0% found this document useful (0 votes)
26 views9 pages

Jsa Glass

Uploaded by

raavana1677
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views9 pages

Jsa Glass

Uploaded by

raavana1677
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 9

BLUEBAYFACADE PVT LTD

JOB SAFETY ANALYSIS(JSA)

JSADATE: REVIEWED:

PREPAREDBY: APPROVED:
TYPE OF ACTIVITY:
CATEGORY OF ACTIVITY:
REQUIRED RECOMMENDED PPES: HARDHAT,
SAFETYSHOES,HANDGLOVES,REFLECTIVEJACKET,FULLBODY SAFETY HARNESS
AND SAFETYGOGGELS

SL SEQUNCE OF POTENTIAL HAZARDS PROC RECOMMANDED OF WHAT CORRECTI


NO JOB SAFETY JOB DURS COULD VE
BASIC GO ACTION.
STEPS. WRONG?
1 Deployment 1)Physical injury, 1) All the workers Leads to 1)Conduct
of work lack of awareness should undergo the Body job
men induction program. injury. related
2)Unaware about 2)TBT conduct one safety
work location and daily basis Ensure trainings
unfit worker’s workers are fit
through 2)Don’t
3)Medically/ 3) Medical test by bypass
physically unfit certified doctor. site safety
Inspect and rules ,
4)Drug & alcohol provide
recommended job
ppe’s
4) All workers have
valid gate pass.
Aware about company
rules and regulation.

5)Get the area


clearance from
DRL authorized

2 Site area 1)Slip trip, falls 1)Housekeeping


clearance should be done

2) Tool box meeting


conduct before start
2)Damage to the work.
material

3) Obstacle free
3)Physical hazards access to be provided
Working 1) Any person working
at height 1)Fall from height. above 2m
height shall be considered
2) Unsafe working as working at height.
3 platforms and
working conduction. 2) Ensure all personnel
assigned to work at height
are not afraid of height and
medically fit for height
works
3) Unsafe access / egress.
3, Work shall not be
4) Hit by the structure. allowed to be carried
outstanding over wooden
boxes, empty barrels and
other make shift
arrangements.

4) in case of any practical


difficulties to provide
proper

working platform, safety


harness with fall arrestors
(self-inertia reels) shall be
installed and used

5. Temporary edge
protection with
top hand rails at a height of
1mand rail at a height of
0.55 man with toe board
shall be installed in all
around the openings in
floor slabs.

6 For small openings floor


covers shall be provided
with adequate strength

7. Stop work at height in


high wind velocity Home
made ladders not to be
used, Ladders with broken
rug not to be used,
Placement of ladder to
being proper securing
position.
4 Partition Glass 1) Fall of person due 1. Trained, experienced &
Installation to Slip/Trip, medically fit workforce to
obstructions in be deployed.
(storage,shifting, access.
handling,cutting, 2. Training on the hazards
& fixing, sealant 2) Fall of material - and control measures
usage) due to breakage, related to equipment's &
lack of anchoring, related works to be
storage, etc. conducted by the vendor
(weekly, fortnightly,
3) Lifting excessive monthly)
weight, large size
Toolbox talks to be given
glass
by the vendor to the work
force daily for the
4) Contact with
Sharp tools, edges precautions to be taken in
the activity.
5)Caught in between
3) All hand tools to be
6) Defective / inspected and damaged /
damaged tools & defective tools to be
equipment rectified / removed.

7). Awkward posture 4) Safety helmet, safety


shoes, dotted hand gloves /
cut resistance hand gloves,
reflective jacket, goggles to
be used.

5) Lighting to be provided
for clear visibility.

6) Mobile scaffold to be
equipped with full boarded
working platform, guard
rails, mid rail, toe board,
access & egress, wheel
locks, tested and certified
scaffold material.
Glass fixing 1) Cut injury due to 1) Wear cotton hand
at height sharp edges. gloves to avoid cut
5 and in 2).Sprain in body injury.
ground due to lifting of
floor. (max overload material 2) Do not carry more
height 10 3)Fall of material than 20kgs weight
meter) 4).Fall of person manually.
3)Worker doing work
5) Slip, trip and fall. with proper manner
Good communication
6) Failure of scissor / between workers.
boom lift.
4)Material shifted by
7)Topple of boom / tested PP rope from
scissor lift bottom to top on
mobile
scaffold/Boom/scissor
8)overload of boom /
lift
scissor lift over
reaching
5) Always use toe
guard on scaffold
9) Overhead line / while working on
cables. scaffold.

10)Overreaching 6) Always carry tools


in toolbox.

7) Use full body safety


harness more than
1.8 meter height.

8) Obstacle free
access to be provided.

9).Check scissor /
boom lift on
daily basis through
approved DRL
checklist

10) Always work with


scissor / boom lift on
level and hard
surface. Always carry
weight on boom /
scissor lift below the
weight capacity.

11) Before started of


work always check
overhead power
cable and remove or
relocate the cable as
required.
12) Daily give TBT to
all workers

13) Ensure that no


one can doing
overreaching during
height work.
Electric 1) Electric shock 1) Ensure work
panel during the handling permit before start of
6 operation of the electrical any work activity.
panel. 2) Using of rubber
coated hand gloves
2) Sharp edge. during panel
operation.
3) Improper
earthling. 3) All sharp edges will
be rounded off or
4)Electrical spark/ protected.
fire hazards
4) Use rubber mate in
5) Improper front of electrical
insulation. panel.

6) Presence of water 5) Provide the 30mA


and moisture. ELCB for all electrical
connection.

6) Only authorized
person will operate
the panel.

7) Always connected
double Earthling in all
electrical panel.

8) All electrical
connection should be
properly connected.

9) Always fire
extinguisher near.

Scaffolding 1) Unstable Ground 1)Once scaffold is erected,


7 Erection 2) Power Lines install plywood to face of
(electrocution) scaffold adjacent to power
lines.
3) Falling from height
4) Overturning 2) During erection, ensure
5) Collapse that all scaffolds have
6) head eye injury, cuts, handrails at 1.0m or safety
burns etc. Harness and |inertia
reel/static line.
3) Ensure that scaffold is
correctly tied into
Building every 4.0m in
height.

4) Ensure that scaffold is


built to manufacturer's
specifications - not to leave
out
Any items such as braces,
safety fittings, toe boards,
S.W.L signs.

5)Wear hard hats and all


relevant personal
protection equipment

1)Do not remove any


plywood, insulation,
Warning signs from area
near.
1)Electrocution
2) Ensure that all ties are
not modified, moved or
2) Overturning
removed unless done by
8 ticketed scaffolders
Use of scaffold 3) Collapse According to regulations.

4) Personal injury 3)Adhere to SWL (Safe


Working Load) of
|scaffold.
5) Fall from scaffold
4) Do not overload with
materials or personnel

5) Ensure helmets and all


personal protection

1) Ensure work platform is


clean prior to dismantle of
scaffold.

2) b) Do not remove lower


ties until scaffold is
|dismantled down to that
level.
1) Falling debris 3) Do not remove lower ties
9 Dismantle of until scaffold is dismantling
scaffold 2) Overturning down to that level.

3) Personal injury 4) Wear all personal


protective equipment.

5) Ensure that all knots are


securely tied when
lowering equipment

1)about the electrical


panel. Always use
double insulated
power tools.

2) Provide whether
protection or shed on
electrical panel.

3) Joint and damaged


cables are not
allowed use male and
female plug top for
jointing the cable.

Electric 4) Provide the 30mA


Joints in electrical
supply to ELCB for all electrical
all power cables may cause
10 connection
hand tools electric shock.
Maintained electrical
Improper insulation
cable
height (min 7 ft from
ground level)

5) Ensure cable
should be kept in dry
place

6) Ensure all electrical


panel have
gland/edge protection

7) Skilled and
authorized worker
should be deputed for
electrical work

8) Always use double


insulated power tools.

1)Keep the working


11 area clean and debris
free.

2)Always look where


House Slip, trip and fall you are going do not
keeping assume there is clean
path

3) Always wear
mandatory ppe

4) Inspection to
ensure clean-up is
complete

JSA DATE: REVIEWED BY: