AccuSine+ 600-690V Installation
AccuSine+ 600-690V Installation
Important information
                        Read these instructions carefully and look at the equipment to become familiar
                        with the device before trying to install, operate, service or maintain it. The
                        following special messages may appear throughout this bulletin or on the
                        equipment to warn of potential hazards or to call attention to information that
                        clarifies or simplifies a procedure.
                        The addition of either symbol to a “Danger” or “Warning” safety label indicates that an
                        electrical hazard exists which will result in personal injury if the instructions are not
                        followed.
                        This is the safety alert symbol. It is used to alert you to potential personal injury hazards.
                        Obey all safety messages that follow this symbol to avoid possible injury or death.
                                                                 DANGER
                         DANGER indicates a hazardous situation which, if not avoided, will result in death
                         or serious injury.
                                                                 WARNING
                         WARNING indicates a hazardous situation which, if not avoided, could result in
                         death or serious injury.
                                                                  CAUTION
                         CAUTION indicates a hazardous situation which, if not avoided, could result in
                         minor or moderate injury.
                                                                 NOTICE
                         NOTICE is used to address practices not related to physical injury.
Please note
                        Electrical equipment should be installed, operated, serviced and maintained only by
                        qualified personnel. No responsibility is assumed by Schneider Electric for any
                        consequences arising out of the use of this material.
                        A qualified person is one who has skills and knowledge related to the construction,
                        installation, and operation of electrical equipment and has received safety training to
                        recognize and avoid the hazards involved.
Legal information
                        The Schneider Electric brand and any registered trademarks of Schneider Electric
                        Industries SAS referred to in this guide are the sole property of Schneider Electric SA
                        and its subsidiaries. They may not be used for any purpose without the owner's
                        permission, given in writing. This guide and its content are protected, within the
NHA71461-00                                                                                                          3
                                                     AccuSine PCS+ / PFV+ Installation Manual
    As standards, specifications and designs change from time to time, please ask for
    confirmation of the information given in this publication.
4                                                                                NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                                                                              Contents
NHA71461-00                                                                                                                                                      5
Contents   AccuSine PCS+ / PFV+ Installation Manual
6                                    NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                   Chapter 1 - Safety precautions
                                                                      DANGER
                                HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
                                • Apply appropriate personal protective equipment (PPE) and follow safe electrical
                                  work practices. See NFPA 70E in the USA, CSA Z462, or applicable local
                                  standards.
                                • This equipment must be installed and serviced only by qualified electrical
                                  personnel.
                                • Do not exceed the device’s ratings for maximum limits.
                                • Ground equipment using the ground connecting point provided before turning on
                                  any power supplying this device.
                                • Turn off all power supplying this device and the equipment in which it is installed
                                  before working on the device or equipment.
                                • After removing power, wait for 15 minutes to allow the capacitors to discharge prior
                                  to opening the doors or removing covers.
                                • Always use a properly rated voltage sensing device to confirm power is off.
                                • Replace all devices, doors, and covers before turning on power to this equipment.
                                • Carefully inspect the interior for tools left behind before closing and sealing the
                                  door.
                                Failure to follow these instructions will result in death or serious injury.
NHA71461-00                                                                                                              7
Chapter 1 - Safety precautions   AccuSine PCS+ / PFV+ Installation Manual
8                                                          NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                          Chapter 2 - Introduction
Chapter 2                      Introduction
                               The product can be provided in either of two types, an Active Harmonic Filter (AHF) or
                               an Electronic VAR Control (EVC). Both types are to be installed as described in this
                               manual. These products are both referred to as an active filter in this manual.
                               AHF also have the ability to correct for poor displacement power factor (DPF) and for
                               mains current balancing. DPF correction can be provided for either leading (capacitive)
                               or lagging (inductive) loads that cause poor DPF. Mains current balancing is achieved
                               by measuring the negative sequence current present and injecting the inverse negative
                               sequence current to balance the current for the upstream network.
NHA71461-00                                                                                                              9
Chapter 2 - Introduction   AccuSine PCS+ / PFV+ Installation Manual
10                                                   NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                        Chapter 3 - Receiving, handling, and storing
Inspection
                               •   Check that all packages and/or crates have been delivered and that the equipment
                                   has not been damaged in transit.
                               •   On the outside packaging and inside the unit, Tip N Tell and Drop N Tell monitoring
                                   devices are installed. If these have been activated, inform the carrier immediately.
                               •   In the event of damaged or missing items, contact the carrier immediately. Check
                                   with them for time limits for filing claims and any documentation required such as a
                                   Bill of Lading number, etc.
                               •   Goods, whether sent freight pre-paid or not, are shipped at the consignee's risk.
                               •   Damaged or missing items are the responsibility of the carrier and must be reported.
                               •   Check that the information shown on the equipment nameplates corresponds with
                                   the order specifications.
                               •   The packaging material should be replaced to protect the unit until installation has
                                   begun.
NHA71461-00                                                                                                               11
Chapter 3 - Receiving, handling, and storing                                        AccuSine PCS+ / PFV+ Installation Manual
Handling
                                                                          WARNING
                                   HAZARD OF PERSONAL INJURY
                                   • Use proper lifting equipment such as an overhead crane to handle the active
                                     filter.
                                   • Do not lay the equipment on its front.
                                   Failure to follow these instructions can result in death, serious injury, or
                                   equipment damage.
                                  Ensure that the proper equipment such as an overhead crane is available at the
                                  installation site to handle the active filter. This equipment will help avoid injury to
                                  personnel and damage to the active filter.
                                  Verify the lifting capacity of the equipment being used to handle the active filter in
                                  accordance with the shipping weight of each shipping section.
Storing
                                  If the active filter is not to be installed when unpacked, it should be stored indoors in a
                                  clean, dry place. The storage temperature must be between -20°C (-4°F) and 60°C
                                  (140°F) with a maximum relative humidity of 85%, non-condensing, and a maximum
                                  dewpoint of 37°C. It is preferable to store the unit in its original shipping container to
                                  protect the unit from potential damage.
12                                                                                                               NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                              Chapter 4 - Installation
Chapter 4                      Installation
                               This chapter provides the information required to properly install the active filter and
                               associated equipment for proper operation and performance. Frequently,
                               commissioning difficulties are the result of incorrect wiring. Every precaution must be
                               taken to assure that the wiring is done as instructed. Read and understand all
                               instructions in this manual prior to installation.
                               Correct installation of the active filter is essential for proper operation of all components.
                               Study the associated instruction books and all drawings carefully.
                               The location chosen for installation should provide working clearances complying with
                               the appropriate section of the National Electrical Code® (NEC®), the Canadian
                               Electrical Code (CEC), or applicable local standards.
                                                                        DANGER
                                HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
                                • Apply appropriate personal protective equipment (PPE) and follow safe electrical
                                  work practices. See NFPA 70E in the USA, CSA Z462, or applicable local
                                  standards.
                                • This equipment must be installed and serviced only by qualified electrical
                                  personnel.
                                • Do not exceed the device’s ratings for maximum limits.
                                • Ground equipment using the ground connecting point provided before turning on
                                  any power supplying this device.
                                • Turn off all power supplying this device and the equipment in which it is installed
                                  before working on the device or equipment.
                                • Do not stand on any part of the active filter.
                                • After removing power, wait for 15 minutes to allow the capacitors to discharge prior
                                  to opening the doors or removing covers.
                                • Always use a properly rated voltage sensing device to confirm power is off.
                                • Replace all devices, doors, and covers before turning on power to this equipment.
                                • Carefully inspect the interior for tools left behind before closing and sealing the
                                  door.
                                Failure to follow these instructions will result in death or serious injury.
                               1. Ensure that the line voltage is compatible with the voltage rating of the active filter.
                               2. Ensure the foundation is prepared for the active filter.
                               3. Ensure that environmental requirements are satisfied.
                               4. Refer to the dimensional drawings for the active filter to be installed.
                               5. Attach the enclosure to the floor.
                               6. Make the electrical connections.
                               7. Make the CT to CT board connection.
                               8. Set up parallel communication if applicable.
NHA71461-00                                                                                                                 13
Chapter 4 - Installation                                                     AccuSine PCS+ / PFV+ Installation Manual
                           9. When installing on Isolated Terra (IT), High Resistance Ground (HRG), or corner
                              grounded systems, ensure that the IT/BP switches are open. Refer to “IT, HRG, and
                              Corner Grounded Systems” on page 47.
                           10. Make the control wiring connections, but do not energize the active filter yet.
                           NOTE: Commissioning and energizing the active filter requires specialized knowledge.
                           Pre-commissioning procedures are covered in “Pre-commissioning” on page 45.
                           Commissioning procedures are covered in the User Manual. Energize and commission
                           the active filter only if you are qualified to do so.
Foundation preparation
                           The mounting location must be able to support the weight of the unit without sagging.
                           Weight specifications are provided in “UL Type 2, UL Type 12, IP31, and IP54
                           Enclosures Physical Specifications” on page 16.
Installation
                           For optimum performance in harmonic mitigation mode, adhere to the following
                           recommendations:
                           •     All harmonic generating loads must have a minimum 3% line reactor or 3% DC
                                 choke installed.
                           •     SCR based rectifiers are required to have a minimum 3% line reactor.
                           •     No capacitors downstream of the Main CTs.
                                                                    NOTICE
                               RISK OF EQUIPMENT DAMAGE
                               Adhere to DC choke, SCR based rectifier, and capacitor placement requirements.
                               Failure to follow this instruction can result in equipment damage.
                           If these recommendations are not followed, the target harmonic level may not be met
                           and equipment damage can occur.
Environmental Requirements
                           Active filters are designed for indoor use only. They require unrestricted exchange of
                           environmental air to the inside of the enclosure for proper cooling. Ensure that the
                           environment meets Pollution Degree 2, i.e., does not contain conductive particles,
                           significant amounts of dust, or corrosive or otherwise harmful gases. Normally only
                           non-conductive pollution occurs. Temporary conductivity caused by condensation is to
                           be expected.
                                                                    NOTICE
                               RISK OF EQUIPMENT DAMAGE
                               Ensure that the installation location satisfies environmental requirements.
                               Failure to follow this instruction can result in equipment damage.
14                                                                                                      NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                                             Chapter 4 - Installation
                               If environmental requirements are not adhered to, malfunction and possible destruction
                               of the active filter may occur.
                               The active filter generates significant heat during operation. Consult the product
                               specifications in “Electrical Specifications” on page 25 for the watt losses for each
                               active filter model. Ensure that the room where the active filter is mounted has adequate
                               ventilation. Maintain ambient temperature between 0°C (32°F) and 40°C (104°F) with a
                               maximum relative humidity of 95%, non-condensing, and a maximum dewpoint of
                               37°C.
                               The operating temperatures are maximum and minimum levels the unit is designed to
                               operate within. Operating above or below these levels will result in the unit either
                               shutting down or reduced performance. The upper or lower limit should not be used as
                               ideal room temperature levels. System reliability and product life expectancy will
                               improve if temperature levels are maintained between 20°C (68°F) and 30°C (86°F).
Physical Installation
                               Active filters can be enclosed in four kinds of enclosures and are referred to as UL Type
                               2, UL Type 12, IP31, and IP54. These enclosures are suitable for an indoor installation
                               only. The following table describes each type.
                                                                                                                UL Type 2        UL Type 12
                               Enclosure Type
                                                                                                                IP31             IP54
                               Enclosure provided                                                               Yes             Yes
                               Standard Compliance: UL508                                                       Yes             Yes
                               Standard Compliance: IEC529                                                      Yes             Yes
                               Unrestricted air exchange, protection against contact with enclosed parts,
                               protection against limited amount of falling dirt, intake of dust, and harmful   Yes             Yes
                               particles
                                                                                                                Yes             Yes
                               Protection against foreign bodies of these diameters
                                                                                                                >2.5 mm         >1 mm
                               Complete protection against touch and protection against dust deposits           No              Yes
                               Protection against dripping water and external condensation of
                                                                                                                Yes             Yes
                               non-corrosive liquids
                               Protection against water from all directions                                     No              Yes
NHA71461-00                                                                                                                                15
Chapter 4 - Installation                                                               AccuSine PCS+ / PFV+ Installation Manual
                                    Physical Description
                           UL Type 2, UL Type 12, IP31, and IP54 Enclosures Physical Specifications
                                                                        Operating                           Exterior Dimensions
 Active filter     Enclosure        Weight Kg (lbs)    Cable Entry                     Heat Load (Watts)
                                                                       Temperature                         H x W x D mm (inches)
                 UL Type 2/IP31         483 (1062.6)                    0° - 40°C                            2,089 x 1300 x 550
     40 A                                              Top or Bottom                         2107
                 UL Type 12/ IP54       494 (1086.8)                   (32° - 104°F)                       (82.24 x 51.18 x 21.65)
                 UL Type 2/IP31         460 (1012)                      0° - 40°C                            2,089 x 1300 x 550
     47 A                                              Top or Bottom                         1807
                 UL Type 12/ IP54       471 (1036.2)                   (32° - 104°F)                       (82.24 x 51.18 x 21.65)
                 UL Type 2/IP31         533 (1172.6)                    0° - 40°C                            2,089 x 1300 x 550
     80 A                                              Top or Bottom                         4503
                 UL Type 12/ IP54       542 (1192.4)                   (32° - 104°F)                       (82.24 x 51.18 x 21.65)
                 UL Type 2/IP31         498 (1095.6)                    0° - 40°C                            2,089 x 1300 x 550
     94 A                                              Top or Bottom                         3903
                 UL Type 12/ IP54       507 (1115.4)                   (32° - 104°F)                       (82.24 x 51.18 x 21.65)
                 UL Type 2/IP31         708 (1557.6)                    0° - 40°C                            2091 x 1400 x 653
     133 A                                             Top or Bottom                         8213
                 UL Type 12/ IP54       730 (1606.0)                   (32° - 104°F)                       (82.32 x 55.12 x 25.71)
                 UL Type 2/IP31         653 (1436.6)                    0° - 40°C                            2091 x 1400 x 653
     157 A                                             Top or Bottom                         7213
                 UL Type 12/ IP54       675 (1485.0)                   (32° - 104°F)                       (82.32 x 55.12 x 25.71)
                 UL Type 2/IP31         826 (1817.2)                    0° - 40°C                            2091 x 1400 x 653
     200 A                                             Top or Bottom                        11,398
                 UL Type 12/ IP54       839 (1845.8)                   (32° - 104°F)                       (82.32 x 55.12 x 25.71)
                 UL Type 2/IP31         757 (1665.4)                    0° - 40°C                            2091 x 1400 x 653
     235 A                                             Top or Bottom                         9898
                 UL Type 12/ IP54       770 (1694.0)                   (32° - 104°F)                       (82.32 x 55.12 x 25.71)
                                    NOTE:
                                    •     Weight information is approximate and subject to change without notice.
                                    •     Lifting lugs are provided for hoisting.
16                                                                                                                  NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                         Chapter 4 - Installation
                               Dimensional Drawings
                               Refer to the drawings on the following pages for active filter dimensions.
40 A - 94 A Drawings
Lift here
NHA71461-00                                                                                                            17
Chapter 4 - Installation                                                      AccuSine PCS+ / PFV+ Installation Manual
                                   AC line entry
                                   top and bottom
                                                    50 x 50 Customer connections
                                                    top and bottom
18                                                                                                      NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                      Chapter 4 - Installation
Lift here
NHA71461-00                                                                                                         19
Chapter 4 - Installation                                                                AccuSine PCS+ / PFV+ Installation Manual
20                                                                                                                NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                             Chapter 4 - Installation
                                The unit must be securely attached to the floor where it is installed. There are eight
                                holes at the bottom of the plinth for securing the enclosure. Use M12 size hardware (not
                                included).
                                                                        WARNING
                                 RISK OF THE ENCLOSURE FALLING
                                 Attach the equipment to the floor using the attachment points indicated below.
                                 Failure to follow these instructions can result in death, serious injury or
                                 equipment damage.
                                                       Dimensions
Amperage Rating         BD mm (inches)           D mm (inches)            BW mm (inches)           W mm (inches)
40 A - 94 A             440 (17.32)              500 (19.69)              700 (27.55)              800 (31.50)
133 A - 235 A           540 (21.26)              600 (23.62)              800 (31.50)              900 (35.43)
                                Refer to the illustration and the table above for the dimensions and attachment
                                locations for the enclosure you are installing and follow these steps:
NHA71461-00                                                                                                                21
Chapter 4 - Installation                                                  AccuSine PCS+ / PFV+ Installation Manual
                           4. Remove the four plinth access covers at the front of the plinth by loosening the four
                              M6 screws using a T30 driver.
6. Replace the front access covers and torque the screws to 5.7 N•m (50.4 Ib-in).
22                                                                                                    NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                               Chapter 4 - Installation
Electrical Connection
                                Line Voltage
                                Refer to “Electrical Specifications” on page 25 to determine the line voltage that is
                                compatible with the voltage range of the active filter.
                                The active filter inrush current does not exceed the unit rating shown in the following
                                table. Circuit breaker settings such as Long Time Pickup, Long Time Delay, and Short
                                Time Pickup can be set for minimum inrush current.
NOTE: Check national and local codes and regulations to ensure compliance.
                                See “40 A - 94 A Enclosure Top and Bottom Dimensional Drawing” on page 18 and
                                “133 A - 235 A Enclosure Top and Bottom Dimensional Drawing” on page 20.
                                                                          NOTICE
                                    RISK OF CONTAMINATION BY CONDUCTIVE MATERIAL OR DEBRIS
                                    Remove conduit entry gland plates to drill cable entry holes.
                                    Failure to follow this instruction can result in equipment damage.
                                The active filter warranty is void if operational difficulties are found to be caused by
                                metal particles from the installation process.
NHA71461-00                                                                                                                  23
Chapter 4 - Installation                                                     AccuSine PCS+ / PFV+ Installation Manual
                                                                   DANGER
                            HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
                            Ground equipment using the ground connecting point provided before turning on any
                            power supplying this device.
                            Failure to follow these instructions will result in death or serious injury.
                           All power wiring has to be routed directly from the conduit entry plate to the terminations
                           on power terminals (and the earth grounding terminal) without loops. Instrumentation
                           and CT wiring has to be routed in a separate grounded metal conduit or shielded
                           encapsulated cable. A dedicated ground conductor must be used when installing the
                           active filter.
                           When used as a harmonic current compensation device, the active filter produces
                           currents at frequencies that are multiples of the AC line fundamental frequency. Power
                           cables as well as input disconnect devices should be rated at 125% of the active filter
                           rated current. This helps avoid excessive heating from any skin effect resistance
                           increase at these higher frequencies.
                           NOTE: Check national and local codes and regulations to ensure compliance.
                           M8 power and ground studs are provided for the 40 A, 47 A, 80 A, and 94 A rated units.
                           M12 power and M8 ground studs are provided for the 133 A, 157 A, 200 A, and 235 A
                           units. The bus bar for power connection has two studs that can accept either a two-hole
                           crimp lug or a two-hole box lug. The bus bar studs are 25.4 mm (1 in) apart
                           center-to-center. See “40 A - 94 A Enclosure Internal Layout Drawing” on page 27 and
                           “133 A - 235 A Enclosure Internal Layout Drawing” on page 28 for details.
                           Box lug accessory kits are available as an option in the catalog. The box lugs are UL
                           compliant. Each kit contains three box lugs for the phase connection and one box lug
                           for the ground connection. When installing 133 A to 235 A units, two box lug kits are
                           required per unit if two conductors per phase are used.
                           The box lugs in the optional accessory kit are not IEC compliant. For IEC installation,
                           use crimp-on ring lugs for electrical connections.
24                                                                                                       NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                                      Chapter 4 - Installation
                                                    Electrical Specifications
                                                                                     Power              Ground
                Total   Voltage                  Wire                                                                    Max. No.
                                                                     Intake Air      Connection Stud    Connection Stud
Active Filter   Current Range       Frequency Hz Temperature                                                             Conductors
                                                                     Temperature     Size and Torque    Size and Torque
                Amperes Volts                    Rating                                                                  Per Phase
                                                                                     N•m (lb-in) ± 5%   N•m (lb-in) ± 5%
40 A
Enclosures                          50 or 60 Hz                        0° - 40°C     M8 stud - 18.2     M8 stud - 18.2
                40      600 - 690                 60°C, 75°C, 90°C                                                        1
N12, IP30,                          ±3 Hz                            (32° - 104°F)   (161.1)            (161.1)
and IP54
47 A
Enclosures                          50 or 60 Hz                        0° - 40°C     M8 stud - 18.2     M8 stud - 18.2
                47      500 - 600                 60°C, 75°C, 90°C                                                        1
N12, IP30,                          ±3 Hz                            (32° - 104°F)   (161.1)            (161.1)
and IP54
80 A
Enclosures                          50 or 60 Hz                        0° - 40°C     M8 stud - 18.2     M8 stud - 18.2
                80      600 - 690                 75°C, 90°C                                                              1
N12, IP30,                          ±3 Hz                            (32° - 104°F)   (161.1)            (161.1)
and IP54
94 A
Enclosures                          50 or 60 Hz                        0° - 40°C     M8 stud - 18.2     M8 stud - 18.2
                94      500 - 600                 75°C, 90°C                                                              1
N12, IP30,                          ±3 Hz                            (32° - 104°F)   (161.1)            (161.1)
and IP54
133 A
Enclosure                           50 or 60 Hz                        0° - 40°C     M12 stud - 37.0    M8 stud - 18.2
                133     600 - 690                 75°C, 90°C                                                              2
Type N1 and                         ±3 Hz                            (32° - 104°F)   (327.5)            (161.1)
Chassis
157 A
Enclosure                           50 or 60 Hz                        0° - 40°C     M12 stud - 37.0    M8 stud - 18.2
                157     500 - 600                 75°C, 90°C                                                              2
Type N1 and                         ±3 Hz                            (32° - 104°F)   (327.5)            (161.1)
Chassis
200 A
Enclosures                          50 or 60 Hz                        0° - 40°C     M12 stud - 37.0    M8 stud - 18.2
                200     600 - 690                 75°C, 90°C                                                              2
N12, IP30,                          ±3 Hz                            (32° - 104°F)   (327.5)            (161.1)
and IP54
235 A
Enclosures                          50 or 60 Hz                        0° - 40°C     M12 stud - 37.0    M8 stud - 18.2
                235     500 - 600                 75°C, 90°C                                                              2
N12, IP30,                          ±3 Hz                            (32° - 104°F)   (327.5)            (161.1)
and IP54
                                    NOTE:
                                    •   Check national and local codes and regulations to ensure compliance.
                                    •   The active filter generates significant heat during operation. Ensure that the room
                                        where the active filter is located has adequate ventilation to maintain intake air
                                        temperature within the specified operating range.
NHA71461-00                                                                                                                         25
Chapter 4 - Installation                                      AccuSine PCS+ / PFV+ Installation Manual
26                                                                                      NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                         Chapter 4 - Installation
M8 Busbar Studs
Power termination
M8 Ground Stud
M8 Ground Stud
NHA71461-00                                                                                            27
Chapter 4 - Installation                                                       AccuSine PCS+ / PFV+ Installation Manual
Power termination
M8 Ground Stud
M8 Ground Stud
28                                                                                                       NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                             Chapter 4 - Installation
                                                                        DANGER
                                HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
                                • Never open circuit a current transformer (CT).
                                • Always use grounded external CTs for current inputs.
                                Failure to follow these instructions will result in death or serious injury.
                               Ensure that CT secondary current is not present when wiring the CT secondary
                               connections. The shorting jumpers must be installed at the X1 to X2 OUT of each CT
                               channel on the CT board unless you are connecting an additional Master parallel unit.
                               Refer to “Source Side CT Position Diagram” on page 34.
                               General CT Information
                               The CT must be orientated properly during installation. The orientation is specified in
                               the drawings with an arrow indicating the direction or polarity of the CT. Most CT
                               manufacturers will indicate orientation with a label indicating H1 on one side of the CT
                               or a dot. There can also be a label indicating H2 and/or an arrow on the CT. The H1
                               side of the CT should always be closest to the power source. If the CT has an
                               orientation arrow, it should point from the source towards the load. See the installation
                               instructions for the specific CTs being installed.
                               A shorting terminal block or shorting switch with galvanic isolation to the active filter for
                               the CT secondary is required. Insert an interposing terminal block in a separate
                               enclosure with the ability to short the secondary wiring of the CT. This provides the
                               ability to short the CT without entering the active filter enclosure (which otherwise would
                               require a power shutdown). Shorting terminal blocks are available in the catalog.
                               Two CTs are required to be installed, one on L1 phase and one on L2 phase of the
                               conductors powering the loads to be compensated by the active filter system. If there
                               are any line-to-neutral connected loads downstream of the active filter system's main
                               CTs, a third CT is required on L3 phase.
                                                                        NOTICE
                                MEASUREMENT ERRORS
                                CTs must be physically separated from any perpendicular conductor by at least 25
                                mm (1 inch) for every 1000 A of current flowing through the perpendicular conductor.
                                Failure to follow this instruction can result in a reduction in performance of the
                                active filter.
NHA71461-00                                                                                                                29
Chapter 4 - Installation                                                     AccuSine PCS+ / PFV+ Installation Manual
                           If this practice is not followed, the magnetic field produced by the current flowing on the
                           perpendicular conductor will cause CT measurement errors.
                           Minimum CT Requirements
                           The active filter uses a minimum of two external current transformers (CTs) to measure
                           load current waveforms. Standard CTs rated for 50/60 Hz or 400 Hz with Type 1
                           accuracy rating, with a 5 A or 1 A secondary are acceptable. The largest primary rating
                           for the CT is 10,000 A. Any splicing to the CT leads needs to be done with crimp style
                           connectors or soldered.
                           The CT should be mounted on phases L1 and L2 with the orientation arrow pointing
                           toward the load. Systems that are using two CTs can have the CTs installed on L1 and
                           L3 or L2 and L3 if necessary. If L1 and L3 or, L2 and L3 CT configurations are used,
                           this information must be provided to the qualified person commissioning the unit. Three
                           external CTs are required if line-to-neutral connected loads are present.
                                                                    NOTICE
                               REDUCED PERFORMANCE
                               CT wiring must be routed separately from power cables.
                               Failure to follow this instruction can result in a reduction in performance.
                           CT wiring must be routed directly from the conduit entry-plate to the terminal block of
                           the CT board.
                           Do not connect the active filter CT to any other loads. Use a separate current
                           transformer if additional uses are required.
                           Any splicing to the CT leads needs to be done with crimp style connectors or soldered.
                           X2 of each CT installed must be grounded as close to the CT as possible.
                           A single active filter, not operating in parallel, can have the CTs installed either on the
                           source side or load side of the active filter. Parallel systems must have the main CTs
                           installed on the source side of the active filter system.
30                                                                                                       NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                          Chapter 4 - Installation
                               CT to CT Board Connection
                               The CT connection is made behind the small customer access panel at the bottom of
                               the active filter chassis. Remove the customer access panel. The CT board is located
                               behind and slightly below the control board. This is the location where the active filter
                               CT secondary wiring must be terminated. Remove the clear plastic safety cover to
                               access the CT board.
                               Typically, L1 CT will be connected to CH1 IN. There are two X1 and X2 IN terminals.
                               The second set of IN terminals can be used to connect additional CTs that may be
                               required for site specific conditions. X1 and X2 OUT are used for parallel active filter
                               systems.
                               The terminal block on the CT board can accept wire sizes of up to 6 mm2 (10 AWG)
                               wire and has a torque specification of 1 N•m (9 Ib-in).
                                                                      NOTICE
                                CIRCULATING CURRENTS
                                When using shielded CT secondary wire, ground the shield in only one location.
                                Failure to follow this instruction can result in a reduction in performance.
                                                                      NOTICE
                                INACCURATE FILTER OPERATION
                                Do not allow the conductor on which the CT is mounted to become lodged in the joint
                                area of a split-core CT.
                                Failure to follow this instruction can result in inaccurate filter operation.
NHA71461-00                                                                                                             31
Chapter 4 - Installation                                       AccuSine PCS+ / PFV+ Installation Manual
Control Board
CT Board
32                                                                                       NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                                       Chapter 4 - Installation
NHA71461-00                                                                                                                          33
34
                                                                                                                                                                                                                                                                                                                                     Chapter 4 - Installation
                                                                                          Source                                                                                                                 Load
                                                                                              L1
                                                                                                                                          X1
                                                                                              L2
                                                                                                                           X1
                                                                                              L3
                                                                                                                 X1
                                                                                                                                                                                                     3-phase Protection
                                                                                                                                                                                                          Device
                                                                                                                                                                                                     Customer supplied.
                                                                                                                                     X2
                                                                                                                                X1         X1   X2
                                                                                      Optional 3rd CT
                                                                                Required if there are Line-to-
                                                                                Neutral connected Loads               X2                                                  L1        L2    L3
                                                                                downstream of the CTs.
                                                                                                                      X1
                                                                                                                                                                          Active Filter
                                                                                                    Shorting                                                  CH1                   CH2              CH3
                                                                                                                                                                                                                                                                                                   Source Side CT Position Diagram
NHA71461-00
                                                                                                                                                                                                                                                                                                                                     AccuSine PCS+ / PFV+ Installation Manual
AccuSine PCS+ / PFV+ Installation Manual                                                                                              Chapter 4 - Installation
Source Load
                     L1
                                                                                                                       X1
                         L2
                                                                                                            X1
                         L3
                                                                                                 X1
                                                                            3-phase Protection
                                                                                 Device                           X2    X1
                                                                                                             X1              X2
                                                                            Customer supplied.                                            Optional 3rd CT
                                                                                                                                    Required if there are Line-to-
                                                                                                       X2                           Neutral connected Loads
                                                                                                  X1                                downstream of the CTs.
                                                   L1        L2     L3
     Factory Installed
     shorting jumpers
                                             Parallel System
                                             Up to ten active filters can be installed in parallel. If more than ten units in parallel are
                                             required, contact the local sales representative for assistance prior to installation.
                                                                                                 DANGER
                                              HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
                                              The factory provided shorting jumpers must be installed at the OUT of the CT board
                                              of the last unit with CT secondary wiring connected.
                                              Failure to follow these instructions will result in death or serious injury.
                                             The main CTs must be installed on the source side of the active filter system. Examples
                                             of CT secondary wiring can be seen on the following pages in this section. Refer to
                                             “Circuit Breaker and Manual Disconnect Selection” on page 23 for information on circuit
                                             breaker and fuses required.
NHA71461-00                                                                                                                                                          35
36
                                                                                                                                                                                                                                                       Chapter 4 - Installation
              Source
                                                                                                                                                                                               Load
                L1
                                                      X1
                L2
                                      X1
L3
                             X1
                                                                                                                      3-phase Protection
                                                                                                                           Device
                                                     X1                                                               Customer supplied.
                                                          X2
X1 X2
                                                                                    L1        L2    L3          MASTER                                      L1    L2        L3           MASTER
                                           X1
                                                X2
                                                                                                                                                                                  Factory Installed
                                                                                                                                                                                  shorting jumpers
                                                                                                                                                                                                      Source Side CT Position Parallel Units Diagram
                           Optional 3rd CT
                     Required if there are Line-to-
                     Neutral connected Loads
                     downstream of the CTs.
NHA71461-00
                                                                                                                                                                                                                                                       AccuSine PCS+ / PFV+ Installation Manual
NHA71461-00
              Source
                                                                                                                                                                                                                    Load
                L1
                                  X1
                                                                                                                                                                                                                                                               AccuSine PCS+ / PFV+ Installation Manual
                L2
                             X1
                L3
                       X1
                                                                                          3-phase Protection                                                  3-phase Protection
                                                                                               Device                                                              Device
                                                                                          Customer supplied.                                                  Customer supplied.
                                                                                                                                                                                                                 Factory Installed
                                                                                                                                                                                                                 shorting jumpers
                                             Optional 3rd CT
                                       Required if there are Line-to-
                                       Neutral connected Loads
                                       downstream of the CTs.
                                                                                                                                                                                                                                                               Chapter 4 - Installation
37
38
                                                                                                                                                                                                                                                                     Chapter 4 - Installation
              Source
                                                                                                                                                                                                                       Load
                L1
                                  X1
                L2
                             X1
                L3
                       X1
                                                                                             3-phase Protection                                                  3-phase Protection
                                                                                                  Device                                                              Device
                                                                                             Customer supplied.                                                  Customer supplied.
                                                                                                                                                      Factory Installed
                                                                                                                                                                                                                               CT wiring for 2 Masters and 1 Slave
shorting jumpers
                                             Optional 3rd CT
                                       Required if there are Line-to-
                                       Neutral connected Loads
                                       downstream of the CTs.
NHA71461-00
                                                                                                                                                                                                                                                                     AccuSine PCS+ / PFV+ Installation Manual
NHA71461-00
              Source                                                                                                                                                                                              Load
                L1
                                   X1
                                                                                                                                                                                                                                                                AccuSine PCS+ / PFV+ Installation Manual
                L2
                              X1
                L3
                         X1
                                                                                           3-phase Protection
                                                                                                 Device
                                                                                            Customer supplied
                                           MASTER                             L3
                                                                                                       MASTER                         L3                           L1   L2   L3             L3    L1   L2   L3
              Shorting                                         L1        L2                                              L1    L2                                                 L1   L2
              Terminal
              Block                                           Active Filter                                             Active Filter                             Active Filter   Active Filter   Active Filter
              Customer
              supplied                            CH1                CH2             CH3                        CH1            CH2               CH3                    SLAVE          SLAVE           SLAVE
                                               IN      OUT       IN      OUT       IN      OUT             IN      OUT       IN      OUT       IN      OUT
                                           X1 X2 X1 X2 X1 X2 X1 X2 X1 X2 X1 X2 X1 X2 X1 X2 X1 X2       X1 X2 X1 X2 X1 X2 X1 X2 X1 X2 X1 X2 X1 X2 X1 X2 X1 X2
                                                                                                                                                   Factory Installed
                                                                                                                                                   shorting jumpers
                                                                                                                                                                                                                         CT wiring for 2 Masters and 3 Slaves
                                              Optional 3rd CT
                                        Required if there are Line-to-
                                        Neutral connected Loads
                                        downstream of the CTs.
                                                                                                                                                                                                                                                                Chapter 4 - Installation
39
Chapter 4 - Installation                                                  AccuSine PCS+ / PFV+ Installation Manual
Parallel Communication
                           For parallel operation, the units communicate through the RJ-45 connectors labeled 1P
                           and 2P on the Control Board. This is a unique communication protocol that is only to be
                           used for parallel communication. The 2P jack has an RJ-45 termination plug installed
                           at the factory.
                                                                  NOTICE
                            EXCESSIVE NOISE IN THE COMMUNICATION CIRCUIT
                            When the unit is set to operate in parallel mode, the termination plug must be
                            installed in any RJ-45 jacks that are not used for parallel communication wiring. See
                            the wiring diagrams in this section.
                            Failure to follow this instruction can result in communication errors.
                           CAT5e cable with all 8 conductors terminated at the RJ-45 connections is required for
                           parallel communication. It is recommended that shielded Cat5e cable be used. Ensure
                           that the total cable length does not exceed 76 meters (250 feet). The CAT5e cable with
                           RJ-45 plugs can be purchased as an option. Refer to the catalog for optional paralleling
                           cable part numbers.
1P and 2P
40                                                                                                    NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                                                                               Chapter 4 - Installation
                                                                1P                  2P                    1P                2P
                                                               (RJ45)              (RJ45)                (RJ45)            (RJ45)
                                              Factory                                                                                  Factory
                                           Provided RJ45                                                                            Provided RJ45
                                             Terminator                                                                               Terminator
                                                                        (Shielded) CAT5e cable with RJ45 connectors
                     1P           2P                   1P                  2P                    1P                2P                       1P           2P
                    (RJ45)       (RJ45)               (RJ45)              (RJ45)                (RJ45)            (RJ45)                   (RJ45)       (RJ45)
       Factory                                                                                                                                                      Factory
    Provided RJ45                                                                                                                                                Provided RJ45
      Terminator                                                                                                                                                   Terminator
Control Wiring
                                          Modbus TCP/IP
                                          Modbus TCP/IP monitoring is available at the RJ-45 jack to the right of the Control
                                          Board labeled ETH. Refer to “Control Board and CT Board Detail” on page 43. Modbus
                                          addresses are provided in the User Manual.
NHA71461-00                                                                                                                                                                      41
Chapter 4 - Installation                                                     AccuSine PCS+ / PFV+ Installation Manual
                           Modbus Serial
                           A serial Modbus connection is available through an RJ-45 jack labeled MBS on the
                           control board. Refer to “Control Board and CT Board Detail” on page 43. Modbus
                           addresses are provided in the User Manual.
42                                                                                                        NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                        Chapter 4 - Installation
J2
Control Board
Com Q1 Q2 Q3 Q4 GND I1 I2 I3 I4
NHA71461-00                                                                                                            43
Chapter 4 - Installation   AccuSine PCS+ / PFV+ Installation Manual
44                                                   NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                                                      Chapter 5 - Pre-commissioning
Chapter 5                      Pre-commissioning
                               This chapter provides information for preparation of the active filter for commissioning.
                               Before applying power, read and understand this information thoroughly.
Pre-energizing procedure
                                                                         DANGER
                                   HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
                                   • Apply appropriate personal protective equipment (PPE) and follow safe electrical
                                     work practices. See NFPA 70E in the USA, CSA Z462, or applicable local
                                     standards.
                                   • This equipment must be installed and serviced only by qualified electrical
                                     personnel.
                                   • Do not exceed the device’s ratings for maximum limits.
                                   • Ground equipment using the ground connecting point provided before turning on
                                     any power supplying this device.
                                   • Turn off all power supplying this device and the equipment in which it is installed
                                     before working on the device or equipment.
                                   • After removing power, wait for 15 minutes to allow the capacitors to discharge prior
                                     to opening the doors or removing covers.
                                   • Always use a properly rated voltage sensing device to confirm power is off.
                                   • Replace all devices, doors, and covers before turning on power to this equipment.
                                   • Carefully inspect the interior for tools left behind before closing and sealing the
                                     door.
                                   Failure to follow these instructions will result in death or serious injury.
Installation Inspection
                               Inspect all connections for both power and control wiring. Ensure that the correct
                               termination points have been made for each wire. Ensure that all connections are firmly
                               tightened prior to start-up.
NHA71461-00                                                                                                                45
Chapter 5 - Pre-commissioning                                                      AccuSine PCS+ / PFV+ Installation Manual
Pre-Commissioning Checklist
                                Prior to commissioning the active filter system, the following items must be completed:
                                •   Electrical connections have been made in accordance with local codes.
                                •   Main CTs are installed to measure the current of the system to be corrected.
                                •   The secondary wiring of the main CTs have been connected to the CT board of the
                                    active filter.
                                •   If it is a parallel active filter system, CT wiring and parallel communications wiring
                                    have been installed between the CT boards of each unit.
                                •   All drives, harmonic generating loads, downstream of the main CTs must have the
                                    recommended minimum 3% line reactor or DC choke installed (required for optimum
                                    performance when harmonic mode is intended).
                                •   There are no un-isolated capacitors, such as power factor correction capacitors
                                    downstream of the main CTs. (required when harmonic mode is intended to
                                    operate).
                                •   At least 50% of the anticipated load should be available during the commissioning
                                    procedure. To fully test the system integration, all loads supported by the active filter
                                    system should be available for operation. The total output current required for the
                                    system must be at least 10% of the unit's nameplate rating. For example, a 300 A
                                    unit will need a minimum of 30 A Total Output current.
                                •   If backup generation is connected to the active filter, the system should also be
                                    tested with the generator supporting the connected loads.
                                The Field Service Engineer will need to know the following information to commission
                                the active filter:
                                •   Installation location of the main CTs in relationship to the active filter (load or grid).
                                •   The ratio of the main CTs installed.
                                •   The phase on which each CT is installed.
                                •   Intended mode of operation (Harmonic, Power Factor, Load Balancing).
Commissioning procedures
                                Refer to the User Manual for commissioning procedures. The User Manual is available
                                as a download from our website.
46                                                                                                               NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                               Chapter 6 - IT, HRG, and Corner Grounded Systems
                                                                       DANGER
                                HAZARD OF ELECTRIC SHOCK, EXPLOSION, OR ARC FLASH
                                • Apply appropriate personal protective equipment (PPE) and follow safe electrical
                                  work practices. See NFPA 70E in the USA, CSA Z462, or applicable local
                                  standards.
                                • This equipment must be installed and serviced only by qualified electrical
                                  personnel.
                                • Do not exceed the device’s ratings for maximum limits.
                                • Ground equipment using the ground connecting point provided before turning on
                                  any power supplying this device.
                                • Turn off all power supplying this device and the equipment in which it is installed
                                  before working on the device or equipment.
                                • After removing power, wait for 15 minutes to allow the capacitors to discharge prior
                                  to opening the doors or removing covers.
                                • Always use a properly rated voltage sensing device to confirm power is off.
                                • Replace all devices, doors, and covers before turning on power to this equipment.
                                • Carefully inspect the interior for tools left behind before closing and sealing the
                                  door.
                                Failure to follow these instructions will result in death or serious injury.
                                                                       NOTICE
                                HAZARD OF EQUIPMENT DAMAGE
                                Open the IT/BP switches before operating the unit on an IT, HRG, or corner
                                grounded system.
                                Failure to follow these instructions can result in equipment damage.
NHA71461-00                                                                                                             47
Chapter 6 - IT, HRG, and Corner Grounded Systems                             AccuSine PCS+ / PFV+ Installation Manual
                               When connecting the active filter to an IT, HRG, or corner grounded system, open the
                               IT/BP switches as follows:
48                                                                                                     NHA71461-00
AccuSine PCS+ / PFV+ Installation Manual                            Chapter 6 - IT, HRG, and Corner Grounded Systems
IT/BP switches
NHA71461-00                                                                                                       49
Chapter 6 - IT, HRG, and Corner Grounded Systems                             AccuSine PCS+ / PFV+ Installation Manual
IT/BP switches
50                                                                                                        NHA71461-00
Schneider Electric
35 rue Joseph Monier
92500 Rueil Malmaison - France
Phone: +33 (0) 1 41 29 70 00
www.schneider-electric.com
© 2015 Schneider Electric. All Rights Reserved.   Schneider Electric, AccuSine. and Modbus are either trademarks or registered
                                                  trademarks of Schneider Electric in France, the USA and other countries. Other
NHA71461-00 06/2015                               trademarks used are the property of their respective owners.