0% found this document useful (0 votes)
19 views7 pages

Assignment 10

Uploaded by

drsrajakumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
19 views7 pages

Assignment 10

Uploaded by

drsrajakumar
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 7

Z ZAID ABDUL RAB RAB AL BALUSHI

Status Finished
Started Sunday, 8 December 2024, 10:04 PM
Completed Monday, 9 December 2024, 2:52 AM
Duration 4 hours 47 mins
Grade 1.77 out of 5.00 (35.33%)
Question 1

Partially correct

Mark 0.60 out of 2.00


v1 (latest)

The activity details and their predecessors are given below use the PERT method to calculate the expected time (1 Marks) and construct the
network diagram (1 Mark) to find the critical path of the activity (0.5 Mark) also indicate the project duration (0.5 Mark) with the standard
deviation (1 Mark).

Activity Predecessors the expected Optimistic Most likely Pessimistic


time
time time time

(to) (tm) (tp)

A -- 10 6 28

B -- 1 1 1

C A 9 17 15

D B 6 24 6

E A 28 22 32

F C,G 9 14 42

G D 6 6 3

H B 9 6 25

I E,F 7 15 8

J G,H 5 8 16

Note: Use upto 3 decimal in your answer and enter your answer in the box, also kindly upload your worked out sheet below.

Enter the expected activity time for A. 10.33

One possible correct answer is: 10.333333333333

Enter the expected activity time for B. 1

One possible correct answer is: 1

Enter the expected activity time for C. 15.33

One possible correct answer is: 15.333333333333

Enter the expected activity time for D. 18

One possible correct answer is: 18

Enter the expected activity time for E. 24.66

One possible correct answer is: 24.666666666667

Enter the expected activity time for F. 17.83


One possible correct answer is: 17.833333333333

Enter the expected activity time for G. 5.5

One possible correct answer is: 5.5

Enter the expected activity time for H. 9.666

One possible correct answer is: 9.6666666666667

Enter the expected activity time for I. 12.5

One possible correct answer is: 12.5

Enter the expected activity time for J. 8.833

One possible correct answer is: 8.8333333333333

Find the critical path value for the total project duration? 55.9

One possible correct answer is: 37

Standard deviation 6.34

One possible correct answer is: 3.4520525295347

Your answer is partially correct.

You have correctly answered 9 part(s) of this question.

Response history
Step Time Action State Marks

1 8/12/24, 22:04:19 Started Not yet answered

2 9/12/24, 02:51:15 Saved: 10.33, 1, 15.33, 18, 24.66, 17.833, 5.5, 9.666, 12.5, 8.833, 55.9, 6.34 Answer saved

3 9/12/24, 02:52:03 Attempt finished Partially correct 0.60


Question 2

Partially correct

Mark 0.50 out of 2.00


v1 (latest)

The following data relate to advertisement expenditure and their corresponding sales, create a scatter plot and find a regression equation
between advertisement expenditure and their corresponding sales (1 Mark). Then use the regression equation to find sales the advertisement
expenditure for 35 (1 Mark) and 100 (1 Mark).

Note: Use upto 3 decimal in your answer and enter your answer in the box, also kindly upload your worked out sheet answer in link
provided below.

Advertisement Sales
expenditure

52 100
65 70
38 57

60 55.5
65 63

50 87.5
75 79

75 60
64 58

Enter the average advertisement expenditure : 60.44

One possible correct answer is: 60.444444444444

Enter the average corresponding sales : 70

One possible correct answer is: 70

Enter the equation constant b value: 0.194

One possible correct answer is: -0.1953154875717

Enter the equation constant a value: 81.72

One possible correct answer is: 81.805736137667

Enter the sales for 35 advertisements : 88.5

One possible correct answer is: 74.969694072658

Enter the sales for 100 advertisements : 70.00

One possible correct answer is: 62.274187380497


Your answer is partially correct.

You have correctly answered 2 part(s) of this question.

Response history
Step Time Action State Marks

1 8/12/24, 22:04:19 Started Not yet answered

2 9/12/24, 02:51:15 Saved: 60.444, 70, 0.194, 81.72, 88.5, 70.002 Answer saved

3 9/12/24, 02:52:03 Attempt finished Partially correct 0.50


Question 3

Partially correct

Mark 0.67 out of 1.00


v1 (latest)

The firm manufactures photocopying machines and the production plant requires 4483 rollers every year. The supplier claims OMR 33.6 for
ordering each time and each roller cost OMR 19.4. The inventory carrying cost is estimated to be 40.5 % of purchase cost. Calculate:

Note: use upto 3 decimal in your answer and also kindly upload your worked out sheet answer in link provided below.

A) Inventory carrying cost. 7.857

One possible correct answer is: 7.857

B) Economic Ordering Quantity. 195.8

One possible correct answer is: 195.81259791274

C) Optimum order interval in days. 15.94

One possible correct answer is: 15.942805763585

D) Average inventory at any time. 769.2

One possible correct answer is: 97.90629895637

E) storage cost at any time. 2895

One possible correct answer is: 769.2497909002

F) Minimum total inventory cost per year. 1538

One possible correct answer is: 1538.4995818004

Your answer is partially correct.

You have correctly answered 4 part(s) of this question.


Response history
Step Time Action State Marks

1 8/12/24, 22:04:19 Started Not yet answered

2 9/12/24, 02:51:15 Saved: 7.857, 195.812, 15.942, 769.24, 2895.14, 1538.499 Answer saved

3 9/12/24, 02:52:03 Attempt finished Partially correct 0.67

Question 4
Complete

Not graded
v1 (latest)

upload all your worksheets

assign .pdf

Response history

Step Time Action State Marks

1 8/12/24, 22:04:19 Started Not yet answered

2 9/12/24, 02:51:15 Saved: Attachments: assign .pdf (6.6 MB) Incomplete answer

3 9/12/24, 02:52:03 Attempt finished Complete

You might also like