.338m

WT. OF REBAR = 5pcs X 1.39m X 0.888kg/m= TWO-WAY SLAB = 1.8/ 2.3 = 0.78
6.17168kg AREA = 1.8m X 2.3 m

L4 = 1.8+ 0.195(2) = 2.19m @LONG DIRECTION


# OF REBARS = (1/0.45) + 1 = 3.22 SAY 4PCS L/4 = 2.3/4 = 0.575m
WASTAGE = 6m – 2.19 = 3.81 m L/2 = 2.3/2 = 1.15m
WT. OF REBAR = 4pcs X 6m X 0.888kg/m= 21.312kg @ SHORT DIRECTION
W/4 = 1.8/4 = 0.45m
TIE WIRE W/2 = 1.8/2 = 0.9m

BENT BARS @ 12mm⌀ x 6m


# OF TIES = 5 x 4 = 20 PCS
WT. OF TIE WIRE = 20pcs X 0.3m X (1kg/53m) =
0.1132kg L1 = 1.8m + (H x 2 + BEND
H @ 12mm = 0.195m
@200 mm thk slab = 200-2(20)-12 = 0.148m

TOP STRAIGHT BARS @ 12mm⌀ x 6m L1 = 1.8m + 0.195 x 2 +0 .148 = 2.338m


L3 = 1 + 0.195(2) = 1.39m # OF REBARS = (1.15/0.45) + 1 = 3.6 SAY 4PCS
# OF REBARS = (0.45/0.45) + 1 = 2X2 = 4PCS WASTAGE = 6 – 2.338 = 3.662m
WASTAGE LENGTH=6- 1.39 =4.61m WT. OF REBAR = 6pcs X 6m X 0.888kg/m =
WT. OF REBAR = 4pcs X 6m X 0.888kg/m = 31.968kg
21.312kg

L4 = 1.8 + 0.195(2) = 2.19m L2 = 2.3m +0.195(2) +0.148m = 2.838m


# OF REBARS = (0.25 / 0.45) + 1 = 1.555=2X 2 = 4 # OF REBARS = (0.9/0.45) + 1 = 3 PCS
PCS WASTAGE = 6 – 2.838 = 3.162m
WASTAGE LENGTH =6-2.19 = 3.81m WT. OF REBAR = 3pcs X 6m X 0.888kg/m =
WT. OF REBAR = 4pcs x 6 m x 0.888g/m = 21.312kg 15.984kg

TIE WIRE TIE WIRE


# OF TIES = 4x 4 = 16 PCS # OF TIES = 4 X 3 = 12PCS
WT. OF TIE WIRE = 16pcs X 0.3m X (1kg/53m) = WT. OF TIE WIRE = 12pcs X 0.3m X (1kg/53m) =
0.1kg 0.1kg

CUT BARS / EXTRA BARS BOTTOM STRAIGHT BARS @ 12mm⌀ x 6m


L/5 = (1/3) + 0.195 = 0.5283m L3 = 1.8 + 0.195(2) = 2.19m
# OF REBARS = 3-1=2x2 = 4PCS # OF REBARS = (2.3/0.45) + 1 = 6.111 SAY 7 PCS
WASTAGE = USE WASTAGE FROM BB @ 2.338m SECOND FLOOR ONE WAY SLAB =9/1 = 9
AND BB @ 2.838 AREA = 9 X 1 = 9 sq.m
DELELOPMENT LENGTH = 40d
WT. OF REBAR = 7pcs X 2.19m X 0.888kg/m=

#OF MAIN BARS = (9/0.45) + 1 = 21Pcs @12mm ⌀ X


13.613kg @1m LENGTH OF REBAR – SHORT DIRECTON

L4 = 2.3+ 0.195(2) = 2.69m 1m


# OF REBARS = (1.8/0.45) + 1 = 5PCS CUTTING LENGTH OF MAIN BAR =Ly + 2Ld + 1 x
WASTAGE = 6m – 2.69 = 3.31 m inclined length- 45degree x 2
WT. OF REBAR = 5pcs X 6m X 0.888kg/m= 26.64kg = 1000 + (2 x 40 x 12) + (1 x 0.42 x D)- (1d X 2)

TIE WIRE D = SLB. THK – 2 CONCRETE COVER – BAR DIA.


# OF TIES = 5 x 7 = 35 PCS = 200 – 2(20) -12 = 148mm
WT. OF TIE WIRE = 35pcs X 0.3m X (1kg/53m) =
0.2kg = 1000 + (2 x 40 x 12) + (1 x 0.42 x 148)- (12X 2)
= 1998.16mm OR 1.99816m

TOP STRAIGHT BARS @ 12mm⌀ x 6m


TOTAL LENGTH OF MAIN BARS = 1.99816 X 21 pcs
= 41.96136m

@12mm ⌀ x 6m
L3 = 1.8 + 0.195(2) = 2.19m #OF REBAR = 41.96136 / 6 = 6.99356 pcs SAY 7 pcs
# OF REBARS = (0.575/0.45) + 1 = 2.227 X2 = 4.454
SAY 5 PCS WT. OF REBAR = 7pcs X 6m x 0.888kg/m = 37.296kg
WASTAGE LENGTH=6- 2.19 = 3.81m
WT. OF REBAR = 5pcs X 6m X 0.888kg/m = 26.64kg @9m LENGTH OF REBAR – LONG DIRECTION
#OF DISTRIBUTION. BARS = (1/0.45) + 1 = 3.222 pcs
L4 = 2.3+ 0.195(2) = 2.69m SAY 4 pcs
# OF REBARS = (0.45 / 0.45) + 1 = 2 X2 = 4PCS CUTTING LENGTH OF TEMP. BAR =Lx + 2Ld
WASTAGE LENGTH =6-2.69 = 3.831m = 9000 + 2 X 40 X 10mm = 9800mm OR 9.8m
WT. OF REBAR = 4pcs x 6 m x 0.888g/m = 21.312kg TOTAL LENGTH OF TEMP. BARS = 9.8 X 4pcs =
39.2m

⌀ x 6m
TIE WIRE #OF REBAR = 39.2 / 6 = 6.533 pcs SAY 7 pcs @12mm
# OF TIES = 4x 5= 20 PCS
WT. OF TIE WIRE = 20pcs X 0.3m X (1kg/53m) = WT. OF REBAR = 7pcs X 6m x 0.616kg/m = 25.872kg
0.1132kg
TOP STRAIGHT BARS
L/4 = ¼ =0.25
CUT BARS / EXTRA BARS # OF REBARS = (0.25/ 0.45) + 1 = 1.555 SAY 5 pcs
L/5 = (1.8/3) + 0.195 = 0.795m LENGTH OF TOP BAR = LENGTH OF TEMP. BARS

# OF REBARS = 49/6 = 8.1667 SAY 9 pcs @12mm ⌀


# OF REBARS = 4-1=3x3 = 6PCS TOTAL LENGTH OF TOP BAR = 9.8 X 5 = 49 m
WASTAGE LENGTH = USE WASTAGE FROM TSB
@ 2.19 m x 6m
WT. OF REBAR = 6pcs X 0.795X 0.888kg/m = WT. OF REBAR = 9pcs X 6m x 0.616kg/m = 33.264kg
4.236kg
TIE WIRE
L6 = (2.3/3) + 0.195 = 0.962m # OF TIES = 7x7= 49 PCS + 9 x 7 = 112pcs
# OF REBARS = 3-1=2x2 = 4PCS WT. OF TIE WIRE = 112 pcs X 0.3m X (1kg/53m) =
WASTAGE LENGTH = USE WASTAGE FROM TSB 0.634kg
@ 2.69
WT. OF REBAR = 4pcs x 0.962m x 0.888g/m
=3.417kg

TIE WIRE
# OF TIES = 4 X 6= 24 PCS
WT. OF TIE WIRE = 24pcs X 0.3m X (1kg/53m) =
0.136kg

You might also like