0% found this document useful (0 votes)
16 views1 page

Moisture Correction

Moisture correction in batching plant

Uploaded by

Shivam joshi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views1 page

Moisture Correction

Moisture correction in batching plant

Uploaded by

Shivam joshi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

PROJECT : Construction of Road Bed, Major Bridges, Minor Bridges, ROBs, RUBs, including road approaches, Station Buildings,

Staff
Name of Qtrs, Other Service buildings, HL Platforms, COPs, FOBs, General electrical work and other works related to construction of Yavatmal-
Work Nanded New BG Line from Km: 157 to Km: 169 of Central Railway in Maharashtra State including construction of two tunnels: T1 (1290m) &
T2 (2505 m) with BLT in tunnels"

Client RAIL VIKAS NIGAM LIMITED

PMC TYPSA

Contractor MAX INFRA (I) PRIVATE LIMITED

BATCHING OF FRESH CONCRETE


Moisture Contents (%) :-
Constituents Moisture Water Absorption Date:
1.) 20mm Time:
2.) 10mm
3.) Crushed sand
4.) Natural sand
Grade of SSD Wt. of MixDesign Water Correction Adjusted Wt.of Constituents for 1m3
Mix Cement Water 20.0mm 10mm C.Sand Admix 20.0mm 10mm C.Sand Total Cement Water 20.0mm 10mm C.sand Admix

Remarks ……………………………………………………………………

Performed By(Contractor) Checked By (Contractor) Approved By (PMC)

Sign.: ………………………… Sign.: ………………………… Sign.: …………………………


Name.: ………………………… Name.: ………………………… Name.: …………………………
Designation…................... Designation….................. Dessignation…..................
Date : ………………………… Date : ………………………… Date : …………………………

You might also like