Comparative Electric

Comparative electrfbjm

Uploaded by

Amit Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
22 views5 pages

Comparative Electric

Comparative electrfbjm

Uploaded by

Amit Kumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 5

COMPARATIVE STATEMENT

Vendor -1 Vendor -2 Vendor -3


S.No. Qty. Item Remark
Gandhi Traders Standard Electric co. Thakural Elec.

1 Ventilator Smart Air Fan 4" 805.00 1070.00


2 Ventilator Smart Air Fan 6" 870.00 1070.00
3 PVC Tape Roll 8.00 8.00
4 CFL 15W Spiral 2 Pin 140.00 113.75
5 CFL 18W Spiral 2Pin 78.00 80.00 75.00
10 Electronic Choke 36W 125.00 169.00 113.75
11 CFL 36W 125.00 90.00 100.00
12 Halogen Tube 500W 50.00 75.00 50.00
13 Choke 40Watt 125.00 130.00 146.25
14 Holder 40Watt 10.00 6.00
15 MCB 63A x 4 Pole 1130.00 1000.50 1131.00
16 MCB 16A x 3Pole 540.00 517.50 585.00
17 PVC Wire 1.5mm 8.78 7.80
18 PVC Wire 2.5mm 14.00 12.45

Note:- Above rates are exclusive of taxes & cartage extra

Naveen Sharma Surender Kaushik Dilip Chhabra


Maintenance Manager Purchase Manager C.A.O
SHIFT HANDING OVER SHEET (Electrical)
S.No. Equipment Status Break Down Complaint Work Pending Work
1 LT Panel
2 Grid Supply
3 Transformer
4 OLTC
5 UPS
6 D.G 1
7 D.G 2
8 D.G 3
9 Diesel
10 External Light
11 Atrium / OPD Lights
12 Signages
13 Fountain
14 Lift's

11 Daily Complaint
(a) Electrical
(b) HVAC
( c) Plumbing
(d) Gas Manifold
(e) Carpenter
(f) Painter
(e) Lift

Date:
Time:
Shift Handing Over by Shift Taking Over by
Name: Name:

Signature: Signature:

HOD ENGINEERING:

Note:
SHIFT HANDING OVER SHEET (HVAC)
Running
S.No. Equipment Status On Time Off Time Break Down Complaint Work Pending Work
Hours
1 Chiller 1
2 Chiller 2
3 Chiller 3
4 Chiller 4
5 Chiller 5
6 Chiller 6 (VFD)
7 Cooling Tower 1
8 Cooling Tower 2
9 Cooling Tower 3
10 Cooling Tower 4
11 Condensor Pump 1
12 Condensor Pump 2
13 Condensor Pump 3
14 Condensor Pump 4
15 Condensor Pump 5
16 Condensor Pump 6
17 Primary Pump 1
18 Primary Pump 2
19 Primary Pump 3
20 Secondary Pump 1
21 Secondary Pump 2
22 Secondary Pump 3
23 Secondary Pump 4
24 Secondary Pump 5
25 Secondary Pump 6
26 Secondary Pump 7
27 Secondary Pump 8
28 Secondary Pump 9
29 MCC PANEL 1
30 MCC PANEL 2

31 Daily Complaint

Date:
Time:
Shift Handing Over by Shift Taking Over by
Name: Name:

Signature: Signature:
HOD ENGINEERING:

Note: